Bid Schedule.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W50S6N-20-B-0002
About this file
This document contains an invitation for bid solicitation notice and bid schedule for construction services. The 187th Fighter Wing of the Alabama Air National Guard is seeking to award a firm-fixed price contract valued between $250,000 and $500,000 to provide all labor, materials, equipment and supervision necessary to extend an existing aluminum canopy and concrete paving system at Building 1502 of their facility. The scope of work includes demolition, excavation, concrete work, electrical lighting installation, landscaping, fencing and utilities. The period of performance is 210 calendar days from notice to proceed. Responses are due no later than the date specified in Block 13 of the SF1442 form. This procurement is set aside exclusively for firms with current HUBZone certification in good standing. All work will be warranted for one year.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| PROJECT: | Bldg 1502 SFS Canopy | ||||||
| DESCRIPTION | QTY | UNIT | MATERIAL | LABOR | EQUIPMENT | UNIT COST | LINE TOTAL |
| Demolition | |||||||
| Remove Curb and Gutter | LF | ||||||
| Pipe Removal | LF | ||||||
| Excavation | CY | ||||||
| Trench Backfill | CY | ||||||
| Concrete | |||||||
| Slab on Grade | CY | ||||||
| Thickened Slab Edge | LF | ||||||
| Concrete Finish | SF | ||||||
| Column Footings | EA | ||||||
| Specialties | |||||||
| Metal Canopy | SF | ||||||
| Electrical | |||||||
| Lighting | LS | ||||||
| Wiring Etc | LS | ||||||
| Exterior Improvements | |||||||
| Topsoil Striping | SY | ||||||
| Rough Grade | EA | ||||||
| Finish Grading | SY | ||||||
| Backfill | CY | ||||||
| Compaction | CY | ||||||
| Excavation | CY | ||||||
| Trench Backfill | CY | ||||||
| Silt Fence | LF | ||||||
| Hauling | CY | ||||||
| Pipe Bollard | EA | ||||||
| Sodding | MSF | ||||||
| Utilities | |||||||
| Storm Drain Piping | LF | ||||||
| Storm Drain Fittings (45 Bend) | EA | ||||||
| Storm Drain Fittings (90 Bend) | EA | ||||||
| General Conditions | |||||||
| Superintendent | WKS | ||||||
| Laborer | WKS | ||||||
| Testing | LS | ||||||
| Office Equipment & Supplies | |||||||
| MOS. |
| Subtotal | - | $ - 0 | |
| Overhead & Profit | 0% | $ - 0 | |
| Signature of Person Preparing Form | Total Bid | - | $ - 0 |