This file is a Questions and Answers (Q&A) document addressing industry inquiries regarding the Integrated Commercial Intrusion System (ICIDS) maintenance services contract at Fort Hamilton, NY (Solicitation W15QKN26QA137). The Government clarifies that 24/7 monitoring is not required; alarms remain on closed local connections with no remote monitoring routing. The Government does not currently possess comprehensive system details, zone/sensor drawings, or OEM/brand information but will provide an inventory of zones and building locations in a follow-on amendment. Existing PM logs, inspection reports, and repair records are available and will be attached in an amendment.

The Q&A establishes critical service level agreements and operational requirements: contractors must respond onsite within four hours of incident notification and restore 100% system connectivity within four hours for emergency repairs; routine corrective maintenance responses are due by the next business day; preventive maintenance must occur quarterly per the PWS; and all maintenance/inspection reports must be submitted within five business days of completion. The COR must be notified within one hour of emergency outages. For parts and equipment procurement under $15,000, the COR has approval authority; requests exceeding $15,000 require written Contracting Officer authorization. The Government provides emergent software patches and replacement equipment; the contractor is responsible for routine software updates, STIG compliance, and maintenance of all other parts and materials. Inactive zones 231, 232, 232A, 232B, and 232C will be reactivated following infrastructure repairs and fall within the PWS scope. Option Year 1 CLIN 1001 must be priced for four quarterly maintenance events, and emergency onsite maintenance baseline pricing is set at six events per contract period, with additional events authorized through bilateral contract modifications using established labor rates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Will the system require 24x7 monitoring by the contractor? If so, what are the SLAs for reporting and notification to the Government?

The Government does not require the contractor to provide continuous, 24x7 monitoring for the system. Consequently, service level agreements (SLAs) for reporting and notification do not apply to this specific function.

Do alarms connect to any remote monitoring entity or location, and will any equipment be required there?

The system does not route alarms to any remote monitoring entity or external location. The architecture exclusively utilizes closed connections directly to the local workstations.

Please provide system details including part numbers, models, counts, quantities, equipment by zone, building/location, and each device location, including panels, keypads, sensors, and modules?

The Government currently lacks the comprehensive system details requested. However, we can supply an inventory of the applicable zones and building locations upon request.

Are existing zone/sensor drawings available for the areas to be maintained?

The Government does not currently possess existing zone or sensor drawings for the maintenance areas.

Are existing PM logs, inspection reports, repair records, or operational status reports available?

The Government possesses these records and will attach in a follow on amendment.

Are there any known current outages or tickets awaiting troubleshooting or parts?

No active outages or pending tickets currently exist. However, infrastructure deficiencies have forced two systems offline. The Government will notify the contractor immediately upon resolving these underlying infrastructure repairs.

Are there any existing spare parts stored for the system onsite?

The facility maintains a highly limited inventory of spare parts onsite.

Are login credentials for administrative access available onsite?

The Government maintains onsite login credentials to grant administrative access.

Please identify any requirements discussed during the site visit that are not reflected in the PWS, including applicable corrective-maintenance SLAs or response requirements?

The contractor must respond onsite within four hours following official notification of an incident, and is updated accordingly in the SOW.

Please confirm whether the vendor is responsible for maintaining spares or whether Fort Hamilton will provide spares for vendor installation?

In accordance with the regulatory framework governing contract administration, the contractor must route all equipment and parts procurement requests through the appropriate Government approval authority based on the total estimated cost of the acquisition. The Contracting Officer's Representative (COR) maintains approval authority for all routine parts and equipment purchases—such as control boards, Balanced Magnetic Switch (BMS) components, and related hardware—that do not exceed $15,000. For any procurement or aggregated order exceeding $15,000, the contractor must obtain explicit, written authorization directly from the Contracting Officer (KO) prior to executing the purchase. To ensure cost reasonableness and allocability, all requests must be submitted to the appropriate official (COR or KO) prior to acquisition, accompanied by necessary cost estimates, technical justifications, and competitive vendor quotes where applicable.

Please define what constitutes an emergency repair and the required response and repair completion time?

The Government defines an emergency as any hardware or software failure that renders a system inoperable and exceeds the scope of basic operator troubleshooting. The contractor must restore systems to 100% connectivity within four hours of receiving official notification.

Please confirm whether server and/or monitoring station replacement equipment will be provided by Fort Hamilton and whether the vendor is responsible only for installation?

Fort Hamilton assumes full responsibility for providing any necessary replacement systems. Conversely, the contractor holds the responsibility for conducting system analysis, performing troubleshooting protocols, and submitting requisitions for required parts.

Please provide or confirm the applicable SLAs for preventive maintenance, corrective maintenance, emergency response, reporting, and notification.

The contractor must adhere to the following minimum Service Level Agreements (SLAs): For emergency response, the contractor must arrive onsite and initiate repairs within four (4) hours of official notification, aiming to restore 100% connectivity. For routine, non-emergency corrective maintenance, the contractor must respond and initiate troubleshooting by the next business day. The contractor must execute scheduled preventive maintenance quarterly, strictly adhering to the timetable outlined in the Performance Work Statement (PWS). Regarding reporting and notification, the contractor must notify the Contracting Officer's Representative (COR) within one (1) hour of identifying an emergency outage and must submit all comprehensive maintenance and inspection reports to the Government within five (5) business days following the completion of any service event.

The site visit indicated operational availability may be expected at 100%, while some issues may be deferred until the next scheduled PM. Please clarify how operational availability is measured and how deferred issues affect availability/SLA compliance?

The Government strictly limits acceptable deferred issues to malfunctioning backup batteries currently pending fulfillment on backorder. The Contracting Officer’s Representative (COR) or the Contracting Officer (KO) must explicitly approve any further instances of deferred maintenance.

Please confirm which batteries, software patches, parts, or other materials will be Government-furnished and which items the vendor must provide, install, or maintain?

The Government will provide emergent software patches mandated by Network Command. The contractor bears full responsibility for executing all other routine software updates, maintaining Security Technical Implementation Guide (STIG) requirements, and installing, and maintaining all required parts, batteries, and materials. Any procurement requests for additional equipment or parts must be routed through the designated Government approval authority prior to purchase, with authorization determined by the total estimated cost of the acquisition

Please confirm access and escort requirements for buildings 206, 212, 301, 302, 114, the SCIFs, arms rooms, and any other restricted areas?

The Contracting Officer’s Representative (COR) assumes responsibility for all access and escort requirements. The COR will actively coordinate these logistical needs as situations dictate.

Please confirm whether inactive zones 231, 232, 232A, 232B, and 232C may be brought online during the period of performance and whether that work is included in scope and price?

The Government will reactivate the specified inactive zones immediately following the conclusion of necessary infrastructure repairs. Upon reactivation, the contractor must thoroughly assess the operational integrity of the equipment. We confirm that these zones fall within the existing scope of the Performance Work Statement (PWS).

The CLIN structure lists Base Year Scheduled Quarterly Maintenance as 4 Each, OY2 Scheduled Quarterly Maintenance as 4 Each, and OY3 Scheduled Quarterly Maintenance as 4 Each, but OY1 CLIN 1001 appears to list Scheduled Quarterly Maintenance as 1 Each. Please confirm whether OY1 CLIN 1001 should be priced as four quarterly maintenance events or one event?

Offerors must price Option Year 1 (OY1) CLIN 1001 to reflect four distinct scheduled quarterly maintenance events and will be updated as such in the CLIN

The solicitation lists Emergency Onsite Maintenance as 6 Each for the Base Year and each Option Year. Please confirm whether offerors should price exactly six emergency onsite maintenance events per period, and how any emergency onsite maintenance events beyond the stated quantity would be authorized and priced.

Offerors must price exactly six (6) emergency onsite maintenance events for the Base Year and each subsequent Option Year to establish a standardized baseline for evaluation, in accordance with FAR 15.204-5 and FAR 52.212-1(b). Should operational exigencies require emergency maintenance events exceeding this baseline, the Contracting Officer (KO) will formally authorize the additional work through a bilateral contract modification under the authority of FAR 43.103(a) (specifically incorporating the standard FAR 52.243-1, Changes—Fixed-Price or FAR 52.243-4, Changes clause as prescribed by FAR 43.205). The Government will price these subsequent, out-of-scope emergency events using the contractually established hourly labor rates and material markups detailed in the contractor’s initially awarded, legally binding proposal, ensuring cost reasonableness pursuant to FAR 15.402.

Are you able to provide the OEM or brand name of the current Integrated Commercial Intrusion System (ICIDS) in Fort Hamilton, NY?

And are you able to provide a listing of the below devices or counts so that we know the size/scope of the ICIDS system to be maintained?

· Intrusion detection sensors

· Passive infrared motion detectors

· Balanced magnetic switches

· Door position switches

· Glass break sensors

· Alarm control panels

· Annunciation devices

· Communication modules

· System servers and workstations

· Network connections supporting ICIDS-IV

· Backup of power supplies and UPS systems

The Government will address this in a follow on Amendment