FAKZ189366DSP Facility RFI 1 Response SIGNED.pdf

PDF 8 MB Posted

Attached to
Deployable Spare Parts Warehouse Vertical Construction Solicitation Federal contract opportunity
Solicitation number
W50S6N-25-B-A010
Issued by
Department of the Army Alabama Army National Guard

About this file

This file is an RFI Response document providing answers to contractor questions for the Deployable Parts Storage Facility project (FAKZ189366) at the Alabama Army National Guard. The document, prepared by Seay, Seay & Litchfield architects, addresses ten contractor inquiries submitted during the bidding process for solicitation W50S6N-25-B-A010.

Key clarifications include site layout and laydown yard information provided in Addendum No. 1, relocation of electrical panels due to space constraints in the existing electrical room, and confirmation that high velocity fans are contractor furnished and installed items. The response specifies that traditional damp proofing is not required for below-grade CMU walls, instead requiring weather barrier material per specification section 07 2500. Security requirements are detailed on drawing 2/E1.1B with equipment sourced through ADVANTOR Systems, and BACnet connectivity requirements are shown on revised mechanical drawings in Addendum #1. The document confirms that electronic bid submissions will not be accepted and all bids must be hand-delivered or mailed. The file includes 115 pages of existing metal building shop drawings and as-built documentation requested by contractors for the project valued between $1-5 million.

View the file

Other files for this federal contract opportunity

Other files attached to Deployable Spare Parts Warehouse Vertical Construction Solicitation, newest first.
File Type Posted
DSP Bid Opening Sign In Sheet.pdf PDF
DSP ABSTRACT Final KO Signed.pdf PDF
FAKZ189366 DSP Facility Addendum No. 1 SIGNED.pdf PDF
Solicitation Amendment W50S6N25BA0100001 SF 30.pdf PDF
W50S6N25BA010 PreBid Conference Sign-in Roster.pdf PDF
PreBid DSP Slides.pptx PPTX presentation
FAKZ189366 TYPE B-3 SPECS VOL I SIGNED.pdf PDF
FAKZ189366 TYPE B-3 SPECS VOL II SIGNED UPDATED.pdf PDF
Solicitation - W50S6N25BA010 V7.pdf PDF
FAKZ189366 TYPE B-3 SPECS VOL I SIGNED.pdf PDF
Dannelly Field Entry Authorization List.pdf PDF
FAKZ189366 TYPE B-3 DRAWINGS SIGNED.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEAY, SEAY & LITCHFIELD, P.C.

1115 S. COURT ST. MONTGOMERY, AL 36104

(334) 263-5162

MAIL@SSLARCH.COM

WWW.SSLARCH.COM

MONTGOMERY DOTHAN AUBURN HUNTSVILLE

MEMORANDUM

DATE: 4 August 2025

TO: Major Jeremy Hendrix

FROM: David Donovan

Job No: ANG #FAKZ189366, SSL Job #19084.00

Job Name: Deployable Parkts Storage Facility

SUBJECT: Bid RFI Response #001

1) Question: Please indicate on the drawings the location of laydown yard and the jobsite trailer. The construction site is very tight and we would like to make sure their is space.

Response: Refer to Addendum No. 1 for site lay-down and access plan.

2) Question: Please upload the shop drawings/as builts for the existing metal building.

Response: Existing metal building shop drawings are included within these RFI responses.

3) Question: Please indicate the location for the new sub panel on the drawings as the existing electrical room is full.

Response: New electrical panel has been relocated. See Addendum No. 1 for revised electrical drawings indicating revised electrical panel location.

4) Question: The specs call the big ass fan a specialty item. I can't find anything implicating we need to provide it. If we do, can you provide the specific model they are requesting please?

Response: High velocity, low speed fan is intended to be Contractor Furnished, Contractor Installed.

Refer to note 5 on exhaust fan schedule on sheet M2.1B for basis of design information.

5) Question: Can the professional provide specs and details on damp proofing at CMU below grade?

Response: Traditional damp proofing is not required. Provide weather barrier material as specified specification section 07 2500. Weather barrier material is intended to be applied to all CMU substrates of exterior wall components. Install weather barrier in accordance with manufacturer’s written installation instructions and in accordance with part 3 of specification section 07 2500.

6) Question: In specs section 230900-6 It says this building need to be connected to the BACnet. Can a drawing be shown for comms?

Response: Refer to revised M2.1B “Mechanical Floor Plan – DSP Storage” included in Addendum #1.

7) Question: Can an SOW be provided for the security requirements?

Response: Refer to drawing 2/E1.1B. Required devices and device locations are indicated on this drawing. A preliminary bill of materials for required security equipment is included within the division 28 specifications. Bidders should contact the Government’s security vendor (ADVANTOR Systems) for updated pricing information.

DEPLOYABLE PARTS STORAGE FACILITY FAKZ189366 / 19084.00

BID RFI RESPONSE #001 4 AUGUST 2025

MONTGOMERY DOTHAN AUBURN HUNTSVILLE

8) Question: Can a specific model be provided for the Big Ass Fan company?

Response: Refer to response to question #4 above.

9) Question: Can bids be submitted electronically?

Response: Electronic submissions will not be accepted. All bids shall be either hand carried/delivered or delivered via mail/shipping.

10) Question: Will the current Transformer on the west side of the building need to be relocated or moved during construction?

Response: The existing manual transfer switch located at the Southwest corner of the existing facility is intended to remain.

End of RFI Responses

1/115 wall girts L/240

See all notes in red added per Zach Watson with Vulcan Steel Structures

Rush Typewritten Text F35 Supply Building, BBI SU #033-00 Section 133419, Metal Building System Design Shop Drawings & Calculations

Rush Polygon

Rush Typewritten Text *See important layout note on following page. BBI/DRS

Rush Polygon

2/115

This dimension will change to 4'-10"

This dimension will change to 13'-7"

This dimension will change to 86'-3"

Rush Typewritten Text *Please note that CL's 1, 25, A & Q are given from outside edge of wall girts. See 2/S2.1 for reference. IMPORTANT FOR BBI AND

SOUTHERN OAK TO MAKE PROPER REFERENCE TO THE

COLUMN LINE LOCATIONS GIVEN ON THESE DRAWINGS

WHEN PERFORMING LAYOUT. BBI/DRS

Rush Polygon

3/115

4/115

5/115

6/115

This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".

This dimension will change to 8'-8"

7/115

This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".

This dimension will change to 8'-8'

8/115

This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".

9/115

10/115

11/115

12/115

We will add the 3'-0" girt extensions at lines 1 & 25

PANELS EXTEND TO GROUND IN THIS LOCATION.

DOOR 146

13/115

This dimension will change to 5'-0" which will change the sill height of the window framed openings to 24'-0".

This dimension will change to 10'-0 3/16"

This dimension will change to 8'-8"

We will add the 3'-0" girt extensions at lines 1 & 25

Coordinate door with portal frame

14/115

12’-0” l

15/115

PANELS EXTEND TO GROUND IN THIS LOCATION.

16/115 wall girts L/240

See all notes in red added per Zach Watson with Vulcan Steel Structures

17/115

This dimension will change to 13'-7"

This dimension will change to 86'-3"

3' WALL PANEL AND GIRT EXTENSION FROM GRID 35

18/115

19/115

20/115

21/115

22/115

23/115

24/115

25/115

26/115

One 3'-4" x 7'-2" framed opening for walkdoor by others will be added on this wall

27/115

28/115

29/115

Wall girts L/240

See all notes in red added per Zach Watson with Vulcan Steel Structures

30/115

This dimension will change to 13'-7"

This dimension will change to 86'-3"

31/115

32/115

33/115

34/115

35/115

36/115

37/115

38/115

39/115

40/115

41/115

42/115

43/115

44/115

45/115

46/115

47/115

48/115

49/115

50/115

51/115

52/115

53/115

54/115

55/115

56/115

57/115

58/115

59/115

60/115

61/115

62/115

63/115

64/115

65/115

66/115

67/115

68/115

69/115

70/115

71/115

72/115

73/115

74/115

75/115

76/115

77/115

78/115

79/115

80/115

81/115

82/115

83/115

84/115

85/115

86/115

87/115

88/115

89/115

90/115

91/115

92/115

93/115

94/115

95/115

96/115

97/115

98/115

99/115

100/115

101/115

102/115

103/115

104/115

105/115

106/115

107/115

108/115

109/115

110/115

111/115

112/115

113/115

114/115

115/115