W15QKN21R0005.pdf
PDF 205 KB Posted
- Solicitation number
- W15QKN-21-R-0005
About this file
This is a request for proposal issued by the U.S. Army Contracting Command - New Jersey on behalf of the Office of the Project Manager, Maneuver Ammunition Systems for the production of 9mm M1041 marking ammunition. The ammunition will be used in the M9 and M11 pistols, M4 Carbine, and future M17 and M18 Modular Handgun Systems with the Close Combat Mission Capability Kit, which allows low-velocity marking rounds to be fired from these weapons at short ranges. The marking rounds must leave a visible blue or red marking on targets without penetrating clothing or protective equipment. The contractor will manufacture, test, inspect, package, and deliver the ammunition in accordance with Military Performance Specification MIL-PRF-32312 and associated drawings. The solicitation anticipates a single award of an indefinite delivery/indefinite quantity contract with a minimum value of $750,000 over five one-year ordering periods. Offerors must submit responses by the specified due date to arrange delivery to the contracting office.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W15QKN-21-R-0005
X
2020OCT23
2020NOV2303:00pm
DOA6
2020OCT23 SEE SCHEDULE
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
DAVID SCHUTZER
(973)724-4065
CCNJ-MC
DAVID.E.SCHUTZER.CIV@MAIL.MIL
1 84
X 1
X 5 X 13
X 20 X 22 X 23
X 28
X 31
X 50
X 51
X 61
X 78
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DAVID SCHUTZER
Buyer Office Symbol/Telephone Number: CCNJ-MC/(973)724-4065
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Executive Summary_________________
This executive summary highlights some of the important features of this solicitation. If conflicts exist between this summary and the provisions of the solicitation, the provisions of the solicitation govern.
1. Introduction: The US Army Contracting Command - New Jersey, Picatinny Arsenal, NJ in support of Project Manager - Maneuver Ammunition _____________
Systems (PM-MAS), hereby issues a Request for Proposal (RFP) for the 9mm M1041 Practice Ammunition Cartridges for use in the M9 & M11
Pistols, M4 Carbine and eventual use in the M17 and M18 Modular Handgun Systems. Marking rounds (blue/red) will be used with the Close
Combat Mission Capability Kit (CCMCK). The CCMCK is a user installed temporary weapon conversion system that allows for the solider to employ an individual weapon (M9, M11 and M4) at a minimum engagement distance of five feet using low velocity marking ammunition while precluding the weapon from firing standard service ammunition. The marking ammunition shall be a reduced-energy, non-lethal cartridge, that leaves a bright, water-soluble color marking compound on target upon impact, without penetrating the soldier Army Combat Uniform
(ACI) or Personal Protective Equipment(PPE). The visible impact left by the marking compound allows for an accurate assessment of simulated lethality and shot placement.
The ammunition shall meet all requirements outlined in Performance Specification MIL-PRF-32312. The ammunition shall also be compatible with the current US Army qualified CCMCK weapon conversion system for the M9 and M11, and for the CCMCK Simunition Upper Receiver
Conversion Kit system for the M4 Carbine. The National Stock Number (NSN) for the 9mm M9 weapon CCMCK conversion kit is 1005-20-003-
2362. The NSN for the M11 weapon CCMCK conversion kit is 1005-20-003-2361. The NSN for the M4 Carbine CCMCK Simunition Upper Receiver
Conversion Kit is 1005-01-454-9283.
2. Acquisition Strategy: The acquisition strategy is to award one (1) new Firm Fixed Price (FFP) Indefinite Delivery/Indefinite ____________________
Quantity (ID/IQ) delivery order contract for five (5) one (1) year ordering periods. The contract award will be based upon Full and Open
Competition (F&OC) in accordance with FAR 6.102(b), and will cover production for Fiscal Years (FY) 2021-2026 requirements.
The contract minimum guarantee is $750,000.00, and the total maximum dollar amount for all delivery orders placed under this contract is
$49,508,333.00.
Delivery schedules for delivery orders will be determined for each individual delivery order based upon the Government's requirements, however, there will be a five (5) year ordering period from date of award.
Ordering Period 1: 12 months from date of contract award.
Ordering Period 2: 12 months from end of Ordering Period 1.
Ordering Period 3: 12 months from end of Ordering Period 2.
Ordering Period 4: 12 months from end of Ordering Period 3.
Ordering Period 5: 12 months from end of Ordering Period 4.
3. Format of the Solicitation: Clauses and provisions that are applicable to the item are located in the appropriate sections of the ___________________________ solicitation document. In order to have a complete copy of the solicitation, you will need to download the entire solicitation document;
inclusive of all applicable sections, all applicable attachments and all applicable amendments, if any.
4. Security Requirements: This solicitation is UNCLASSIFIED. The contractor shall be capable of handling, receiving and storing ______________________ documents, equipment and test items at a security classification of UNCLASSIFIED.
5. Limited Distribution Data Information Instructions: ___________________________________________________
The following documents are labeled Distribution Statement D:
MIL-PRF-32312, Cartridge, 9 Millimeter: Dye, Marking - M041 (Attachment 0001)
MIL-PRF-31000, Technical Data Package List (TDPL) and Drawings (Attachment 0002)
To obtain these documents, offerors are required to submit a fully executed Non-Disclosure and Non Use Agreement, an AMSTA-AR 1350 -
Technical Data Request Questionnaire and a DD 2345 Military Critical Technical Agreement and all of which are included as attachments to this Request for Proposal (RFP). The handling/destroying of Unclassified/Limited Distribution documents shall be handled using the same standard as "For Official Use Only (FOUO)" material, and shall be destroyed by any method that will prevent disclosure of contents or
2 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
reconstruction of the document.Technical data that is export-controlled must be marked with the following destruction notice:
DESTRUCTION NOTICE - For classified documents, follow the procedures in DoD 5220.22-M, Industrial Security Manual, Section 11-19 or DoD
5200.1-R, Information Security Program Regulation, Chapter IX. For unclassified, limited documents, destroy by any method that will prevent disclosure of content or reconstruction of the document.
All technical documents that are determined to contain export-controlled technical data shall be marked "WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export
Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25." When it is technically infeasible to use the entire statement, an abbreviated marking may be used, and a copy of the full statement added to the "Notice to Accompany Release of
Export-Controlled Data" required by DoD Directive 5230.25.
6. Arms Ammunition and Explosives (AA&E):
In addition to the information submitted under 52.215-6, the contractor shall provide the following information for all facilities and subcontractors (at any tier) facilities that will be performing AA&E work under this contract:
Contractor Name | Contractor Address | CAGE Code | Component/Work being done.
Upon receipt of this information a Pre-Award Safety and Security Survey will be requested.
*** END OF NARRATIVE A0001 ***
GENERAL INFORMATION TO OFFERORS OR QUOTERS__________________________________________
1. Responses must set forth full, accurate and complete information as required by this solicitation (including attachments). Fill-ins are provided on Standard Form (insert form numbers), and other solicitation documents. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S.C. 1001.
2. Responses must be plainly marked with the Solicitation Number and the date and local time set forth for bid opening or receipt of proposals in the solicitation document.
3. Information regarding the timeliness of response is addressed in the provision of the solicitation entitled either Late Submission, Modification and Withdrawal of Bid or Instructions to Offerors Competitive Acquisitions.
4. Procurement Information (use one of the below in your solicitation)
_X_ This Procurement is unrestricted (use if soliciting Full and Open Competition)
__ This Procurement is % set-aside for (enter Small Business or other Socio-Economic Program). The applicable SIC/NAICS codes are:
332992.
__ This Procurement is being solicited using Other Than Full and Open Competition in accordance with Title 10 U.S.C. 2304(c) (insert number) as implemented by FAR 6.302- (insert J&A authority).
5. Issuing Office
U.S. Army Contracting Command - New Jersey
ATTN: Stephanie G. Kless
Office Symbol: CCNJ-MC
Picatinny Arsenal, NJ 07806-5000
Email:stephanie.g.kless.civ@mail.mil
6. Point of Contact for Information:
Name: David E. Schutzer ____________________
Title: Contract Specialist _____________________
Email: david.e.schutzer.civ@mail.mil _____________________________
Phone: 973-724-4065 ____________
3 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Name: Stephanie G. Kless __________________
Title: Contract Officer __________________
Email: stephanie.g.kless.civ@mail.mil ______________________________
Phone: 973-724-6671 ____________
DISCLOSURE OF UNIT PRICE INFORMATION
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial
Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5
USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.
*** END OF NARRATIVE A0002 ***
4 84
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 9MM MARKING, M1041 (BLUE/RED) OP1 $ _________________________________ __________________
See Range Pricing
COMMODITY NAME: AC36 & AC37 LEAD FREE
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
75000 750000 $
750001 1500000 $
1500001 2500000 $
2500001 4500000 $
4500001 7000000 $
PSC: 1305
Blue (AC36)
NSN: 1305-01-536-7721
Red (AC37)
NSN: 1305-01-536-7722
Ordering Period 1 (OP1) will be 12 months from date of base award.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0002 9MM MARKING, M1041 (BLUE/RED) OP2 $ _________________________________ __________________
See Range Pricing
COMMODITY NAME: AC36 & AC37 LEAD FREE
5 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
75000 750000 $
750001 1500000 $
1500001 2500000 $
2500001 4500000 $
4500001 7000000 $
PSC: 1305
Blue (AC36)
NSN: 1305-01-536-7721
Red (AC37)
NSN: 1305-01-536-7722
Ordering Period 2 (OP2) will be 12 months from the end of OP1.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0003 9MM MARKING, M1041 (BLUE/RED) OP3 $ _________________________________ __________________
See Range Pricing
COMMODITY NAME: AC36 & AC37 LEAD FREE
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
75000 750000 $
750001 1500000 $
1500001 2500000 $
6 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
2500001 4500000 $
4500001 7000000 $
PSC: 1305
Blue (AC36)
NSN: 1305-01-536-7721
Red (AC37)
NSN: 1305-01-536-7722
Ordering Period 3 (OP3) will be 12 months from the end of OP2.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0004 9MM MARKING, M1041 (BLUE/RED) OP4 $ _________________________________ __________________
See Range Pricing
COMMODITY NAME: AC36 & AC37 LEAD FREE
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
75000 750000 $
750001 1500000 $
1500001 2500000 $
2500001 4500000 $
4500001 7000000 $
PSC: 1305
Blue (AC36)
NSN: 1305-01-536-7721
7 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Red (AC37)
NSN: 1305-01-536-7722
Ordering Period 4 (OP4) will be 12 months from the end of OP3.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0005 9MM MARKING, M1041 (BLUE/RED) OP5 $ _________________________________ __________________
See Range Pricing
COMMODITY NAME: AC36 & AC37 LEAD FREE
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
75000 750000 $
750001 1500000 $
1500001 2500000 $
2500001 4500000 $
4500001 7000000 $
PSC: 1305
Blue (AC36)
NSN: 1305-01-536-7721
Red (AC37)
NSN: 1305-01-536-7722
Ordering Period 5 (OP5) will be 12 months from the end of OP4.
(End of narrative B001)
8 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0006 FIRST ARTICLE TESTING OP1 $ _________________________ __________________
SERVICE REQUESTED: FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0007 FIRST ARTICLE TESTING OP2 $ _________________________ __________________
SERVICE REQUESTED: FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0008 FIRST ARTICLE TESTING OP3 $ _________________________ __________________
9 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0009 FIRST ARTICLE TESTING OP4 $ _________________________ __________________
SERVICE REQUESTED: FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0010 FIRST ARTICLE TESTING OP5 $ _________________________ __________________
SERVICE REQUESTED: FAT
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
0011 DESIGN VERIFICATION TESTING (IF NECESSARY) $ ___________________________________________ __________________
SERVICE REQUESTED: DVT
CLIN CONTRACT TYPE:
Firm Fixed Price
10 84
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
If the proposed design requires Design Verification
Testing prior to production, the Offeror shall use this CLIN to propose any qualification testing from the specification that can be handled by the Offeror, with supporting documentation verifying its ability to conduct those tests.
NOTE: Any qualification testing from the specification that cannot be handled by the Offeror will be performed by the Government, though the costs of that testing will be added to the total evaluated price.
(End of narrative B001)
Deliveries or Performance _________________________
0012 DD FORM -1423 - CDRLS - OP1-OP5 _______________________________
A001 CONTRACT DATA REQUIREMENTS LIST (CDRL) 1 EA $ ** NSP ** $ ** NSP ** ______________________________________ ______________ __________________
COMMODITY NAME: CDRL
CLIN CONTRACT TYPE:
Firm Fixed Price
This applies to Data Items A001-A022.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
11 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
B.1 CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum amount and contract value for all orders issued against this contract shall not be less than the contract value stated in the following table. The maximum amount and contract value for all orders issued against this contract shall not exceed the contract value stated in the following table.
| Minimum Quantity | Minimum Amount | Maximum Quanity | Maximum Amount |
| N/A | $ 750,000 | N/A | $49,508,333 |
B.2 Delivery Order Pricing and Procedures: The Government intends to award Delivery Order 0001 at the same time the contract is awarded.
See Section I, FAR clause 52.216-19 for minimum and maximum quantity and dollar threshold information.
B.3 Each Ordering Period (OP) of the contract shall be from the date of contract award until one year later. For example, if the base contract were awarded on 01 September 2021, OP1 would be from 01 September 2021 to 31 August 2022. OP2 would then begin on 01 September
2022. OP3-OP5 would follow the same schedule.
B.4 The prices agreed to between the Government the Contractor shall be valid for the entire Ordering Period (OP), regardless of when an order is placed within that year. For example, if the period of performance is 12 months and an order is placed in the 11th month, the price in effect during the 12 month period is the price that is awarded.
B.5 The Government reserves the right to obtain a price at the higher range if an order is placed within 120 days of a previous order.
For example, if an order is placed for the negotiated price for the range of 750,000 on 01 September 2021, and another order is placed within 120 days of 01 September 2021 that brings the aggregate amount of both orders to the next range of 750,001 - 1,500,000, then the negotiated price for that higher range will be used. This will be accomplished by modifying the initial order to reflect the higher range and its negotiated price. A new order will not be placed. Also, please note that this window shall not cross ordering periods.
*** END OF NARRATIVE B0001 ***
12 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
STATEMENT OF WORK_________________
CARTRIDGE, 9 MILLIMETER: DYE, MARKING M1041____________________________________________
1.0 SCOPE _____
This Statement of Work (SOW) defines the effort required for the manufacturing, testing, packaging, and delivery of 9mm: Dye, Marking
M1041 Cartridges.
1.1 Background __________
This ammunition is fired in the M9 Pistol converted with the Close Combat Mission Capability Kit (CCMCK) Conversion Barrel (NSN 1005-20-
003-2362), the M11 Pistol converted with the CCMCK Conversion Barrel (NSN 1005-20-003-2361), and the M4 Carbine converted with the
Simunition M4 9mm Upper Receiver Conversion Kit (NSN 1005-01-454-9283).
2.0 APPLICABLE DOCUMENTS ____________________
The following specifications, standards, handbooks, drawings and documents form a part of this SOW to the extent specified herein.
Unless otherwise specified, the documents below shall be listed in the latest issue of the DODISS (Department of Defense Index of
Specifications and Standards).
2.1 Military Specifications _______________________
MIL-PRF-32312 Cartridge, 9 Millimeter: Dye, Marking 03 JUL 2019
M1041
MIL-A-70625 Automated Acceptance Inspection Equipment, 24 APR 2000
Design, Testing, and Approval Of
2.2 Military Standards __________________
MIL-STD-1168 Ammunition Lot Numbering and Ammunition 21 FEB 2019
Data Card
MIL-STD-31000 Technical Data Packages 31 OCT 2018
MIL-STD-882 System Safety 11 MAY 2012
MIL-DTL-46506 Boxes, Ammunition Packing, Wood, 31 OCT 2016
Wire-bound
(The above documents are available online at https://quicksearch.dla.mil/ .)
2.3 Product Drawings ________________
13008817 Cartridge, 9mm, Marking 10 DEC 2018
13073641 Combinations of Adopted Items 03 OCT 2018
13073642 Combinations of Adopted Items 03 OCT 2018
13073643 Combinations of Adopted Items 03 OCT 2018
13032542 Box, Ammunition, M2A2 Assembly 26 JUL 2012
7553347 Box, Wire-bound, Boxes, Ammunition, M2A1 15 JAN 2018
9396206 Packing and Marking for Wire-bound Box 15 FEB 2019
9396205 Packing and Marking for M2A1 15 FEB 2019
12631028 Packing and Marking for Paperboard Box 15 FEB 2019
13 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
9362826 Box, Paperboard 22 NOV 2011
9362803 Tray, Cartridge 22 NOV 2011
12999545 Two-Dimensional Barcode Ammunition Label 26 JAN 2018
Instructions for Ammunition and Explosive Containers
2.4 Other Documents _______________
| U.N.19 | Uniform Standard for Wood Containers | |
| NAS 411 | National Aerospace Standard Hazardous | 30 SEP 2013 |
| | Materials Management Program | |
| DOD 5100.76-M | Physical Security of Sensitive | |
| | Conventional Arms, Ammunition, | 17 APR 2012 |
| | and Explosives (AA&E) | |
| AR 190-11 | Physical Security of Arms, Ammunition, | 17 JAN 2019 |
| | and Explosives | |
| ITAR)Section 120.16 | International Traffic In Arms | 21 APR 2006 |
| | Regulations Foreign Person | |
2.5 Industry Standards __________________
(ISO) 9001-2015 Quality Management System 23 SEP 2015
Unless otherwise indicated, copies of the above specifications, standards, handbooks, or publications are available from the
Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094. Any documents required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.
3.0 REQUIREMENTS________________
The contractor shall deliver 9mm M1041 Cartridges conforming to drawing 13008817 and U.S. Military Specification, MIL-PRF-32312 dated 03
Jul 2019, which is the controlling document. Any changes to qualified designs that are on file with the U.S. Government shall require review and approval by the U.S. Government. Approvals shall only be given by the Procuring Contracting Officer (PCO). Delivery dates relative to award date and delivery locations are detailed under each order. Production will be conducted onsite at the contractor facility.
3.1 Manufacturing _____________
3.1.1 Design Requirement
The cartridges to be delivered under this contract shall be of a design that has been qualified or approved by the U.S. Government IAW
MIL-PRF-32312. The contractor (and/or subcontractor) shall have a design that has been confirmed by the U.S. Government to be fully qualified IAW MIL-PRF- 32312. Contractors (and/or subcontractors) with designs that have not been previously qualified shall provide all test data and related supporting documentation to the U.S. Government for review to verify compliance IAW MIL-PRF-32312. The Government will review the submission of any supporting data and documentation and will provide a determination whether it is sufficient to warrant
U.S. Government approval.
3.1.1.1 Design Verification Testing (DVT)
For designs that have not been previously qualified or approved, after 90 days of contract award, the contractor shall deliver 76,000 cartridges IAW MIL-PRF-32312 to the U.S. Government to verify supporting data and documentation from Section 3.1.1.
3.1.2 Changes to a Previously Qualified or Approved Design
Once a design has qualified or approved IAW MIL-PRF-32312, this shall constitute the product baseline per MIL-PRF-32312, Paragraph 6.8.
Any proposed changes to a U.S. Government qualified or approved design shall require review and approval by the U.S. Government prior to production of the modified design and establishment of a new product baseline. Approvals shall only be given by the Procuring
Contracting Officer (PCO). Additional testing at the contractors expense may be required to re-qualify or re-approve the proposed changes. The contractor shall provide all test data and related supporting documentation sufficient to support and prove that the modified design still meets the requirements outlined in MIL-PRF-32312. The contractor shall notify in writing to the PCO seventy-five
14 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(75) days prior to testing so that the U.S. Government may witness testing, if desired. The U.S. Government will review the submission of any proposed changes and will provide a determination as to whether any additional qualification testing shall be required. The U.S.
Government shall review the submitted information and shall determine if the modified design meets the MIL-PRF-32312 requirements.
3.1.3 First Article Testing (FAT): The contractor shall manufacture a minimum of 3,500 of 9mm M1041 ammunition in accordance with drawing numbers 13008817 and U.S Military Performance Specification, MIL-PRF-32312. The quantities to be delivered shall be packaged and prepared in accordance with the terms of the contract. No later than thirty (30) days prior to the conducting of FAT, the contractor shall submit a FAT Plan for PCO approval (DI-NDTI-81307;A001).
3.1.4 FAT-Physical Configuration Audit (PCA): The contractor shall submit the FAT sample IAW MIL- PRF-32312. The contractor shall prepare and submit the results of first article tests and inspections IAW Table V of MIL-PRF-32312. The contractor shall prepare for a
PCA to be conducted for the Government. The PCA shall be performed in conjunction with the first article tests and inspections to evaluate the degree to which the components and assemblies conform to the requirements of the drawings and specifications. Inspection results shall validate 100% of all drawing dimensions and characteristics with actual variable data. The U.S. Government reserves the right to request a PCA throughout the period of performance of the contract. The contractor shall identify and provide descriptions of any special equipment (DI-SESS-81004F; A002) used to perform the required inspections and tests of MIL-PRF-32312. The contractor shall notify in writing to the PCO seventy-five (75) days prior to FAT-PCA testing. FAT-PCA testing shall be witnessed by U.S. Government
Representatives. The contractor shall supply the Quality Acceptance data per (DI-NDTI-80809B (tailored); A003). If an unforeseen issue occurs and the FAT-PCA must be delayed, the contractor shall submit an official letter to the PCO at least five (5) days in advance acknowledging the cause for delay and the new FAT-PCA date. For FAT requirements, see Section E of the contract.
3.1.5 Quality Conformance Test (Lot Acceptance Test (LAT)): Upon successful completion and U.S. Government acceptance of the FAT, the contractor shall deliver the quantity as stated in the contract and according to the delivery section. A Quality Conformance Test shall be performed on each lot of ammunition IAW MIL-PRF-32312. The contractor shall supply the Quality Acceptance data (DI-NDTI-80809B;A004).
The quantities to be delivered shall be packaged and prepared in accordance with the terms of the contract. For Quality Conformance requirements see Section E of the contract.
3.1.5.1 The contractor shall perform and submit the results of a Quality Conformance Test on each lot of ammunition manufactured to meet the requirements IAW MIL-PRF-32312. The contractor shall submit the Quality Conformance sample IAW MIL-PRF-32312. Quality Conformance
Testing shall be witnessed by U.S. Government Representatives. The contractor shall notify in writing the time and location of Quality
Conformance Test to the PCO a minimum of seventy-five (75) days prior to testing. If an unforeseen issue occurs and the Quality
Conformance Test must be delayed, the contractor shall submit an official letter to the PCO at least five (5) days in advanced acknowledging the cause for delay and the new Quality Conformance Test date.
3.1.5.2 Once a lot sample has been submitted for Quality Conformance Testing, testing shall continue until completed, except under direction of the PCO.
3.1.6 Ammunition Lot Numbering and Data Cards: Ammunition Lot Numbers and Ammunition Data Cards (ADC) shall be prepared and submitted and shall follow the format required by the Worldwide Ammunition-data Repository Program (WARP) at https://mhpwarp.redstone.army.mil , as well as MIL- STD-1168 and (DI-MISC-80043B;A005). Prior to gaining access to WARP, the contractor/facility personnel involved in the preparation of ammunition data cards shall obtain a user name and password for the Army Electronic Product Support (AEPS) network. The individual will need to click on Access Request Form and continue through the steps until completion and click on SUBMIT. The individual is required to provide a supervisor name, email and phone number if the applicant is a Department of Defense (DOD) civilian or military.
Government contractors are required to provide Commercial and Government Entity (CAGE) Code and Contract Number. All requestors shall provide their Information Assurance Security Officers (IASO) (formerly ISSO) name, e-mail, DSN phone and commercial phone.
3.2 Packaging _________
Packaging shall be in accordance with Combination of Adopted Items Drawing(s) 13073641, 13073642, and 13073643 for unleaded primer orders as well as Section D of the contract. Prior to shipment, the manufacturer shall make sure the wirebound boxes have been tested by a Government approved Performance Oriented Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title
49 Code of Federal Regulation. If the wirebound boxes are manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract. The contractor/container manufacturer is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture. All wood packing material shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement
Regulations.
3.3 Quality Assurance Provisions ____________________________
3.3.1 Quality Program Plan: The contractor shall implement and maintain a Quality Program Plan (QPP) approved by the U.S. Government that meets or exceeds the standards established by International Organization for Standardization (ISO) 9001-2015 Quality Management
Systems Requirements. The QPP shall encompass all technical and manufacturing aspects of production, related engineering designs and materials utilized. All supplies and services under this contract, whether manufactured, performed within the contractor's plant or from any other source, shall be controlled at all points necessary to assure conformance to contractual requirements (DI-QCIC-81722; A006).
15 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
3.3.2 The contractor shall be responsible for the complete, accurate, and fully documented implementation of the QPP IAW the contractor generated QPP for products and processes. The QPP shall be submitted for U.S. Government review and approval (DI-QCIC-81722; A006).
Approval shall be given by the PCO.
3.3.3 The contractor may employ their own test methods in accordance with commercial standard practices. However, the contractor shall submit to the U.S. Government the proposed test methods for approval prior to the beginning of the production. All associated test data shall be submitted for record (DI-MISC-80678; A007). Approval shall be given by the PCO.
3.3.4 Engineering Change Proposals (ECPs) & Value Engineering Change Proposals (VECPs): The contractor shall not make any changes to designs, drawings, specifications, or inspection plans without written approval from the PCO. The contractor shall submit all ECPs &
VECPs (DI-SESS-80639D; A008). The contractor shall submit to the U.S. Government for review and approval any changes to the contractor or U.S. Government drawings, specifications, or inspection plans. Any submission shall address ozone depleting chemicals (ODCs), as required by Public Law 102-484, Section 326.
3.3.5 Notice of Revisions (NORs): The contractor shall submit all NORs (DI-SESS-80642D; A009). The contractor shall not make any changes to designs, drawings, specifications, or inspection plans without written approval from the PCO. The contractor shall submit to the U.S.
Government for review and approval any changes to the contractor or U.S. Government drawings, specifications, or inspection plans as documented by a NOR. Written approval shall be obtained from the PCO prior to the implementation of proposed changes detailed in the
NOR. Any submission shall address ODCs, as required by Public Law 102-484, Section 326.
3.3.6 Request for Variations (RFVs): The contractor shall submit all RFVs (DI-SESS-80640D; A010). The contractor shall not make any changes to designs, drawings, specifications, or inspection plans without written approval from the PCO. The contractor shall submit to the U.S. Government for review and approval any non-conformance to the drawings, specifications, or inspection plans. Any submission shall address ODCs, as required by Public Law 102-484, Section 326.
3.3.7 Certificate of Compliance: Each time a lot of cartridges are submitted for acceptance, the contractor shall provide records to indicate all materials for the manufacturing of the munitions are in compliance with the materials, construction and design requirements specified in the Technical Data Package (TDP) or specification. A Certificate of Compliance shall be prepared and submitted to the PCO
(DI-MISC-80678(tailored); A011).
3.3.8 Measurement System Evaluation (MSE): The contractor shall prepare and submit MSE for U.S. Government review and PCO approval to ensure conformance of components and end-items to contract requirements, MIL-PRF-32312 and the Contractors TDP (e.g. drawings, specifications) and Quality Assurance Provisions (DI-QCIC-81960; A012).
3.3.9 Failure Analysis: The contractor shall notify the Government within 48 hours of any failure, and prepare and submit a Failure
Analysis and Corrective Action Report (FACAR). The contractor shall include in the FACAR a summary of the analysis and identify each root cause and the corrective action for all materiel affected. The Contractor shall not consider the FACAR closed until the PCO has concurred with the report in its entirety to include the corrective action (DI-SESS-81927; A013).
3.4 Safety ______
3.4.1 Critical Characteristics: The contractor shall submit a Safety Critical Items/Characteristics report (DI-SAFT-80970A; A014).
3.4.2 Accident/Incident Report: The contractor shall report immediately to the Quality Assurance Representative (QAR), and PCO any major accident/incident (including fire) resulting in any one or more of the following: causing one or more fatalities, or one or more disabling injuries; damage of U.S. Government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of equipment under contract, such that personal injury or property damage may be involved; identifying a potential hazard requiring corrective action. The contractor shall prepare the report for each incident (DI-SAFT-81563; A015).
3.4.3 Safety Assessment Report (SAR): If the item has NOT been previously fielded by the U.S. Government and the item is going to be tested at a U.S. Government facility, the contractor shall perform a safety assessment of the item, IAW (DI-SAFT-80102C; A016), and deliver a SAR to the U.S. Government. If any changes are made to the item, a new safety assessment shall be performed at the contractors expense. The SAR shall be submitted and approved by the PCO prior to any deliveries. The SAR shall contain results from the contractors safety assessments, hazard analyses, and testing (DI-SAFT-80102C; A016 and MIL-STD-882).
3.4.4 ECPs/RFVs: The contractor shall perform and submit an analysis of all ECPs (DI-SAFT- 80103C; A017). The contractor shall analyze each ECP (as specified by the managing activity) to determine the hazards associated with it, assess the associated risk, and predict the safety impact of the ECP on the existing item. The contractor shall notify the managing activity when an ECP will decrease the level of safety of the existing system.
The contractor shall perform and submit an analysis of all RFV's (DI-SAFT-80104C; A018). The contractor shall analyze each request for variation to determine the hazards and assess the risk of the proposed variation of a requirement, or a specified method or process. The change in the risk involved in accepting the variation shall be identified. When the level of safety of the system will be reduced by variation of the requirement, method, or process, the managing activity shall be notified.
16 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
3.4.5 Final Hazard Classification: For energetic materials or energetic items from a foreign country, the foreign company shall provide a specific hazard classification. This specific hazard classification information should include at a minimum a letter from the competent authority. This letter shall be issued in accordance with Part 2, Chapter 2.0 and Chapter 2.1, paragraph 2.1.2 of United
Nations - Transport of Dangerous Goods ST/SG/AC.10/1/ (Latest Revision). The letter shall approve the hazard and compatibility group assignment and assign the appropriate shipping name to the energetic material or energetic item. If available, the test data from running UN Test series 4(a), 4(b) (ii), 6(a) or 6(b) and 6(c) shall be obtained. The above information and test data shall be provided to the U.S Army CCDC- AC, ATTN: FCDD-ACE-QSF, Picatinny Arsenal, NJ 07806-5000 (DI-MISC-80508B; A019).
3.4.6 Interim Hazard Classification (IHC): The contractor may, at his option, utilize the capability of CCDC-AC to obtain Interim Hazard
Classification (IHC) for shipment of R&D quantities of energetic materials/items in support of this contract. If the contractor elects to use CCDC-AC for this support, the contractor will need to provide technical data to CCDC-AC 60 days prior to shipment of the energetic materials/items. The necessary data is explained in Army Technical Bulletin (TB) 700-2 and (DI-SAFT- 81299C; A020). DOT and UN serial number information and packaging method is available in Title 49, Code of Federal Regulations (CFR).
3.5 Environmental _____________
3.5.1 Hazardous Material Management Program (HMMP) Plan and HMMP Report: The contractor shall conduct all activities in compliance with federal, state, and local environmental laws and regulations as well as international treaties and agreements. The contractor shall prepare and follow a HMMP Plan (NAS 411 and DI-MGMT-81398C; A021). The plans outline shall be made part of the proposal and the full
HMMP Plan shall be generated within ninety (90) days after contract award for review and approval by the PCO. The production efforts under this contract shall be conducted in accordance with the HMMP Plan. The contractor shall prepare a HMMP report (DI-MGMT-81398C;
A021). The report shall include a description of the hazardous materials used in the development and production processes and the hazardous materials that have been eliminated or reduced in the production processes. Any submission shall address ODCs, as required by
Public Law 102-484, Section 326.
3.5.3 Hazardous Waste Report*: The contractor shall evaluate the environmental consequences and if applicable, identify the specific types and amounts of hazardous waste to be generated during execution of this Performance Work Statement. The contractor shall submit a
Hazardous Waste Report IAW (DI- MGMT-80899; A022).
*: If applicable. If there are no hazardous wastes generated during production of the 9mm M1041 Cartridges, then this report is not required.
3.5.4 Pollution Prevention Plan (P2 Plan): The contractor shall prepare a Pollution Prevention Plan (P2 Plan) in the contractors format
IAW (DI-MGMT-80508B; A023).
3.6 Configuration Management ________________________
3.6.1 The 9mm M1041 Cartridges shall meet all of the requirements of drawings 13008817 and U.S. Military Performance Specification, MIL-
PRF-32312. Any changes to the qualified designs that are on file with the U.S. Government shall require review and approval by the PCO.
Additional qualification testing at the contractors expense may be required to qualify design changes.
3.6.2 For the duration of the contract, any proposed changes to a qualified design shall require review and approval by the PCO prior to initiation of the production of the modified design. Additional qualification testing at the contractors expense may be required to qualify proposed changes. The U.S. Government shall review the submission of any proposed changes and shall provide a written determination from the PCO as to what additional qualification testing shall be required. All required test data and related documentation to support the change shall be submitted to the PCO for review and approval. The U.S. Government shall review the submitted information and shall determine if the modified design meets the qualification requirements.
3.6.3 Technical Data Package (TDP): The contractor shall provide the TDP of the item to the U.S. Government within sixty (60) days after contract award IAW (DI-SESS-80776B; A024). The TDP shall contain all product drawings, detailed engineering drawings and specifications for all cartridge components, subcomponents, and critical interim process steps. These shall include, but are not limited to: material specifications, process descriptions, critical physical characteristics, chemical compositions, and sources of supply for critical items, giving the U.S. Government a complete description of all items being purchased. If the contractors (or subcontractors) submission is deemed inadequate by the U.S. Government, the contractor (or subcontractor) shall deliver additional information as requested by the
U.S. Government. The contractors TDP shall be proprietary and it shall be used solely for configuration verification purposes. The TDP shall be submitted IAW MIL-STD-31000.
3.6.4 Configuration Control: In order to protect the safety of the Warfigher and track any proposed changes to the expected ammunition, configuration control shall be shall be maintained by the U.S. Government over the production of the ammunition. The contractor shall submit to the U.S. Government any proposed changes to the qualified design that successfully passed the Design Verification or
Qualification Tests. If the contractor proposes a change to the product baseline, the contractor shall submit to the U.S. Government evidence demonstrating the item requirements continue to be met. If the contractors (or subcontractors) submission is deemed inadequate by the U.S. Government, the contractor (or subcontractor) shall deliver additional information as requested by the U.S. Government. The contractor may be required to provide additional test data performed at their facility or at an approved U.S. Government agency at the
17 84
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
contractors own expense. The U.S. Government reserves the right to witness and/or participate in any testing. All changes shall be approved by the PCO.
3.7 Physical And Transportation Security ____________________________________
3.7.1 The contractor shall provide adequate physical, transportation and informational security of Government Furnished Property (GFP) including test hardware, weapons, ammunition, technical data and proprietary information. The contractor shall protect sensitive conventional arms, ammunition, and explosives (AA&E) manufactured for the U.S. Government or provided as Government Furnished
Equipment/Government Furnished Material (GFE/GFM) in accordance with the standards in DoD 5100.76-M and AR 190-11.
3.7.2 The contractor shall provide U.S. Government officials access to prime and subcontractor facilities so that regulatory surveys, inspections and investigations can be conducted. This applies to all items being developed, produced, or manufactured for the U.S.
Government and items furnished or released to the contractor as GFE/GFM for this contract.
3.8 Security Requirement ____________________
3.8.1 Level of Classification: The highest level of classification under this contract is UNCLASSIFIED. The contractor shall be capable of handling, receiving, and storing documents, equipment and test items at a security classification level of UNCLASSIFIED. The contractor shall comply with the requirements of the Security Classification Guide provided.
3.8.2 Information Protection: Information or data developed under this contract is the property of the United States Army. All rights are reserved to the U.S. Government. The contractor shall not distribute or use the information and data without the express and specific written approval of the Picatinny Arsenal Public Affairs Office.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .