This synopsis announces a forthcoming solicitation for the production of Stinger fuzes and warhead body assemblies. The U.S. Army Contracting Command-New Jersey intends to issue a sole source, firm fixed price IDIQ contract to Lockheed Martin Sippican, Inc. for the manufacture of Stinger M934E6 fuzes, Stinger M934E7 proximity fuzes, warhead body assemblies, and warhead body assemblies with antennas. The quantities will range from 250-499, 500-999, and 1000-2500 for each item. Production must be in accordance with the applicable technical data packages and specifications. The period of performance will be four twelve-month ordering periods. Responses to this synopsis are not offers and cannot form a binding contract. An actual solicitation is expected to be issued within fifteen days with proposals due thirty days thereafter.

W15QKN-19-R-0021 0001

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: CHARIS MURRAY

Buyer Office Symbol/Telephone Number: CCNJ-MC/(973)724-4268

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of amendment 0001 to Solicitation W15QKN-19-R-0021 is to make the following changes:

Section B_________

1. Update CLIN title for CLINs 0005, 0012, 0019, and 0026

FROM M934E7 Fuze Production

TO Upgrade to M934E7 Fuze

2. Update CLIN narrative for CLINs 0005, 0012, 0019, and 0026

FROM M934E7 Stinger Fuze Production shall be in accordance with the Statement of Work and the requirements contained throughout this document

TO Upgrade M934E6 production units to M934E7 specification outlined in the Statement of Work and the requirements contained throughout this document

3. Update CLIN title for CLINs 007, 0014, 0021, and 0028

FROM M934E7 Warhead Body Production

TO Upgrade to M934E7 Warhead Body with Antenna

4. Update CLIN narrative for CLINs 0007, 0014, 0021, and 0028

FROM M934E7 Warhead Body Assembly with antenna Production shall be in accordance with the Statement of Work and the requirements contained throughout this document

TO Upgrade M934E6 Warhead Body Assembly units to M934E7 Warhead Body Assembly with antenna specification outlined in the Statement of

Work and the requirements contained throughout this document

5. Update CLIN title to include "FAT" at the end for CLINs 0003, 0010, and 0017.

Section C_________

1. Within section C.3.6.3.1, change

FROM MIL-DTL-XXXXX Fuze M934E6, Proximity TDD *

TO MIL-DTL-XXXXX Fuze M934E7, Proximity TDD *

2. Within section C.3.6.4, change

FROM MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing for Specification to be updated to include M934E6 TDD provisions

TO MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing for Specification to be updated to include M934E7 TDD provisions

3. Within section C.3.2.4, change

2 22

W15QKN-19-R-0021

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

FROM Government serial numbers will be provided upon request for the M934E7 Fuze and Warhead Body Assembly with antenna

TO Serial numbers for the M934E7 Fuze and Warhead Body Assembly with antenna will continue with the next sequential number from the previous production build.

Section E_________

1. Update Clause 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT to add the following language below (a):

The prime and subcontractors for the following critical subcomponents are subject to the above quality standards:

Microcircuit, Digital Firing Circuit

Microcircuit, Digital-Safing and Arming

Actuator, Abort

Actuator, Arming

Lead, Explosive

Detonator, Electric

Rotor

Base

Warhead Body Assembly, Antenna

Warhead Body Assembly

Target Detection Device

Section F_________

1. Update Clause 52.211-8 TIME OF DELIVERY (JUN 1997) -- ALTERNATE III (APR 1984), A. section Fuze and System Lot Acceptance Testing (LAT) to change

FROM There is no LAT sample size for the WARHEAD BODY ASSEMBLY. There is no LAT sample for the WARHEAD BODY ASSEMBLY WITH ANTENNA

TO Refer to MIL-W-48855 for the LAT sample sizes for WARHEAD BODY ASSEMBLY and the WARHEAD BODY ASSEMBLY WITH ANTENNA.

B. Section STINGER M934E6 FUZE, STINGER M934E7 FUZE, WARHEAD BODY ASSEMBLY, AND WARHEAD BODY ASSEMBLY WITH ANTENNA REQUIRED DELIVERY

SCHEDULE to change

FROM ... if FAT is not required then delivery of all lots will take place 365 calendar days after receipt of order

TO ... if FAT is not required then initial deliveries will begin no later than 365 days after receipt of order regarding the STINGER

M934E6 Fuze And STINGER M934E7 Fuze.

C. Section STINGER M934E6 FUZE, STINGER M934E7 FUZE, WARHEAD BODY ASSEMBLY, AND WARHEAD BODY ASSEMBLY WITH ANTENNA REQUIRED DELIVERY

SCHEDULE to change

FROM ... if FAT is not required then delivery of all lots will take place 300 calendar days after receipt of order

TO ... if FAT is not required then initial deliveries will begin no later than 300 days after receipt of order regarding the Warhead

Body Assembly and Warhead Body Assembly with Antenna.

D. Section STINGER M934E6 FUZE, STINGER M934E7 FUZE, WARHEAD BODY ASSEMBLY, AND WARHEAD BODY ASSEMBLY WITH ANTENNA REQUIRED DELIVERY

SCHEDULE to change

FROM The WARHEAD BODY ASSEMBLY and WARHEAD BODY ASSEMBLY WITH ANTENNA are not limited by a lot size

TO Refer to MIL-W-48855 for the LAT sample sizes for WARHEAD BODY ASSEMBLY and the WARHEAD BODY ASSEMBLY WITH ANTENNA.

E. Section STINGER M934E6 FUZE, STINGER M934E7 FUZE, WARHEAD BODY ASSEMBLY, AND WARHEAD BODY ASSEMBLY WITH ANTENNA REQUIRED DELIVERY

SCHEDULE TO ADD The Government will accept units delivered earlier than the delivery schedule notated above.

3 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0003 ***

4 22

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0003 YEAR 1 M934E6 & M934E7 APPROVED WARHEAD BODY FAT $ ________________________________________________ __________________

SERVICE REQUESTED: M934E6 & M934E7 WARHEAD FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0005 YEAR 1 UPGRADE TO M934E7 FUZE $ $ _____________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO M934E7 FUZE

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 production units to M934E7 specification outlined in the Statement of Work and the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0007 YEAR 1 UPGRADE TO M934E7 WARHEAD BODY WITH ANTENNA $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO WBA/A

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 Warhead Body Assembly units to M934E7

Warhead Body Assembly with Antenna specification outlined in the Statement of Work and the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

5 22

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0010 YEAR 2 M934E6 & M934E7 APPROVED WARHEAD BODY FAT $ ________________________________________________ __________________

SERVICE REQUESTED: M934E6 & M934E7 WARHEAD FAT

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0012 YEAR 2 UPGRADE TO M934E7 FUZE $ $ _____________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO M934E7 FUZE

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 production units to M934E7 specification outline in the Statement of Work and the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0014 YEAR 2 UPGRADE TO M934E7 WARHEAD BODY WITH ANTENNA $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO WBA/A

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 Warhead Body Assembly units to M934E7

Warhead Body Assembly with Antenna specification outlined in the Statement of Work and the

6 22

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0017 YEAR 3 M934E6 & M934E7 APPROVED WARHEAD BODY FAT $ ________________________________________________ __________________

SERVICE REQUESTED: M934E6 & M934E7 WARHEAD FAT

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0019 YEAR 3 UPGRADE TO M934E7 FUZE $ $ _____________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO M934E7 FUZE

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 production units to M934E7 specification outline in the Statement of Work and the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0021 YEAR 3 UPGRADE TO M934E7 WARHEAD BODY WITH ANTENNA $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO WBA/A

7 22

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 Warhead Body Assembly units to M934E7

Warhead Body Assembly with Antenna specification outlined in the Statement of Workand the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0026 YEAR 4 UPGRADE TO M934E7 FUZE $ $ _____________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO M934E7 FUZE

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 production units to M934E7 specification outline in the Statement of Work and the requirements contained throughout this document.

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

0028 YEAR 4 M934E7 UPGRADE TO WARHEAD BODY WITH ANTENNA $ $ __________________________________________________ ______________ __________________

COMMODITY NAME: UPGRADE TO WBA/A

CLIN CONTRACT TYPE:

Firm Fixed Price

Upgrade M934E6 Warhead Body Assembly units to M934E7

Warhead Body Assembly with Antenna specification outlined in the Statement of Work and the requirements contained throughout this document.

8 22

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Federal Supply Code (FSC): 1390

(End of narrative A001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

9 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK

FOR

STINGER FUZES AND WARHEAD BODY ASSEMBLIES

C.1. SCOPE: The contractor shall deliver the production requirements manufactured in accordance with (IAW) the following

Technical Data Packages (TDPs):

i. Stinger M934E6 Fuze TDP 9297066, dated 10 December 2018, ID #19BBH014A

ii. Stinger Warhead Body Assembly TDP 9344462, dated 10 December 2018, ID # 19BBH014B

iii. Stinger M934E7 Fuze Drawing #s 13052431, 13052430, 13052429, 13052428, & 13051690

iv. Stinger Warhead Body Assembly (with Antenna) Drawing #s 13051777, 13051731, & 13051730

C.2. APPLICABLE DOCUMENTS: ____________________

C.2.1. DETAIL SPECIFICATION: ____________________

MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing (Specification to be updated to include

M934E7 TDD provisions) * 02 OCT 1999

MIL-DTL-XXXXX Fuze M934E7, Proximity TDD * N/A

MIL-F-48370A Fuze, M934E6, Hybrid Microcircuits 02 OCT 1999

MIL-F-48388A Fuze, M934E6, Launch Sensing Switch 02 DEC 1996

MIL-F-48382A Fuze, M934E6, Impact Switch 02 DEC 1996

MIL-F-63051A Fuze, M934 Series, Actuators 12 NOV 1998

MIL-D-48865 Detonators, Electric, PA500 Parts For, Loading, Assembling and Packing 02 DEC 1996

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) * 02 DEC 1996

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD. * 07 OCT 2017

*Contractor Performance Specification 518001 shall be used in conjunction with annotated drawings to identify the TDD and

Warhead Body Assembly with Antenna.

C.2.2. DRAWINGS (UNCLASSIFIED): ______________________

| GOVERNMENT DRAWINGS | | |

| 13052431 | FUZE, GUIDED MISSILE: M934E7 | REV - |

| 13052430 | FUZE SUBASSEMBLY, PROX | REV - |

| 13052428 | HOUSING, FUZE M934E7 | REV - |

| 13052429 | ASSEMBLY, HOUSING, FUZE PROX | REV - |

| 13051690 | TARGET DETECTION DEVICE ASSEMBLY | REV XA |

| 13051777 | WARHEAD BODY ASSEMBLY, ANTENNA | REV - |

| 13051731 | WARHEAD BODY ASSEMBLY, HTS | REV - |

| 13051730 | BODY, ANTENNA SLOT | REV - |

| CONTRACTOR DRAWINGS | | |

| 305544 | M934E6/E7 PACKAGING | REV E |

C.2.3. TECHNICAL DATA PACKAGES (UNCLASSIFIED): ______________________________________

| Stinger M934E6 Fuze | TDP 9297066 | ID # 19BBH014A | 10 DEC 2018 |

| Stinger Warhead Body Assembly | TDP 9344462 | ID # 19BBH014B | 10 DEC 2018 |

| Stinger M934E7 Fuze (See Section C.2.2) | | | |

| Stinger Warhead Body Assembly (with Antenna) (See Section C.2.2) | | | |

C.2.4. MILITARY STANDARDS: __________________

| MIL-STD-3046 | Configuration Management | 06 MAR 2013 |

| MIL-STD-1168C | Lot Numbering for Ammunition | 11 MAR 2013 |

| MIL-STD-1171A | Acceptance and Description Sheets (FOR PROPELLANTS AND EXPLOSIVES) | 29 APR 1994 |

10 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.2.5. OTHER DOCUMENTS MANDATORY COMPLIANCE: ____________________________________

| Document | Title | Date |

| ISO 9001:2008 | Quality Systems Management Requirements | 01 September 2015 |

| AR 381-12 | Threat Awareness and Reporting Program (TARP) | LATEST |

| DoDD 8570.01 | IA Training, Certification, and Workforce Management | 23 April 2007 |

| DoD 8570.01-M | Information Assurance Workforce Improvement Program, Incorp Change 4 | 10 NOV 2015 |

| AR 25-2 | Information Assurance | 23 MAR 2009 |

| AR 25-1 | Information Management Army IT | 25 July 2013 |

| DoD 5220.22-M | National Industrial Security Program Operating Manual (NISPOM) | 28 February 2006 |

| Public Law 90-629 | Arms Export Control Act | 13 August 2018 |

| Executive Order (EO) 12470 | Continuation of Export Control Regulations | March 1984 |

| DODI 5200.39 | CPI Identification and Protection Within RDT&E, Incorp Change 2 | 15 October 2018 |

| AR 70-1 | Research, Development, and Acquisition Army Acquisition Policy | 16 June 2017 |

| DA PAM 70-3 | Research, Development, and Acquisition | 11 March 2014 |

| AMC-R-380-13 | Acq & Storage of Information Concerning Non-Affiliated Persons & Organizations | 30 September 1974 |

| AR 530-1 | Operations Security | September 2014 |

| DoDD 5230.25 | Withholding/Unclassified Tech Data From Public Disclosure, Incorp Change 2 | 15 October 2018 |

| J-STD-001 | Requirements for Soldered High Performance/Harsh Environment Electronic Products | 01 September 2018 |

C.3. REQUIREMENTS: ____________

C.3.1. HARDWARE REQUIREMENTS: The Contractor shall manufacture the Stinger M934E6 Fuze, Stinger M934E7 Fuze, Warhead Body _____________________

Assembly (with and without Antenna) and deliver IAW the delivery schedule in Section F. All performance shall take place at

Contractors site. These items are to be built IAW the following TDPs inclusive of all approved Engineering Changes (ECs):

i. Stinger M934E6 Fuze TDP 9297066, dated 10 December 2018, ID # 19BBH014A

ii. Stinger Warhead Body Assembly TDP 9344462, dated 10 December 2018, ID # 19BBH014B

iii. Stinger M934E7 Fuze Drawing #s 13052431, 13052430, 13052429, 13052428, & 13051690

iv. Stinger Warhead Body Assembly (with Antenna) Drawing #s 13051777, 13051731, & 13051730

C.3.1.1. PRODUCTION/TEST EQUIPMENT VALIDATION REQUIREMENTS: All unclassified Government Furnished Equipment/Property currently _________________________________________________ in place at the Contractors facility and sub-vendors accountable under contract W15QKN-14-D-0082 shall be transferred to this contract. The Contractor shall set up the necessary facilities and provide Production, Engineering, and Quality

Assurance/Reliability personnel to actively participate in the facility/production plan. The Contractor shall calibrate and demonstrate production line and lot acceptance test equipment, tooling, and inspection equipment prior to assembly/test of

First Article/Production Fuze, sub-assemblies and Warhead Body Assemblies. Government furnished Fuzes and Warhead Body

Assemblies may be provided for validation purposes. Fuzes may be disassembled to allow for sub-assembly testing.

C.3.1.2. WAIVER OF SPECIFIC VALIDATION TEST REQUIREMENTS: _______________________________________________

C.3.1.2.1. The Noise Immunity test requirement of MIL-F-48863C, Amendment 2, paragraph 3.2.13.1 (Performance characteristics) and paragraph 4.4.2.38 Major 109 (Test Requirements) is waived for the Fuzes being delivered under this contract.

C.3.1.2.2. Lot testing (QCI) of the Impact Switch, 9297012, per MIL-F-48382A, Amendment 1, paragraph 4.4.2.8, group B, and

Launch Switch, 9297015, per MIL-F-48388A, Amendment 1, paragraph 4.4.2.11, group B, will be accomplished by nondestructive testing in the Lot Test Fuzes, 9297066, which are tested per MIL-F-48863C, paragraph 4.4.2.38. This method of testing is conditional upon the fact that the prime Fuze contractor manufactures the Launch and Impact Switch assemblies within their facilities.

C.3.1.2.3. Electrical testing in accordance with sheet 5 of drawing 9297035 (M934E6 TDP), Firing Circuit Assembly, will not be performed. However, the Government reserves the right to impose the testing based upon any trend indicating a problem area focusing on the Firing Circuit Hybrid and it will be at no additional cost to the contract.

C.3.1.2.4. Electrical testing in accordance with subgroups 2 and 3 on sheets 4 and 5 of drawing 9297064 (M934E6 TDP), Electronics Components Assembly-Fuze, will not be performed. However, the Government reserves the right to impose the testing based upon any trend indicating a problem area focusing on the Electronics Components assembly and it will be at no additional cost to the contract.

C.3.2. CONFIGURATION MANAGEMENT: ________________________

11 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.2.1. CONFIGURATION MANAGEMENT PLAN (CMP): The contractor shall maintain a CMP that includes the Configuration Management __________________________________

Operating Plan/Instructions and describes the contractors hardware, firmware and software Configuration Management (CM) program; how it is organized; how it shall be conducted; and the methods, procedures and controls of effective configuration identification, change control and status accounting. The contractor shall follow these CM processes documented in the CMP throughout the period of performance of this contract. The contractor shall provide the Government the CMP and updates (MIL-STD

3046 and DI-SESS-81875)(A005).

C.3.2.2. ECPs/NORs/ERRs/RFVs: The contractor shall prepare and submit as required: Engineering Change Proposals (ECP) (DI-SESS- ___________________

80639D)(A001); Notices of Revision (NOR) (DI-SESS-80642D) (A003); Engineering Release Record (ERR) (DI-SESS-80643D) (A004); and

Request for Variance (RFV) (DI-SESS-80640D) (A002). Draft copies shall be provided to CCDC Engineering and Quality Assurance offices for initial comments prior to the contractors final review. As necessary, MIL-STD-3046 (Configuration Management) may be used as guidance when preparing these reports.

C.3.2.3. AS BUILT RECORDS: The contractor shall record and report the hardware configuration actually delivered (as-built) ________________ including serialization and date lot code data. This report shall cover all hardware, firmware and software produced under this contract. The contractor shall maintain these records utilizing systems currently in existence. The As Built Records shall be maintained to provide Major Assembly configuration identification for all delivered hardware, firmware and software, and shall be submitted to the Government (DI-SESS-81885)(A013, Tailored).

C.3.2.4. SERIAL NUMBER REPORT: The contractor shall prepare a final report of all Government serial numbers assigned to ____________________ hardware under this contract (DI-MISC-80508B) (A015, Tailored). The report shall identify the items to which each serial number is assigned and whether the items were consumed or destroyed due to test or material loss. Serial numbers for the M934E7 Fuze and Warhead Body Assembly with antenna will continue with the next sequential number from the previous production build. Serial numbers for the legacy M934E6 Fuze and Warhead Body Assembly (without antenna) will continue with the next sequential number from the previous production build. Serial numbers shall be applied IAW the applicable drawings and specifications for the items requiring the serial number.

C.3.2.5. TECHNICAL DATA PACKAGE (TDP): The Contractor shall review the Technical Data Packages (TDPs) and conduct a Pre- ____________________________

Production Engineering (PPE) study to review and propose recommendations on the TDP in a TDP Review Report (DI-MISC-

80750)(A016, Tailored). The contractor shall identify any problem areas that would be detrimental to production, component obsolescence, incorrect drawing content or significant change in cost, and propose recommendations/corrective actions through the Configuration Management process.

C.3.3. MANUFACTURING: _____________

C.3.3.1. MANUFACTURING PLAN: The contractor shall submit a Manufacturing Plan (DI-MGMT-81889)(A011, Tailored). The __________________

Manufacturing Plan shall identify the contractor's overall system and detailed factors necessary to achieve an effective, efficient manufacturing program. The plan shall contain the documents the contractor will use to plan and manage the production from contract award through final delivery and close-out.

C.3.3.2. DESCRIPTION OF MANUFACTURE: The Contractor shall deliver to the Government a Description of Manufacture (D of M) __________________________ identifying the materials and manufacturing methods/process and facilities involved in manufacturing operations prior to assembly of hardware for First Article Inspection (DI-MGMT-81889)(A014, Tailored). The Contractor shall include any sub-contractors processes. The D of M shall document the procedures by which the contractor will ensure that adequate quality of work is performed throughout all phases of fabrication and assembly. These procedures shall include, but not be limited to, a description of fabrication and assembly plans and aids, visual aids, standard procedures, and methods and frequency of workmanship inspections. Where samples or visual aids showing acceptable workmanship are to be used, they shall be approved by the Government prior to use. The D of M shall describe critical processing and document the procedure by which the contractor will ensure that uniformly high quality processing is maintained. These processes shall include, but not be limited to:

manual, machine and bath (wave) soldering, joining, bonding, plating, brazing and coating of metal; bending, forming, preparing and tinning of leads, protective conformal and thermal coating; and adhesive and other bonding of materials or parts, cleaning process prior to conformal coating and bonding and baking procedures. The D of M shall describe the level of skill to be required of operators of these processes and shall describe the methods, type and frequency of inspections of workmanship of the operators and of uniformity and quality of the processes. The D of M shall document the type and extent of equipment and processes that will be maintained to ensure process control. The D of M provided shall serve as a baseline and shall not be changed without notification to and written approval from the Government. Manufacturing process documentation previously defined under contracts W15QKN-14-D-0082 may be updated and submitted for review.

C.3.4. PROGRAM MANAGEMENT: __________________

C.3.4.1. INTEGRATED PRODUCT TEAM: The contractor shall adhere to concurrent engineering practices and hence, partake in a _______________________

Government chaired Integrated Product Team (IPT). The IPT shall monitor the progress of the program, evaluate all data required to be submitted by the contractor, approve all TDP changes, and provide recommendations to reach consensus solutions to issues as they arise to encourage efficiency towards meeting the programs objectives. The contractor remains responsible for the

STINGER production in accordance with the requirements of the contract.

12 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.4.2. CONTRACTORS PROGRESS, STATUS AND MANAGEMENT REPORT: The contractor shall prepare and submit a Contractors Progress, __________________________________________________

Status and Management Report (DI-MGMT-80227)(A012, Tailored). The status shall include as a minimum; program status and technical issues, Integrated Master Schedule (IMS) per paragraph C.3.4.3, material status and obsolescence, GFE tooling and equipment status, and CDRL status.

C.3.4.3. INTEGRATED MASTER SCHEDULE: The contractor shall prepare and submit to the Government an IMS (DI-MGMT-80227)(A012, __________________________

Tailored). The IMS shall contain the contract milestones, accomplishments, and discrete tasks/activities (including planning packages where applicable) from contract award to the completion of the contract. The IMS shall be developed and resourced to the lowest level where the work is performed. The following suggested resources shall include Contract Schedule, Contract

Review, Document Drawing Control, Quality Control, Material Control, Production Control / Line Setup, First Article Testing, and Production Deliveries. The IMS shall include schedule risk assessment which is limited to the key problems/drivers related to critical path and near-critical path items.

C.3.4.4. SUPPLIER NETWORK: The Contractor shall establish a supplier network that will ensure timely delivery of material and ________________ parts throughout production to meet the STINGER Fuze and Warhead Body Assembly requirements. Concerns related to the supplier network shall be included in the Contractors Progress, Status and Management Report (DI-MGMT-80227)(A012, Tailored). The contractor shall maintain control of the quality of all suppliers throughout production. The control techniques shall be defined but not limited to, incoming inspection, source inspection, and monitoring vendor selection, evaluation, and rating techniques. The Government reserves the right to inspect subcontractor/vendor facilities and processes as needed after contract award.

C.3.4.5. SUBCONTRACTOR MANAGEMENT: The contractor is responsible for performance of all contractual requirements and shall ________________________ institute appropriate management actions relative to subcontractor performance. Requirements that are contractually specified shall apply to subcontractor performance; however, the contractor shall be accountable for compliance by subcontractors and is responsible for ensuring all deliverable products comply with the contract requirements.

C.3.4.6. GOVERNMENT PROPERTY INVENTORY REPORT: The contractor shall prepare and submit a Government Property Inventory Report ____________________________________

(DI-MGMT-80441C) (A023, Tailored).

C.3.5. PACKAGING: _________

C.3.5.1. PERFORMANCE ORIENTED PACKAGING (POP): The contractor shall provide POP information for the STINGER Fuze shipping ____________________________________ container. Prior to shipment, the contractor shall make sure the container has been tested by a Government approved

Performance Oriented Packaging (POP) Test Laboratory for compliance with POP requirements in accordance with Title 49 Code of

Federal Regulations. POP marking shall not be applied to the container until verified by the Government. The contractor shall submit a POP test report (DI-PACK-81059A)(A017) following the test.

C.3.5.2. FUZE PACKAGING: THE M934E6 and M934E7 Fuzes shall be packaged in accordance with the contractors drawing 305544. The ______________ external wooden crate cover shall be attached to the box by either a single, double-headed nail. The wooden crate shall be further secured steel strapping. The wooden crate and all internal packing materials will be returned to the contractor the point of delivery, after the contents have been completely removed, for reutilization for subsequent Fuze lot deliveries.

C.3.6. QUALITY ASSURANCE PROVISION: ___________________________

C.3.6.1. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall provide a Quality Assurance Program Plan (QAPP) that demonstrates ______________________________ compliance with ANSI/ISO/ASQ 9001:2015 or equivalent (DI-QCIC-81794)(A020). The QAPP shall also address:

i. The plan shall identify all quality assurance tasks required for production.

ii. The plan shall detail by specific task, the organization performing quality functions and interface with other organizations.

iii. A brief description of each task shall be included in the plan and if it is not solely a quality function, the quality organizations participating in the control over the task shall be delineated.

iv. The plan shall identify appropriate actions to be taken or data to be generated as a result of quality task milestone completion.

v. The plan shall include as a minimum all tasks specifically identified in this statement of work.

vi. The plan shall specify specific samples and intervals for verifying processes for the fabrication of components, sub-assemblies, and assemblies.

C.3.6.2. AMMUNITION LOT NUMBERS AND DATA CARDS: The Contractor shall prepare Ammunition Lot Numbers and Data Cards and _____________________________________

13 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

submitted IAW MIL-STD-1168C (DI-MISC-80043B)(A007). Ammunition Data Cards shall be prepared for the M934E6 Fuze, M934E7 Fuze, Target Detection Device, and Warhead Body Assembly (with and without Antenna) and all Explosive Chemicals. The contractor shall prepare Acceptance and Description sheets for all Explosive Chemicals IAW MIL-STD-1171A, section 5.5 (Description sheet for explosives, chemicals, etc.) and Figure A-5. The Acceptance and Description sheets for Explosive Chemicals shall be submitted (DI-NDTI-80809B)(A006, Tailored) and data uploaded to Munitions History Program (MHP) Worldwide Ammunition Repository

Program (WARP) as an attachment to the Ammunition Data Card. Ammunition Data Cards shall be uploaded to the WARP or Worldwide

Ammunition-data Repository Program. Prior to being able to view or access WARP, contractors/facility personnel involved in the preparation of ammunition data cards shall obtain a user name and password for MHP; website https://mhpwarp.redstone.army.mil .

C.3.6.3. FIRST ARTICLE TEST: __________________

C.3.6.3.1. FIRST ARTICLE TEST (FAT) PLAN: First Prior to conducting First Article, the contractor shall submit a First Article _____________________________

Test Plan and Procedures (DI-NDTI-81307A) (A021, Tailored). The Test Plan shall demonstrate the Fuze, TDD, Warhead Body

Assembly, its sub-assemblies and piece parts meet the requirements of the following item specifications as guidance:

MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing For (Specification to be updated to include

M934E7 TDD provisions) *

MIL-DTL-XXXXX Fuze M934E7, Proximity TDD *

MIL-F-48370A Fuze, M934E6, Hybrid Microcircuits

MIL-F-48388A Fuze, M934E6, Launch Sensing Switch

MIL-F-48382A Fuze, M934E6, Impact Switch

MIL-F-63051A Fuze, M934 Series, Actuators

MIL-D-48865 Detonators, Electric, PA500 Parts For, Loading, Assembling and Packing

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) *

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD *

*Contractor Performance Specification 518001 shall be used in conjunction with the following draft drawings to identify the TDD and Warhead Body assembly with antenna

C.3.6.3.2. FIRST ARTICLE TEST (FAT) COMPONENT PIECE PART LEVEL: Component piece parts not procured from the qualified incumbent ___________________________________________________ vendors under contracts W15QKN-14-D-0082 and W15QKN-14-9-1001, DOTC-16-01-INIT0752 shall be delivered in the form of the

Acceptance Test Report (ATR)(DI-QCIC-81891)(A019), along with any test reports or supporting documentation verifying that the piece parts meet the requirements, for FAT IAW with the sample quantities and testing conducted utilizing the following item specifications as guidance:

MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing For (Specification to be updated to include

M934E7 TDD provisions) *

MIL-DTL-XXXXX Fuze M934E7, Proximity TDD *

MIL-F-48370A Fuze, M934E6, Hybrid Microcircuits

MIL-F-48388A Fuze, M934E6, Launch Sensing Switch

MIL-F-48382A Fuze, M934E6, Impact Switch

MIL-F-63051A Fuze, M934 Series, Actuators

MIL-D-48865 Detonators, Electric, PA500 Parts For, Loading, Assembling and Packing

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) *

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD *

*Contractor Performance Specification 518001 shall be used in conjunction with the following draft drawings to identify the TDD and Warhead Body Assembly with Antenna

C.3.6.3.3. FIRST ARTICLE TEST MAJOR ASSEMBLY LEVEL: The contractor shall deliver First Article Test (FAT) samples and perform _______________________________________ testing utilizing the following item specifications as guidance:

MIL-DTL-XXXXX Fuze M934E7, Proximity TDD For *

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) *

MIL-F-48370A Fuze, M934E6, Hybrid Microcircuits

MIL-F-63051A Fuze, M934 Series, Actuators

MIL-D-48865 Detonators, Electric, PA500 Parts For, Loading, Assembling and Packing

MIL-F-48388A Fuze, M934E6, Launch Sensing Switch (switch assembly level only)

MIL-F-48382A Fuze, M934E6, Impact Switch (switch assembly level only)

14 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD *

*Contractor Performance Specification 518001 shall be used in conjunction with the following draft drawings to identify the TDD and Warhead Body Assembly with Antenna

C.3.6.3.4. FIRST ARTICLE TEST FUZE LEVEL: The Government will randomly select twenty (20) Fuzes from the first lot for a _____________________________

FAT/LAT combined test. The contractor shall conduct the test IAW MIL-F-48863C, FUZE, GUIDED MISSILE, M934E6 PARTS ASSEMBLY, LOADING AND PACKING FOR, paragraphs 4.3.2.1.1a, c, and d, groups I through VI, nondestructive tests only (detonator assembly will be replaced with a 680 ohm resistor). Mechanical characteristic inspection per paragraph 4.3.2.1.1a shall be performed as part of FAT with the exception of Fuze Weight and Center of Gravity. Fuze weight and center of gravity measurements shall be performed as part of Fuze final inspection after all explosive components are installed. 518001 - Performance Specification for the Stinger Missile Warhead Section Proximity TDD shall be used to supplement MIL-F-48863C for proximity level test requirements. The criteria for passing FAT requires all 20 test samples to successfully pass all tests mentioned above. The

FAT results may be used to accept/reject the first lot.

C.3.6.3.5. FIRST ARTICLE TEST WARHEAD BODY ASSEMBLY LEVEL: The Government will randomly select six (6) Warhead Body Assemblies ______________________________________________ from the first lot for a FAT/LAT combined test. The contractor shall conduct the test IAW MIL-W-48855C - Warhead Body Assembly for Warhead Section, GM, HE, M258, paragraphs 4.3.1, 4.3.2 (Table I First Article Inspection), 4.4.2.6, and 4.4.2.7. 518001 -

Performance Specification for the Stinger Missile Warhead Section Proximity TDD shall be used to supplement MIL-W-48855C for antenna level test requirements. The criteria for passing FAT requires all 6 test samples to successfully pass all tests mentioned above. The FAT results may be used to accept/reject the first lot.

C.3.6.3.6. FIRST ARTICLE TEST REPORT: The Contractor shall compile a First Article Test Report (FATR) documenting the results _________________________ of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The

FATR shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing and specification characteristic. The Contractor shall submit an Acceptance Test Report

(ATR) to the Government (DI-QCIC-81891)(A019).

C.3.6.4. LOT ACCEPTANCE TEST (LAT): The Contractor is responsible for conducting Lot Acceptance Testing, IAW the LAT _________________________ quantities and test requirements contained in the following item specifications as guidance. Lot Acceptance Test samples, upon completion of successful testing, shall be refurbished into completed end items for delivery with the balance of the lot IAW the contract requirements.

MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing for Specification to be updated to include

M934E7 TDD provisions) *

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) *

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD *

*Contractor Performance Specification 518001 shall be used in conjunction with the following draft drawings to identify the TDD and Warhead Body Assembly with Antenna

C.3.6.5. INSPECTION EQUIPMENT DESIGNS - MEASUREMENT SYSTEM EVALUATION (MSE): The contractor shall establish and maintain a __________________________________________________________________ documented measurement evaluation system for the identification and approval of Acceptance Inspection Equipment (AIE) /

Automated Acceptance Inspection Equipment (AAIE), for performance of inspection/tests identified in the below item specifications, to include the calibration and verification of inspection equipment (i.e., calibration, validation, non-destructive testing, and standards) as necessary to meet contract requirements. Approved AIE / AAIE, in accordance with this requirement, shall be utilized for all hardware inspection and acceptance. The Government reserves the right to disapprove, at any time during the performance of this requirement, the use of any AIE / AAIE that is not meeting the requirements of the approved documentation (i.e., calibration, validation, non-destructive testing, standards) (DI-QCIC-81960)(A018, Tailored) and

Section E.

MIL-F-48863C Fuze, Guided Missile, M934E6 Parts Assembly, Loading and Packing For (Specification to be updated to include

M934E7 TDD provisions) *

MIL-DTL-XXXXX Fuze M934E7, Proximity TDD *

MIL-F-48370A Fuze, M934E6, Hybrid Microcircuits

MIL-F-48388A Fuze, M934E6, Launch Sensing Switch

MIL-F-48382A Fuze, M934E6, Impact Switch

MIL-F-63051A Fuze, M934 Series, Actuators

MIL-D-48865 Detonators, Electric, PA500 Parts For, Loading, Assembling and Packing

MIL-W-48855C Warhead Body Assembly for Warhead Section, GM, HE, M258 Conformal Antennal assembly (Specification to be updated to include Antenna provisions for TDD Sensor) *

15 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

518001 Performance Specification for the Stinger Missile Warhead Section Proximity TDD *

*Contractor Performance Specification 518001 shall be used in conjunction with the following draft drawings to identify the TDD and Warhead Body Assembly with Antenna

C.3.6.6. SERVICES ON GFE TOOLING, TEST AND INSPECTION EQUIPMENT: The contractor shall provide technical services to support ______________________________________________________

GFE tooling, test and inspection equipment located at the contractors and sub-contractors facilities. This support shall include updating/replacing non-functional and/or obsolete tooling, gages, measurement equipment and interconnects to the computer controlled in-process inspection and lot acceptance test station, trouble shooting, maintenance and redesign (to address obsolescence/maintenance issues) of equipment for the total life cycle management of the GFE. A supplementary Scope of

Work may be provided on an individual task basis to meet the needs as they arise.

C.3.6.7. FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT: The contractor shall conduct thorough failure analysis to determine the _____________________________________________ failure mode and root cause and shall submit a Failure Analysis and Corrective Action Report (DI-SESS-81315B) (A008, Tailored) for each Major In-Process Test failure, First Article Test failure or Lot Acceptance Test failure.

C.3.6.8. SOLDERING: The contractor shall adhere to ANSI/IPC/J-STD-001 (included in the TDPs), Class 3 High Performance _________

Electronic Products to develop the Soldering Process Control Plan and Soldering Plan of Instruction. The Soldering Process

Control Plan and Soldering Plan of Instruction shall be included as part of the QAPP.

C.3.7. ACCIDENT/INCIDENT REPORT: The contractor shall report immediately any major accident/incident (including fire) resulting ________________________ in any one or more of the following: causing one or more fatalities, or one or more disabling injuries; damage of Government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of the equipment under contract, such that personal injury or property damage may be involved; or identifying a potential hazard requiring corrective action. The contractor shall prepare the report (DI-SAFT-81563)(A009) as guidance.

C.3.8. CRITICAL SAFETY ITEM/CRITICAL DEFECT: As a part of the quality program, the contractor shall establish, document and ____________________________________ maintain specific procedures, work and material handling instructions and process controls covering all operations involved in the manufacture and assembly of all Critical Safety Items (CSIs) identified in the TDP so as to assure the compliance of all

CSIs with the requirements of TDP. The following definitions and requirements apply:

i. Critical Safety Item: A part, assembly, installation or production system with one or more critical characteristics that, if not conforming to the TDP requirements, would result in hazardous unsafe conditions. Unsafe conditions include failure modes, which cause loss or serious injury to personnel using, maintaining or depending upon the item.

ii. Critical Safety Characteristic: Any feature (i.e. tolerance, finish, material composition, material hardness, manufacturing, assembly or inspection process) of product, material, or process, which if not conforming or missing would cause the safety failure or malfunction of the critical item.

iii. The contractor shall implement 100 percent automatic inspection or test for all CSI characteristics that can be nondestructively inspected or tested.

iv. All technical quality requirements relating to critical safety characteristics must be traceable to the time and place of production. The contractor's records on file should provide the degree of traceability required to enable after the fact verification of all aspects of material, manufacture, special processing, assembly and inspection of critical safety characteristics.

v. The contractor's vendor quality program shall address controls critical safety item characteristics produced by vendors and contain a requirement for the periodic audit of the implementation of these controls. Purchase orders to subcontractors producing CSIs shall contain a requirement for 100 percent inspection of all critical safety characteristics.

vi. Nonconformance to critical safety characteristics shall not be accepted through contractor Material Review Board actions.

In instances where engineering analysis of the nonconformance determines that the existing tolerances or requirements can be changed without degrading product safety, an engineering change action may be submitted for Government approval.

vii. Whereas the emphasis of the contractor's quality program procedures pertaining to CSIs is to assure nonconforming critical safety characteristics do not occur, in the event that a critical defect is found whether by the contractor, subcontractor, or the Government, the following specific actions shall be taken:

viii. Production of the affected component, subassembly, or assembly, shall cease immediately; operations involved in the creation of the defect must stop, including "feeder" operations, and the Government Quality Assurance Representative (QAR) notified at once with concurrent notification to the Procurement Contracting Officer (PCO) and Administrative Contracting

Officer (ACO). The contractor shall determine which operations to stop, document the rationale for this determination and provide preliminary findings pertinent to the defect to the contracting officer within 48 hours of the occurrence. Copies of this notification shall be furnished to the Government QAR and ACO (DI-SAFT-80970A)(A010).

16 22

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

ix. All suspect material must be segregated and shall not be used for further production. Suspect product must be "fenced" both ahead and behind the point of detection. The contractor shall conduct a detailed investigation and analysis to assess the extent of product affected and take all actions necessary to assure the conformance of all suspect material. A request for the use of any fenced material associated with the critical defect, along with the analysis supporting the request, shall be forwarded to the contracting officer for approval, with copies furnished to the Government QAR and ACO (DI-SAFT-80970A)(A010).

x. A detailed investigation and analysis with Government participation shall be conducted of the process, equipment, handling, quality control, etc. to determine the cause of the defect. Corrective action to prevent future manufacture of the critical defect shall be instituted. Positive corrective action is required. Screening of the affected product alone is insufficient to meet this requirement without other appropriate action intended to eliminate the cause of the defect.

xi. A request to restart production operations along with supporting documentation (i.e., investigation results, screening information, corrective action, etc.) shall be submitted to the contracting officer for approval with copies furnished to the

Government QAR and ACO. Restart shall begin only after approval to restart has been issued by the contracting officer and any conditions or restrictions associated with the approval are satisfied. Contracting officer response to restart requests will be provided within five (5) working days from the time of receipt. Confirmation of receipt of the request to restart is the contractor's responsibility (DI-SAFT-80970A)(A010).

C.4. ENVIRONMENTAL COMPLIANCE: The Contractor (and its subcontractors) shall comply with all federal, state, and local ________________________ environmental laws, regulations, and policies for all activities defined in this SOW, whether conducted at Government or contractor facilities. Upon request, the contractor shall make available to the Government applicable environmental permits, documentation, and procedures. The contractor shall be solely responsible for the management, cleanup, protection, and disposal of any and all emissions, effluents, wastes, and hazardous materials used in, generated by, or associated with the actions required by this SOW.

C.5. SECURITY: ________

C.5.1. The highest security classification level for this effort is SECRET.

C.5.2. The contractor will be required to obtain and maintain a Facility Clearance with safeguarding from the Defense Security

Service for the life of the contract. The contractor will only receive classified material at the actual performance location(s) as identified in block 8a of the DD254.

C.5.3. The Contractor shall not perform on CLASSIFIED requirements without an authorized DD254 provided by the USA CCDC

Armaments Center Intelligence and Technology Protection Office (I&TPO). Prior approval by the Contracting Officers

Representative (COR) and concurrence from the ISS is required for any subcontractor DD254s issued by the contractor under this effort to the official shown in Block 16a of this DD254.

C.5.4. Information Disclosure: A Classified Information Nondisclosure Agreement Standard Form (SF 312) shall be signed by all ______________________ contractor employees working under this effort and returned to the COR prior to their being granted access to classified information. The contractor employees will also have to sign a non-disclosure agreement provided by the requiring activity for the protection of unclassified, sensitive and/or proprietary information.

C.5.5. Personnel: Contractor personnel shall have the appropriate level of investigation and/or security clearance for each _________ site of performance of work. The Contractor shall observe and comply with all security provisions in effect at each selected site. Only U.S. Citizens are authorized to work on this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .