B08 Questions and Answers 1 through 22 3.10.21.pdf

PDF 111 KB Posted

Attached to
7-1/2 TON BRIDGE CRANE FOR BUILDING 3 BAY 1 FOR TOBYHANNA ARMY DEPOT (TYAD)
Solicitation number
W25G1V21R0020
Issued by

About this file

This document contains questions and answers regarding a solicitation for the supply and installation of a 7-1/2 ton bridge crane at Tobyhanna Army Depot. The solicitation seeks an offeror to install a new bridge crane, runway, and supporting structure in Building 3 Bay 1, as there are currently no existing crane components. Offerors are responsible for verifying dimensions, site conditions, and connecting the crane to the on-site electrical substation located in the southwest corner of the bay. Foundation drawings and some building details have been provided, though additional information may be required from offerors such as overhead clearance levels. The Army Contracting Command at Aberdeen Proving Ground is the contracting agency.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Solicitation W25G1V21R0020 Supply and Install of a 7-1/2 Ton Bridge Crane at Tobyhanna Army Depot

Q1: Is there an existing crane runway

A1: There is no existing bridge crane in the area.

Q2: What is the size and psi of the foundations?

A2: The foundation is 4000 psi.

Q3: Item 8 of statement of work states:

‘It shall be the contractor’s responsibility to install and connect all the electrical controls and utilities to place the crane in service. Source of power shall be from the electrical substation in the Southeast corner of the bay.’

How far is the electrical substation and what is our responsibility as far as this goes?

More detail on scope of requirements please such as TYAD electrical specifications/requirements and distances etc.

We have no idea currently of how to bid getting power from the substation, for example is power currently to a disconnect or distribution board external to the substation and we have to get power from that?

A3: There is a 12' w x 16'h cargo door entrance into the bay.

Refer to drawing, electrical substation is located in the Southwest corner of the 200' x 200' bay where the crane is being installed.

The CAD drawing shows the substation in the corner of the bay. Whoever installs the crane is going to have to have an electrician or hire an electrician to electrically connect the crane.

Q4: Please let us have the cad drawing of the foundation layout.

A4: The PDF drawing has been uploaded, if you need a dwg file email me.

Q5: Is there an existing crane runway if so:

1. What is the size/type of the existing crane Runway rail?

2. What headroom is there (top of crane rail to nearest roof obstruction)?

3. What is the floor to top of runway rail dimension?

4. What lifting capacity/weight/wheel loadings was the crane runway designed to?

5. What access is there into the site/building as we are quoting site unseen, is there a roll up door/truck access into the fabrication area?

A5: There is no bridge crane, runway, or any part of a crane structure in place in Bldg.

3-1. An all new crane and structure are required.

There is not an existing bridge crane or railway in place.

There is no runway in place.

There is no bridge crane, runway or any part of a bridge crane structure in place in Bldg.

3-1.

There is direct access into the bay though a 11'-10" wide by 13'-10" high cargo door.

While fossil fuel vehicles are not permitted in the bay without prearranged permission a wheeled vehicle such as a forklift can be driven up a ramp and straight into the building.

There is not a dock delivery point on the bay (200' x 200' portion of the building).

Q6: If there is no crane runway then we need to know, again the Bid only calls for a 7,5t bridge crane it does not mention that you require a crane runway. Please clarify.

A6: There is no bridge crane, runway, or any part of a crane structure in place in Bldg.

3-1. An all new crane and structure are required.

Q7: The CAD drawing you sent does not show any substation despite your answer saying it does, furthermore you have given no information as to what is needed, simply saying we must hire an electrician to electrically connect is insufficient, it would all be guesswork as to what is required and could cost from $1000 to $50k... More detail is required as to what you require.

A7: As already identified, the substation is located in the Southwest corner of a 200' x 200' bay. There is not an existing electrical disconnect installed for the crane because specific electrical requirements of the crane being proposed is unknown. Contractor shall be responsible for connecting to the substation and installing the necessary electrical service to include the electrical disconnect, conduit and conductor from the substation to the crane.

Q8: I am looking at the documents for the above project and the drawing’s dimensions are too fuzzy to make out- specifically I’m looking for the column spacing on the runway.

Also, the specified minimum hook height of the hoist is 18’6”, should this be used to determine the height of the runway columns?

A8: The drawing is clear, try increasing the size. I can also supply a PDF version, which you will also have to increase the size to see dimensions.

Runway column height is certainly a part of the how the hook height shall be accomplished but it is up to the vendor to determine the height and clearances required to accomplish the identified 18'-6" hook height, taking into account such factors as the ceiling and superstructure height and the bridge dimensions and hoist dimension.

Just for clarification because it is not labeled on the drawing, the enclosed are in the Southwest corner of the bay in the drawing is the substation. The enclosure is simply chain link fence with a double swing gate for access.

Q9: Is this an existing building, correct?

A9: This is an existing building.

Q10: Drawing shows specific steel columns but no description, are they present or simply shown to describe required locations?

A10: Structural building columns are in place but columns identified on CL Column & Footing lines are for reference and location related to the existing footings.

Q11: Is temporary partition wall present?

A11: No, temporary partition wall has been removed this is a reference that was left behind from when this drawing was recently used for bay renovation purposes.

Q12: Foundation descriptive notes reference a foundation detail being shown but is not present, is this detail available?

A12: A PDF has been uploaded. If you need a dwg file, email me.

Q13: Page 3, Par. 5, Additional information: Please provide elevations and locations of lowest overhead obstructions that may interfere with the crane. That would include piping, ducting, sprinkles, lights, roof structural members, etc. In other words, please provide maximum available headroom for the crane system, that is the dimension from the floor to the top of trolley hoist.

A13: Elevation drawings showing all heights and obstacles are not available. It is the contractor's responsibility to verify site conditions.

Q14: Page 4, Par. 10, Foundations: Please provide drawing showing location of anchor bolts, their size, quantity and projection AFF. Please confirm that anchor bolts are not in the SOW for the crane.

A14: Foundation drawing has been provided, it is the responsibility of the contractor to identify anchor locations, sizes and quantities. Anchor bolts are to be provided and installed as part of the overall crane installation.

Q15: Page 16, Par. 1, Excavation, and Par. 2, Trenching: Please confirm these are not applicable to this project

A15: Page 16 is part of the General Contractors Safety Standards for TYAD, if the any of these requirements are applicable to the SOW, the contractor is responsible to comply with requirements defined in this section.

Q16: Page 29: The drawing is not legible to read. Please provide a monochrome PDF drawing with legible text and lines.

A16: There are no additional drawings available. PDF’s of the drawings have already been posted to Beta.SAM. These drawings are the best we have and look to be legible.

If you require a CADD drawing, as already stated email the Contract Specialist.

Q17: Page 29, ML disconnect: Please provide location of floor level main power disconnect.

A17: Main power disconnect is expected to be along the South wall of Bldg. 3-1 or column line of crane runway, specific location of main power disconnect shall be coordinated between COR and successful bidder.

Q18: Test Weights: Please clarify who is responsible for providing test weights and rigging.

A18: Test Weights and rigging shall be provided by the contractor.

Q19: What are the dimensions of the opening where the system will brought in.

A19: The Doorway is an opening of 11'-10" wide by 13'-10" high.

Q20: Crane span: Foundation layout drawing shows 67'-0" span crane. SOW requires 63'-6" span. Please reconcile.

A20: Additional drawings provided were provided by a vendor from a previous contract and have not been field verified. Vendors are expected to verify dimensions and conditions. "As built" drawings provided by vendor indicate a foundation plan based on a similar bridge crane design located in another building with similar dimension as building 3 bay 1 and that is also why 63' was specified. Any drawings provided by the government are for reference only and the contractor is responsible to design the crane according to the parameters set forth in the statement of work. This is the purpose of the site visit.

Q21: Proposal Submission Requirements: Solicitation Page 5, Par. F requires FAR Clause 52.204-6 to be filled out in SF 1449 of the solicitation. It appears that the Clause is not included in the Solicitation. Please clarify.

A21: It is FAR clause 52.204-26

Q22: Building drawings: Please provide "As Built" building drawings, especially showing cross-section of building looking in the Project North direction (showing plane perpendicular to runway length).

A22: As stated above, there are no additional drawings available. The only available drawings have been posted to Beta.SAM. If a CADD version of the POSTED drawings are needed, email the Contract Specialist.