Amendment 0003 BPA Conference Room _AVS Upgrade - Industry Q_A v1.pdf
PDF 221 KB Posted
- Solicitation number
- W15QKN27QA011
About this file
This file is a Questions and Answers (Q&A) document for BPA Conference Room & AV Systems solicitation W15QKN27QA011, a zero-dollar Blanket Purchase Agreement (BPA) issued by the Department of the Army for a 100% small business set-aside. The procurement establishes a pool of pre-qualified contractors to provide repair, replacement, and installation services for video teleconference (VTC) and audio-visual (AV) systems at Picatinny Arsenal, New Jersey and Benet Laboratories, New York. The proposal submission deadline is December 3, 2026, at 1:00 PM EST. Offerors must demonstrate technical capability (Factor 1) through current state and local licenses for New Jersey and New York, and listing of VTC/AV equipment manufacturers for which they are authorized dealers or service providers. Experience (Factor 2) requires three to five relevant VTC repair or replacement projects completed within the last three years, with ongoing contracts acceptable as qualifying projects. All qualifications, including licenses and manufacturer authorizations, may be satisfied by either the prime contractor or first-tier subcontractors, and projects may be performed by proposed subcontractors if clearly attributed to that entity. Joint ventures are permitted if structured in accordance with 13 CFR § 125.8(e), with documentation including a signed Joint Venture Agreement, proof of active SAM.gov registration and UEI for the joint venture entity, and an approved SBA Mentor-Protégé Agreement if applicable.
Under FAR 52.219-14(e)(4) for special trade construction (NAICS 238210), the prime contractor plus any similarly situated small business subcontractor must perform at least 25% of labor cost, meaning no more than 75% can be subcontracted to small businesses, measured by the end of the performance period for each order. Majority prime self-performance is an evaluation preference only, not a minimum requirement. No dedicated on-site staffing, local office, or minimum response time is required at the installations. Daily permanent staffing is not a baseline requirement; technicians report only as authorized and funded under individual call orders. All security, cybersecurity assessment, and operational security requirements are satisfied at the call order level. Major replacements and upgrades will be individually scoped and quoted on a firm-fixed-price basis at the call order level, with the Government obtaining required internal Army Information Technology Approval System (ITAS) approval and Statement of Non-Availability (SoNA) prior to issuance if equipment is unavailable through CHESS. All project management, mobilization, travel, training, and documentation costs must be fully loaded into individual call order quotations, with no separate recurring funding between call orders. Site visits for capabilities evaluation are not authorized during the BPA establishment phase; all responses to industry questions are posted in the solicitation Q&A section.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BPA Conference Room & AV Systems - W15QKN27QA011
Question 1: Can we see a representative sample of conference, VTC, and classroom space details?
Answer: No. Not necessary for the purposes of establishing the BPAs, will provide this information at the order level.
Question 2: What are the existing AV and control platforms standards (Crestron, Extron, AMX, etc.).
Answer: Existing platforms include Crestron and AMX. Most of these are being replaced with simplified systems utilizing Logitech systems. Most small rooms are focused on MS TEAMS functionality and simple microphone and speaker arrays. There are a small number of larger rooms that would utilize more complicated AV Systems.
Question 3: Is there an incumbent contract? If there is, can you please send me the previous contract information/incumbent info?
Answer: No. This is a new requirement; there is no incumbent contract or previous contract information available.
Question 4: Can we schedule a site visit?
Answer: No. Site visits cannot be scheduled for this announcement.
Question 5: Please let us know if there are any special instructions or any information you require from us to schedule an appointment for this site visit.
Answer: Not applicable. No site visits are scheduled or held for this solicitation.
Question 6: Kindly confirm who will escort the visitors on the site?
Answer: Not applicable. In-person site visits are not authorized; therefore, no Government escorts will be assigned.
Question 7: Any Special instructions for the attendees?
Answer: Not applicable. Offerors should focus their submission efforts on the requirements outlined in Section L of the solicitation (Factor 1 Technical Capability and Factor 2 Experience).
Question 8: Licenses (Factor 1): May an offeror meet the New Jersey and New York license requirement using the licenses of its proposed first-tier small business subcontractor?
Answer: Yes.
Question 9: OEM authorizations (Factor 1): May an offeror submit the VTC/AV manufacturer authorizations held by its proposed first-tier subcontractor?
Answer: Yes.
Question 10: Relevant experience (Factor 2): May an offeror submit VTC repair/replacement projects performed by its proposed first-tier subcontractor, with that subcontractor's customer POCs and project values?
Answer: Yes. See #8 and #9.
Question 11: Joint venture: If the offeror and a small business partner submit as a joint venture, will the Government credit each member's licenses, OEM authorizations, and project experience toward Factors 1 and 2? Is any documentation of the arrangement required with the quote?
Answer: Yes. In accordance with 13 CFR § 125.8(e), the Government will evaluate and credit the licenses, OEM authorizations, certifications, and experience held individually by each partner in the aggregate.
Documentation of the JV arrangement is required with the capabilities statement, including:
• A complete, signed Joint Venture Agreement (compliant with 13 CFR § 125.8 or applicable program rules).
• Proof of active SAM.gov registration and UEI for the joint venture entity itself.
• An approved SBA Mentor-Protégé Agreement (MPA) approval letter (if applicable).
Question 12: QASP: Attachment 0001 references Solicitation W15QKN-26-Q-A154, dated 7/23/2026. Does it apply to this solicitation, or will a corrected version be issued?
Answer: Yes, Attachment 0001 (Quality Assurance Surveillance Plan - QASP) applies to this solicitation (W15QKN-27-Q-A011) as provided. No corrected version will be issued. The quality assurance standards and performance surveillance requirements outlines therein remain fully applicable to this procurement.
Question 13: We're preparing pricing for the Repair / Replacement of Conference Room, Digital Workplace, and Audio-Visual Systems BPA (W15QKN27QA011), and we'd like to schedule site visits at both locations.
Could you let us know:
(1) What information you need for installation access (names, DOB, ID, vehicle info, etc.) and the deadline to submit it;
(2) Where we should report on arrival, and whether the visits will be escorted;
(3) Whether photography is permitted during the walkthrough.
Answer: See #4, #5, and #6.
Question 14: FAR 52.219-14: Which percentage limitation in paragraph (e) and which measurement period in paragraph (f) will apply? The selection boxes in the solicitation are not marked.
Answer: Since NAICS 238210 is being used for this solicitation, the limitation in paragraph (e)(4) for Construction by special trade contractors applies.
Under FAR 52.219-14(e)(4) for special trade construction, the prime contractor (plus any similarly situated small business subcontractor) must perform at least 25% of the labor cost, meaning no more than 75% of the labor cost can be subcontracted to small businesses.
The measurement period for paragraph (f) of this clause is “By the end of the performance period for each order issued under the contract.”
Question 15: Could you please advise whether this participation model is acceptable for the current opportunity?
Answer: No. To ensure a fair, impartial, and competitive evaluation process, the Government cannot pre-screen, review, or approve individual participation models or business structures prior to proposal submission.
Question 16: How can we register our company in your vendor/supplier system?
Answer:
Step 1: Register in SAM.gov: Vendors must obtain a Unique Entity ID (UEI) and register in the System for Award Management (SAM.gov). Registration is free and mandatory.
Step 2: Obtain a CAGE/NCAGE Code: During SAM registration, US-based firms receive a Commercial and Government Entity (CAGE) code. As a "LTD" entity (potentially international), must obtain a NATO CAGE (NCAGE) code before registering in SAM.
Step 3: Register in PIEE: Once active in SAM.gov, they must register in the Procurement Integrated Enterprise Environment (PIEE) to submit proposals and manage contracts.
Timeline Warning: SAM.gov registration and CAGE validation can take several weeks to process.
Joint Certification Program (JCP): If the opportunity requires access to unclassified military export-controlled technical data, they must obtain JCP certification (DD Form 2345).
Cybersecurity Compliance: If they will handle sensitive data, they must implement NIST SP 800-171 standards and report their self-assessment score to the Supplier Performance Risk System (SPRS).
Question 17: How can we become an approved provider to receive RFPs/RFQs directly?
Answer: DoW does not maintain a private "direct-invite" vendor list for standard opportunities. Instead, vendors must actively monitor federal databases: (e.g.
SAM.gov).
Question 18: Licenses. Factor 1 asks for copies of state and local licenses for New Jersey and New York. If the licensed work is performed by a licensed subcontractor, may we submit that subcontractor's licenses with a signed teaming agreement?
Answer: See #8.
Question 19: Experience. Factor 2 asks for three to five VTC repair or replacement projects. May we include projects performed by a proposed subcontractor or teaming partner?
Answer: Yes.
Question 20: Will the Government please clarify if there is Question submission deadline?
Answer: The deadline for Industry questions is November 18, 2026, at 1300 EST.
Question 21: The current requirement states to “Provide copies of all current, valid state and local licenses required to perform repair and installation in New Jersey and New York". Will the Government accept copies of valid state and local licenses from other states such as Pennsylvania, Maryland, and Virginia? Or is this restricted to New Jersey and New York?
Answer: Yes.
Question 22: The current requirement states: "Provide a listing of Video Teleconference and Audio-Visual equipment manufacturers and types of equipment for which the vendor is an authorized dealer/service provider.” Will the Government please clarify whether an Offeror’s listing may include manufacturers and equipment for which its proposed subcontractors are authorized dealers or service providers?
Answer: See #9.
Question 23: Do you have a bill of materials or any photos of the site to assure that we are quoting the correct parts?
Answer: No. This will be determined at the call order level.
Question 24: May the offeror rely on relevant project experience and technical qualifications of a named teaming partner or subcontractor, or must the offeror itself demonstrate the required recent projects?
Answer: See #19.
Question 25: For work ordered under this BPA, how should offerors apply FAR 52.219- 14’s subcontracting limitation under NAICS 238210—particularly where an order combines AV equipment, installation, repair, and service—and at what level is compliance measured?
Answer: See #14.
Question 26: Must the offeror hold all applicable New Jersey and New York licenses and manufacturer authorizations at quote submission, or may named subcontractors provide these qualifications before performance?
Answer: See #8 and #9.
Question 27: Is there a formal deadline for Industry to submit questions?
Answer: See #20.
Question 28: What is the designated method for questions?
Answer: Refer to Section L, page 41 of the solicitation.
Question 29: Have any amendments or updated attachments been issued since the original solicitation package?
Answer: Yes. Amendments are posted in SAM.Gov.
Question 30: Experience – Section L/M, pages 40/45: May the required 3-5 VTC projects belong to the proposed subcontractor, clearly attributed to that company, or must all projects be the prime’s own?
Answer: See #19.
Question 31: Licenses and OEM authorization – pages 39/44: Which qualifications must the prime hold itself at submission, and which may be satisfied by the performing subcontractor?
Answer: The licenses and OEM qualifications can be satisfied by either prime or subcontractor.
Question 32: Subcontracting – FAR 52.219-14, pages 26-28: Which percentage limitation applies to this BPA, and is compliance measured per call or over the BPA period?
Answer: See #14.
Question 33: Is majority prime self-performance an evaluation preference only, or also a minimum requirement?
Answer: Preference.
Question 34: Service coverage: Is a local office or a minimum on-site response time required for Picatinny Arsenal or Benet Labs?
Answer: No.
Question 35: Security/CUI – PWS §3.6: Which security, cybersecurity assessment and OPSEC requirements must be satisfied at proposal submission or BPA establishment, and which apply only when an individual call requires access to installations, systems, or CUI?
Answer: All security, cybersecurity assessment and OPSEC requirements shall be satisfied at the call level.
Question 36: RFQ Statement: Section M, Factor 1 states that the Government will verify that the offeror holds “current, valid state and local licenses, required to perform repair and installation in both New Jersey and New York.”
Because the solicitation does not identify specific license types, we respectfully request clarification on which state and local licenses the Government expects offerors to submit, to ensure our quote aligns with the evaluation criteria.
Answer: Dedicated state trade licenses are not required for low-voltage AV work.
Question 37: RFQ Statement: Section L, Factor 2 requests relevant projects, “completed within the last three (3) years,” while Section M, Factor 2 refers to relevant projects “from the last three (3) years.”
Will the Government accept ongoing contracts as relevant projects for Factor 2?
Answer: Yes.
Question 38: If licensing is required, can those requirements be satisfied through a properly licensed subcontractor, or must the prime contractor hold the licenses?
Answer: See #8.
Question 39: I saw your recent Notice ID on SAM.gov and wanted to introduce myself as a resource for your upcoming federal Audio Visual and technology needs. Would have time for a quick conversation?
Answer: No. The Government is conducting a competitive small business set-aside announcement with a formal evaluation process to establish this zero-dollar BPA pool, we cannot hold one-on-one meetings at this time.
Question 40: If possible, we'd also appreciate the opportunity to visit Picatinny Arsenal, meet with the end-user team, and provide an overview of our capabilities.
Would you be able to direct me to the appropriate point of contact or advise on the best way to coordinate an introductory discussion?
Answer: No. See #4.
Question 41: Licensing: Does the Government require the prime contractor to hold all applicable New Jersey and New York licenses, or may a proposed subcontractor’s licenses satisfy the requirements for work that subcontractor will perform? Are there specific licenses the Government expects offerors to submit?
Answer: See #8, # 9, #31 and #36. A general business license and active SAM.gov registration satisfy this requirement. NY/NJ low-voltage electrical work does not have state-level licensing requirements for this scope. Any order-specific licenses will be handled at the individual Call level.
Question 42: Relevant experience: May projects completed by a proposed subcontractor count toward the required three to five relevant VTC repair or replacement projects, or must the prime contractor independently demonstrate the minimum three projects?
Answer: See #8, #9 and #10.
Question 43: Manufacturer authorizations: May an offeror rely on a proposed subcontractor’s manufacturer authorizations for equipment that subcontractor will install or service, or must those authorizations be held by the prime?
Answer: See #9.
Question 44: Do you have a list of general contractors I can reach out to, or if not, do you know who I could contact regarding this project?
Answer: No. Contact your local Small Business Office and APEX Accelerators for assistance.
Question 45: May an offeror satisfy the state and local licensing and manufacturer authorization requirements through qualified subcontractors or teaming partners, provided the prime contractor identifies those partners, establishes clear lines of authority, and retains responsibility for overall contract performance?
Alternatively, must the prime offeror itself hold all required licenses and manufacturer authorizations?
Answer: See #8 & #9.
Question 46: We are reviewing the AV/VTC BPA opportunity for Picatinny Arsenal, NJ and
Benet Laboratories, NY.
Could you please confirm whether contractors performing AV/VTC installation and low-voltage cabling work at these federal installations are required to hold state or local contractor/electrical licenses?
Answer: See #8, #31, #36 and #41. A general business license and active SAM.gov registration satisfy this requirement. NY/NJ low-voltage electrical work does not have state-level licensing requirements for this scope. Any order-specific licenses will be handled at the individual Call level.
Question 47: Factor 2 asks for 3 to 5 projects completed in the last 3 years that are the repair or replacement of a Video Teleconference system. Our recent federal work is structured cabling and low-voltage infrastructure installation (for example, CAT6A network cabling for the VA Sioux Falls Health Care System under an IDIQ contract), and we do not have a completed VTC repair or replacement project in the last 3 years.
Will the Government consider related low-voltage, network cabling and telecommunications installation projects as relevant experience under Factor 2? If so, please confirm whether we should clearly label how each project relates to VTC system support.
Answer: Yes and Yes — you should submit your low-voltage and structured cabling projects as long as you clearly explain how each project supports or enables VTC system functionality.
Question 48: I'm looking for a list of bidding GCs or planholders for the above project. Could you send me this information or direct me to someone who would have it?
Answer: See #44.
Question 49: Would the scope of this BPA permit the purchase of fully integrated, standalone Portable Media Systems that provide professional projection, audio, microphones and media playback without requiring permanent installation?
Answer: To be determined at the BPA call order level.
Question 50: Would a UK-based manufacturer with active SAM.gov registration and an NCAGE code be eligible to supply its own manufactured equipment directly under this requirement, given the small business set-aside?
Answer: No. This acquisition is 100% set aside for small businesses. Under FAR 19.505 & FAR 52.219-33 (Nonmanufacturer Rule), a contractor proposing under a small business set-aside must either be the domestic manufacturer of the end items, or—if they are a nonmanufacturer—supply end items that were manufactured, processed, or produced by a small business concern in the United States or its outlying areas.
Because the equipment in question is manufactured outside the United States, a foreign-based manufacturer supplying its own foreign-produced equipment does not meet the domestic manufacturing requirements of the Nonmanufacturer Rule and is ineligible for award. Foreign manufacturers may, however, act as subcontractors to a prime small business contractor, provided the overall solution remains compliant with all FAR domestic sourcing, Trade Agreements Act (TAA), and Buy American Act requirements.
Question 51: Where eligible, could delivery of equipment be made to US military establishments in the UK for onward transportation through existing US military logistics arrangements?
Answer: No
Question 52: Would you please advise whether:
1. An interested-vendors, prospective-BPA-holder, or subcontractor list is available.
Answer: No
2. The Army may share OCP’s Federal Subcontractor Capability Portfolio and contact information with qualified small-business offerors seeking signage, transportation, storage, staging, room-activation, PMO, or installation-coordination partners.
Answer: See #44.
3. Prospective BPA holders may identify specialty subcontractors after BPA establishment or at the individual call-order level.
Answer: Yes. BPA holders may propose specialty subcontractors at the individual call-order level or request an addition to their approved base BPA team post-award. Any proposed subcontractor must be fully compliant with all base BPA requirements—including required facility and personnel security clearances, active SAM.gov registration, and non-debarment status—and must receive written approval from the Contracting Officer prior to performance on a call order.
4. Material transportation, temporary off-site storage, receiving, staging, inventory control, signage, environmental graphics, FF&E coordination, room-readiness, and closeout services.
Answer: Material transportation, receiving, staging, inventory control, site coordination, room-readiness, and project closeout services directly related to the delivery and installation of AV systems are within scope as incidental, ancillary services and must be factored into individual Call Order quotations.
However, standalone architectural signage, broad environmental graphics, or general facility Furniture, Fixtures, & Equipment (FF&E) outside of direct AV-integration are not within the scope of this BPA.
Question 53: Performance Work Statement (PWS) paragraph 3.3.3 identifies Computer Hardware, Enterprise Software and Solutions (CHESS) as the mandatory primary source for conference room Audio-Visual (AV) hardware, software, and integrated services, while PWS paragraph 3.4 states the Contractor shall provide all necessary parts and components.
At the call order level, will the Government procure CHESS-available AV equipment directly and furnish it to the Contractor for installation, or will the Contractor be expected to furnish that equipment?
Answer: Major replacements and upgrades will be individually scoped and quoted on a Firm- Fixed-Price (FFP) basis at the Call Order level.
Question 54: If the Contractor furnishes equipment, will the Government obtain the Statement of Non-Availability (SoNA) and Information Technology Approval System (ITAS) approval before the call order is issued, allowing the Contractor to procure through its normal manufacturer-authorized distribution channels?
Answer:
ITAS Approvals and SoNA Timing
The Government will obtain required internal Army Information Technology Approval System (ITAS) approval prior to the issuance of each individual Call Order. f required equipment is not available via CHESS, a Statement of Non-Availability (SoNA) will be processed in accordance with Army CHESS guidelines before authorization is granted to procure via alternative manufacturer-authorized commercial distribution channels.
Question 55: For Contractor-furnished equipment and materials, may the Contractor include reasonable material handling and markup in its call order pricing?
Answer: Firm-Fixed-Price / Fully Burdened Rates All Call Order pricing must be submitted on a Firm-Fixed-Price basis in accordance with the established BPA pricing structure. Material handling, overhead, and general and administrative (G&A) expenses should be incorporated into the fully burdened proposal rates or established CLIN structures provided at the call order level of the BPA Schedule.
Question 56: Would you be able to connect us with the appropriate technical point of contact responsible for AV standards and conference room modernization at these installations?
Answer: No. We’re not able to connect you with a technical point of contact for AV standards or conference room modernization at those installations.
All responses will be posted in the solicitation Q&A section, which is the sole method for addressing questions. Please continue to monitor the solicitation for updates.
Question 57: Regarding the capabilities packet submission through PIEE; As an AV manufacturer rather than an integration contractor pursing the BPA directly, would a manufacturer capabilities statement be appropriate for submission, or is that process intended exclusively for prospective BPA holders?
Answer:
No. Capabilities packet submissions through Procurement Integrated Enterprise Environment (PIEE) are intended exclusively for prospective prime BPA holders (or formal joint ventures/price teaming leads). An Original Equipment Manufacturer (OEM) should not submit an independent capabilities statement unless they are proposing as a prime contractor or formally partnering with a bidding integration contractor.
Question 58: Daily on-site AV/VTC staffing
Q&A No. 34 confirms that a local office and minimum on-site response time are not required.
Please clarify whether the BPA requires a technician to be physically stationed at Picatinny Arsenal or Benet Laboratories daily, or whether technicians are expected to report only for work authorized under individual orders. If daily coverage is intended, please identify the required locations, staffing levels, hours and duties.
Answer:
Daily, permanent on-site staffing is not a baseline requirement for this BPA. Technicians are expected to report to Picatinny Arsenal, Benet Laboratories, or other specified locations only as authorized and funded under individual Call Orders. Specific staffing levels, hours of operation, and on-site duties will be defined at the Call Order level based on mission requirements.
Question 59: Program Management The QASP identifies a contractor Program Manager. Does this require a dedicated, full-time or on-site position, or may the contractor provide off-site management and coordination as individual orders are issued? Please identify any management or availability obligations that apply between funded orders and how those requirements would be funded.
Answer: The Program Manager (PM) position is not required to be a dedicated, full-time, or on-site role under the base BPA. The Contractor may mange and coordinate requirements off-site as individual Call Orders are executed.
There are no separate management or availability funding mechanisms between Call Orders; all program management, administration, and coordination costs must be factored into the Contractor's fully burdened labor rates or the specific Firm-Fixed-Price (FFP) Call Order proposals.
Question 60: Troubleshooting and diagnostic visits For routine service requests, will site visits, mobilization/travel, diagnostic labor, repairs and replacement parts be authorized and priced under individual orders? When an on-site diagnosis is needed before a firm repair scope can be established, may a separately funded diagnostic visit be authorized before submission of the follow-on repair quotation?
Answer: Yes. All site visits, mobilization/travel, diagnostic labor, repairs, and replacement parts will be authorized, competed, and priced under individual Call Orders.
When the exact scope of a repair cannot be determined remotely, the Government may issue a separately funded Call Order specifically for on-site diagnostics and troubleshooting.
Following the completion of the diagnostic visit, the Contractor will submit a detailed findings report and a firm-fixed-price quotation for the subsequent repair and replacement parts for Government evaluation and authorization.
Question 61: Recurring operational support Does the intended scope include daily conference/VTC operation, support for scheduled meetings, preventive maintenance, standby coverage or after-hours response? If so, please clarify whether these services would be expressly defined and funded under individual orders, together with the applicable service hours and response requirements.
Answer: No. The baseline scope of the BPA does not include daily conference/VTC operations, meeting support, preventive maintenance, standby coverage, or after-hours response. Any such requirements, if needed, will be explicitly defined and funded at the individual Call Order level.
Question 62: Upgrade orders and equipment sourcing Our understanding is that major replacements and upgrades will be individually scoped and quoted on a Our understanding is that major replacements and upgrades will be individually scoped and quoted on a firm-fixed-price basis. Under revised PWS Sections 3.3.2 through 3.3.4, will the Government procure applicable equipment/furniture through CHESS, UNICOR or other required sources and furnish it for installation, or should the BPA contractor include those items in its quotation? Please clarify the contractor’s procurement role and the required approval/waiver process before commercial purchases.
Answer: See #53.
Question 63: Order pricing Please confirm whether applicable program/project management, mobilization, travel, required training and documentation costs should be included in each individual order quotation, or whether any of these functions will be covered by a separately funded recurring order. We understand that no pricing submission is required for initial BPA establishment.
Answer: Confirmed. No pricing submission is required for the initial BPA establishment.
All project management, mobilization, travel, training, and documentation costs must be fully loaded and incorporated into each individual Call Order quotation. There will be no separately funded recurring orders or base-level funding to cover these administrative or mobilization expenses between active Call Orders.
Question 64: Proposal submission deadline The current SAM.gov notice lists November 30, 2026 at 12:00 PM EST, while the solicitation text states 1:00 PM EST. Please confirm the controlling submission deadline.
Answer: The proposal submission deadline has been extended to December 03, 2026, at 1:00PM EST. The SAM.gov notice will be updated via Amendment 0003 to algin with the solicitation text. Offerors are responsible for ensuring their proposals are fully submitted in PIEE by this controlling deadline.
Question 65: Request for an extension to the response due date.
Answer: The proposal submission deadline has been extended to December 03, 2026, at
1:00PM EST.
| Answer: Yes. |
| Answer: Yes. |
| Answer: Yes. See #8 and #9. |
| Answer: |
| Answer: Yes. |
| Answer: Yes. |
| Answer: No. |