This document includes a performance work statement and related federal contract opportunity notice. The performance work statement outlines requirements for an extension of an existing aluminum canopy and concrete paving system at Building 1502 for the 187th Fighter Wing in Montgomery, Alabama. The related federal contract opportunity is an invitation for bid for the construction services with a period of performance of 210 calendar days. The opportunity is a competitive set-aside for HUBZone certified small businesses with a NAICS code of 236220 and estimated value between $250,000 and $500,000. The pre-bid site visit will be held on February 11, 2020 and questions are due by February 7, 2020. Sealed bids must be submitted by the date specified in block 13 of the SF1442 form.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALABAMA AIR NATIONAL GUARD
HEADQUARTERS 187TH FIGHTER WING
5187 SELMA HIGHWAY
MONTGOMERY, ALABAMA 36108
07 January 2020
Performance Work Statement
Introduction. The 187th Civil Engineering Squadron has a requirement for an extension of the existing aluminum canopy and cement concrete paving systems at Bldg 1502, 187th Fighter Wing, Dannelly Field, Montgomery, AL.
Background. This is a first time installation at this location.
General Requirements.
Work hours will be Tuesday- Friday, 7:00 am – 5:30 pm, unless written approval is granted from the 187 Fighter Wing Contracting Office 72 hours in advance. Any utility disruptions will be coordinated 72 hours in advance.
The Contractor shall be fully responsible for compliance with all base, local, state, and federal environmental/occupational safety laws, rules, and regulations that apply.
All salvage materials and debris shall become the property of the contractor and will be removed daily as service is performed. The use of Government dumpsters is prohibited.
All work shall be performed in a manner which has minimal impact on base operations. Any damage made to existing Government property will be repaired and/or replaced to “like new” at the expense of the contractor.
Contractor Manpower Reporting
The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for AIR FORCE collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ .
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/ .
http://www.ecmra.mil/ http://www.ecmra.mil/
Performance Requirements.
Vendor will complete all work in accordance with the Specifications and Drawings for this project. All work shall be warranted for materials and workmanship for one (1) year from acceptance of completed work.
Special Requirements.
A site visit will be held on the date and time specified in the solicitation documentation at:
187 Fighter Wing, Building 1502, Dannelly Field 5187 Selma Hwy.
Montgomery AL 36108
Per Federal Acquisition Regulation Clause 52.237-1, Site Visit; Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after award.