This is a summary of a solicitation for metal containers and covers. The U.S. Army Materiel Command Contracting Command at Picatinny Arsenal is seeking proposals for PA161 and PA103A2 metal containers. The response date has been extended from March 14 to March 21, 2019 at 4:00pm EST. The solicitation number is W15QKN19R0008. The purpose is to procure these metal containers and covers for the Department of Defense.
Exhibit A - CDRLs Index A001 - A011.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
Contract Data Requirements List (CDRL) Index For PA161 and PA103A2 Metal Containers and Covers
W15QKN-19-R-0008
CDRL
Number
DID
Number
| CDRL Title |
| CDRL Document |
A001
DI-QCIC-81722
(Tailored) Quality Program Plan
A002
DI-MGMT-80004A
Process Capability Control & Improvement PCCI (Management Plan)
| A003 |
| DI-ADMIN-81505 |
Report, Record of Meeting Notes (Post Award)
| A004 |
| DI-QCIC-81960 |
(Tailored) Measurement System Evaluation (MSE)
| A005 |
| DI-SESS-81315B |
| Failure Analysis and Corrective Action |
Report (FACAR)
A006
| DI-MGMT-80899 |
| Hazardous Waste (HW) Report |
A007
DI-SESS-81880
Engineering Change Proposal (ECP)
| A008 |
| DI-SESS-81883 |
| Request for Variance (RFV) |
| A009 |
| DI-SESS-81881 |
Notice of Revisions (NOR)
| A010 |
| DI-NDTI-80809B |
Test/Inspection Report
| A011 |
| DI-SAFT-81563 |
Accident/Incident Report
A001 Quality Program Plan (QPP).pdf
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED Page____of____
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP _______ TM _______ OTHER ____________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT REQ’D 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13.13. DATE OF SUBSEQUENT SUBMISSION
Draft Final
Reg Repro
16. REMARKS
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
TDP _______ TM _______ OTHER _____________________
16. REMARKS (Continued)
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning, “Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through
15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, and frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
1 DATA ITEM NO: A001
2 TITLE OF DATA ITEM: Quality Program Plan (QPP)
3 SUBTITLE: Quality Management System (QMS)
5 CONTRACT REFERENCE: SOW Para. C.3.4.1.1
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION: AS REQ
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: R/AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: * TAILORING-Use paragraphs 3.1, 3.2, 3.3, 3.4 and 3.6. The contractor shall maintain a QMS audit schedule (including vendor/suppliers) and notify the government at least 30 days prior to any subcontractor/vendor audit.
The Contractor shall maintain a Quality Program Plan (QPP) that is equivalent to ISO 9001:2015.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-04T16:08:04-0500
KURTZ.JACK.G.1367700056
2019-02-04T16:07:44-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-QCIC-81722 (*Tailored) image3.emf
A002 Management Plan.pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A002
2 TITLE OF DATA ITEM: Process Capability Control & Improvement PCCI)
3 SUBTITLE: Management Plan
5 CONTRACT REFERENCE: SOW para. C.3.4.4
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION:
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: The PCP (Process Control Plan) shall contain Process Failure Modes and Analysis (PMFEA), Process Capability Studies, Measurement System Analysis(MSA), Process Flowchart, and Process Plan of Action.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-04T16:13:49-0500
KURTZ.JACK.G.1367700056
2019-02-04T16:13:32-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-MGMT-80004A image4.emf
A003 Report Record of meeting notes (Post Award).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A003
2 TITLE OF DATA ITEM: Report,Record of Meeting Notes (Post Award)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW para. C.3.4.5
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: F
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION:
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: Electronic submission is requested with email as the preferred format. The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:45:39-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:45:20-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-ADMIN-81505 image5.emf
A004 Measurement System Evaluation (MSE).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A004
2 TITLE OF DATA ITEM: Measurement System Evaluation (MSE)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW para. C.3.4.6
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: F
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION: See Blk 16
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: See Blk 16 a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: BLK 12: The Contractor shall submit a completed AIE package no later than (120*) calendar days after contract award and no later than (60*) calendar days prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The Government will furnish disposition within (45*) calendar days of final AIE package receipt.
BLK 13: If further revisions are necessary, the Contractor shall have (30*) calendar days to generate them and the Government shall have (30*) calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract.
If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within (30*) calendar days.
The Contractor shall notify the responsible Government technical agency a minimum of (30*) calendar days prior to acceptance (prove out) testing.
* Number of days may be tailored for programmatic purposes taking into account MSA requirements.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:47:51-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:47:39-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-QCIC-81960 (Tailored) image6.emf
A005 Failure Analysis Corrective Action Report (FACAR).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A005
2 TITLE OF DATA ITEM: Failure Analysis & Corrective Action Report (FACAR)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW para. C.3.4.8
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: F
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION:
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: Electronic submission is requested with email as the preferred format. The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:50:24-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:50:13-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-SESS-81315B image7.emf
A006 Hazardous Waste (HW) Report.pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A006
2 TITLE OF DATA ITEM: Hazardous Waste (HW) Report
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW para. C.3.6.2
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: F
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION:
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: Electronic submission is requested with email as the preferred format. The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:52:10-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:52:00-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-MGMT-80899 image8.emf
A007 Engineering Change Proposals (ECP).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A007
2 TITLE OF DATA ITEM: Engineering Change Proposals (ECP)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW Para. C.3.8.1
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION: AS REQ
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: R/AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: The Government will respond within 45 days of receipt.
The Contractor shall respond within 7 calendar days of Government comments.
Electronic submission is requested with email as the preferred format.
The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:54:04-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:53:38-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-SESS-81880 image9.emf
A008 Request For Variance (RFV).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A008
2 TITLE OF DATA ITEM: Request For Variance (RFV)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW Para. C.3.8.1
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION: AS REQ
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: R/AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: Government will respond within 30 days of receipt.
The Contractor shall respond within 7 calendar days of Government comments.
Electronic submission is requested with email as the preferred format.
The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:55:42-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:55:31-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-SESS-81883 image10.emf
A009 Notice of Revisions (NOR).pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Clarification of submittal dates in Items 12 and 13; Explanation of conformance with Government requirements, and the perform additional work to conform to Government requirements without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
1 DATA ITEM NO: A009
2 TITLE OF DATA ITEM: Notice of Revisions (NOR)
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW Para. C.3.8.1
6 REQUIRING OFFICE: RDAR-EIQ-PE
7 DD 250 REQ: LT
9 DIST STATEMENT REQD: A
10 FREQUENCY: AS REQ
12 DATE OF FIRST SUBMISSION: AS REQ
11 AS OF DATE: AS REQ
13 DATE OF SUBSEQUENT SUBMISSION: R/AS REQ
a ADDRESSEERow1: See Block 16
DraftRow1:
RegRow1:
ReproRow1:
a ADDRESSEERow2:
DraftRow2:
RegRow2:
ReproRow2:
a ADDRESSEERow3:
DraftRow3:
RegRow3:
ReproRow3:
a ADDRESSEERow4:
DraftRow4:
RegRow4:
ReproRow4:
a ADDRESSEERow5:
DraftRow5:
RegRow5:
ReproRow5:
a ADDRESSEERow6:
DraftRow6:
RegRow6:
ReproRow6:
a ADDRESSEERow7:
DraftRow7:
RegRow7:
ReproRow7:
a ADDRESSEERow8:
DraftRow8:
RegRow8:
ReproRow8:
a ADDRESSEERow9:
DraftRow9:
RegRow9:
ReproRow9:
a ADDRESSEERow10:
DraftRow10:
RegRow10:
ReproRow10:
a ADDRESSEERow11:
DraftRow11:
RegRow11:
ReproRow11:
a ADDRESSEERow12:
DraftRow12:
RegRow12:
ReproRow12:
a ADDRESSEERow13:
DraftRow13:
RegRow13:
ReproRow13:
a ADDRESSEERow14:
DraftRow14:
RegRow14:
ReproRow14:
a ADDRESSEERow15:
DraftRow15:
RegRow15:
ReproRow15:
a ADDRESSEERow16:
DraftRow16:
RegRow16:
ReproRow16:
a ADDRESSEERow17:
DraftRow17:
RegRow17:
ReproRow17:
a ADDRESSEERow18:
DraftRow18:
RegRow18:
ReproRow18:
a ADDRESSEERow19:
DraftRow19:
RegRow19:
ReproRow19:
a ADDRESSEERow20:
DraftRow20:
RegRow20:
ReproRow20:
a ADDRESSEERow21:
DraftRow21:
RegRow21:
ReproRow21:
a ADDRESSEERow22:
DraftRow22:
RegRow22:
ReproRow22:
a ADDRESSEERow23:
DraftRow23:
RegRow23:
ReproRow23:
a ADDRESSEERow24:
DraftRow24:
RegRow24:
ReproRow24:
a ADDRESSEERow25:
DraftRow25:
RegRow25:
ReproRow25:
a ADDRESSEERow26:
DraftRow26:
RegRow26:
ReproRow26:
Draft15 TOTAL:
Reg15 TOTAL:
Repro15 TOTAL:
H DATE: 4 FEB 2019
J DATE: 4 FEB 2019
16 REMARKS Continued:
A CONTRACT LINE ITEM NO:
B EXHIBIT:
TDP:
TM:
OTHER:
D SYSTEMITEM: PA103A2 and PA161 Containers
E CONTRACTPR NO:
F CONTRACTOR:
Pg:
pg:
Remarks: Electronic submission is requested with email as the preferred format.
The file used should be compatible with Microsoft Office.
BLOCK 14: SUBMIT ELECTRONICALLY TO: Contact information will be provided in Section "J" after contract award.
2019-02-05T07:57:20-0500
KURTZ.JACK.G.1367700056
2019-02-05T07:57:08-0500
KURTZ.JACK.G.1367700056
8 APP CODE:
4 AUTHORITY Data Acquisition Document No: DI-SESS-81881 image11.emf
A010 Test Inspection Report.pdf
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Item F.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .