A07_Exhibit_A000_Contract_Data_Requiremtns_Lists_(CDRL).pdf

PDF 841 KB Posted

Attached to
S Band Lewis Scanner Repair
Solicitation number
W25G1V18R0008
Issued by

About this file

Exhibit A000 Contract Data Requirements List

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A001 title: TEST AND EVALUATION REPORT sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 7.3 A req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: First Test and Evaluation Report shall provide information concerning the visual, measurement, and mechanical inspections of the two (2) S-Band Lewis Scanner cones, PN: 583Z5001MC-1 and PN: 583Z5001MC-3. The report shall also contain proposed repair methods that will restore the Scanner cones to a like new condition. The Report shall include, but not be limited to:

- How evaluations were developed and conducted

- Specialized labor and materials needed to complete the overhaul

- Total cost for the completion of repair, including:

- Direct labor costs (types of labor, total estimated labor costs)

- Overhead costs (overhead rate, total estimated overhead costs)

- Subcontractor costs

- Parts and materials costs

- Special equipment costs (rented or purchased)

- Travel costs

- Schedule for the completion of repair

- Test and alignment procedures to be conducted

- Method of mechanical and finishing overhaul

- Location where work shall be performed

- Potential risk factors that can result in a processing occurrence or in a processing impact that is uncertain and would diminish the Radio Frequency (RF) performance of the S-Band Lewis Scanner Antenna and would likely result in work delay

- Method for Voltage Standing Wave Ratio (VSWR) testing

16.3 Review: The Government will review the Test and Evaluation Report and determine whether the overhaul is reasonable and the repair method(s) technically adequate. The contractor shall take no further action until the Report has been reviewed by the Government and written instruction is provided by the Contracting Officer as to whether the Government's intention is to proceed. The Government's review of the Report shall not obligate the Government to proceed with the antenna overhaul as specified in that Report.

16.4 Format: Two (2) Reports shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000101 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: TECHNICAL INTERCHANGE MEETING DOCUMENTATION sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 5.2 A req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: N/A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: First Technical Interchange Meeting Documentation shall provide sufficient information to document and summarize the meeting, as well as provide pertinent technical information to the Government. Documentation shall include, but not be limited to:

- Agenda

- Presentation materials

- Minutes

- Action item documentation, including assignment of responsibility and due dates

- Collected data

- Inspection reports

- Analysis and recommendation for repair

16.3 Format: Two (2) sets of documentation shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000201 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A003 title: VSWR TEST RESULTS sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 7.3 B req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode:

dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: Voltage Standing Wave Ratio (VSWR) Test Results shall provide information concerning the VSWR performance of the two (2) S-Band Lewis Scanner Cones, prior to further assembly of the (2) S-Band Lewis Scanner Antennas. The Results shall include, but not be limited to, the following data:

- Measured antenna parameters

- Voltage Standing Wave Ratio (VSWR)

- Antenna parameters shall be measured at the following frequencies

- 2,900 MHz

- 2,950 MHz

- 3,000 MHz

- 3,050 MHz

- 3,100 MHz

16.4 Format: Two (2) Reports shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000202 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A004 title: TEST AND EVALUATION REPORT sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 7.3 A req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: First Test and Evaluation Report shall provide information concerning the visual, measurement, and mechanical inspections of the two (2) geodesic lenses, PN: 583Z5010-1, two (2) asymmetrical horns, PN: 583Z5021-1, and two (2) reflectors, PN: 583Z5011-1. The report shall also contain proposed repair methods that will restore the Scanner cones to a like new condition. The Report shall include, but not be limited to:

- How evaluations were developed and conducted

- Specialized labor and materials needed to complete the overhaul

- Total cost for the completion of repair, including:

- Direct labor costs (types of labor, total estimated labor costs)

- Overhead costs (overhead rate, total estimated overhead costs)

- Subcontractor costs

- Parts and materials costs

- Special equipment costs (rented or purchased)

- Travel costs

- Schedule for the completion of repair

- Test and alignment procedures to be conducted

- Method of mechanical and finishing overhaul

- Location where work shall be performed

- Potential risk factors that can result in a processing occurrence or in a processing impact that is uncertain and would diminish the Radio Frequency (RF) performance of the S-Band Lewis Scanner Antenna and would likely result in work delay

16.3 Review: The Government will review the Test and Evaluation Report and determine whether the overhaul is reasonable and the repair method(s) technically adequate. The contractor shall take no further action until the Report has been reviewed by the Government and written instruction is provided by the Contracting Officer as to whether the Government's intention is to proceed. The Government's review of the Report shall not obligate the Government to proceed with the antenna overhaul as specified in that Report.

16.4 Format: Two (2) Reports shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000301 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A005 title: TECHNICAL INTERCHANGE MEETING DOCUMENTATION sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 5.2 B req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: N/A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: Second Technical Interchange Meeting Documentation shall provide sufficient information to document and summarize the meeting, as well as provide pertinent technical information to the Government. Documentation shall include, but not be limited to:

- Agenda

- Presentation materials

- Minutes

- Action item documentation, including assignment of responsibility and due dates

- Vendor scheduling

- Developed drawings

16.3 Format: Two (2) sets of documentation shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000401 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A006 title: RADIO FREQUENCY PERFORMANCE TEST PLAN sub: TEST PLAN auth: DI-QCIC-81110 ref: SOW Para. 7.4 A-I req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1: 2 reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 2 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: Radio Frequency (RF) Performance Test Plan shall provide information required to provide a complete evaluation of the RF performance of the S-Band Lewis Scanner Antenna. The Test Plan shall include, but not be limited to:

- Narrative describing the antenna test range

- Method for minimizing reflections from ground if outdoor range is employed

- Block diagram of the testing equipment configuration used for the various testing requirements of the SOW

- Parameters to be tested shall be identified and described in detail, including:

- Frequency range

- Polarization

- Voltage Standing Wave Ratio (VSWR)

- Gain

- Beamwidth

- Sidelobes

- Scan Sector

- Fabrication of any mechanical and electrical interface assemblies required for RF pattern testing

- Description of test report product deliverable indicating the number of antenna patterns to be provided to the Government and parameters tested

- Scheduling of tests to be performed on the test range along with the names of personnel that are to be conducting testing

- Equipment calibration certificates

- Schedule of planned testing procedures that support the parametric testing

16.3 Review: The Government will provide questions or comments for clarification of and possible modifications to the Test Plan. The contractor shall take no further action until the Test Plan has been approved by the Government and written instruction is provided by the Contracting Officer as to whether the Government's intention is to proceed. The Government's review of the Test Plan shall not obligate the Government to proceed with the antenna testing as specified in that Test Plan.

16.4 Format: Two (2) Reports shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000402 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A007 title: TECHNICAL INTERCHANGE MEETING DOCUMENTATION sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 5.2 C req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: N/A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: Third Technical Interchange Meeting Documentation shall provide sufficient information to document and summarize the meeting, as well as provide pertinent technical information to the Government. Documentation shall include, but not be limited to:

- Agenda

- Presentation materials

- Minutes

- Action item documentation, including assignment of responsibility and due dates

- Pertinent testing information

16.3 Format: Two (2) sets of documentation shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000403 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A008 title: RF PERFORMANCE TEST RESULTS sub: TECHNICAL REPORT auth: DI-MISC-80508B ref: SOW Para. 8.0 req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode:

dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 2 total_repro: 0 remarks: 16.1 Format: Documentation shall be in the contractor's format.

16.2 Content: Radio Frequency (RF) Performance Test Results shall provide information concerning the RF antenna pattern and performance of the two (2) S-Band Lewis Scanner Antennas. The Results shall include, but not be limited to, the following data:

- Measured antenna parameters

- Voltage Standing Wave Ratio (VSWR)

- Antenna gain

- Beamwidth

- Sidelobe levels

- Polarization

- Measurements resulting in a set of antenna patterns and measurement data that can be analyzed on the basis of meeting the general antenna requirements

- Antenna parameters shall be measured at the following frequencies

- 2,900 MHz

- 2,950 MHz

- 3,000 MHz

- 3,050 MHz

- 3,100 MHz

- Antenna parameters shall be measured at the following scan settings, in degrees

- -10

- -8

- -6

- -4

- -2

- 0

- +2

- +4

- +6

- +8

- +10

16.4 Format: Two (2) Reports shall be supplied to the Government in electronic format, via CD/DVD or secure electronic transmittal.

group:

total_price:

prep_name: Ricky Saunders line_item: 000404 exhibit: A xtdp: Off xtm: Off othercat: See Block 16 system: S Band Lewis Scanner Antenna ctr_no: W25G1V-18-X-XXXX contr:

remarksb:

Page2:

Reset:

prep_date: 3 Jan 17 app_by:

app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A009 title: MECHANICAL/ELECTRICAL END ITEM DOCUMENTATION sub: ENGINEERING DOCUMENTATION auth: DI-SESS-81003E ref: SOW Para. 4.8 req_ofc: Tobyhanna Army Depot (TYAD) dd250: DD appcode: N/A dist: C freq: One/R asof:

firstsub: SOW 12.0 subsub:

addressee1: Tobyhanna Army Depot draft1:

reg1: 2 repro1:

addressee2: Mail Stop 5143 draft2:

reg2:

repro2:

addressee3: 11 Hap Arnold Blvd draft3:

reg3:

repro3:

addressee4: Tobyhanna, PA 18466 draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.