AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0005 2015OCT01
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
WILLIAM JOSEPH LABANCE
EMAIL: WILLIAM.J.LABANCE.CIV@MAIL.MIL
W15QKN-15-R-0079
2015AUG31
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 21
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: WILLIAM JOSEPH LABANCE
Buyer Office Symbol/Telephone Number: ACC-NJ-MA/(973)724-6673
Type of Contract 1: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
Executive Summary
Background:___________
Description: The U.S. Army Contracting Command New Jersey (ACC-NJ), on behalf of The Office of the Project Manager, Maneuver Ammunition
Systems, located at Picatinny, NJ is seeking possible sources capable of providing ON-SITE Information Technology (IT) support. Required support will include coordination, trouble shooting, and management of networks, hardware, software, and operating systems. Sources will be required to possess a secret clearance.
Acquisition Approach:_____________________
The acquisition approach is Full and Open Competition (F&OC) for the award of a single, five (5) year, Firm Fixed Price (FFP) contract consisting of a base with four (4) option years. The single award Firm Fixed Price (FFP) contract will be set aside to small business.
This contract will be awarded on a best value basis utilizing the trade-off source selection methodology. The Government will select for award the proposal that is most advantageous and represents the best value to the Government giving due consideration to the relative order of importance of the factors. The Government will weigh the relative benefits of each proposal and award will be made based on an integrated assessment of the results of the evaluation. The Government anticipates a single award and reserves the right to make an award without discussions.
*** END OF NARRATIVE A0001 ***
The purpose of this amendment is as follows:
1. To hereby remove Trade Booth Management as a requirement of the solicitation. Reference to "Trade Booth" has been removed from the following sections of the solicitation:
- SUPPLEMENTAL INFORMATION
- DESCRIPTION/SPECIFICATIONS/WORK STATEMENT (Performance Work Statement)
- LIST OF ATTACHMENTS
- INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
- EVALUATION FACTORS FOR AWARD
2. To answer the following industry questions:
Question: Performance Work Statement (PWS) section 6.5.2 says AT training must be completed for contractor employees/subcontractor employees requiring access Army installations. Does this mean contractor employees with Government furnished work spaces or access to
Government facility display spaces?
Answer: This refers to contractor employees with Government furnished work spaces.
Question: If subcontractor employees need AT training, is the small business prime contractor expected to go into another business and train the employees? Is this a billable expense?
Answer: AT Level I Training is available at the following website: http://jko.jten.mil. The prime contractor is responsible for submitting certificates of completion of training by all employees and subcontract personnel.
Question: What should offerors use as the presumed start date in developing the prices?
Answer: April 2016 should be used as the presumed start date.
Question: The Solicitation requires offerors to submit a Compensation Plan in accordance with FAR 52.222-46 Evaluation of Compensation for Professional Employees. Are Offerors to include this plan in Volume III - Price?
Answer: FAR 52.222-46 does not apply to solicitation and has been deleted as part of this amendment.
2 21
W15QKN-15-R-0079 0005
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Question: Section B has CLIN 0015 CDRLs designated as NSP; however in the instructions for Volume V (paragraph 4.5) it states that blocks 17 & 18 on the CDRLs are to be filled in with the Price Group (17) and Total Estimated Price (18). Recommend the Government delete the requirement to complete the CDRLs since this information is not a requirement for this procurement.
Answer: Blocks 17 & 18 on the CDRLs are to be filled in. In the event the Government descopes the requirement, the Government will need to know the cost of the report to determine what kind of savings or amount of money returned.
Question: Volume V paragraph 4.5.1 instructions states: "Each Offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the solicitation." Does the Government want Offerors to complete the Solicitation document itself and submit a complete copy of the Solicitation; or, can offerors simply include the applicable sections in their entirety in the body of Volume V?
Answer: Offerors shall complete the Solicitation document itself and submit a complete copy.
Question: The Solicitation states in a couple of places that work will be performed On-site (Government facilities), yet in the Volume
III instructions (4.2.2) it states:
"the Government shall consider any potentially unfair competitive advantage that may result from an offeror using Government property.
To eliminate the competitive advantage, a rental equivalent valuation factor shall be added to each offer which is predicated on the use of Government property. Offerors shall refer to Local Clause 52.245-4003 Use and Rental of Government Property for submission instructions." Is - or is not - the Government providing facilities and associated services and equipment in the performance of the resultant contract? If it is providing these facilities, recommend this paragraph be deleted as this requirement does not appear to apply to the services being provided in the PWS.
Answer: The Government agrees and the referenced paragraph has been removed from the soliciation via this amendment.
Question: PWS section 6.5.16 says that the Contractor must be capable of handling, receiving and storing SECRET documents. If the work is performed on-site at OPM MAS, why is the contractor required to receive and store SECRET documents?
Answer: The PWS has been revised to read "unclassified" in paragraphs 6.5.3 and 6.5.16.
*** END OF NARRATIVE A0006 ***
3 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PERFORMANCE WORK STATEMENT
Maneuver Ammunition Systems
Automated Data Processing/Information Technology On-Site Support
1.0 Scope
2.0 Background
3.0 Objectives
4.0 Documents
5.0 Requirements
6.0 Additional Requirements
7.0 Performance Requirement Summary/Quality Assurance Surveillance Plan (PRS/QASP)
1.0 Scope:
This Statement of Work describes administrative and technical support requirements for The Office of Project Manager for Maneuver
Ammunition Systems (OPM-MAS) Information Technology Services.
2.0 Background:
2.1 The OPM-MAS, Bldg. 354, and Picatinny Arsenal, NJ utilize a variety of software applications for budgetary, project management, presentation, and data communication tasks.
2.2 The OPM-MAS has desktop and laptop computers, wireless communication devices, supporting servers and peripheral equipment, video
Teleconferencing and conference room audio/video/data equipment. This equipment operates either directly or indirectly from a myriad of software acquired and accessed through a number of sources and media.
2.3 All of these hard and soft assets require system support, coordination and management on a daily basis. These hard and soft assets combined with system coordination/management, support the project management, scientific, engineering, business and clerical activities, and are critical to OPM-MAS operations and mission accomplishment.
3.0 Objective:
The OPM-MASs goal mirrors the Armys goal to achieve a near paperless environment and to this end, manage all information and data in an automated fashion which enhances daily productivity of OPM-MAS personnel.
4.0 Documents:
The contractor shall use the following documents as appropriate to meet the requirements stated herein:
4.1 Mandatory Documents:
Number______ Title _____ Date____
Army Regulation 25-1 Army Information Technology 25 June 2013
Army Regulation 25-2 Information Assurance 24 October 2007
Army Regulation 5-9 Area Support Responsibilities 16 October 1998
Army Regulation
380-67 Personnel Security Program 24 January 2014
DODI 2000.16 AntiTerrorism 08 December 2006
Army Regulation
525-13 AntiTerrorism Regulation 11 September 2008
4.1.2 Reference Documents/Guidance:
Number______ Title _____ Date____
Number 5000.01 DoD Directive May 12, 2003
Number 5000.02 DoD Instruction 07 January 2015
N/A Defense Acquisition Guidebook https://dag.dau.mil
4 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
S.933 American Disabilities Act 1990
FAR 9.505-4 Obtaining access to proprietary Information 1990
5.0 Requirements: The contractor shall provide On-Site Information Technology (IT) support, coordination and management for OPM-MAS networks, hardware, software, operating systems, and applications in accordance with documents listed in Paragraph 4.1 Mandatory
Documents. This support, coordination, and management will include, but is not limited to:
5.1 IT Hardware and Software:
Programs Utilized Software: Adobe CS6: Adobe After Effects, Adobe Acrobat Professional, Adobe Bridge, Adobe Illustrator, Adobe
ImageReady, Adobe PhotoShop, Adobe Premiere, Adobe Acrobat Reader, Auto FX Filters, Camtasia Studio 3, Digital Juice, Fixmo SafeZone, Gravograph software, HP Scanner & plotter software, InfoPath, Microsoft Access, Microsoft Excel 2013, Microsoft PhotoDraw, Microsoft
PowerPoint 2013, Microsoft Project 2013, Microsoft Publisher 2013, Microsoft Visio Professional 2013, Microsoft Word 2013, Printshop
Deluxe, Roxio Creator DE, Smart Draw 7, Snag IT 8
Video Editing Software Utilized - Adobe Premiere, Compressor (MAC), Apple Quicktime Pro, DVD Studio Pro (MAC), Digital Juice Editors
Toolkit, Final Cut Pro HD, Microsoft Movie Maker, Roxio Easy Media Creator
Information Technology Software - Active Directory User Manager, Adobe Connect, Adobe Flash Player, Adobe Shockwave Player, AirPort
Utility, Axway Desktop Validator, Blackberry Desktop Manager, Blackberry S/MIME Support Package, Cisco AnyConnect VPN Client, Google
Chrome, Host Based Security System, IBM Lotus Sametime Connect, Java Runtime Environment, LotusForms 4.0, McAfee VirusScan Enterprise, Microsoft Internet Explorer 9, Microsoft Media Player, MobileIron Mobility Software, Mozilla FireFox, MS SCCM Client, NetReg, PowerDVD
DX Player, Quick Time, Safari, Webmail application, WinZip
Hardware- Apple Macintosh computers, Blackberry CAC Readers, Blackberry devices, Mifi Devices, Cisco routers, Ledco Cutting machines, Dremel equipment, Engraver, Laminating machine, Network switches, Network wiring , Plotters, PC Platform, MAC Platform, Printers, Public
Key Infrastructure (CAC), Routers, Video teleconferencing equipment
Operating Systems Windows, OS X, iOS, Blackberry, VTC
5.1.1 Support desktop and laptop PC and peripheral installation, configuration, upgrading, and troubleshooting. This includes, but is not limited to, Dell desktop and laptop computers, Apple Macintosh computers, Hewlett Packard printers and scanners, Visioneer scanners
Logitech and MS input devices.
5.1.2 Ensure reliable hardware functionality by directly conducting repairs or arranging for repairs (warranty or service call through the OPM-MAS Administrative Officer).
5.1.3 Assist employees to resolve questions regarding use of hardware.
5.1.4 Provide multimedia hardware support for PM conference rooms. Visual presenters and multiple brands of audio & video equipment.
5.1.5 Resolve account management, file space, or related server issues.
5.1.6 Install, configure and troubleshoot Linksys and Cisco network equipment.
5.1.7 Resolve issues regarding use of the following software including but not limited to Microsoft Windows, Apple OS, Microsoft Office
Professional, Microsoft Visio, Microsoft Outlook, Microsoft Media Player, Real Player, QuickTime, Adobe Acrobat, Cisco IPTV Viewer, Cisco VPN, Symantec Antivirus, Video Teleconferencing Software, and SAP.
5.1.8 Provide multimedia software and video teleconference support for conference rooms.
5.1.9 Support vulnerability management for operating systems and applications.
5.2 IT Communication:
5.2.1 Support IT communications peripherals including installing, configuring, upgrading, and troubleshooting communications peripherals
(Blackberry wireless devices, cellular modems).
5.2.2 Assist employees to resolve questions regarding use of hardware and software.
5.3 IT Hardware/Software Assessment:
5 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5.3.1 Provide IT business administration support: research, analysis, planning, and capital investment recommendations. Investigate industry hardware, software, systems, emerging technologies to benefit computing and networking infrastructure.
5.3.2 Asset inventory and allocation.
5.3.3 Document system configuration.
5.4 Graphics: See labor category Sr. Graphics Artist paragraph 6.1.1 and Graphics Artist paragraph 6.1.2 for a detailed list of graphics
Software.
5.4.1 Briefings: Prepare and modify computer-based briefing materials. The contractor shall also incorporate a variety of graphics and special effects to generate multimedia presentations when necessary.
5.4.2 Website: Develop and maintain an office web site using FrontPage as the development tool.
6.0 Additional Requirements:
6.1 Labor Categories: The labor categories listed below are the suggested labor categories which the Government anticipates will be necessary to perform the tasks for this proposed contract effort. Offerors may propose alternate labor categories, provided they are equivalent to the suggested categories below and meet the respective stated requirements for each category.
6.1.1 Sr. Graphics Artist: The candidate will be required to prepare high-level computer graphic presentations, training materials, exhibits, logos, awards, material layouts, and project schedules. Candidate will be involved in all aspects of graphics projects from conceptualization and development to final presentation. Specifically, the candidate is required to work with the application of the following software: Adobe CS6: Adobe Acrobat Professional, Adobe Bridge, Adobe Illustrator, Adobe ImageReady, Adobe PhotoShop, Adobe
Premiere, Adobe Acrobat Reader, Auto FX Filters, Camtasia Studio 3, Digital Juice, Gravograph software, Quicktime, HP Scanner & plotter software, InfoPath, Microsoft Access, Microsoft Excel 2013, Microsoft PhotoDraw, Microsoft PowerPoint 2013, Microsoft Project 2013, Microsoft Publisher 2013, Microsoft Visio Professional 2013, Microsoft Word 2013, Printshop Deluxe, Roxio Creator DE, Smart Draw 7, and
Snag IT 8. The candidate must exercise creative judgment, and originality by translating requirements into graphics including development of specialized graphic materials and/or working with other Government employed contractors at ARDEC to produce materials that cannot be produced in-house. The candidate must perform video editing utilizing: Adobe Premiere, Digital Juice Editors Toolkit, and
Microsoft Movie Maker. The candidate will perform scheduling utilizing MS Project as well as creating databases. In addition, candidate must operate graphics hardware including a host of printing equipment (plotters, printers & large scale lamination process) along with state of the art cutting machines, engravers, Dremel equipment, pc platform and Video Teleconferencing equipment. Also, the candidate will assist users with software issues that include MS Word, Excel, Acrobat and Project. Candidate will provide supervision, technical training and guidance to lower-level graphics personnel. Candidate will be required to handle classified and sensitive information necessary for completing work assignments.
6.1.2 Graphics Artist: This position contributes to or develops the design, layout, and production of brochures, pamphlets, briefings, posters, displays, and other materials; assists in making recommendations to the Sr. Graphics Artist on methods and materials; assists in the creation of presentations including graphics, charts, photos and clip-art including determining style, size and arrangement of text and images. The position will also require the creation of other graphic materials, including scanned documents and photography.
The candidate for this position will utilize a variety of software applications including: Adobe CS6: Adobe After Effects, Adobe
Acrobat Professional, Adobe Bridge, Adobe Illustrator, Adobe PhotoShop, Adobe Acrobat Reader, Digital Juice, Gravograph software, HP
Scanner & plotter software, Microsoft Excel 2013, Microsoft PowerPoint 2013, Microsoft Project 2013, Microsoft Publisher 2013, Microsoft
Word 2013 and the following Information Technology Software: Microsoft Internet Explorer 9, Microsoft Media Player, Quick Time, and
Webmail application. In addition to the aforementioned skills, the candidate will be required to operate graphics hardware including a variety of printing equipment (plotters, printers, engravers & large scale lamination process and set ups) along with state of the art cutting machines, and PC platform. The candidate must perform video editing software Apple Quicktime Pro and the set up and operation of video teleconferencing equipment.
6.1.3 Multimedia & Technical Applications Specialist: This position will serve as task leader for the contract. The candidate is required to perform video editing, computer graphics, multimedia presentations and information technology support. The candidate must set up and troubleshoot blackberry, enterprise mobility devices and cellular modems. The candidate must install, repair and trouble shoot PCs and notebook computers with a Microsoft Windows 7 Enterprise operating system. The candidate must install, repair and trouble shoot Apple Macintosh computers running Apple OS X and iOS along with the operating systems for Windows, blackberry and VTC. The candidate must set up and troubleshoot blackberry and cellular modems. The candidate will be required to utilize the Public Key
Infrastructure. The candidate must set up and operate video teleconferencing equipment including establishing bridges and troubleshooting as needs arise. The candidate will utilize the following software: Adobe CS6: Adobe Acrobat Professional, Adobe
PhotoShop, Adobe Premiere, Adobe Acrobat Reader, Auto FX Filters, Digital Juice, Fixmo SafeZone, HP Scanner & plotter software, Microsoft Excel 2013, Microsoft PowerPoint 2013, Microsoft Project 2013, Microsoft Publisher 2013, Microsoft Visio Professional 2013, Microsoft Word 2013, Printshop Deluxe, Roxio Creator DE, Smart Draw 7, Snag IT 8; and the following Video editing software: Adobe
Premiere, Compressor (MAC), Apple Quicktime Pro, DVD Studio Pro (MAC), Final Cut Pro HD, Microsoft Movie Maker, Roxio Easy Media
Creator; the following Information Technology Software: Active Directory User Manager, Adobe Connect, Adobe Flash Player, Adobe
Shockwave Player, AirPort Utility, Axway Desktop Validator, Blackberry Desktop Manager, Blackberry S/MIME Support Package, Cisco
6 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
AnyConnect VPN Client, Google Chrome, IBM Lotus Sametime Connect, Java Runtime Environment, LotusForms 4.0, McAfee VirusScan Enterprise, Microsoft Internet Explorer 9, Microsoft Media Player, MobileIron Mobility Software, Mozilla FireFox, NetReg, PowerDVD DX Player, Quick
Time, Safari, Webmail application, and WinZip. In addition to the aforementioned skills, the candidate will be required to operate graphics hardware including a variety of printing equipment (plotters) and other hardware such as, Apple Macintosh computers, Blackberry
CAC Readers, Blackberry devices, Mifi Devices, Plotters, PC Platform, MAC Platform, Printers, Public Key Infrastructure (CAC), and Video teleconferencing equipment. The candidate will organize and manage tasks on a priority basis both with the technology support and the graphics support.
6.1.4 Sr. Hardware Manager: The candidate must provide support for computer hardware both PC and Macintosh, networks, Outlook/Exchange technology, information assurance, including secure networks, remote access systems, and emerging technologies. The candidate will setup and configure PCs, workstations and laptop computers in the MS Windows Active Directory Environment. The candidate will troubleshoot network support issues. The candidate must work with CISCO and Linksys network electronics and manage the installation, upgrade and or replacement of network switches, routers and wiring. The candidate must work with plotters, PC platform, MAC platform, and printers. The candidate must work with software vulnerability management and information assurance tools such as PATCHLINK. The candidate must work with the following software: Adobe Acrobat Professional, Adobe Acrobat Reader, Microsoft Excel 2013, Microsoft Powerpoint 2013, Microsoft Word 2013; and with the following Information Technology Software: Active Directory User Manager, Adobe Connect, Adobe Flash
Player, Adobe Shockwave Player, AirPort Utility, Axway Desktop Validator, Cisco AnyConnect VPN Client, Google Chrome, Host Based
Security System, IBM Lotus Sametime Connect, Java Runtime Environment, LotusForms 4.0, McAfee VirusScan Enterprise, Microsoft Internet
Explorer 9, Microsoft Media Player, Mozilla FireFox, MS SCCM Client, NetReg, PowerDVD DX Player, Quick Time, Safari, Webmail application, and WinZip. The candidate must perform video editing with Microsoft Movie Maker and Roxio Easy Media Creator. The candidate will also be required to work with Public Key infrastructure (Common Access Card) for the sending and receiving of digitally signed and/or encrypted email. The candidate must work with secure network systems and assist users with transmission, storage and printing.
The candidate must work with dialup systems, wireless cellular systems, CISCO VPN software and File Transfer Protocol software. The candidate must maintain and repair Macintosh hardware and software running on the OS X and iOS operating systems along with Windows and
Blackberry operating systems. The candidate will act as the Directorate of Information Management (NEC) Liaison and be required to report maintenance issues to the NEC contractors and ensure repairs and/or resolutions are carried out in a timely manner.
6.2 Each labor category shall be staffed full time with one dedicated person for the period of performance. Full time is defined as 1920 hours per man year. Although not anticipated, overtime may be required and will be compensated incrementally as necessary.
Overtime hours will be granted with prior approval from the Contracting Officer Representative (COR) and Procuring Contracting Officer
(PCO) through the exercise of the overtime option.
6.3 Overtime Option: The contractor must notify the COR when they feel that overtime hours will be required to accomplish a task that has been given upon short notice.
6.4 Government Furnished Facilities/Equipment: The government shall furnish access to government computers/equipment, as appropriate, to the contractor to accomplish this effort. Full-time contractor personnel shall be based in OPM-MAS.
6.5 Security:
6.5.1 Any information or data developed under this effort belongs to the U.S. Government and shall be classified at a minimum for official use only. No information or data shall be released by the contractor without the approval of the PCO.
6.5.2 Only U.S. Citizens are authorized to work on this effort. The Contractor is required to abide by the conditions set forth in the
Contract Clause IDENTIFICATION AND ACCESS ELIGIBILITY REQUIREMENTS OF CONTRACTOR EMPLOYEES (52.000-4000, HS7011, ARDEC 68, MAR 2015).
All employees must wear their security badge at all times.
6.5.3 The Contractor will observe and comply with all security provisions in effect at each selected site. Contractor personnel shall have the appropriate level of investigation and/or security clearance for each site of performance of work. Work associated with this contract effort will be UNCLASSIFIED Information or data developed under this contract belongs to the U.S. Government. The contractor shall not release any information or data without the approval of the PCO.
6.5.4 To preserve national security interests, the contractor shall ensure that all aspects of the work performed under specific task are evaluated for conformance with security procedures and standards. The contractor shall evaluate all information, material, products for security implications and prepare appropriate security documents and plans as necessary. The contractor shall support the government in the management of special security activities.
6.5.5 Classified access is required under this contract effort. The contract will include a DD form 254 Security Classification
Specification covering the specific needs for the classified effort. See SIPRNET access indicated in 6.5.10 below.
6.5.6 Antiterrorism Requirements (AT): All DoD employed contractors are required to be AT awareness trained under terms and conditions as specified in DODI 2000.16 and in accordance with Army Regulation (AR) 525-13. All contracts per AR 525-13, paragraph 5-19. Standard
18, 11 Sep 2008, AT Measures for Logistics and Other Contracting are required to include AT Level I requirements. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall
7 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30 days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
http://jko.jten.mil.
6.5.7 Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services or Security
Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.209-9, Personal Identity
Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the charges otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
6.5.8 Before Common Access Card (CAC) issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency
Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Direction 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, o
DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3)
Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
6.5.9 iWatch Training. The contractor and all associated sub-contractors shall brief all employees on the local iWatch program (AR 525-
13) (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed with 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results report to the COR no later than 30 calendar days after contract award.
6.5.10 All contractor employees with access to a government information system must be registered in the Army Training Certification
Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access for the IS and then annually thereafter.
6.5.11 Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training (AR 530-1). New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
6.5.12 All contractor employees and associated sub-contractor employees must complete the DoD Information Assurance (IA) training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DOD 8570.01-M, and AR 25-2 within six months of appointment to IA/IT functions.
6.5.13 Per DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
6.5.14 Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified
Confidential, Secret, or Top Secret and requires contractors to comply with (1) The Security Agreement (DD Form 441), including the
National Industrial Security Program Operating Manual (DoD 5220.2-M); (2) any revisions to DoD 5220.22-M, notice of which has been furnished to the contractor.
6.5.15 For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.
6.5.16 The contractor shall be capable of handling, receiving and storing UNCLASSIFIED documents, equipment and test items, using the applicable standards outlined in AR 380-5 and DoDM 5200.01 Vols. 1.4.
6.5.17 All contractor personnel performing Information Technology (IT) sensitive duties are subject to investigation required in accordance with AR 25-2 and AR 380-67 and other affiliated regulation. Upon termination of employment in sensitive automation duties or temporary separation for a sixty (60) day period or more, contractor employees shall attend a Termination Briefing, and shall execute a
Security Termination Statement. Primary and subcontractor facilities under government contract will comply with their policies and procedures authorized through their Defense Security Service Industrial Security Specialists for IT sensitive duty requirements.
6.5.18 A Certificate of Non-Disclosure shall be signed and returned to the COR prior to task order inception.
6.5.19 Contractor shall maintain a SIPRNET account in order to assist employees with their SIPRNET accounts.
6.6 Reports: In contractor format, the contractor shall prepare and deliver to the government on a monthly basis the schedule of projected and accomplished hardware and/or software changes and a log of significant IT activities. The contractor shall provide a
8 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
system for weekly electronic reporting that records/tracks all issues identified by the COR. A draft of the system will be prepared in contractor format and submitted for government approval during the first week of work. The contractor shall submit a monthly progress and status report in accordance with DI-MGMT-80227 (CDRL A005).
In contractor format, within 10 days of contract award, the contractor shall prepare and deliver to the government the following: (1)
Name of Contractor; (2) Contract Number (including the task order number, if applicable);(3) Start date and end date of contract; (4)
Names of contractor personnel occupying administrative space at Picatinny;(5) The Building number the contractor personnel occupy. This shall be in accordance with DI-MGMT-81596 (CDRL A006).
6.7 Network Enterprise Center (NEC) Contracting Officers Representative (COR): Army Regulation (AR) 25-1 mandates that each
Garrison/location have a single NEC, designated by and established under the Garrison Commander.
The Garrison NEC is responsible for executing and implementing Command, Control, Communications, Computers and Information Management
C4IM common-user services.
The Chief of Staff, Army (CSA) directed the move to one Army network. The Chief Information Officer (CIO)/G-6 serves as the Executive
Agent for implementation of this plan.
Formally staffed Army-wide Aug 2005.
Single NEC Action Plan 2002 2005: The Single NEC Action Plan for Common-User Services outlines a strategy to consolidate C4IM common user baseline services within a Garrison NEC as designated in AR 5-9, Table C2.
This Action Plan mandates that each installation have a single NEC responsible for delivering common-user baseline services.
Therefore, in addition to the currently designated contracting officers representative (COR) for mission related IT tasks, the government supports designation, by the Contracting Office, of an IT COR from the Picatinny Arsenal NEC to provide oversight and guidance to mission contractor employees performing common-user IT services normally provided by the NEC or related services as described below:
a. Communication Systems and System Support - providing switch-based and wireless communications to facilities and/or activities of an installation.
b. Visual Information Systems - providing customers with visual information products and services.
c. Document Management - managing information e.g. provide official electronic forms and official publications.
d. Information Assurance - providing necessary Communications Security (COMSEC) and Computer Security (COMPUSEC) requirements.
e. Automation - providing software and hardware components necessary to process and store data, as well as the management services needed to maintain them.
The contractor employees will adhere to all applicable regulations, technical standards, policies, and procedures as provided by the NEC
IT COR and as approved by the Single NEC IPT.
6.8 Manpower Reporting: Contractor Manpower Reporting (CMR)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Maneuver Ammunition Systems Automated Data Processing/Information Technology Support via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/, and then click on Department of the Army CMRA or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each
Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on Send an email which is located under the Help Resources ribbon on the right side of the login page of the applicable
Service/Components CMR website.
6.9 Surveillance Plan: All of the work in the SOW shall be performed in accordance with the attached surveillance plan. Since this is a performance-based service acquisition, if the contractor does not perform the services adequately in accordance with the surveillance plan, then the Contracting Officers Representative (COR) will not process the invoice for payment until work has been performed adequately.
7.0 Performance Requirement Summary/Quality Assurance Surveillance Plan (PRS/QASP): See List of Attachments
*** END OF NARRATIVE C0001 ***
9 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
10 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0007 PM MAS BOOTH INVENTORY LIST DELETED 002 EMAIL
11 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 DELETED 52.222-46 EVALUATION OF COMPENSATION FOR PROFESSIONAL EMPLOYEES FEB/1993
1.0 PROPOSAL SUBMISSION:
1.1 Introduction: This section contains general proposal submission instructions as well as specific proposal requirements for PM-MAS
On-site Information Technology Services.
1.2 General: The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the
Request for Proposal (RFP). The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
2.0 PROPOSAL INSTRUCTIONS
2.1 General:
2.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation.
The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
2.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.
2.1.3 The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.
2.1.4 Alternate Proposals: Alternate proposals will not be accepted.
2.1.5 Proposals shall be valid for 150 days from closing date of RFP.
2.2 All questions concerning this procurement, either technical or contractual must be submitted in writing to the Contracting Officer.
No direct discussion between the technical representative and a prospective Offeror shall be conducted. Questions and proposals shall be submitted to the following point of contact:
William Labance
Army Contracting Command New Jersey
ACC-NJ, Bldg. 10
ATTN: William J. Labance Telephone: (973)724-6673
Picatinny Arsenal, NJ 07806-5000
E-mail: william.j.labance.civ@mail.mil
Please note that electronic e-mail proposal submissions will not be accepted.
2.3 The proposal shall consist of the following:
2.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:
a. One (1) signed and completed paper copy of the attached Standard Form 1449 (SF 1449) and continuation sheets signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the CLINs/Pricing Matrices, any fill-ins required, such as
Contract Data Requirements List: DD Form 1423 with Blocks 17 and 18 completed if required, and Certifications and Representations.
Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses.
For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government Property, if applicable.
b. Original and three (3) paper copies and five (5) electronic CD copies of the proposal volumes, as reflected in 3.0, shall be compiled using the Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, and formatted for an MS Windows compatible computer. The Price Factor shall be contained on a separate CD from non-price
Factors. Price breakdown, when applicable, will include MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the Offerors Name and
12 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the Solicitation Number. Alternatively, files may be provided in Portable Document Format (.pdf).
c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all
Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the Information Technology Support solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (S.A.M.) at https://www.sam.gov/ and provide one (1) hard copy and one (1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.
3.0 FORMAT FOR PROPOSALS
3.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.
Page limitation for each Volume is as follows:
Volume I: On-Site Support Determination (No page limit)
Volume II: Technical Factor (Maximum of 40 pages. Resumes and Slide Show do not count against page limit)
Volume III: Price (No page limit)
Volume IV: Past Performance (No page limit)
Volume V: Solicitation, Offer and Award Documents, Certifications/Representations (No page limit)
3.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:
Margins Top, Bottom, Left, Right - 1
Gutter 0
From Edge Header, Footer 0.5
Page Size, Width 8.5
Page Size, Height 11
3.3 Length:
3.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will be returned to the Offeror and will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one additional page. The font used shall not be less than 10 point.
3.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring Contracting
Officer (PCO) no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.
3.3.3 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal. Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Evaluation Factors for Award
Section of the RFP.
3.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.
4.0 SPECIFIC PROPOSAL INSTRUCTIONS
Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Performance Based Statement of Work (PBSOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable PBSOW paragraph by placing the appropriate PBSOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the PBSOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information
13 21
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
and data provided shall be specific to the PM-MAS On-site Information Technology Support, except for the area of Past Performance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .