B08 REVISED s-2-21-StructuralNotesnDetails.pdf
PDF 595 KB Posted
- Solicitation number
- W25G1V21R0020
About this file
This document package includes structural notes and details for a building renovation project, as well as a solicitation for a 7-1/2 ton bridge crane to be installed at the project site. The structural notes provide design references, load criteria, and construction details for concrete foundations, masonry walls, interior slabs, and future crane footings at the Tobyhanna Army Depot building renovation in Pennsylvania. The solicitation seeks bids for the bridge crane and requires vendors to review addendums and submit all required documentation to the Army Contracting Command at Aberdeen Proving Ground by the response date. Installation of the crane will support material handling at the renovated building on the Army depot campus.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE & FOUNDATION NOTES EARTHWORK NOTES REINFORCED HOLLOW CMU NOTES
JH
OR
NS
BY
:23
A M
- J :\C ur re nt Jo bs \Jo bs -1
8\1
9 - T
YA
D
Bl dg
Ba y 1 R en ov ati on
R -0
4\D ra wi ng s\I nc om ing \M ike y\2
1-
-1
7\3 -2
-2 1 S
TR
UC
TU
RA
L N
OT
ES
A
ND
D
ET
AI
LS
.dw g
TOBYHANNA ARMY DEPOT
Job No.
Christopher A. Garick; FL. PE No.53924 Thomas A. Alexander; FL. PE No.73172 Daniel J. White; FL. PE No.73790
Humber-Garick Consulting Engineers 142 Eglin Parkway SE Fort Walton Beach, Florida, 32548 E-mail: admin@h-gce.com Ph: 850.243.6723 Fax: 850.664.5420 Fl. Authorization No.00006680
GENERAL NOTES
DESIGN REFERENCES
ROOF SNOW LOAD CRITERIA
DEAD LOADS
LIVE LOADS
WIND LOAD CRITERIA
DESIGN SOIL BEARING PRESSURES
SEISMIC LOAD CRITERIA
DESIGN CRITERIA
INTERIOR SLAB ON GRADE TYPICAL SECTION
X X XX X
X X
EXPANSION JOINT DETAIL CONSTRUCTION JOINT DETAIL
CONTRACTION JOINT DETAIL ENLARGED CONTRACTION JOINT DETAIL
ENLARGED CONSTRUCTION JOINT DETAIL
ENLARGED EXPANSION JOINT DETAIL
XX
INTERIOR FLOOR SUBGRADE NOTES
FUTURE CRANE FOOTING NOTES:
FUTURE CRANE FOOTING & BASE PLATE
PROVIDED BY BMH
7.5 TON CRANE REACTIONS & MEMBERS
CRANE FOOTING PLAN
REVISED SEPT., 2019 BY
HUMBER GARRICK ENGINEERS
http://www.Humber-Garick.com http://www.Humber-Garick.com
| Sheets and Views |
| 3-2-21 STRUCTURAL NOTES AND DETAILS |
File details come from the government source that posted it. Updated .