RFI Question and Answer 31 -59.pdf

PDF 292 KB Posted

Attached to
Renovate Fitness Room
Solicitation number
W50S6T26QA028
Issued by

About this file

This is a Request for Information (RFI) responses document for federal contract W50S6T26QA028, a fitness room renovation project, current as of July 16, 2026.

The document addresses clarifications on project scope, materials, and installation requirements. Key specifications include 2,592 square feet of interlocking 3/8-inch minimum thickness, 2x2-foot square light gray rubber slip-resistant athletic mats to be installed as floating interlocking systems. The project involves replacement of two ADA-compliant drinking fountains, replacement of an existing Christy box, installation of a backwater drain, and LED bulb replacements (bulbs only, not fixtures) in both interior and exterior areas. Painting scope covers interior and exterior portions excluding doors and roofs, with color selection and scheme requirements referenced in RFI question 22 and a paint scheme exhibit. The document confirms that ceramic tile flooring is excluded from scope, restroom facilities are available for trade use, existing exit lights remain in place, and the government will relocate gym equipment prior to project commencement. Multiple questions regarding floor leveling specifications, elevation deltas, floor drain modifications, and related details are marked as "N/A with the new SOW," indicating these items were addressed in an updated Statement of Work. As-built drawings are provided as attachments. One person may serve simultaneously as Site Superintendent, Quality Control Manager, and Site Safety Health Officer. LED tube type selection (Type A plug-and-play or Type B ballast bypass) is left to contractor discretion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI responses for Project:

W50S6T26QA028 - Renovate Fitness Room, Questions 31 - 59

Current as of: 16 July 2026

QUESTION ANSWER

31. Slurry Seal Material Specifications. Section

3.1.9 requires a "slurry seal" to level the concrete surface. Please provide technical specifications or a Basis of Design for the slurry material (e.g., polymer-modified cementitious, epoxy-based, or standard sand/cement) to ensure the floor meets the load requirements for athletic matting.

N/A with the new SOW

32. Elevation Delta for Floor Leveling. To accurately calculate the volume of leveling material required, what is the current elevation difference (delta) between the low points of the slab and the benchmark at the south end of B124? Please provide photos from the initial job walk if possible.

N/A with the new SOW

33. Floor Drain Modification Details. Section

3.1.10 requires raising existing floor drains to the new elevation. Are there specific plumbing details, manufacturer requirements, or preferred extension kits to maintain the waterproof integrity of the new slurry-leveled surface and matting?

N/A with the new SOW

34. Athletic Mat Specification Details. Please clarify if the 2,592 sq. ft. of athletic mats should be ¼” standard thickness, recycled rubber material, split fleck

Interlocking 3/8 inch (min) 2x2 foot square light gray rubber slip-resistant athletic mats

35. Athletic Mat Installation Method. Please clarify if the 2,592 sq. ft. of athletic mats should be loose-laid, perimeter-taped, or fully adhered to the new slurry-leveled surface.

Floating interlocking.

36. Rubber Flooring Material Specifications.

Section 3.1.11 requires the furnishing and installation of 2,592 sq. ft. of athletic mats. To ensure a compliant bid, please provide the following technical details

● Thickness: What is the required thickness (e.g., 8mm, 10mm, 1/2")?

Interlocking 3/8 inch (min) 2x2 foot square light gray rubber slip-resistant athletic mats

Current as of: 16 July 2026

● Material Composition: Is the requirement for vulcanized rubber, recycled crumb rubber, or a specific dual-durometer athletic surface?

● Aesthetics: Does the government require a specific color or percentage of EPDM color fleck inclusion?

● Format: Are these to be interlocking tiles, square-cut tiles, or rolled rubber flooring?

37. Original construction drawings and remodel drawings from 2000 were mentioned during the job walk. Please provide available drawings.

As-builts provided as an attachment

38. Please confirm if the existing (2) drinking fountains are to be salvaged at demolition and reinstalled.

Two new ADA compliant drinking fountains are to be installed

39. Please confirm that the flooring scope does not include the existing ceramic tile flooring. Correct. Ceramic tile is not included

40. An existing Christy box with a broken lid is located in the center of the gym space. Please confirm if this box is to be replaced.

Christy box to be replaced

41. An existing drain is located in the center of the gym space. Please confirm that the floor is not to slope towards this center drain, but to the south end of the building as noted in the statement of work.

N/A with the new SOW

42. The aforementioned center drain appears to be connected to a broken pipe. Please advise if this pipe will need to be repaired as part of this project scope.

N/A with new SOW

43. During the job walk, a drain was mentioned at the south end of the gym space but is not called out in the statement of work. Please clarify if the floor is to slope to this drain at the south end and if any work is to be done on this drain.

In new SOW

44. Please confirm whether trades will be able to use the restroom facilities in the building or if the GC will need to provide temporary restroom facilities.

Restrooms are available

Current as of: 16 July 2026

45. Please provide any available products specifications for new ceiling fans. In new SOW

46. Are there any as-built drawings available? If so, please provide. As-builts provided as an attachment

47. The scope of work indicates to paint interior and exterior portions of the building. Is the painting scope of work to include painting the doors? Please confirm.

No

48. The RFP indicates preparing and painting the roof.

Please confirm. Not roof. Only the interior ceiling

49. Are there any known hazardous materials? Not known.

50. Is there an existing hazardous materials survey report? If so, please provide. Not available

51. Can the Site Superintendent be the Quality Control Manager as well as the Site Safety Health Officer (one person wearing all three hats)?

Yes

52. The scope of work indicates replacing exterior and interior light bulbs with new LED bulbs/tubes. Is the intent to replace the existing lamps with LED retrofit kits for the existing light fixtures? Or, replace the existing light fixtures with new LED type light fixtures?

Please advise.

Only replace the bulbs not the fixtures

53. Are the existing exit lights to remain? Yes

54. Floor Leveling (PWS 3.1.9). What is the approximate elevation differential to the south-end target elevation (average/maximum depth of leveling compound anticipated)?

N/A with the new SOW

55. Floor Drains (PWS 3.1.10). Please confirm the number of drains to be adjusted/raised. None with the new SOW

56. LED Tubes (PWS 3.1.16). Are existing ballasts to remain in service (Type A plug-and-play tubes), or is ballast bypass (Type B) preferred?

Contractors’ choice

57. Backwater Valve (PWS 3.1.17). Please confirm the drainpipe size/material and approximate burial depth at the installation point.

New SOW calls for a backwater drain.

58. Colors. Who selects interior/exterior paint colors, and how many colors are anticipated?

See answer to question RFI question 22. and review the paint scheme exhibit.

Current as of: 16 July 2026

59. Occupancy & Equipment. Will the Government relocate gym equipment prior to commencement, or is relocation/protection within the contractor's scope?

Government will relocate equipment

File details come from the government source that posted it. Updated .