Transmittal 11 - Mechanical Design Drawings (1).pdf
PDF 1 MB Posted
- Attached to
- CONSTRUCTION - Multiple Projects - Boston, MA Federal contract opportunity
- Solicitation number
- W15QKN-24-R-5021
About this file
This document is a material approval submittal related to a federal contract opportunity for the replacement of a Tecogen chiller at the Barnes Building in Boston, MA. The contract numbers are W15QKN21D5018 and W15QKN21F5410. The submittal includes mechanical design drawings for the chiller replacement. Approval is required from the A&E, COR, and Contracting Officer. The new electric chiller will have a 350 ton capacity, 1050 GPM condenser water flow, and 837 GPM chilled water flow. The submittal also includes a mechanical legend, specifications, schedules, demolition plans, new work floor plans, and schematics for the condenser water and chilled water systems.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W15QKN-24-R-5021_0002.pdf | ||
| 201 of 301 - Basement Floor Plan Sec II.pdf | ||
| Loading Dock Doors 2.jpg | JPG image | |
| Loading Dock Doors 1.jpg | JPG image | |
| Loading Dock Doors 3.jpg | JPG image | |
| QtAs - W15QKN-24-R-5021.docx | DOCX document | |
| W15QKN-24-R-5021_0001.pdf | ||
| MA004-Boston-A4-CSS 90242-SOW-Clean Exterior of Buiding-Clean Windows.docx | DOCX document | |
| MA004-Boston-A4-CSS 90242-PICS-Clean Exterior of Building-Clean Windows.pdf | ||
| SF1413 Statement of Acknowledgement.pdf | ||
| MA004-BOSTON-B07-CSS-89231-SOW-REPAIR LOADING DOCK DOORS - V3.pdf | ||
| W15QKN-24-R-5021.pdf | ||
| DBA MA20240001 (Mod. 1) 1-19-2024.pdf | ||
| MA004-Boston-B7-CSS 94754-SOW-Replace Chiller Piping and ValvesV2.docx | DOCX document | |
| Contractor Cost Breakdown Form (NOV 2022).xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MATERIAL APPROVAL SUBMITTAL
TO: ACOE
CC: A&E, COR
FROM: Swan Contracting PROJECT TITLE: Replace Tecogen Chiller @ Barnes Building - Boston, MA
CONTRACT NUMBER:
W15QKN21D5018/W15QKN21F5410
(To be completed by the Contractor) Government Use Only
SUBMITTAL
NUMBER: 11
PREVIOUS SUBMITTAL NUMBER
(only if items listed were submitted previously):
A&E Recommendation
COR/EPM
Recommendation
Contracting Officer Approval/Disapproval
Line No.
Specification Sect.
Para No., Draw No.
Description of Material (Include type, model, mfg) APP DISAP
See Comments on Reverse APP DISAP
See Comments on Reverse APP DISAP
See Comments on
Reverse
1 236400 Mechanical Design Drawings
If an item is disapproved, a resubmittal is due within ________ calendar days of the Contracting Officer’s signature below.
Contractor (Ktr) A&E COR/EPM Contracting Officer TYPE or PRINT NAME & TITLE Stephen G. Guarracino
TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE TYPE or PRINT NAME & TITLE
SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:
DATE: DATE: DATE: DATE:
By completing this form, the above signed contractor certifies that the material complies with all specifications of the subject contract.
DATE RECEIVED FROM KTR: DATE RECEIVED FROM A&E: DATE RECEIVED FROM COR:
Material Approval Submittal Cover Sheet (11/2016)
4/6/2022
X
Lewis Rosenberg, RFOS
06 APR 2022
CONTRACT #: W15QKN21D5018/W15QKN21F5410
SUBMITTAL # 11 – Mechanical Design Drawings
COMMENTS
Instructions: Enter the initials of the individual making the comment, the Line Number of the item for which the comment is being made, and the comment.
Material Approval Submittal Cover Sheet (11/2016) (Reverse)
Swan Contracting 93 Old Greenfield Road Peterborough, New Hampshire 03458 P: 6033712261 F: 7813265263
Project: 460008 Rplc Tecogen w/ Electric Chiller, Barnes Bldg (W15QKN21F5410)
495 Summer Street Boston, Massachusetts 02110
Submittal #236400-8.0 - Mechanical Design Drawings 236400 - HVAC Chiller System
Revision 0 Submittal Manager Christopher Pray (Enfield Enterprises, LLC)
Status Open Date Created Apr 5, 2022
Issue Date Apr 5, 2022 Spec Section 236400 - HVAC Chiller System
Responsible Contractor
Enterprise Equipment Co, Inc. Received From Henry Corinha (Enterprise Equipment Co, Inc.)
Received Date Apr 5, 2022 Submit By Apr 5, 2022
Final Due Date Apr 19, 2022 Lead Time
Cost Code
Type Shop Drawings
Approvers Christopher Pray (Enfield Enterprises, LLC), Stephen Guarracino (Swan Contracting), Sharon Wilson-Emmons (US Army Contracting Command)
Ball in Court Sharon Wilson-Emmons (US Army Contracting Command)
Distribution
Description - Mechanical Design Drawings for the Chiller Replacement at the Barnes Building.
Submittal Workflow
Name Sent Date Due Date Returned Date Response Attachments
General Information Attachments
Barnes Chiller Mechanical Design Drawing Submittal.pdf
Christopher Pray Apr 5, 2022 Apr 5, 2022 Apr 5, 2022 Approved
Stephen Guarracino Apr 5, 2022 Apr 5, 2022 Apr 5, 2022 Approved
Sharon Wilson-Emmons Apr 5, 2022 Apr 19, 2022 Pending
Swan Contracting Page 1 of 1 Printed On: Apr 5, 2022 08:15 AM EDT https://app.procore.com/1813011/project/submittal_logs/document_downloader?attachment_id=3307523936&item_id=37352289&item_type=SubmittalLog&project_id=1813011&source=coversheet https://app.procore.com/1813011/project/submittal_logs/document_downloader?attachment_id=3307523936&item_id=37352289&item_type=SubmittalLog&project_id=1813011&source=coversheet
HVAC SCHEDULES
WATER COOLED CHILLER SCHEDULE
TAG No. MODEL No. TYPEMANUFACTURER
EWT °F
CHILLED WATER DATA ELECTRICAL DATA
HZVOLTS PH
WEIGHT
(LBS) REMARKSMOCPMCALWT °F GPM WPD (FT) EWT °F LWT °F GPM- CONDENSER FLUID TYPE
COOLING TOWER WATER DATA
CH-1 YORK YKCPCKQ6 WATER COOLED 55 45 837.5 17.1 85 94.2 1050 WATER 460 3 60 317 500 16,618 --
TOTAL COOLING
TONNAGE
WPD (FT)
15.6
REFRIG.
R-134A
FOR PIPE DIA. (INCHES)
2"-2 1/2"
INSULATION WALL THICKNESS (INCHES)
FITTING INSULATION TYPELOCATION INSULATION TYPE RUNOUTS < 1 1/2" 3"-6"
PIPE INSULATION SCHEDULE
ZESTON
CHILLED WATER
SUPPLY & RETURN
PIPING
FIBERGLASS WITH ALL
SERVICE JACKET TO MATCH EXISTING
ABOVE GROUND
PIPE MATERIAL TABLE
CHILLED WATER
2-1/2" AND SMALLER
3" AND LARGER
TYPE "L" SEAMLESS COPPER TUBING
SCHEDULE 40 SEAMLESS BLACK
STEEL
WROUGHT COPPER
SCHEDULE 40 SEAMLESS BUTT
WELDED
SWEAT SOLDER
WELDED
SERVICE LOCATION PIPING FITTINGS JOINTS
TYPE "K" SEAMLESS COPPER TUBING
SCHEDULE 40 SEAMLESS BLACK STEEL 3" AND LARGER
CONDENSER WATER
OR SWEAT SOLDER
SCHEDULE 40 SEAMLESS
WROUGHT COPPER, PRESSURE FITTING
OR WELDED
2-1/2" AND SMALLER
MECHANICAL CONNECTION
MECHANICAL CONNECTION
SA = SUPPLY AIR
RPM = REVOLUTIONS PER MINUTE
SD = SUPPLY AIR DIFFUSER
SEN = SENSIBLE
SR = SUPPLY REGISTER
TSP = TOTAL STATIC PRESSURE
TYP = TYPICAL
VAV = VARIABLE AIR VOLUME TERMINAL UNIT
VD = MANUAL VOLUME DAMPER
W = WATT OR WIDE
WB = WET BULB
WC = WATER COLUMN
WG = WATER GAUGE
SP = STATIC PRESSURE
TA = TRANSFER AIR
TR = TRANSFER REGISTER
CONNECT TO EXISTING
IN = INCH
LD = LINEAR DIFFUSER
HWS = HOT WATER SUPPLY
LRA = LOCKED ROTOR AMPS
LVG = LEAVING
MBH = THOUSAND BTUH
LWT = LEAVING WATER TEMPERATURE
RA = RETURN AIR
RG = RETURN GRILLE
RLA = RUNNING LOAD AMPS
PH = PHASE (ELECTRICAL)
R = RETURN
NTS = NOT TO SCALE
OA = OUTSIDE AIR
EA = EACH "OR" EXHAUST AIR
EAT = ENTERING AIR TEMPERATURE
ESP = EXTERNAL STATIC PRESSURE
F = FAHRENHEIT
FC = FLEXIBLE CONNECTOR
FPM = FEET PER MINUTE
FPS = FEET PER SECOND
FT = FEET
HP = HORSEPOWER
EWT = ENTERING WATER TEMPERATURE
EXIST'G = EXISTING
GA = GAGE
FTR = FIN TUBE RADIATION
HWR = HOT WATER RETURN
HZ = FREQUENCY (CYCLES PER SECOND)
LAT = LATENT "OR" LEAVING AIR TEMPERATURE
HVAC ABBREVIATIONS
AFF = ABOVE FINISHED FLOOR
AMP = AMPERE
APD = AIR PRESSURE DROP
ATC = AUTOMATIC TEMPERATURE CONTROL
AV = AIRVENT
BTU = BRITISH THERMAL UNIT
BTUH = BTU PER HOUR
CFM = CUBIC FEET PER MINUTE
DB = DRY BULB
DIA = DIAMETER
DIFF = DIFFERENCE OR DELTA
DN = DOWN
DEG = DEGREE
HVAC LEGEND
CO = CLEAN OUT
LPS = LOW PRESSURE STEAM
LPC = LOW PRESSURE CONDENSATE
KH = KITCHEN HOOD
DW = DISHWASHER RR = RETURN AIR REGISTER
HVAC SPECIFICATIONS
KE(F) = KITCHEN EXHAUST (FAN)
PC = PUMPED CONDENSATE
CWR = CONDENSER WATER RETURN
CWS = CONDENSER WATER SUPPLY
MUA = MAKE UP AIR
ACD = AUTOMATIC CONTROL DAMPER
FS = FLOW STATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. THE WORK UNDER THIS SECTION SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, LABOR, EQUIPMENT AND SUPPLIES AND THE PERFORMANCE OF ALL OPERATIONS TO PROVIDE COMPLETE WORKING SYSTEMS AS INDICATED ON THE CONTRACT DRAWINGS.
B. FURNISH, SET UP AND MAINTAIN ALL DERRICKS, HOISTING MACHINERY, SCAFFOLDS, STAGING AND PLANKING AS REQUIRED FOR THE
WORK.
1.02 CODES, ORDINANCES, AND PERMITS: INSTALLATION OF SYSTEMS AND EQUIPMENT PROVIDED UNDER THIS SECTION SHALL BE DONE IN STRICT ACCORDANCE WITH MASSACHUSETTS DEPARTMENT OF PUBLIC SAFETY CODES, MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION, MASSACHUSETTES STATE BUILDING CODE AND TOWN REGULATIONS HAVING JURISDICTION.
1.04 RECORD DRAWINGS: FURNISH UPON COMPLETION OF ALL WORK, RECORD DRAWINGS OF THE WORK OF THIS SECTION.
1.05 SHOP DRAWINGS: PROVIDE SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL OF ALL EQUIPMENT, MATERIALS SPECIFIED AND AUTOMATIC
TEMPERATURE CONTROLS.
1.06 OPERATING AND MAINTENANCE INSTRUCTIONS: FURNISH UPON COMPLETION OF ALL WORK, OPERATION AND MAINTENANCE DATA FOR ALL
EQUIPMENT PROVIDED UNDER THIS SECTION.
1.07 CUTTING AND PATCHING: ALL CUTTING AND PATCHING NECESSARY FOR THE PROPER INSTALLATION OF WORK TO BE PERFORMED UNDER THIS
SECTION AND SUBSECTIONS SHALL BE PERFORMED BY THE CONTRACTOR.
1.08 SEISMIC RESTRAINT REQUIREMENTS: ALL WORK INDICATED ON THESE DRAWINGS SHALL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF THE MASSACHUSETTS STATE BUILDING CODE, 780 CMR, 8TH EDITION, AND REFERENCED REQUIREMENTS OF NFPA.
PART 2 - PRODUCTS
2.01 INSULATION
PROVIDE INSULATION FOR PIPING AS SCHEDULED
2.02 EQUIPMENT
PROVIDE ALL EQUIPMENT WITH ACCESSORIES AS SCHEDULED.
2.03 PIPING
A. PROVIDE PIPING MATERIALS AND SIZES AS SHOWN ON THE SCHEDULE AND CALLED OUT ON PLANS
2.04 AUTOMATIC TEMPERATURE CONTROL
A. REFER TO THE BASE-BUILDING DRAWINGS FOR ALL CONTROLS.
PART 3 - EXECUTION
3.01 GENERAL:
A. INSTALL ALL ITEMS SPECIFIED UNDER PART 2 - PRODUCTS, ACCORDING TO THE APPLICABLE MANUFACTURER'S RECOMMENDATIONS AND SHOP DRAWINGS, THE DETAILS SHOWN ON THE DRAWINGS AND AS SPECIFIED UNDER THIS
SECTION. PROVIDE ALL REQUIRED HANGERS AND SUPPORTS.
3.02 EQUIPMENT
A. EQUIPMENT SHALL BE INSTALLED COMPLETE WITH ALL REQUIRED HANGERS AND SUPPORTS IN ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
B. FURNISH AND INSTALL ALL STEEL STRUCTURAL SUPPORT MEMBERS FOR PROPER HANGING AND SUPPORT OF EQUIPMENT. PROVIDE
VIBRATION ISOLATION ON ALL HANGERS.
C. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3.03 MISCELLANEOUS IRON AND STEEL:
A. PROVIDE STEEL SUPPORTS AND HANGERS REQUIRED TO SUPPORT EQUIPMENT, DUCTWORK, AND OTHER EQUIPMENT OR MATERIALS.
SUBMIT DETAILS OF STEEL SUPPORTS AND METHOD OF FABRICATION FOR APPROVAL.
3.04 BALANCING:
THE HVAC CONTRACTOR SHALL ENGAGE THE SERVICES OF AN INDEPENDENT FIRM TO PERFORM ADJUSTING AND BALANCING OF THE HVAC SYSTEMS (WATER). SYSTEMS SHALL BE ADJUSTED AND BALANCED SO THAT WATER FLOW RATES ARE AS INDICATED ON THE DRAWINGS. AFTER COMPLETION OF THE TESTING, BALANCING AND ADJUSTING OF THE WATER SYSTEMS, A BALANCING REPORT SHALL BE SUBMITTED TO THE
ENGINEER FOR APPROVAL.
A. PRIOR TO BALANCING A SAMPLE REPORT SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL. REPORT SHALL INCLUDE THE
FOLLOWING:
A.A. CONDENSER WATER FLOW
A.B. CHILLED WATER FLOW
B. HYDROSTATIC TESTING SHALL BE COORDINATED BY THE CONTRACTOR AND SHALL BE WITNESSED BY A BUILDING OWNER'S
REPRESENTATIVE.
C. THE CONDENSER AND CHILLED WATER SYSTEM WILL BE HYDROSTATICALLY TESTED WITH WATER AT 1-1/2 TIMES THE WORKING
PRESSURE FOR A MINIMUM PERIOD OF TWO HOURS, WITH NO LEAKS.
3.05 COMMISSIONING: THE OWNER SHALL ENGAGE THE SERVICES OF AN INDEPENDENT FIRM TO COMMISSION THE HVAC SYSTEMS
6. INSTALL ALL WORK IN ACCORDANCE WITH STATE AND LOCAL CODES.
7. DO NOT SCALE THESE DRAWINGS. TAKE ALL MEASUREMENTS IN THE FIELD
IN COORDINATION WITH ALL EQUIPMENT AS APPROVED AND WITH ALL OTHER
1. ALL PIPING AND DUCTWORK SHOWN IS DIAGRAMMATIC ONLY. DETERMINE
2. REVIEW ALL DRAWINGS BEFORE STARTING WORK TO BECOME FAMILIAR WITH
THE DETAILS OF CONSTRUCTION, AND COORDINATE WITH OTHER TRADES
3. OBTAIN ALL REQUIRED PERMITS AND PAY ALL FEES RELATED TO SAME.
4. PROVIDE ALL NECESSARY PIPING, EQUIPMENT AND SUPPORTS AS WELL AS ANY
ADDITIONAL EQUIPMENT, ETC. NOT SHOWN ON THE DRAWINGS OR CALLED FOR
5. PROVIDE ACCESS TO ALL EQUIPMENT REQUIRING PERIODIC SERVICE AND
IN THE SPECIFICATIONS BUT NECESSARY TO PROVIDE COMPLETE AND
ALL ROTATING EQUIPMENT SHALL HAVE FLEXIBLE PIPE ON DUCT CONNECTIONS
PROVIDE VERTICAL SUPPORTS FOR PIPING AT THE
MAXIMUM INTERVALS INDICATED IN THE SPECIFICATIONS.
TRADES.
AND APPROVED VIBRATION ISOLATORS.
9.
HVAC GENERAL NOTES
MAINTENANCE.
THE EXACT LOCATION IN THE FIELD.
TO ELIMINATE CONFLICTS.
WORKABLE SYSTEMS.
8.
1. CONTRACTOR SHALL VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED
OBSERVERS.
2. PRIOR TO COMMENCING WORK OF THIS SECTION, EXAMINE SITE AND CONDITIONS UNDER WHICH WORK WILL BE PERFORMED. DETERMINE EXACT LOCATIONS OF EXISTING EQUIPMENT, PIPING AND CONTROLS. REPORT TO OWNER ANY CONDITIONS THAT MIGHT ADVERSELY AFFECT WORK. COMMENCEMENT OF WORK SHALL BE
CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS AND PREPARATORY WORK.
3. ABANDONING OF DUCTWORK, PIPING OR EQUIPMENT IN PLACE SHALL NOT BE ALLOWED. COMPLETE REMOVAL
REQUIRED UNLESS NOTED OTHERWISE.
4. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP REMAINING
PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL.
5. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND CAP REMAINING
DUCTS WITH SAME OR COMPATIBLE DUCTWORK MATERIAL.
6. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT.
7. EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT
AND DELIVER TO OWNER.
8. COMPLY WITH ALL STATE AND LOCAL CODES AS TO REMOVAL AND DISPOSAL OF EQUIPMENT REMOVED FROM
THE SITE.
9. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE DEMOLITION.
10. REMOVE PREVIOUSLY ABANDONED WORK IN THE WAY OF EXISTING CONSTRUCTION, OR AS NOTED.
11. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
12. COMPLY WITH ANSI A10.6 AND NFPA 241.
13. PERMITS: GIVE ALL REQUIRED NOTICES, FILE ALL REQUIRED PLANS AND SPECIFICATIONS RELATING TO THE WORK OF THIS SECTION WITH THE PROPER AUTHORITIES AND PAY FOR ANY REQUIRED PERMITS.
14. ALL AIR-CONDITIONING EQUIPMENT AND SYSTEMS SHALL BE REMOVED DEMOLISHED WITHOUT RELEASING REFRIGERANTS. REFRIGERANT RECOVERY IS TO BE PERFORMED BY A REFRIGERANT RECOVERY TECHNICAL
CERTIFIED BY AN EPA-APPROVED CERTIFICATION PROGRAM.
15. ALL EQUIPMENT AND SYSTEMS TO BE REMOVED OR DEMOLISHED UNDER THIS SECTION AND NOT DESIRED BY OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE ALL SUCH
EQUIPMENT FROM THE SITE PROMPTLY AFTER DETACHMENT FROM BUILDING STRUCTURE.
16. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.
17. IT IS UNKNOWN WHETHER HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY
NOTIFY ARCHITECT AND OWNER.
18. EXISTING PIPING SHOWN ON DRAWINGS DOES NOT INDICATE FULL EXTENT OF PIPING DEMOLITION. FIELD
VERIFICATIONS REQUIRED.
HVAC DEMOLITION NOTES
PIPE UP
BRANCH CONNECTION
RUN-OUT OFF BOTTOM
RUN-OUT OFF TOP
PIPE OFF TOP
PIPE OFF BOTTOM
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CWS CONDENSER WATER SUPPLY
CWR CONDENSER WATER RETURN
CHWR
CHWS
PIPING TO BE REMOVED
GATE VALVE (GV)
ISOLATION VALVE (ISV), REFER TO DETAILS & SPEC.
GLOBE VALVE (GLV)
BALL VALVE (BLV)
DRAIN VALVE (DV)
LIFT CHECK VALVE (LCV)
UNION (U)
FLANGE (FLG)
IN-LINE STRAINER
ECCENTRIC REDUCER/ENLARGER (ERD)
CONCENTRIC REDUCER/ENLARGER (CRD)
THERMOMETER (TRM)
PRESSURE GAUGE (PG)
PIPE ANCHOR (AN)
FLOW MEASURE STATION (FMS)
PIPE GUIDE (PG)
EXPANSION COMPENSATOR (EC)
PIPE FLEXIBLE CONNECTION (PFC)
PIPE CAP
STRAINER W/ DRAIN VALVE AND CAP
HOSE END DRAIN VALVE
CONTROL VALVE
MODULATING CONTROL VAVLE
MODULATING 3-WAY CONTROL VALVE
SWING CHECK VALVE
BUTTERFLY VALVE
PRESSURE REGULATOROR
311 Great Road, Post Office Box 1551 www.blwengineers.com T: 978.486.4301 F: 978.428.0067
Littleton, Massachusetts 01460
BLW Engineers, Inc.
HVAC * ELECTRICAL * PLUMBING * FIRE PROTECTION
Stamp:
Project Description:
Project:
Project No.: 21522.00
Drawing No.:
Title:
Date:
Scale:
Checked By:
Drawn By:
Revisions:
No. Issue Date
Replace Tecogen Chiller with Electric Chiller.
Project Number CSS#25586
B A
R N
ES
B
U
IL
D
IN
G (M
A
SU
M
M
ER
S
TR
EE
T
B O
ST
O
N , M
A
2.16.2022
JP
JP
MECHANICAL
LEGEND,
SPECIFICATIONS, &
SCHEDULES
M0.1
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text B
10"CHWR
"C
HW
R
"C
HW
R
10"CHWR
"C
HW
S
10"CHWS
8"
CH
W R
10"CWS
8"CWS
8"CWS
8"
CW
S
10"CWS
8"CWS
8"CWS
"C
W S
10"CWR 10"CWR
"C
W R
8"CWS
8"CWR
10"CWS
14"CWR
8"CWS
8"CHWS
8"CWR
3/4"RV
TO HEADER
1-1/4"RV
TO HEADER
1-1/2"CD
EXISTING
STEAM PIPE
4"HPS
8"CHWR
8"CHWS
BLIND
FLANGE.
(TYPICAL)
10"CHWR
8"CHWR
1"RV
TO HEADER
EXISTING BOILER STACK
20"X25"
30"X20"
EXISTING LOUVER
ACD
22"X20" 26"X16"
2"CHWS&R
1"RV
TO HEADER
8"CHWS
ACD
3/4"RV
TO
HEADER
8"CHWS
EXISTING 3" REFRIGERANT
RELIEF HEADER.
8"
CH
W S
80"X24 DUCT RISER UP
TO EXISTING WALL
LOUVER.
8" COMBUSTION AIR
PIPES
ANCHOR CHIMNEY
EXHAUST
EXISTING EXPANSION
TANK
10" BF VALVE AND
BLIND FLANGE FOR
TEMP COOLING
CONNECTION
EXISTING SUPPLY
FAN.
EXISTING
EXHAUST FAN.
EXISTING PUMP. EXISTING PUMP. EXISTING PUMP.
EXISTING
GAS-FIRED
CHILLER
EXISTING
ELECTRIC
CHILLER
EXISTING PUMP.
EXISTING PUMP.
1 DEMO CONDENSER WATER PIPING BACK
TO EXISTING BUTTERFLY VALVE.
2 DEMO CHILLED WATER PIPING BACK TO
EXISTING BUTTERFLY VALVE.
3 REMOVE CHILLER EXHAUST PIPING AND
ALL ASSOCIATED COMPONENTS.
4 REMOVE CHILLER COMBUSTION PIPING
AND ALL ASSOCIATED COMPONENTS.
5 REMOVE CHILLER ALL ASSOCIATED
COMPONENTS.
DEMOLITION NOTES
HATCHED AREAS TO BE DEMOLISHED
TO EXTENT INDICATED ON
DRAWINGS. (TYP.)
SCALE: 1/4"=1'-0"1 Chiller Mechanical Equipment Room Demolition Part-Plan
311 Great Road, Post Office Box 1551 www.blwengineers.com T: 978.486.4301 F: 978.428.0067
Littleton, Massachusetts 01460
BLW Engineers, Inc.
HVAC * ELECTRICAL * PLUMBING * FIRE PROTECTION
Stamp:
Project Description:
Project:
Project No.: 21522.00
Drawing No.:
Title:
Date:
Scale:
Checked By:
Drawn By:
Revisions:
No. Issue Date
Replace Tecogen Chiller with Electric Chiller.
Project Number CSS#25586
B A
R N
ES
B
U
IL
D
IN
G (M
A
SU
M
M
ER
S
TR
EE
T
B O
ST
O
N , M
A
2.16.2022
JP
JP
MECHANICAL
DEMOLITION
FLOOR PLAN
M1.0
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
10"CHWR
"C
HW
R
"C
HW
R
10"CHWR
"C
HW
S
10"CHWS
8"
CH
W R
10"CWS
8"CWS
8"CWS
8"
CW
S
10"CWS
8"CWS
8"CWS
"C
W S
10"CWR 10"CWR
"C
W R
8"CWS
8"CWR
10"CWS
14"CWR
8"CWS
8"CHWS
8"CWR
TO CHILLER
3/4"RV
TO HEADER
1-1/4"RV
TO HEADER
1-1/2"CD
EXISTING
STEAM PIPE
4"HPS
8"CHWR
8"CHWS
BLIND
FLANGE.
(TYPICAL)
10"CHWR
8"CHWR
EXISTING BOILER STACK
20"X25"
30"X20"
EXISTING LOUVER
ACD
22"X20" 26"X16"
2"CHWS&R
1"RV
TO HEADER
8"CHWS
ACD
8"CHWS
EXISTING 3" REFRIGERANT
RELIEF HEADER.
8"
CH
W S
80"X24 DUCT RISER UP
TO EXISTING WALL
LOUVER.
EXISTING EXPANSION
TANK
10" BF VALVE AND
BLIND FLANGE FOR
TEMP COOLING
CONNECTION
EXISTING SUPPLY
FAN.
EXISTING
EXHAUST FAN.
EXISTING PUMP. EXISTING PUMP. EXISTING PUMP.
EXISTING
ELECTRIC
CHILLER
EXISTING PUMP.
EXISTING PUMP.
CH
8"CHWR
8"CHWS
8"CWS
TO CHILLER 8"CHWS DN.
TO CHILLER.
8"CHWR DN.
TO CHILLER.
PIPE INSTALLED
ABOVE CHILLER.
SCALE: 1/4"=1'-0"1 Chiller Mechanical Equipment Room Part-Plan
311 Great Road, Post Office Box 1551 www.blwengineers.com T: 978.486.4301 F: 978.428.0067
Littleton, Massachusetts 01460
BLW Engineers, Inc.
HVAC * ELECTRICAL * PLUMBING * FIRE PROTECTION
Stamp:
Project Description:
Project:
Project No.: 21522.00
Drawing No.:
Title:
Date:
Scale:
Checked By:
Drawn By:
Revisions:
No. Issue Date
Replace Tecogen Chiller with Electric Chiller.
Project Number CSS#25586
B A
R N
ES
B
U
IL
D
IN
G (M
A
SU
M
M
ER
S
TR
EE
T
B O
ST
O
N , M
A
2.16.2022
JP
JP
MECHANICAL
NEW WORK
FLOOR PLAN
M2.0
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
ROOFLINE
"C
W S
"C
W R
TITITTTE TTTE
VALVE
POSITION
DO
FCV
ZAC ZAO
10"CWS
10"CWR 10"CWR
10"CWS
"C
W S
TITTTE
TI
TT
TE
TI TT TE
8"
CW
R 8"
CW
R PDSL
DI
CW FLOW SWITCH
HARDWIRE TO CH-2
STARTER
VALVE
POSITION
FY AO
I/P
PI
TI
FCV
8"
CW
S
PI
TI
PDI
DIFF. PRESSURE
PDT
2"D TO SANITARY
2"
EXISTING 350 TON ELECTRIC
MOTOR DRIVEN CHILLER
2 PASS CONDENSER: 1050 GPM, 18.5' HD
85°F EWT, 94.33°F LWT
CH
BLOW DPWM SOLENOID VALVE.
WIRE TO NEW CONDUCTIVITY/PH
CONTROLLER. INITIALLY BALANCE
LINE TO 10 GPM.CONNECT DOWNSTREAM
OF EXISTING BACKFLOW
PREVENTER.
CONNECT DOWNSTREAM
OF EXISTING COOLING
TOWER MU SOLENOID
VALVE
WATER METER
PRV. SET @ 12 PSIG.
10"CWS
1/2" 1/2"
"C
W S
1/2"D TO
SANITARY
1/2"1/2" CHEMICAL
FEED
2"MU2" MU
"C
W R
PIPI
1"BYPASS
1"BYPASS
1"MUM2" MU
PI
TI
P
40 HP
1130 GPM
100' HD
S/S
HOA HOA
CURRENT
8"CWS
2" D
2" D
2" D
M
HS
HS ZS
IIIT
2"D TO SANITARY
8"CWS
PI
TI
P
40 HP
1130 GPM
100' HD
S/S
HOA HOA
CURRENT
8"CWS
2" D
2" D
2" D
M
HS
HS ZS
IIIT
2"D TO SANITARY
8"CWS
1/4"D TO
SANITARY
8"
CW
S
1- 1/4
"D
S
TI
TT
TE
8"
CW
R 8"
CW
R PDSL
CW FLOW SWITCH
HARDWIRE TO CH-1
STARTER
PI
TI
8"
CW
S
PI
TI
PDI
DIFF. PRESSURE
PDT
3/4"D TO
SANITARY
3/4"
NEW 350 TON ELECTRIC
MOTOR DRIVEN CHILLER
2 PASS CONDENSER: 1050 GPM, 15.6' HD
85°F EWT, 94.2°F LWT
14" CWS FROM COOLING TOWER 14" CWR TO COOLING TOWER
SCALE: NTS1 Condenser Water Flow Schematic & Piping Diagram
NEW WORK
EXISTING ISOLATION
VALVE TO REMAIN
EXISTING ISOLATION
VALVE TO REMAIN
PROVIDE NEW
CONTROL VALVE.
311 Great Road, Post Office Box 1551 www.blwengineers.com T: 978.486.4301 F: 978.428.0067
Littleton, Massachusetts 01460
BLW Engineers, Inc.
HVAC * ELECTRICAL * PLUMBING * FIRE PROTECTION
Stamp:
Project Description:
Project:
Project No.: 21522.00
Drawing No.:
Title:
Date:
Scale:
Checked By:
Drawn By:
Revisions:
No. Issue Date
Replace Tecogen Chiller with Electric Chiller.
Project Number CSS#25586
B A
R N
ES
B
U
IL
D
IN
G (M
A
SU
M
M
ER
S
TR
EE
T
B O
ST
O
N , M
A
2.16.2022
JP
JP
MECHANICAL
CONDENSER WATER
FLOW SCHEMATIC
M3.0
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
TE
TT TI
10"CHWS
"C
HW
R
"C
HW
R
10"CHWR 10"CHWR
2" 2"
2"D TO FLOOR
DRAIN
PDT
PDI
DIFF.
PRESSURE
8"CHWR
PI
TI
PDSL
CHW
FLOW
SW
DI
HARDWIRE TO CH-2
CONTROL PANEL
PI
TI
TE TT TI
FCV
VALVE
POSITION
FY AO
I/P
8"
CH
W R
8"
CH
W S
EXISTING 350 TON ELECTRIC
MOTOR DRIVEN CHILLER
2 PASS EVAPORATOR: 840 GPM, 16.4 HD
55°F EWT, 45°F LWT
1/4 "R
LF
1/4 "R
LF
3/4 "R
LF
3/4 "R
LF
1"
RL
F
2"RLF 2"RLF 3"RLF
3"
RL
F
EXTERIOR
WALL
DRIP LEG SEIZED
TO HOLD 1
GALLON
CAPPED
REFRIGERANT
SERVICE DRAIN
VALVE MAX 5 FT
AFF
1/4 "R
LF
1/4 "R
LF
1"
RL
F
1"
RL
F
1"
RL
F
CH
EXISTING
CHILLER
3/4"D TO FLOOR
DRAIN
PDT
PDI
DIFF.
PRESSURE
8"CHWR
PI
TI
PDSL
CHW
FLOW
SW
HARDWIRE TO CH-1
CONTROL PANEL
PI
TI
8"
CH
W R
8"
CH
W S
NEW 350 TON ELECTRIC
MOTOR DRIVEN CHILLER
2 PASS EVAPORATOR: 837 GPM, 17.1 HD
55°F EWT, 45°F LWT
CH
SCALE: NTS2 Chilled Water Flow Schematic & Piping Diagram
SCALE: NTS1 Refrigerant Relief Flow Schematic
EXISTING ISOLATION
VALVE TO REMAIN
EXISTING ISOLATION
VALVE TO REMAIN
EXISTING CONTROL
VALVE TO REMAIN
3/4"
NEW WORK
NEW WORK
311 Great Road, Post Office Box 1551 www.blwengineers.com T: 978.486.4301 F: 978.428.0067
Littleton, Massachusetts 01460
BLW Engineers, Inc.
HVAC * ELECTRICAL * PLUMBING * FIRE PROTECTION
Stamp:
Project Description:
Project:
Project No.: 21522.00
Drawing No.:
Title:
Date:
Scale:
Checked By:
Drawn By:
Revisions:
No. Issue Date
Replace Tecogen Chiller with Electric Chiller.
Project Number CSS#25586
B A
R N
ES
B
U
IL
D
IN
G (M
A
SU
M
M
ER
S
TR
EE
T
B O
ST
O
N , M
A
2.16.2022
JP
JP
MECHANICAL
CHILLED WATER
FLOW SCHEMATIC
M4.0
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text C
| 2022-04-06T09:19:56-0400 | |
| ROSENBERG.LEWIS.AARON.1260664359 |
File details come from the government source that posted it. Updated .