This file is an RFI Response document providing answers to contractor questions for the Deployable Parts Storage Facility project (FAKZ189366) at the Alabama Army National Guard. The document, prepared by Seay, Seay & Litchfield architects, addresses ten contractor inquiries submitted during the bidding process for solicitation W50S6N-25-B-A010.
Key clarifications include site layout and laydown yard information provided in Addendum No. 1, relocation of electrical panels due to space constraints in the existing electrical room, and confirmation that high velocity fans are contractor furnished and installed items. The response specifies that traditional damp proofing is not required for below-grade CMU walls, instead requiring weather barrier material per specification section 07 2500. Security requirements are detailed on drawing 2/E1.1B with equipment sourced through ADVANTOR Systems, and BACnet connectivity requirements are shown on revised mechanical drawings in Addendum #1. The document confirms that electronic bid submissions will not be accepted and all bids must be hand-delivered or mailed. The file includes 115 pages of existing metal building shop drawings and as-built documentation requested by contractors for the project valued between $1-5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DSP Bid Opening Sign In Sheet.pdf | ||
| DSP ABSTRACT Final KO Signed.pdf | ||
| FAKZ189366 DSP Facility Addendum No. 1 SIGNED.pdf | ||
| Solicitation Amendment W50S6N25BA0100001 SF 30.pdf | ||
| W50S6N25BA010 PreBid Conference Sign-in Roster.pdf | ||
| PreBid DSP Slides.pptx | PPTX presentation | |
| FAKZ189366 TYPE B-3 SPECS VOL I SIGNED.pdf | ||
| FAKZ189366 TYPE B-3 SPECS VOL II SIGNED UPDATED.pdf | ||
| Solicitation - W50S6N25BA010 V7.pdf | ||
| FAKZ189366 TYPE B-3 SPECS VOL I SIGNED.pdf | ||
| Dannelly Field Entry Authorization List.pdf | ||
| FAKZ189366 TYPE B-3 DRAWINGS SIGNED.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEAY, SEAY & LITCHFIELD, P.C.
1115 S. COURT ST. MONTGOMERY, AL 36104
(334) 263-5162
MAIL@SSLARCH.COM
WWW.SSLARCH.COM
MONTGOMERY DOTHAN AUBURN HUNTSVILLE
MEMORANDUM
DATE: 4 August 2025
TO: Major Jeremy Hendrix
FROM: David Donovan
Job No: ANG #FAKZ189366, SSL Job #19084.00
Job Name: Deployable Parkts Storage Facility
SUBJECT: Bid RFI Response #001
1) Question: Please indicate on the drawings the location of laydown yard and the jobsite trailer. The construction site is very tight and we would like to make sure their is space.
Response: Refer to Addendum No. 1 for site lay-down and access plan.
2) Question: Please upload the shop drawings/as builts for the existing metal building.
Response: Existing metal building shop drawings are included within these RFI responses.
3) Question: Please indicate the location for the new sub panel on the drawings as the existing electrical room is full.
Response: New electrical panel has been relocated. See Addendum No. 1 for revised electrical drawings indicating revised electrical panel location.
4) Question: The specs call the big ass fan a specialty item. I can't find anything implicating we need to provide it. If we do, can you provide the specific model they are requesting please?
Response: High velocity, low speed fan is intended to be Contractor Furnished, Contractor Installed.
Refer to note 5 on exhaust fan schedule on sheet M2.1B for basis of design information.
5) Question: Can the professional provide specs and details on damp proofing at CMU below grade?
Response: Traditional damp proofing is not required. Provide weather barrier material as specified specification section 07 2500. Weather barrier material is intended to be applied to all CMU substrates of exterior wall components. Install weather barrier in accordance with manufacturer’s written installation instructions and in accordance with part 3 of specification section 07 2500.
6) Question: In specs section 230900-6 It says this building need to be connected to the BACnet. Can a drawing be shown for comms?
Response: Refer to revised M2.1B “Mechanical Floor Plan – DSP Storage” included in Addendum #1.
7) Question: Can an SOW be provided for the security requirements?
Response: Refer to drawing 2/E1.1B. Required devices and device locations are indicated on this drawing. A preliminary bill of materials for required security equipment is included within the division 28 specifications. Bidders should contact the Government’s security vendor (ADVANTOR Systems) for updated pricing information.
DEPLOYABLE PARTS STORAGE FACILITY FAKZ189366 / 19084.00
BID RFI RESPONSE #001 4 AUGUST 2025
MONTGOMERY DOTHAN AUBURN HUNTSVILLE
8) Question: Can a specific model be provided for the Big Ass Fan company?
Response: Refer to response to question #4 above.
9) Question: Can bids be submitted electronically?
Response: Electronic submissions will not be accepted. All bids shall be either hand carried/delivered or delivered via mail/shipping.
10) Question: Will the current Transformer on the west side of the building need to be relocated or moved during construction?
Response: The existing manual transfer switch located at the Southwest corner of the existing facility is intended to remain.
End of RFI Responses
1/115 wall girts L/240
See all notes in red added per Zach Watson with Vulcan Steel Structures
Rush Typewritten Text F35 Supply Building, BBI SU #033-00 Section 133419, Metal Building System Design Shop Drawings & Calculations
Rush Polygon
Rush Typewritten Text *See important layout note on following page. BBI/DRS
Rush Polygon
2/115
This dimension will change to 4'-10"
This dimension will change to 13'-7"
This dimension will change to 86'-3"
Rush Typewritten Text *Please note that CL's 1, 25, A & Q are given from outside edge of wall girts. See 2/S2.1 for reference. IMPORTANT FOR BBI AND
SOUTHERN OAK TO MAKE PROPER REFERENCE TO THE
COLUMN LINE LOCATIONS GIVEN ON THESE DRAWINGS
WHEN PERFORMING LAYOUT. BBI/DRS
Rush Polygon
3/115
4/115
5/115
6/115
This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".
This dimension will change to 8'-8"
7/115
This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".
This dimension will change to 8'-8'
8/115
This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".
9/115
10/115
11/115
12/115
We will add the 3'-0" girt extensions at lines 1 & 25
PANELS EXTEND TO GROUND IN THIS LOCATION.
DOOR 146
13/115
This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".
This dimension will change to 10'-0 3/16"
This dimension will change to 8'-8"
We will add the 3'-0" girt extensions at lines 1 & 25
Coordinate door with portal frame
14/115
12’-0” l
15/115
PANELS EXTEND TO GROUND IN THIS LOCATION.
16/115 wall girts L/240
See all notes in red added per Zach Watson with Vulcan Steel Structures
17/115
This dimension will change to 13'-7"
This dimension will change to 86'-3"
3' WALL PANEL AND GIRT EXTENSION FROM GRID 35
18/115
19/115
20/115
21/115
22/115
23/115
24/115
25/115
26/115
One 3'-4" x 7'-2" framed opening for walkdoor by others will be added on this wall
27/115
28/115
29/115
Wall girts L/240
See all notes in red added per Zach Watson with Vulcan Steel Structures
30/115
This dimension will change to 13'-7"
This dimension will change to 86'-3"
31/115
32/115
33/115
34/115
35/115
36/115
37/115
38/115
39/115
40/115
41/115
42/115
43/115
44/115
45/115
46/115
47/115
48/115
49/115
50/115
51/115
52/115
53/115
54/115
55/115
56/115
57/115
58/115
59/115
60/115
61/115
62/115
63/115
64/115
65/115
66/115
67/115
68/115
69/115
70/115
71/115
72/115
73/115
74/115
75/115
76/115
77/115
78/115
79/115
80/115
81/115
82/115
83/115
84/115
85/115
86/115
87/115
88/115
89/115
90/115
91/115
92/115
93/115
94/115
95/115
96/115
97/115
98/115
99/115
100/115
101/115
102/115
103/115
104/115
105/115
106/115
107/115
108/115
109/115
110/115
111/115
112/115
113/115
114/115
115/115
| 2025-08-07T08:28:00-0500 | |
| David Donovan |
File details come from the government source that posted it. Updated .