Amendment 0001 to Solicitation W15QKN17R0160

View the file

Other files

File Type Posted
W15QKN17R0160-0004.pdf PDF
W15QKN17R0160-0003.pdf PDF
W15QKN17R0160-0002.pdf PDF
Attachment_0022_-_M205_NDA.pdf PDF
Attachment_0017_-377_-_NUT,SLOTTED,_HEXAGON.doc DOC document
Attachment_0004_-_M205_Tripod_Product_Requirement.pdf PDF
Attachment_0007_-_M205_Tripod_Special_Packaging_Instructions.pdf PDF
Attachment_0013_-377_-_M205_Visual_User_Guide.doc DOC document
Attachment_0015_-377_-_Machine_Gun,_50_Caliber.doc DOC document
Attachment_0005_-_DD2345_Military_Critical_Technical_Data_Agreement.pdf PDF
Attachment_0003_-_M205_Tripod_Certificate_of_Destruction.pdf PDF
Attachment_0016_-377_-_MK93_Carriage_and_Cradle_(PN_13001176).doc DOC document
Attachment_0021_--_DD1348-6_Single_Item_Requisition_System_Document.pdf PDF
Attachment_0008_-377_-_M205_Machine_Gun_Tripod_Mount.doc DOC document
Attachment_0014_-377_-_M3_Pintle.doc DOC document
Attachment_0011_-_377_-_BOLT,_MACHINE,_HEXAGON_HEAD.doc DOC document
Attachment_0020_-_Past_Performance_Questionaire.docx DOCX document
Attachment_0002_--_AMSTA-AR_Form_1350_Technical_Data_Request_Questionnaire.pdf PDF
Attachment_0012_-_377_-_50_Caliber_M33_Ball_Ammunition.doc DOC document
Attachment_0019_-_Clearance_of_Technical_Information_For_Public_Release.pdf PDF
Attachment_0006_-_M205_Tripod_TDP_Request_Form.pdf PDF
Attachment_0018_-377_-_Operators_Manual.doc DOC document
W15QKN17R0160.pdf PDF
Attachment_0009_-_377_-_50_Cal_Ammo_Holder.doc DOC document
Attachment_0010_-_377_-_40MM_Ammo_Holder.doc DOC document
Exhibit_A_-_CDRLs.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2017AUG30

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

MARCOS KAMIYAMA

EMAIL: MARCOS.G.KAMIYAMA.CIV@MAIL.MIL

W15QKN-17-R-0160

2017AUG28

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 9

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARCOS KAMIYAMA

Buyer Office Symbol/Telephone Number: ACC-NJ-SW/(973)724-2137

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0001 to Solicitation W15QKN-17-R-0160 is to:

1. Add a Non-Disclosure Agreement (Attachment 0022) requirement in addition to the completed AMSTA-AR Form 1350 Technical Data Request

Questionnaire (Attachment 0002), approved DD 2345 Military Critical Technical Data Agreement (Attachment 0005), and completed M205

Tripod TDP Request Form to obtain access to the M205 Tripod Technical Data. As a result of this new requirement Section A paragraphs

A.6, A.9, and A.10 are updated.

2. Remove the M205 Tripod Product Requirement (Attachment 0004)as this is already included in the detailed specification of the TDP. As a result Section C paragraphs C.3.3.2, C.3.3.4.1, C.3.3.4.1.1, C.3.3.5 and Section H paragraph H.5 are updated.

3. All other terms and conditions apply and remain unchanged as a result of this Amendment.

*** END OF NARRATIVE A0002 ***

EXECUTIVE SUMMARY_________________

A.1 THIS SOLICITATION IS A 100% TOTAL SMALL BUSINESS SET-ASIDE.

A.2 The Army Contracting Command - New Jersey (ACC-NJ), on behalf of Project Manager Soldier Weapons (PM SW), has a requirement to satisfy for the M205 Machine Gun Tripod Mount (hereafter referred to as M205 Tripod) for the Army and other Services.

A.3 The United States Government intends to award a single Indefinite Delivery/Indefinite Quantity (ID/IQ) contract with Firm Fixed

Price (FFP) Delivery Orders. The contract will include five (5) one (1) year ordering periods to cover FY18 - FY22 Army and Department of Defense (DoD) M205 Tripod requirements. The contract will have a Period of Performance of five (5) years with a total contract ceiling of 19,024 Tripods and a minimum guarantee of $630,000.00. The minimum guarantee will be met when the first delivery order is issued.

A.4 The basis for award of a contract resulting from this solicitation will be the results of the evaluation of the Factors specified in

Section M of the solicitation utilizing the Lowest Price Technically Acceptable (LPTA) Source Selection methodology.

A.5 As part of the solicitation process the Government will make available the Technical Data Package (TDP) for the M205 Tripod in Adobe

Portable Document Format. This TDP (ATTACHMENT 0001) is categorized as Distribution D and contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or Export Administration Act of 1979 (Title 50, U.S.C., App 2401, et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. This also applies to distribution of the TDP to all Subcontractors at every level. The manufacture of the M205 Tripod is restricted to within the United

States and its Territories.

A.6 Only contractors who have a completed and signed AMSTA-AR Form 1350 Technical Data Request Questionnaire (ATTACHMENT 0002), and a ______

Non-Disclosure Non-Use Agreement (NDA) (ATTACHMENT 0022), along with a signed DD 2345 Militarily Critical Technical Data Agreement Form________________________________________________________

(ATTACHMENT 0005) to be executed by an authorized representative of the respondent's firm, will be granted access to the technical data.

At the conclusion of the solicitation process, all respondents in receipt of data covered under the NDA will be required to complete the supplied Certificate of Destruction (ATTACHMENT 0003) notifying the USG that all licensed data received in response to the solicitation have been destroyed.

A.7 The USG is required to maintain records of all persons or entities which have been provided this TDP. This includes name and address of the person/entity, time, date, purpose, and a description of what data was provided.

A.8 Interested offeror's should also note that under the solicitation the complete M205 Tripod TDP will be made available and must be used in proposal preparation. The complete TDP will include: 1) the Adobe Portable Document Format drawing and documents previously made available, 2) ProEngineer drawings, 3) ProEngineer models and 4) Engineering changes approved since the draft RFP. PTC's

ProEngineer Wildfire 5.0 or higher is required to view/utilize the data provided in ProEngineer format.

A.9 Please see Section J for copies of the AMSTA-AR Form 1350, Non-Disclosure Non-Use Agreement (NDA), and U.S. Government Use ______________________________________

2 9

W15QKN-17-R-0160 0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Certificate of Destruction, and the M205 Tripod TDP Request Form (ATTACHMENT 0008).

A.10 To obtain a copy of this TDP: Interested parties must mail/email a completed and signed AMSTA-AR Form 1350 Technical Data Request

Questionnaire, a signed Non-Disclosure Non-Use Agreement, an approved DD 2345 Militarily Critical Technical Data Agreement, and a ___________________________________________________________________________________________________________ completed M205 Tripod TDP Request Form to:

U.S. Army Contract Command - New Jersey (ACC-NJ)

ACC-NJ-SW

ATTN: Marcos Kamiyama, Molly Michaud

Phipps Road, Bldg. 9

Picatinny Arsenal, NJ 07806-5000

Email: marcos.g.kamiyama.civ@mail.mil and molly.l.michaud.civ@mail.mil.

A.11 In the event that the requirement for the M205 Tripod increases 90 days after a delivery order has been issued, the subsequent delivery order for this new requirement will be priced at the quantity range for the cumulative quantity of the prior delivery and the new delivery order.

A.12 THE CERTIFICATE OF DESTRUCTION AND THE ORIGINAL TDP CD MUST BE SENT TO THE ABOVE ADDRESS NO LATER THAN 10 DAYS AFTER RECEIPT OF AN

UNSUCCESSFUL OFFEROR LETTER OR NO LATER THAN 10 DAYS AFTER THE SOLICITATION CLOSES AND THE VENDOR DECIDES NOT TO SUBMIT A PROPOSAL.

COPIES OF THE CD, DIGITAL COPIES TO HARD DRIVES / THUMB DRIVES / SERVER DRIVES, AND ANY PAPER COPIES MUST BE DESTROYED OR RETURNED UPON

RECEIPT OF AN UNSUCCESSFUL OFFEROR LETTER OR UPON DECIDING NOT TO SUBMIT A PROPOSAL.

*** END OF NARRATIVE A0001 ***

3 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

M205 MACHINE GUN TRIPOD MOUNT

STATEMENT OF WORK (SOW)

23 MAY 2017

C 1.0 Scope The objective of this procurement is to manufacture, inspect, assemble, package and deliver M205 Machine Gun Tripod Mounts _____ in accordance with U.S. Government Technical Data Package, the associated individual drawing Quality Assurance Provisions, Specialized

Packaging Instructions (SPI) and this Statement of Work (SOW). The U.S. Government reserves the right to waive the requirement for the

First Article Sample if the offeror is currently producing the item or has produced this item no more than four months prior to award of this solicitation

C 2.0 Applicable Documents ____________________

C 2.1 Government Documents: ______________________

C 2.1.1 Drawing # 13046100, M205 Machine Gun Tripod Mount

C 2.1.2 SPI (AM) # 13046100, M205 Machine Gun Tripod Mount

C 2.1.3 MIL-DTL-32493, Detail Item Specification for M205 Machine Gun Tripod Mount (4 Nov 2015)

C 3.0 Requirements ____________

C 3.1 Technical Requirements ______________________

C 3.1.1 The M205 Tripod shall be fabricated in accordance with the drawings, inspected in accordance with the Quality Assurance

Provisions (QAP) on the associated drawings and in accordance with paragraph 3.3.7 of this Statement of Work, and packaged in accordance with the Specialized Packaging Instructions (SPI) of 2.1.2 and paragraph 3.4 of this Statement of Work

C 3.1.2 Start of Work Meeting The contractor shall conduct a start of work meeting with Government personnel at the contractors facility _____________________ within thirty (30) days following contract award. The contractor shall summarize the meeting minutes and send them to the Government within three (3) days of the meeting (DI-ADMN-81505) Data Item A001.

C 3.2 Deliverable Hardware/Products _____________________________

C 3.2.1 The First Article sample shall be fabricated and submitted one hundred and eighty (180) days after contract award in accordance with the drawings, QAP, and SPI information provided by the Government.

C 3.2.2 Production deliveries shall commence sixty (60) days after approval of First Article.

C 3.2.3 The contractor shall over-pack one (1) M205 Technical Manual with Change 1 and one (1) M205 Visual User Guide for each M205

Tripod delivered. Technical Manuals and Visual User Guides are not required for the First Article quantity.

C 3.3 Quality Assurance Provisions ____________________________

C 3.3.1 Responsibility for Inspection The contractor is responsible for the performance of all inspection requirements as specified _____________________________ herein. The contractor may use his own facilities or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections deemed necessary to ensure that supplies and services conform to prescribed requirements.

C 3.3.2 Responsibility for Compliance All items shall meet all the requirements of the applicable U.S. Government drawings, QAP, SPI and _____________________________ detail specification of the TDP. The absence of any inspection requirements shall not relieve the contractor of the responsibility of_______________________________ ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of this contract.

C 3.3.2.1 The contractor may submit Engineering Change Proposals (ECPs) (DI-SESS-81880) Data Item A002, or Requests For Variance (RFV)

(DI-SESS-81883) Data Item A003. For each document affected by an ECP, the contractor shall submit a Notice of Revision (NOR) (DI-SESS-

81881) Data Item A004.

C.3.3.2.2 The contractor shall prepare a Certification/Data Report (DI-MISC-80678, Tailored) Data Item A005, for all applicable tests as described in DI-MISC-80678.

C 3.3.3 Classification of Inspections Inspection requirements specified herein are classified as follows: _____________________________

a. First Article Inspection (see section 3.3.4)

b. Lot Acceptance Inspection (see section 3.3.5)

4 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C 3.3.4 First Article Inspection The contractor is responsible for performance of the First Article inspection. The First Article shall ________________________ consist of five (5) M205 Machine Gun Tripod Mounts. These five (5) mounts shall be representative of items to be manufactured using the same processes and procedures. The five (5) M205 Tripods shall be inspected in accordance with paragraph 3.3.4.1. The contractor shall prepare Test and Inspection Reports (DI-NDTI-80809B, Tailored) Data Item A006.

C 3.3.4.1 Inspection to be Performed The First Article shall be inspected and tested to all requirements of the drawings, specifications __________________________ and associated QAPs including visual inspection of packaging and packaging material and tested in accordance with the detail ___________ specification of the TDP.________________________

C 3.3.4.1.1 First Article Testing First Article Testing shall be in accordance with the detail specification of the TDP. The Government _____________________ ___________________________________ will provide weapons and ammunition to support the firing requirement referenced.

C 3.3.4.2 Acceptance Criteria Any nonconformity shall be cause for rejection of the First Article. ___________________

C 3.3.5 Lot Acceptance Inspection Lot acceptance inspection and testing shall be conducted as specified in the drawings Quality _________________________

Assurance Provisions and in accordance with the detail specification of the TDP at the contractors facility. The contractor shall ___________________________________ prepare Test and Inspection Reports (DI-NDTI-80809B, Tailored) Data Item A007.

C 3.3.6 Quality Control Program The contractor shall implement and maintain the Quality Program that is incorporated at time of award. _______________________

C 3.3.7 Inspection and Test The contractor shall furnish all equipment for inspections and tests. Test and Inspection equipment designs ___________________ used to verify compliance with the requirements shall be submitted by the contractor to the Government for approval (DI-QCIC-81006, Tailored) Data Item A008.

C 3.4 Packaging Preservation, packing, and packaging of the M205 Tripod shall be in accordance with the Special Packaging Instructions. _________

C 3.5 Environmental Compliance All activities must be in compliance with federal, state and local laws and regulations. ________________________

C 3.6 Safety The contractor shall report immediately any major accident or incident (including fire) resulting in one or more of the _______ following: causing one or more fatalities; or one or more disabling injuries; damage to Government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of equipment under contract such that personal injury or property damage may be involved; identifying a potential hazard requiring corrective action. The contractor shall prepare the report in accordance with

DI-SAFT-81563, Data Item A009 for each incident in accordance with the CDRL.

C 4.0 OPSEC Verification The contractor will implement an employee verification process, whether through background checks or other __________________ similar processes and provide a written response explaining how the verification process was completed and attest to the trustworthiness of the workforce, within forty-five (45) days of contract award (Contractor Format) Data Item A010.

C 5.0 Phosphate Coating and Welding Procedures Phosphate Coating and Welding Procedures Prior to production, approval through the ________________________________________ contracting officer is required within 60 days after contract award. A DD form 250 is not required for phosphate coating or welding procedure approval. Phosphate Coating Procedures shall be submitted (DI-NDTI-80603A, Tailored, Data Item A011). Welding Procedures shall be submitted (DI-NDTI-80603A, Tailored, Data Item A012).

C 6.0 Security Classification The highest security classification for this effort is UNCLASSIFIED. _______________________

C 7.0 Place of Performance The place of performance for this effort shall be at the contractors facility (to be determined at time of ____________________ award).

C 8.0 Information Management Army Information Technology /IA The Contractor shall be capable of accessing, handling, receiving, and ______________________________________________________ storing UNCLASSIFIED documents, equipment, hardware, and test items, using the applicable standards of FOUO information. All Controlled

Unclassified Information (documents designated as FOR OFFICIAL USE ONLY and/or LIMITED DISTRIBUTION) shall be submitted by a controlled means using USPS mail, Safe Access File Exchange (SAFE) website and/or DoD Army approved encryption software as per AR 25-1.

C 9.0 Export Control Laws/International Traffic in Arms Regulation Information Subject to Export Control Laws/International Traffic in ____________________________________________________________

Arms Regulation (ITAR): Public Law 90-629, Arms Export Control Act, as amended (22 U.S.C 2751 et. Seq.) requires that all unclassified technical data with military application may not be exported lawfully without an approval, authorization, or license under EO 12470 or the Arms Export Control Act and that such data required an approval, authorization, or license for export under EO 12470 or Arms Export

Control Act. For purposes of making this determination, the Militarily Critical Technologies List (MCTL) shall be used as general guidance. All documents determined to contain export controlled technical data will be marked with the following notice: WARNING: - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq.

Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive

5230.25.

5 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C 10.0 For Official Use Only Information (FOUO) and Controlled Unclassified Information (CUI): Contract personnel shall be capable of ________________________________________________________________________________________ accessing, handling, receiving, and storing UNCLASSIFIED documents, equipment, hardware, and test items, using the applicable standards of FOUO and CUI. DFARS Clause 252.204-7012 (Safeguarding Covered Defense Information and Cyber Incident Reporting) applies to this effort.

C 11.0 For Contracts That Require Development of an OPSEC Standing Operating Procedure/Plan. The contractor shall develop an OPSEC _____________________________________________________________________________________

Standing Operating Procedure (SOP)/Plan, in accordance with DI-MGMT-80934C, within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will specify the projects critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual becomes

OPSEC Level II certified per AR 530-1. ARDEC OPSEC POC email: usarmy.pica.ardec.mbx.ardec-opsec@mail.mil .

C 12.0 For Contracts That Require OPSEC Training. Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor __________________________________________ employees, must complete initial OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC Officer/Coordinator. The Contracting Officer

Representative (COR) or Agreements Officer Representative (AOR) can request ARDEC OPSEC training from ARDEC OPSEC POC e-mail:

usarmy.pica.ardec.mbx.ardec-opsec@mail.mil.

C 13.0 For Contracts that Involve the Public Release of Information: Per AR 530-1(or DoDM 5205.02-M), an OPSEC review is required prior _____________________________________________________________ to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.

C 14.0 Contracting Officer Representative __________________________________

Anthony Piccolo

US Army RDECOM-ARDEC

ATTN: RDAR-WSW-F (Bldg. 2)

Picatinny Arsenal, NJ 07806-5000 anthony.t.piccolo.civ@mail.mil______________________________

(973) 724-6762

*** END OF NARRATIVE C0001 ***

6 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 MAXIMUM UNITS.

The total maximum number of units for this M205 Tripod effort is 19,024.

H.2 ORDERING.

H.2.1 The minimum guarantee for the contract awardee shall be satisfied with Delivery Order 0001. The Government intends to issue

Delivery Order 0001 concurrently with the base contract award.

H.2.2 The Government reserves the right to award quantities with Delivery Order 0001 that are above and beyond the contract minimum guarantee; the Government may purchase quantities at any range in Ordering Period 1.

H.2.3 Subsequent Orders. All deliveries for orders placed beyond the first production delivery shall be determined on a per delivery order basis.

H.3 MULTIPLE ORDER WINDOW.

In the event that the requirement for the M205 Tripod increases 90 days after a delivery order has been issued, the subsequent delivery order for this new requirement will be priced at the quality range for the cumulative quantity of the prior delivery and the new delivery order.

H.4 ENGINEERING CHANGE PROPOSALS

The initial baseline shall be the Technical Data Package provided by the Government.

H.5 FIRST ARTICLE TEST (FAT) ENDURANCE LIVE FIRE TESTING REQUIREMENTS

Any Offeror awarded a contract resulting from the formal solicitation shall be required to conduct First Article Test(s) (FAT) and a

Lot Acceptance Test(s) (LAT). A crucial aspect of FAT is a Live Fire Test requirement to be performed by the successful Offeror.

The Live Fire Test requirement(s) will be solely performed by the contractor. Awardee will be required to safely and securely store

Government furnished machineguns, ammunition, and equipment in order to be considered for award. The Live Fire Test requirement is outlined in the detail specification of the TDP. ___________________________________

H.6 DELIVERABLE HARDWARE/PRODUCTS

The contractor shall over-pack one (1) M205 Technical Manual with Change 1 and one (1) M205 Visual User Guide for each M205 Tripod delivered. Technical Manuals and Visual User Guides are not required for the First Article quantity.

H.7 SCHEDULE OF GOVERNMENT FURNISHED PROPERTY

H.7.1 The Government will furnish and deliver (FOB Contractor's place of performance) the property listed below.

H.7.2 If the delivery schedule is not met, the Contractor will notify the Contracting Officer in writing.

H.7.3 Government Furnished Property Delivery Schedule:

| Name | QTY per contractor | Time of Delivery |

| Machine Gun, Cal .50: M2A1 | 2 | 120 DAC |

| M2A1 Machine Gun Barrel | 4 | 120 DAC |

| .50 Caliber, M33 Ball Ammunition | 10,500 | 120 DAC |

| Replica M2 Machine Gun | 1 | 120 DAC |

| M205 Operator's Manual w/ Change 1 | 1 per tripod | 180 DAC |

| M205 Visual User Guide | 1 per tripod | 180 DAC |

| MK93 Carriage and Cradle | 1 | 90 DAC |

7 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

| .50 Cal Ammo Holder | 1 | 90 DAC |

| 40mm Ammo Holder | 1 | 90 DAC |

| M3 Pintle | 1 | 90 DAC |

| M3 Pintle Bolt | 1 | 90 DAC |

| M3 Pintle Nut | 1 | 90 DAC |

*** END OF NARRATIVE H0001 ***

8 9

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0004 M205 PRODUCT REQUIREMENT DELETED 002 EMAIL

Attachment 0022 M205 NON-DISCLOSURE NON-USE AGREEMENT (NDA) 30-AUG-2017 004 EMAIL

9 9

SECTION A
SECTION C
SECTION H
SECTION J

File details come from the government source that posted it. Updated .