- Propane Supply to Tobyhanna Army Depot
- Solicitation number
- W25G1V20R0024
About this file
This document is a solicitation amendment modifying a federal contract for propane supply services. The amendment reduces the number of propane tanks to be serviced at Tobyhanna Army Depot from twelve to eight. The contract line items for propane supply are updated to reflect supplying propane to eight tanks instead of ten. The description for each line item is changed from supplying ten tanks to supplying eight tanks. The solicitation seeks bi-weekly supply of propane at a price per gallon, including supplier/wholesale pricing plus a firm fixed markup. Offerors must provide pricing for a 10,000 gallon evaluation quantity, installation and removal costs for the tanks, with the evaluation considering total price. The Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground issued the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1V002300MH
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for Amendment 03 is to remove an additional tw o tanks from the lists of propane tanks at TYAD in the Statement of Work. The number of propane tanks has been reduced from 12 tanks to 8 tanks.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W25G1V20R0024
X 9B. DATED (SEE ITEM 11)
06-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2020
CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W25G1V20R0024
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
Description: PROPANE SUPPLY TO 10 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
AND REMOVE TANKS.
To:
Description: PROPANE SUPPLY TO 8 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
CLIN 0002
Description: PROPANE SUPPLY TO 10 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
CLIN 0003
Description: PROPANE SUPPLY TO 10 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
CLIN 0004
Description: PROPANE SUPPLY TO 10 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
CLIN 0005
Description: PROPANE SUPPLY TO 10 TANKS OF VARIOUS SIZES LOCATED THROUGHOUT
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
TOBYHANNA ARMY DEPOT IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK. - SEE
FAR CLAUSE 52.212-2 FOR BASIS FOR AWARD-AT TIME OF AWARD FUNDING WILL BE PROVIDED FOR THIS LINE ITEM.-THE GOVERNMENT IS UNDER NO OBLIGATION TO USE ALL OR ANY OF THE
FUNDS PROVIDED ON THIS CLIN.THE AMOUNT OF FUNDING PROVIDED IS A CEILING FOR
PROPANE SUPPLIED ON A BI-WEEKLY BASIS AND PAYMENTS WILL ONLY BE MADE FOR SUPPLIED
PRODUCT. CHANGES TO THE CEILING WILL BE MADE BY CONTRACT MODIFICATION
ONLY.INVOICING WILL BE BI-WEEKLYENTER PRICING BELOW:PRICE PER GALLON: PRICE PER
GALLIN WILL BE SUPPLIER/WHOLESALE PRICING PLUS VENDORS FIRM FIXED MARK-UP.THE
SUPPLIER PRICING MUST BE PUBLICALLY PUBLISHED/SEARCHABLE PRICING.TOTAL COST FOR
10,000 GALLONS AT CURRENT PRICE PER GALLON RATE:THE 10,000 GALLONS IS STRICTLY FOR
EVALUATION PURPOSES AND WILL NOT RESTRICT OR OBLIGATE THE GOVERNMENT TO A
SPECIFIC AMOUNT OF PROPANE.COST TO INSTALL TANKS:COST TO REMOVE TANKS:PRICE
EVALUATION WILL TAKE INTO CONSIDERATION PRICE PER GALLON COST AND COST TO INSTALL
AND REMOVE TANKS.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .