Q and A 138 IDS Cameras.2.pdf
PDF 1 MB Posted
- Attached to
- Building Security Cameras for IDS
- Solicitation number
- W50S6V24Q0026
About this file
This document contains a set of Questions and Answers related to Solicitation #W50S6V24Q0026 for Building Security Cameras for an Intrusion Detection System (IDS) at Peterson Air Force Base in Colorado Springs, CO.
The key details are:
- The solicitation is for the procurement and installation of security cameras for an IDS system.
- It includes questions and answers regarding requirements for conduit color-coding, use of existing equipment, availability of as-built drawings, power capacity, camera placement and positioning, and access to underground utility maps.
- The solicitation is being issued as a Request for Quotation (RFQ) using simplified acquisition procedures.
- The NAICS code is 561621 (Security Systems Services).
- Quotes are due by August 21, 2024 at 5:00 PM MDT.
- The anticipated award date is August 30, 2024.
- Quotes will be evaluated on conformance to the Statement of Work, price, and past performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Wage Determination 2015-5417.pdf | ||
| Visitor Pass Template.docx | DOCX document | |
| Combo W50S6V24Q0026 with Clauses.pdf | ||
| Statement of Work (SOW).pdf | ||
| Brand Name Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
138 IDS Cameras
Questions and Answers Solicitation #: W50S6V24Q0026 www.SAM.gov
Q1. Should camera conduit be color coded, and if so what specific shade is necessary?
A1. Refer to project TDKA 16-9004 specification for IDS conduit standards.
Q2. Can the contractor use the existing equipment in Room 114 (Telecom room)?
A2. Specify which equipment is proposed for reuse.
Q3. Are there as-builts available for the newer portion of the building?
A3. See attached as-builts, not all areas have as-builts updated by contractors.
Q4. Is there additional power available for use in Room 114?
A4. Current power demands unknown, no as-builts for electrical.
Q5. Should external camera set ups be similar to existing cameras and power poles?
A5. Yes
Q6. Should the cameras be lined up with the fence corner?
A6. Follow performance work statement on placement. Defer to 21 SFS for camera angle and desired field of view.
http://www.sam.gov/
Q7. Will the camera on the building, close to the hanger doors, need to be positioned to capture the exterior doorway?
A7. Exterior doorway is recessed in alcove, camera angle should capture the southern wall with high bay doors and operations floor doors.
Q8. Are underground utility maps available for the site?
A8. Underground utility maps were prepared by 21 CES & 21 CS and provided to 140 CES/CEE. Excavation permit must be requested through 21 CES.