Questions and answers for W15QKN-18-R-1006

View the file

Other files

File Type Posted
Amendment_4.docx DOCX document
W15QKN-18-R-1006-A0003.pdf PDF
BB_Snow_Removal_PWS_REVISED.docx DOCX document
Barnes_Snow_Questions_Set_1.docx DOCX document
Barnes_Snow_Questions_Set_2.docx DOCX document
W15QKN-18-R-1006-0002.pdf PDF
Question_and_Answers_2.pdf PDF
W15QKN-18-R-1006_0001.pdf PDF
W15QKN-18-R-1006_Q&A.pdf PDF
Map_Barnes_Building_Snow_Removal.pdf PDF
W15QKN-18-R-1006.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS FROM POTENTIAL BIDDERS

CONTRACT FOR SNOW AND ICE REMOVAL AT THE BARNES BUILDING COMPLEX,

BOSTON MA

AUTHOR: Raymond Prisk, Director of Public Works USAG Fort Devens on 12/20/2017

The scope of work states that the areas to be treated and clear include parking lots 1,3,4 and 5, Inman Street between the Barnes Building and the Fargo Building, the sidewalk and walkways area the Barnes building to include the E street walkway from parking Lot

3 to the Barnes Building. 4. Specific Tasks states that there are 5 separate lots. This does not include parking lot 2, is that correct?

RESPONSE: Snow is to be removed from four (4) Parking Lots 1, 3, 4, and 5 and from

Inman Street. Snow removal in Parking Lot 2 is not included in the statement of work requirements.

Where in parking lot 4 will the snow be stored? Back by the buildings shown in the map?

RESPONSE: Facing Parking Lot 4 from E Street, the snow would be stored in back right

(southeast) quarter of the lot near the small building.

Is anything supposed to be done to the grassy areas shown in the map?

RESPONSE: None. Snow can be piled on to the grassy areas of Parking Lots 3, 4 and 5.

What is the total size of the areas that must be hand shoveled?

RESPONSE: Physical measurement of the hand shoved areas is not available at this time.

How many lineal feet of fence is there?

RESPONSE: 4,197 linear feet.

Can the snow be removed from the fence using equipment or must that be hand shoveled?

RESPONSE: Snow can be removed using equipment or hand. Damage by equipment will need to be repair by and at the expense of the contractor. Snow should not be piled against the fence.

If we are called out more than 1 time in the 24 hour period of a snow and ice event do we get paid for the snow depth at the time of each plow or are we only paid 1 time for the depth of the total event no matter how many times we were called to plow?

RESPONSE: Paragraph 2.2 defines a Snow and Ice Event as the 24 hours period between

1800 hours (6:00 pm) until 1800 hours the next day. You will paid for amount of snow fall during that period. Snow measurements are based upon NOAA’s measurement for

Boston Logan Airport. You are paid one time for snow clearing during that period as according to the amount of inches of snow 1 to 6, 7 to 10, 11 to 15, or 16+. If snow continues past 1800 hours or a second event starts later, snow removal is billed as a separate event.

Is sidewalk clearing included in the shoveling per inch pricing? Or is it billed separately under item # 0006 Snow & ice removal by hand?

RESPONSE: Sidewalk clearing by vehicle or heavy equipment is included in the per inch pricing. Sidewalk clearing by shovel or by a man pushed machine is billed under item #0006.

Item # 0006 snow & ice removal by hand also mentions AFTER the city of Boston has plowed, so is this to be used as like an after storm work charge item?

RESPONSE: At times, the City of Boston will clear snow from the streets and the snow will pile back onto the sidewalks after the contracted snow clearance work has been completed. Item #0006 will be billed when it is necessary to return to the site to reclear the sidewalks

Are there any sidewalk measurements completed?

RESPONSE: The measurements follow:

BARNE BUILDING

Summer Street sidewalk in total is 845 linear feet. That includes the frontage along the building and the frontage along the triangle shaped parking area (Parking Lot 1) . In segment the sidewalk along the building is 488 linear feet and the sidewalk along Parking

Lot 357 linear feet. The total area of sidewalk along Summer Street is 563 square yards.

The total length of sidewalk along the face of the Barnes Building at "D" Street is 132 linear feet. The total area of this sidewalk is 117 square yards.

PARKING LOT #1 (TRIANGLE LOT)

There is 164 linear feet total of sidewalk along the south side of "E" Street at the Triangle

Parking Lot. The total area is 146 square yards.

PARKING LOT #3

Total length of sidewalk at “D" Street is 602 linear feet. Total length of sidewalk at the

Fargo Street is 225 linear feet. The total area of both sidewalks combined is 551 square yards.

PARKING LOTS # 4 and #5

The total length of sidewalk along the South side of “E" Street at the Parking Lot

Frontage is 921 linear feet. The area of this sidewalk is 614 square yards.

Since this project is such a large area, are we able to submit our invoices as we provide service throughout the month, or do we have to do it at the end of each month? I'm asking because it's such a large project for a "small business" to perform that if we provide service on 2/1 and we can only bill on 3/1, that it could take us up to 60 days to get paid from services provided.

RESPONSE: Invoices can be submitted the day after the snow event.