Technical Factors 26QA27.pdf

PDF 82 KB Posted

Attached to
Paint and Lights Bldg 102 & Bldg 110
Solicitation number
W50S6T26QA027
Issued by

About this file

This document contains the Technical Factors evaluation criteria for Project HAYW 26-2012 Fresh Paint and Lights Building 102 & B110. To be considered for award, contractors must demonstrate a fully developed plan to execute contract performance and satisfy the Statement of Work requirements through three mandatory submissions.

Contractors must provide: (1) a brief written work procedure addressing SOW requirements in section 3.0, limited to two pages; (2) acknowledgment of any subcontractors selected at the time of quote submission, including both primary and alternative options with business names and cities; and (3) qualifications demonstrating competence in the work area, satisfied by either a current relevant California license (with license number provided) held by the prime contractor or subcontractor, or equivalent credential/certificate if a CA license is not held.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Factors Project: HAYW 26-2012 Fresh Paint and Lights Bldg 102 & B110

To be considered for award a contractor must have a fully developed plan to execute contract performance and satisfy the statement of work (SOW). The following concerns must be addressed to be considered for award.

1. Procedure. Provide a brief written work procedure to satisfy the SOW requirements of section 3.0. (Limited to two pages).

2. Acknowledgment of subcontractors. If a subcontractor is utilized, they must be selected at the time of quote submission. A primary and alternative may be referenced. Provide the business name and city of the selected subcontractor(s).

3. Qualifications. Qualifications are required to prove competence in the area of work. A relevant current CA license by the prime or the sub-contractor will satisfy this requirement. If a relevant CA license is held provide the license number. In lieu of a CA license an equivalent credential/certificate may suffice and must be provided to evaluate competency.