This document is a Questions and Responses file for the Army Enterprise Public Safety Answering Point (PSAP) Modernization solicitation (PSAP_25-01). The U.S. Army is seeking a comprehensive solution to modernize emergency communications systems across 38 Continental United States military installations, focusing on implementing Computer Aided Dispatch (CAD), Next Generation 9-1-1 (NG-911) Call Handling Equipment (CHE), and Location Information Services (LIS). The project involves a five-year fielding plan with implementations of 8 installations per year, with a base period and four option years.
Key requirements include developing fully redundant, IP-based emergency communication systems that integrate with existing infrastructure, support multiple mission partner networks, and meet specific technical standards including JITC approval. The solicitation uses an Army Open Solicitation framework with a potential Other Transaction Agreement (OTA) mechanism. Vendors must submit detailed solution briefs by October 17, 2025, with ROM pricing for NG-911, CAD, and LIS subsystems. The government anticipates initiating the period of performance in FY26 Q2 or Q3, with a 6-month operational demonstration requirement and subsequent 12-month implementation periods for each installation. Specific technical details and precise installation requirements will be finalized during post-award site coordination visits.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSAP_25-01
| Questions and Responses for Call Number PSAP_25-01 | ||||||
| Question No. | Date Received | Referenced Documentation | Page, Paragraph or Section | RFP Language/Issue/Reference | Question | Government Response |
| 1 | 9/5/25 | The solicitation mentions the goal of making operations easier for dispatchers and first responders. | Is the Fire Station Alerting (FSA) System included within the current scope of work, or should it be considered? | The Fire Station Alerting (FSA) System is not included within the current scope of work. However, the scope is to provide an interface to existing FSA systems. | ||
| 2 | 9/10/25 | Call for Solution | 6.1.e. | The Team Lead shall include a separate Affirmation of Business Status Certification form (Attachment 0002 – Affirmation of Business Status Certification) for each company/vendor participating in the prototype project. | Will the Government please provide Attachment 0002, along with any other attachments associated with this solicitation? | Attachment 0002 was provided in Amendment Call #2. |
| 3 | 9/10/25 | Call for Solution | 8.ORGANIZATIONAL CONFLICT OF INTEREST (OCI) | The Offeror shall perform an OCI analysis and submit the results of that analysis in addition to their submission. | Will the Government please clarify in which Phase the OCI analysis shall be submitted? If the OCI analysis is required as part of Phase 1, should it be submitted as an appendix to the "High-Level Solution/Concept" volume? | The OCI shall be submitted as part of the required Phase 1. Yes, please submitted as an appendix to the "High-Level Solution/Concept" volume. |
| 4 | 9/10/25 | Call for Solution | 6.1 PHASE 1 | For Phase 1, should items a through g listed in section 6.1 be submitted as separate files or should these items be combined into a single file with the exception of item d (ROM/Schedule) which is required to be in MS Excel? | Yes, they can be in a single, consolidate file. The page counts defined still apply. Refer to CSO Call. | |
| 5 | 9/10/25 | Call for Solution | 6.1(e) | Will the Government allow the Affirmation of Business Status Certification to be submitted as an appendix? | The Government will allow the Affirmation of Business Status Certification to be submitted as an appendix. Attachment 0002 "Affirmation of Business Status Certification" was provided in Amendment Call #2. Refer to CSO Call. | |
| 6 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3, and 2.4 | The NG-911 CHE is to provide full redundancy with automatic failover, eliminating single points of failure. The solution is to be on the Defense Information Systems Agency’s (DISA’s) Joint Interoperability Test Center’s (JITC) Approved Products List (APL). AND "The desired solution shall be JTIC approved, listed on the APL, and should provide automatic discovery of end-user VoIP telephone devices and the dispatchable location if technically feasible." | The Government’s use of the Commercial Solutions Opening (CSO) framework strongly suggests an intent to explore and leverage a broad spectrum of technically viable commercial technologies. However, the current Statement of Objectives (SOO) includes a stipulation that the NG-911 Call Handling System and NG-911 Location Information Services (LIS) must be listed on the Defense Information Systems Agency’s (DISA) Joint Interoperability Test Center (JITC) Approved Products List (APL). |
This requirement, as currently written, significantly narrows the field of eligible solutions to only those already JITC APL-listed. Such a constraint undermines the CSO’s purpose by limiting competition, excluding innovative and technically sound offerings, and preventing the Government from fully engaging with the commercial marketplace.
We respectfully request the following clarifications to either:
| • | Remove the JITC APL listing requirement for the NG-911 Call Handling System and LIS; or | ||||||
| • | Provide justification for its inclusion, along with | ||||||
| • | Alternative or equivalent criteria that would allow vendors to demonstrate compliance with the underlying goals of the JITC APL—namely, assured security and interoperability—without requiring formal JITC certification. | The SOO requires that the 9-1-1 call handling and LIS solutions interconnect and interoperate with Army voice switches which are on the Army network and are JITC approved per Army requirements. Therefore JITC approval is required. For solutions not currently on the JITC Approved Products List (APL), companies are asked to demonstrate how that could be achieved to meet the 6 month operational window. | |||||
| 7 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3, and 2.4 | "The NG-911 CHE is to provide full redundancy with automatic failover, eliminating single points of failure. The solution is to be on the Defense Information Systems Agency’s (DISA’s) Joint Interoperability Test Center’s (JITC) Approved Products List (APL)." AND "The desired solution shall be JTIC approved, listed on the APL, and should provide automatic discovery of end-user VoIP telephone devices and the dispatchable location if technically feasible." | Is JITC APL certification for the NG-911 Call Handling System and Location Information Services a mandatory requirement at the time of proposal submission, or would a pathway to future certification be acceptable? | The SOO requires that the 9-1-1 call handling and LIS solutions interconnect and interoperate with Army voice switches which are on the Army network and are JITC approved per Army requirements.Therefore JITC approval is required. For solutions not currently on the JITC Approved Products List (APL), companies are asked to demonstrate how that could be achieved to meet the 6 month operational window. | |
| 8 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3, and 2.4 | "The NG-911 CHE is to provide full redundancy with automatic failover, eliminating single points of failure. The solution is to be on the Defense Information Systems Agency’s (DISA’s) Joint Interoperability Test Center’s (JITC) Approved Products List (APL)." AND "The desired solution shall be JTIC approved, listed on the APL, and should provide automatic discovery of end-user VoIP telephone devices and the dispatchable location if technically feasible." | Is it the Government's intention that console workstation requirements are also inferred to include peripheral hardware and software necessary to implement, operate, and maintain a complete dispatch console including keyboard; keyboard, video, and mouse (KVM) switch; mouse; desk; monitor stands; etc.? | Yes, it is the Government's intention that console workstation requirements are also inferred to include peripheral hardware and software necessary to implement, operate, and maintain a complete dispatch console including keyboard; keyboard, video, and mouse (KVM) switch; mouse; desk; monitor stands; etc... | |
| 9 | 9/10/25 | Call for Solution | 3 DESIRED SOLUTION ATTRIBUTES | These capabilities must be operational within six (6) months, require minimal customization, and offer long- term sustainability and scalability. | Is it the Government's intention that the notional schedule to be submitted for the achievable solution be limited to the 6 month period of implementation for operational modernized solutions at each PSAP, or is the Government's desire that the notional schedule be for the complete period of performance to include the base and all option years? | The Government's desire is that the notional schedule be for the complete period of performance to include the base and all option years. Specfically, Offerors shall provide a notional schedule that covers the complete period of performance, from award to 6 months functional operation, implementation of the base year and each option year. The Company would, within 6 months of contract award, demonstrate the solution is operational and meets the attributes detailed in the CSO SOO. Each Installation implementation would subsequently be awarded per task order and have a 12 month implementation period of performance (PoP). Upon System Acceptance, the 12 month warranty period would begin. | |
| 10 | 9/10/25 | Call for Solution | 3 DESIRED SOLUTION ATTRIBUTES | These capabilities must be operational within six (6) months, require minimal customization, and offer long- term sustainability and scalability. | Is it the Government's intention that the ROM is to be submitted for the achievable solution be limited to the 6 month period of implementation for operational modernized solutions at each PSAP, or is the Government's desire that the ROM be for the complete period of performance to include the base and all option years? | Regarding the 6 month period, see answer to question #9. It is requested that the ROM reflect the on Installation implementations and 12 month warranty period. | |
| 11 | 9/10/25 | Call for Solution | 6.1(d) ROM/Schedule | Submit one (1) Rough Order of Magnitude (ROM) and one (1) Notional Schedule and describe how the notional schedule is achievable for the submitted solution. | Will the Government provide specific guidance on the information and level of detail that should be included in the ROM? Does the Government want the ROM presented by site, task, and year, or a combination of all three? | The government requests that the company submit a detailed ROM for all 38 PSAPs by Installation, task and year. The government should be able to derive an average procurement unit cost (APUC) from the ROM for each of the three capabilities which would also equate to an APUC for each site. It is requested costs are broken down by capabilities subsystem: NG-911: Typical of Server/Core/Host cost (HW&SW) and per dispatch console cost (HW&SW), CAD: Typical of Server/Core/Host cost, per dispatch console cost(HW&SW), mobile terminal/handheld device software application, FSA, Alarm, Criminal DB and National incident reporting Systems interfaces. LIS: Typical of Server/Core/Host cost (HW&SW)and end point license cost. Circuit/services cost, post warranty sustainment. | |
| 12 | 9/10/25 | Call for Solution | 6.1(d) and 6.1(g) | Submit one (1) Rough Order of Magnitude (ROM) and one (1) Notional Schedule and describe how the notional schedule is achievable for the submitted solution. | Would the Government please clarify the distinction between the Rough Order of Magnitude (ROM) required by Section 6.1(d) and the Total Proposed Price and associated breakdown required by Section 6.1(g)? | The Total Proposed Price would be the total of subsystem ROMs. | |
| 13 | 9/10/25 | Call for Solution | 6.1(d) ROM/Schedule | Submit one (1) Rough Order of Magnitude (ROM) and one (1) Notional Schedule and describe how the notional schedule is achievable for the submitted solution. | In addition to the reasonableness determination in Phase 1, does the Government intend to perform a comparative price evaluation or best-value tradeoff (including price) in any phase? | Pursuant to the terms set forth in the Call for Solution the Government will not perform a comparative price evaluation or best-value tradeoff (including price) in any phase. | |
| 14 | 9/10/25 | Call for Solution | 6.1(d) ROM/Schedule | Submit one (1) Rough Order of Magnitude (ROM) and one (1) Notional Schedule and describe how the notional schedule is achievable for the submitted solution. | Will offerors be given an opportunity to revise their proposed prices in the full proposals submitted in Phase 3? | The Government reserves the right to request Best and Final Offers during Phase 3. | |
| 15 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3 | Console Workstations: Engineer, furnish configure, install, and test complete 9-1-1 CH console workstations each including a Central Processing Unit (CPU), LCD displays, related operating systems and application software. | Do the numbers in the SOO represent 100% replacement of workstations at the sites? | Yes | |
| 16 | 9/10/25 | Statement of Objectives | 2. Specific Tasks Capabilities and Performance Objectives | Will the Government please clarify if 9-8-8 Lifeline call handling requirements and associated laws and regulations governing them are in the scope for this solicitation? | 9-8-8 is not in scope. | ||
| 17 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.2, 2.3 | CAD solutions should operate as a fully redundant (no single point of failure) solution that is accessible by all primary and alternate dispatch workstations and authorized mobile devices. The government will consider an on-premise, centrally hosted solution or GovCloud hosted solution." AND "The NG-911 CHE is to provide full redundancy with automatic failover, eliminating single points of failure. The solution is to be on the Defense Information Systems Agency’s (DISA’s) Joint Interoperability Test Center’s (JITC) Approved Products List (APL)." | Will the Government please define "fully redundant" and/or "full redundancy" capability at greater length to assist offerors in designing and submitting compliant solutions? For example, is it the Government's intention that fully redundant take the form of multiple telecommunications circuits or otherwise? | The government is seeking best practice input from industry to achieve technical and operational redundancy. Technical redundancy applies to critical components Example: Servers, network switches, gateways, firewalls etc. Operational redundancy applies to diversity in design architecture: Example: Primary and backup components install is different facilities, redundant cabling taking disparate paths etc. | |
| 18 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3 | Multiple ESINets: Integrate with, and directly interconnect to, multiple Mission Partner ESInet and NG-911 Core Service (NGCS) provider supporting each Army Installation. | Will the Government provide more detail on the expected connections to ESInets to clarify which ESInets are expected to be connected to with respect to Mission Partners? In addition, is the Government's definition of Mission Partners limited to other branches of the armed forces, or does this also include state, Federal, and local partners? | Mission Partners (MP) include local municipal, county, state, federal and tribal jurisdictions. With regard to ESINet specifics, this will vary by Army Installation. Precise interface not required for Phase 1 as it is anticipated to that MP ESInet data could change over the 5 years fielding period. The Installation specific fielding information will be provided during Post-award site Coordination Visits. | |
| 19 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.4 | The desired solution will provide an on-premise, LIS capability, collocated with Army VoIP Session Controllers. | Will the contractor provide LIS solution that incorporates VoIP Instruments, VoIP End Points, Legacy/Analog instruments, Hot Lines (elevator phones and other emergency phones), and Cellular Phones on the DoD installation? | The desired LIS solution would interface with Army owned VoIP Session Controllers, end points and network environment. Regarding cellular phone, location to be provided by the commercial cellular/mobile phone carriers and therefore not in scope for the LIS solution. | |
| 20 | 9/10/25 | Statement of Objectives | 6.1(d) | NG-911, CAD and LIS ROMS to be broken out separately. | Is the Government specifying that any one of the three capabilities (NG-911, CAD and LIS) could be acquired and implemented independent of the others, or even not at all, and should be planned and priced on that premise? | Yes, while the government intends to implement all three capabilities, there could be exceptions where capabilities may be implemented individually. | |
| 21 | 9/10/25 | Call for Solution | 6.1; Not Selected for Further Consideration | As such, a Company’s solution may be evaluated as selected for further consideration, however not invited to Phase 2 and/or Phase 3. | Under what scenario will an Offeror be selected for further consideration in Phase 1, but not invited to participate in Phase 2 or Phase 3, as stated in section 6.1? | Offerors may be evaluated as technically meritorious but not advanced due to resource limitations, funding constraints, or Government prioritization of alternate solution as examples. | |
| 22 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | Installation Specific Configuration and Data: Migrate Installation specific CAD data, response assets, codes, run/event cards, and other related data to the new CAD solution. | Based on this requirement, would the Government please define what other data will need to imported into the new system? | The government is seeking best practice input from industry. Companies are encouraged to recommend other data to be migrated. | |
| 23 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3 | Media Gateways: Support interconnection to legacy telephony circuits: Primary Rate Interface (PRI), Centralized Automatic Message Accounting (CAMA) based 9-1-1 circuits and analog lines (Foreign eXchange Office (FXO)/Foreign eXchange Subscriber (FXS) in support of ring downs, hot lines, etc. | Will the Government please provide the counts of the legacy lines and signaling type for each location? | Each Installation will be unique and actual line counts may differ by site. For purpose of the ROM, assume the following circuits count at the system level: Two (2) PRIs , Four (4) 9-1-1 (CAMA), Four (4) FXO and Four (4) FXS. | |
| 24 | 9/10/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives 2.3 | Multiple ESINets: Integrate with, and directly interconnect to, multiple Mission Partner ESInet and NG-911 Core Service (NGCS) provider supporting each Army Installation. | The NG9-1-1 Call Handling requirements indicate that connectivity to multiple Mission Partner ESInets and NG-911 Core Service providers is required. Will all bases be rolled out as NG9-1-1 solutions? The diagram indicates that bases will be receiving calls from ESInet however the requirements indicate that the CHE must be able to accept calls from Legacy PSTN E-911 networks. | At Installations where local Mission Partners have transitioned to NG and Army has transitioned to IP, the government anticipates that there will be Installations that will require a hybrid approach. Example: The installation has transitioned to VoIP, but the state/local MP has not implemented NG. in that example, the call handling system will need to support SIP based (NG) call delivery from the Army voice network and interconnect to legacy E9-1-1 networks to receive calls from commercial wireline and wireless sources. | |
| 25 | 9/10/25 | Statement of Objectives | 3 Sustainment and Readiness | Provide new equipment training (NET) for operators, administrators, and maintainers. | How often will training for each base be required? | Only initial New Equipment Training is in scope and will be required. | |
| 26 | 9/10/25 | Statement of Objectives | 2 Specific Tasks Capabilities and Performance Objectives | Leverage Government provided GIS data and updates for integrated mapping. | In what format will Government provided GIS data and updates be provided? | ESRI feature classes delivered via secure Government-approved electronic delivery. | |
| 27 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | CAD to CAD Interoperability: Provides the capability to support CAD to CAD information exchange between disparate CAD systems and vendors, including those used by local Mission Partner agencies. | For CAD-to-CAD information exchange requirement, should Offerors assume that all CAD vendors will support the NG9-1-1 i3 standards? | That would depend on the standard. The Army anticipates that there will be MPs that operate CAD system that do not comply with NENA standards. Industry is encouraged to provide solutions to address either scenario. | |
| 28 | 9/10/25 | Statement of Objectives | 2.3 NG-911 Call Handing System Performance Objectives | Network Time Protocol (NTP) Service: Synchronizing time used by software and other components. | The requirements indicate that NTP Service is required for NG911 Call Handling. Is this a requirement to provide an NTP Service or connect to an existing Army Base NTP Service? | Provide NTP timing as a requested part of the solution. | |
| 29 | 9/10/25 | Statement of Objectives | 2.3 NG-911 Call Handing System Performance Objectives | Console Workstations: Engineer, furnish configure, install, and test complete 9-1-1 CH console workstations each including a Central Processing Unit (CPU), LCD displays, related operating systems and application software. | Console Workstations – Is touchscreen desired for monitors used for NG-911 Call Handling? If yes, for which applications? | Army PSAPs are accustomed to touchscreen, dial pads and mouse/keyboard interface for the 9-1-1 control. Government anticipates that Companies will recommend whether touchscreen are appropriate to their solutions. | |
| 30 | 9/10/25 | Statement of Objectives | 2.3 NG-911 Call Handing System Performance Objectives | Console Audio and input/Output Management: Connection of handset/headsets, a radio console call director and auxiliary audio inputs and outputs. | Console Audio and input/output Management – Should headsets be provided by the Offeror? Is the desire to use a common headset connected to the radio system? | Yes, wired headset are a minimum requested attribute. The desired solution would support common headset for radio and 9-1-1. | |
| 31 | 9/10/25 | Statement of Objectives | Table 2. | Quantity of Dispatch Console Workstations per Installation. | Would the Government please update Table 2 to include the base telephone switches at each CONUS site? | The Installation specific fielding information will be provided during Post-award site Coordination Visits. | |
| 32 | 9/10/25 | Statement of Objectives | 2. Specific Tasks Capabilities and Performance Objectives | Leverage Government provided GIS data and updates for integrated mapping | Does the Government have a GIS system that the CAD system can integrate with or does the Government expect the Offeror to provide software and licenses for the mapping system? | The government will provide NG-911 compliant GIS data. The desired solution would provide hardware, software and licensing to implement GIS mapping in CAD, LIS and NG-911 systems. | |
| 33 | 9/10/25 | Statement of Objectives | 2. Specific Tasks Capabilities and Performance Objectives | Leverage Government provided GIS data and updates for integrated mapping | Does the Government require the deployed NENA i3 Compliant NG9-1-1 solution provide Geospatial Routing at cut-over? | The desired NG-911 Call Handling solution is expected to receive calls. | |
| 34 | 9/10/25 | Statement of Objectives | 2. Specific Tasks Capabilities and Performance Objectives | Satisfy applicable DoD and commercial standards for installation, commissioning, physical security, and cybersecurity of the delivered system. | Would the Government please specify which | NIST RMF 800-53 Rev 5, Army AR 25-1, Army AR 25-2, Army AR 25-400-2, NENA NG-911 i3 Standards | |
| 35 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | CAD solutions should operate as a fully redundant (no single point of failure) solution | Would the Government please advise how it defines and interprets a "fully redundant (no single point of failure) solution?" | The government is seeking best practice input from industry to achieve technical and operational redundancy. Technical redundancy applies to critical components Example: Servers, network switches, gateways, firewalls etc. Operational redundancy applies to diversity in design architecture: Example: Primary and backup components install is different facilities, redundant cabling taking disparate paths etc. | |
| 36 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | Mobile Devices: Provide CAD incident data to field responders. | Can the Government please provide the number of concurrent users and/or licenses required for Mobile Laptop clients and iOS Android devices? | Mobile data terminal and/or handheld devices are not in scope. Companies are requested to address the capability and provide ROM cost for system level and per end user device software application licensing and sustainment. | |
| 37 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | Alarm Monitoring: Interface providing automated delivery of fire and security alarm events. | Would the Government please identify which fire and security alarm system(s) CAD must be able to integrate with? | The alarm system specifics will differ by Installation. Desired solution would to provide interface to existing alarm central reporting systems. Details to be provided at Post Award Site Coordnination visit | |
| 38 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | Fire Station Alerting (FSA): Interface to FSA systems to support dispatch | Would the Government please identify which Fire Station Alerting (FSA) system(s) CAD must be able to integrate with? | The FSA specifics will differ by installation. Scope would be to provide interface to existing FSA systems. Details to be provided at Post Award Site Coordnination visit | |
| 39 | 9/10/25 | Statement of Objectives | 2.2 CAD Performance Objectives | Automatic Vehicle and Personnel Location Tracking: Map based plotting and tracking of emergency responders and resources. | Would the Government please estimate the total number of devices required for AVL and PLT? | The desired solution would provide an interface to existing PLT/AVL systems. Procuring devices is not in scope. Details to be provided at Post Award Site Coordnination visit | |
| 40 | 9/10/25 | Call for Solution | 2. Specific Tasks Capabilities and Performance Objectives | Satisfy applicable DoD and commercial standards for installation, commissioning, physical security, and cybersecurity of the delivered system. | Will the Government require an Agency ATO for the system to meet the operational 6-month timeline? | Agency ATO will be required but not at the 6 month operational demonstration phase. Solutions would be expected to have required Cybersecurity hardening applied at the 6 month point. | |
| 41 | 9/10/25 | Call for Solution | 5. SOLICITATION NOTES and 6.1 PHASE 1, Pages 5,6 | The Call for Solutions states "Use of diagram(s) or graphics with associated bullet points and text layout to depict the essence of the proposed solution is strongly encouraged" on Page 5 the following on Page 6 "Solution Briefs shall follow the below-referenced page limits and use 12-point “Arial” font." Will the Government please confirm that they will accept font less than 12-point on graphics? | Graphics may use fonts smaller than 12-point for readability, provided narrative text complies with the 12-point Arial requirement. | ||
| 42 | 9/10/25 | Call for Solution | 6.1.g.i, Page 8 | Will the Government provide guidance as to the number and technical specifications of additional systems, such as Alarm Panels, the respondent should assume as part of the pricing? | The desired solution would be to provide interface to existing alarm central reporting systems. | ||
| 43 | 9/10/25 | Call for Solution | 3, Para 1, Page 1 | The Call for Solution indicates "…capabilities must be operational within six (6) months.." Will the Government please clarify if this indicates go-live / IOC at 6 months after contract start for the first installation shown as APG in the SOO? | This request is intended to demonstrate to the Government, within 6 months of award, and prior to fielding at Installations, that the solution capabilities are operational and shown to meet the desired attributes of the CSO SOO. | ||
| 44 | 9/10/25 | Call for Solution | 5 Page 5 | The Call for Solution states "Resellers and academic research proposals are not desired." However, the designated NAICIS code for the solicitation is 517121 Telecom Resellers. Will the Government consider changing the NAICS code to 541512 to remove this contradiction? | The designated NAICS code remains at 517121 (Telecom Resellers). The exclusion of “resellers” in the Call is intended to prevent purely pass-through entities without technical capability. | ||
| 45 | 9/10/25 | Call for Solution | 6, Para 3, Page 6 | Should the government require a Phase 2 demonstration, how long after notification of Phase 1 down-select does the Government anticipate this will occur and at what location? | If required, demonstrations will generally occur within 30–60 days after Phase 1 down-select. Location will be determined by the Government and specified in invitations. | ||
| 46 | 9/10/25 | Call for Solution | 6.1, Para g | Is the Total Proposed Price per section G a Rough Order of Magnitude (ROM) as indicated in section d or a Firm and Binding offer? Please clarify the Government's expectations for the ROM in Section D versus the Price in Section G. | The Total Proposed Price per section G a Rough Order of Magnitude (ROM) as indicated in section d is not a Firm and Binding offer. | ||
| 47 | 9/10/25 | Call for Solution | 6, Para 3, Page 6 | Should the Government require a demonstration for phase 2, how will the demonstration be evaluated? | Per the Call for Solutions Pg 10, Advancement to Phase 2 and/or Phase 3 will be limited to those submissions that the Government determines offer the most technically sound, operationally relevant, and compelling solutions with the highest potential to address the identified PSAP capability gaps. Phase 2 and/or Phase 3 submission requirements and evaluation criteria will be outlined within the invitation into the respective Phase. |
| 48 | 9/10/25 | Call for Solution | 8, Page 11 | Does the Government require submission of the OCI analysis with the ROM or only with the final proposal submission in Phase 3? | The OCI shall be submitted as part of the required Phase 1. Please submit as an appendix to the "High-Level Solution/Concept" volume. |
| 49 | 9/10/25 | Statement of Objectives | 2, Page 2 | What is the minimum warranty period required from Site Acceptance? | 12 months |
| 50 | 9/10/25 | Statement of Objectives | 2.2, Page 4 | "Mobile Devices" are list as a component of the CAD solution. Will the mobile devices be provided at GFE and the contract provides the CAD software or should the contract provide both the mobile device Hardware and Software? | Procurement of mobile data terminal and/or handheld devices are not in scope. Companies requested to address the capability and provide ROM cost for system level and end user device software application licensing and sustainment |
| 51 | 9/10/25 | Statement of Objectives | 2.2, Page 4 | "Mobile Devices" are list as a component of the CAD solution. Please provide the number of mobile devices required per installation and type of mobile device to support contractor pricing. | This detail to be provided during Post Award Site Coordination Visits. |
| 52 | 9/10/25 | Statement of Objectives | Page 3 | Will the Government provide the "BECS CDD" referenced in SOO section 3? | The referenced BECS Capability Development Document will not be provided as part of this solicitation. Offerors should base solutions on the SOO. |
| 53 | 9/10/25 | Statement of Objectives | Page 3 | In order to support a consistent cost evaluation for Total Proposed Price in CFS, G and SOO Section 3, will the Government please indicate the period of 1) Engineering, Integration, Site Acceptance, Warranty Support, versus 2) Sustainment Period? | Offerors should separate costs into: |
1. Engineering, integration, Installation (site) acceptance, and warranty support.
2. Post warranty sustainment period.
| 54 | 9/10/25 | Statement of Objectives | 2.2, Para 1, Pages 1-3 | Will the Government provide more specific high-availability requirements, such as Recovery Time Objective (RTO) and Recovery Point Objective (RPO) objectives, or detailed fault tolerance levels (e.g., N+1 redundancy)? | The Government will not provide more specific high-availability requirements. |
| 55 | 9/10/25 | Statement of Objectives | 2.2, Para 1, Pages 1-3 | For proposed cloud-based solutions, will the Government provide existing GovCloud infrastructure as GFE? | No, the infrastructure would be included in the desired solution. |
| 56 | 9/10/25 | Statement of Objectives | 2.3, Para 2, Pages 1-5 | Regarding the NG911 Call Handling requirement, Section 2.3 of the SOO states: "The solution is to be on the Defense Information Systems Agency’s (DISA’s) Joint Interoperability Test Center’s (JITC) Approved Products List (APL)." Will the Government please clarify whether or not JITC APL listing is required at the time of proposal submission, at the time of award, or at some other point during the period of performance? | The SOO requires that the 9-1-1 call handling and LIS solutions interconnect and interoperate with Army voice switches which are on the Army network and are JITC approved per Army requirements. Therefore JITC approval is required. For solutions not currently on the JITC Approved Products List (APL), companies are asked to demonstrate how that could be achieved to meet the 6 month operational window. |
| 57 | 9/11/25 | Call for Solution |
— Section 4 Awarding Instrument
— Section 6.1, subsection d.
ROM/Schedule
— Section 6.1, subsection g.
Total Proposed Price
— Section 6.1, subsection Solution Brief Basis of Evaluation Section 6.1 subsection d. ROM/Schedule and Subsection 6.1 subsection Solution Brief Basis of Evaluation refer to ROM pricing whereas Section 4 and Section 6.1 subsection g. Total Proposed Price indicate Firm Fixed pricing.
a. Please confirm if ROM pricing or firm fixed pricing is required for Phase 1.
b. If ROM pricing is required, is the price reasonableness determination during this
| phase really required? | Phase 1 requires ROM pricing. Price reasonableness determinations will be made at later phases when binding proposals are submitted. | ||||
| 58 | 9/11/25 | Call for Solution | Section 6.1 | Please confirm if cover pages and table of | |
| contents are excluded from the page count. | The Government confirms that cover pages and table of |
contents are excluded from the page count.
59 9/11/25 Call for Solution/Statement of Objectives COS Section 3 Desired Solution Attributes and
SOO;
| Section 1 General | The Call for Solution Section 3 Desired Solution Attributes requests capabilities be operational within 6 months while the Statement of Objectives Section 1 General asserts that the period of performance will consist of a 12-month base period, with four 12-month option periods for a total of five years. Please confirm if each location within the requested period of performance must be operational within 6 months or 12 months. | This request is intended to demonstrate to the Government, within 6 months of award, and prior to fielding at Installations, that the solution capabilities are operational and shown meet the desired attributes of the CSO SOO. Each Installation's implementation would be awarded per task order and have a 12 month implementation PoP. Upon Installation specific System Acceptance, the 12 month warranty period would begin. | |||||
| 60 | 9/11/25 | Call of Solution | Section 3, Desired Solutions Attributes, Page 4 | The CfS states, “The desired solution should integrate NG-911, CAD, and LIS capabilities into an interoperable group of systems that leverages IP based voice and data communications, dynamic geolocation, dispatch automation, and information sharing within a secure, redundant, and compliant operational framework.” | Will the Government please identify which of the 38 installations identified in Table 1 of the SOO do not have an existing telecommunications infrastructure capable of supporting IP-based voice and data communications? | This detail to be provided during Post Award Site Coordination Visits | |
| 61 | 9/11/25 | Call of Solution | Section 3, Desired Solutions Attributes, Page 4 | The CfS states, “The desired solution should integrate NG-911, CAD, and LIS capabilities into an interoperable group of systems that leverages IP based voice and data communications, dynamic geolocation, dispatch automation, and information sharing within a secure, redundant, and compliant operational framework.” | If any of the 38 installations identified in Table 1 of the SOO do not have an existing telecommunications infrastructure capable of supporting IP-based voice and data communications, will the awardee(s) on this solicitation be responsible for implementing an upgrade of the infrastructure and services and make it part of the Solution furnished? | No | |
| 62 | 9/11/25 | Call of Solution | Section 3, Desired Solutions Attributes, Page 4 | The Government states, “These capabilities must be operational within six (6) months.” | Will the Government please describe the success criteria to consider this objective satisfied? | The criteria used would be an approved Functional Verification Test, submitted post award. | |
| 63 | 9/11/25 | Call of Solution | Section 3, Desired Solutions Attributes, Page 4 | The Government lists as an objective, “Provide New Equipment Training: Operator/Dispatch, system administration, and preventative maintenance training for provided systems.” | Will the Government please clarify the acceptable method of training delivery for the New Equipment Training (NET) period? | On Installation, instructor lead training. | |
| 64 | 9/11/25 | Call of Solution | Section 3, Desired Solutions Attributes, Page 4 | The Government lists as an objective, “Provide system warranty, software and cyber security upgrades, ongoing system monitoring/scanning, where applicable, and support services for each delivered system including system interfaces, from the time of Site Acceptance.” | Will the Government please clarify whether this interim contractor sustainment and warranty period for all 38 installations will end on the last day of the PoP? | Warranty period begins at system acceptance for 12 months. | |
| 65 | 9/11/25 | Call of Solution | Section 4 Awarding Instrument | The Government states that it reserves the right to award an OTA. | Will the Government please clarify what OTA and/or Consortium will be used if awarded under an OTA? In utilizing an OTA, the Government may restrict competition to only those Bidders who are a party to that OTA. | If awarded under an OTA, the Government will utilize the Army’s open solicitation OTA framework under 10 U.S.C. 4022. The Government is not limiting participation to a specific consortium | |
| 66 | 9/11/25 | Call of Solution | Section 4 Awarding Instrument, Page 4 | The Government states that it intends to award a Firm-Fixed-Price (FFP) type contract. And the Government also reserves the right to award an Other Transaction (OT) contract. | Please provide clear instructions on how a budgetary estimate (ROM) can be provided if there is lack of clarity on contractual methodology and/or terms, conditions, clauses of an FFP contract/OTA that will be used. | ROMs are intended as best estimates based on commercial experience. Final contractual terms will be addressed in Phase 3. | |
| 67 | 9/11/25 | Call of Solution | Section 4 Awarding Instrument, Page 4 | The Government states that it reserves the right to award an OTA pursuant to 10 USC 4022. | If the Bidding Contractor is a “Traditional Defense Contractor” and, due to the potential award under an OTA, needs to locate and engage at least one Nontraditional Defense Contractor (NDC) or Nonprofit Research Institution (NRI) that would participate to a significant extent in the prototype project to satisfy the requirements of the “Appropriate Use of Authority”, will the Government please indicate the level of likelihood of OTA utilization and extend the Due Date of the Call for Solution by two weeks in order for Bidding Contractors to meet this requirement? | Acquisition Strategy pending. Due date to be extended to 17 Oct, 2025, 1200EST | |
| 68 | 9/11/25 | Call of Solution | Section 6.1.e, Solution Brief Content, Page 8 | The Government requires submission of an Affirmation of Business Status Certification form. This form seems appropriate for an OTA award, but not for a traditional FFP award. | Will the Government please clarify whether page 2 of this form is required of all Phase 1 companies? | Yes, page 2 of the form is required for all Phase 1 participants, regardless of anticipated award instrument. | |
| 69 | 9/11/25 | Call of Solution | Section 6.1.d, Solution Brief Content, Pages 7-8 | The Government provides these instructions: |
“ROM/Schedule (Limited to one excel sheet with no more than three tabs)
i. Submit one (1) Rough Order of Magnitude (ROM) and one (1) Notional Schedule and describe how the notional schedule is achievable for the submitted solution. NG-911, CAD and LIS ROMS to be broken out separately. Annotate assumptions used within the respective tab, ROM or Notional Schedule.”
| The information that should be included in each of the up to three tabs is ambiguous. | Will the Government please clarify the information required on all three of the tabs in the Excel workbook? | Four 4 tabs are permissible: NG-911, CAD, LIS, and Notional Schedules. | |||||
| 70 | 9/11/25 | Call of Solution | Section 6.1g, Solution Brief Content, Page 8 | The instructions for Total Proposed Price provides a two-page limit and states, “The Vendor shall propose a total price, broken down by phase/milestone, to complete the effort, as well as provide any other data or supporting information necessary for the determination of a fair and reasonable price. This can include, but is not limited to, a commercial price catalog or other proprietary information to help the Government assess the reasonableness of the project price.” | As commercial price catalogs can be lengthy, will the Government allow supporting data to be submitted as an appendix outside the two-page limit of the Total Proposed Price response? | Yes. Supporting data such as commercial price catalogs may be submitted as a separate appendix and will not count toward page limits. | |
| 71 | 9/11/25 | Call of Solution | Section 6.1, Phase 1, Page 10 | The Call for Solution states, “Companies selected for further consideration may be invited to participate in the next Phase, subject to the availability of funds. The Government reserves the right to limit the number of companies invited to Phase 2 (if not bypassed) and/or Phase 3. As such, a Company’s solution may be evaluated as selected for further consideration, however not invited to Phase 2 and/or Phase 3.” | Will the Government please clarify the evaluation criteria that would prohibit a company deemed “selected for further consideration” from being invited to participate in Phase 2 and/or Phase 3? | Offerors may be selected for further consideration but not invited forward due to Government resource prioritization, even if technically acceptable. | |
| 72 | 9/11/25 | Statement of Objectives | Section 1.1, Introduction, Figure 1, Page I-1 | Figure 1 depicts the First Responder Broadband Network (FRBN) as part of the Army Installation Emergency Infrastructure. | Will the Government please specify which of the 38 installations in Table 1 already have FRBN service and which would need new contracts with AT&T? | Details to be provided at Post Award Site Coordination Visits. | |
| 73 | 9/11/25 | Statement of Objectives | Specific Tasks Capabilities and Performance Objectives, Page I-2 | The SOO states, “The Company is to engineer, furnish, install, secure, and test a fully operational and redundant solution for the installation of CAD, NG-911 CHE, and LIS solutions.” In Section 2.2, CAD Performance Objectives, the SOO states, “The government will consider an on-premise, centrally hosted solution or GovCloud hosted solution. |
| “If a centrally hosted and managed solution is proposed, it shall provide flexibility and scalability to support up to 80 Army installations, with primary and alternate PSAPs, and 200 operator consoles. The CAD solution would provide fully redundant, dedicated commercial IP connections between the CAD central hosting data centers and each installation defined in the Place of Performance.” | Will the Government please confirm that all installations in Table 1 have existing internet connectivity and sufficient available bandwidth to support the necessary data transfer required by an on-premise or GovCloud hosted solution and that the company’s responsibility is restricted to providing CAD, NG-911 CHE, and LIS solutions to work over those existing networks? If not, is it the expectation of the Government that contractors will make this part of their solution? | Commercial IP connections would be part of the solutions submitted. | |||||
| 74 | 9/11/25 | Statement of Objectives | Section 2.4, NG-911 Location Information Service (LIS) Performance Capabilities, Page I-6 | The SOO states, “LSCs are installed on-premises at 23 Army Installations with an average EUD quantity of 16,000. There are two (2) RSCs, in CONUS providing service to a total of 31 Army Installations with an average EUD quantity of 8,000 per Installation.” | Will the Government please specify the locations of the 23 LSCs, the locations of the two RSCs, and whether and which installations in Table 1 are not covered by either an LSC or an RSC? | The Installation specific fielding information will be provided during Post-award site Coordination Visits | |
| 75 | 9/11/25 | Statement of Objectives | Section 1.2, Background, Page I-2 | The SOO states, “This effort encompasses capabilities that deliver CAD, NG-911, Land Mobile Radio (LMR), Enterprise Mass Warning and Notification (EMWN) and the First Responder Broadband Network (FRBN) – Long Term Evolution (LTE) 4G and 5G.” | Will the Government confirm that the contractor is not responsible for delivering Land Mobile Radio (LMR); Enterprise Mass Warning and Notification (EMWN); First Responder Broadband Network (FRBN) – Long Term Evolution (LTE) 4G and 5G)? | Section 1.2 Background was general background information about the Army PD-BECS Program. LMR and EMWN are not in scope. It is up to the Companies discretion to include use of FRBN in its solutions. | |
| 76 | 9/11/25 | Statement of Objectives | Section 2 and Section 3, Specific Tasks Capabilities and Performance Objectives and Sustainment and Readiness, Pages I-2, I-7 | Section 2: The third and fifth bullet points, “Perform New Equipment Training (NET): operator/Dispatch, system administration, and |
preventative maintenance training for provided systems” and “Provide system warranty, software upgrades, ongoing system monitoring/scanning, where applicable, and support services for each delivered system including system interfaces, from the time of Site Acceptance.”
Section 3: First and second bullet points, “Provide new equipment training (NET) for operators, administrators, and maintainers” and “Deliver system sustainment, including warranty, patching, upgrades, and lifecycle
| support.” | The bullet points indicate the contractor will train the end user on system preventative maintenance and also provide a warranty, upgrades, security scanning, and support services from the time of system acceptance. Will the Government confirm when responsibility for these services will be turned over to the Government for each site? | At the expiration of the 12 month warranty period. | |||||
| 77 | 9/11/25 | Call of Solution | Section 5, Solicitation Notes, Page 5 | The Government states that, “The use of Artificial Intelligence (AI) tools may be used during evaluations. Any AI tools utilized by the Government will be employed in a manner consistent with applicable regulations that govern the protection of proprietary and source selection sensitive information. No proposal data will be transmitted to or processed by external, non-Government systems without appropriate safeguards and authorizations in place.” | Will the Government please disclose the name and version of the AI that will be used in the evaluation? | The Government has not determined if Artificial Intelligence (AI) will be used during evaluations. | |
| 78 | 9/11/25 | Call of Solution | Cover Page, Page 1 | Solutions Brief Due 2 October 2025, 1200, Eastern Daylight Time (EDT) | Will the Government consider a two (2) week Due Date extension in order to allow the Bidding Contractors a reasonable amount of time to integrate the Government’s Answers into their Solution to be submitted? | Due date to be extended to 17 Oct, 2025, 1200EST | |
| 79 | 9/11/25 | Statement of Objectives | Section 2.3, NG-911 Call Handling System Performance Objectives, Page I-5 | The SOO states that the solution must provide “Location Database: A fully redundant database to manage and store Army VSS telephone location records.” | Will the Government please clarify how this Location Database requirement in Section 2.3 is different than the LIS requirement in Section 2.4? | The LIS to support location for NG-911 call, the Location Database provides location for legacy E9-1-1 calls. | |
| 80 | 9/11/25 | Statement of Objectives | Section 2.3, NG-911 Call Handling System Performance Objectives, Page I-6 | The SOO states that the solution must provide “Media Gateways: Support interconnection to legacy telephony circuits: Primary Rate Interface (PRI), Centralized Automatic Message Accounting (CAMA) based 9-1-1 | |||
| circuits and analog lines (Foreign eXchange Office (FXO)/Foreign eXchange Subscriber (FXS) in support of ring downs, hot lines, etc.” | To allow offerors to develop an accurate ROM, will the Government please specify how many media gateways are required? | Each Installation will be unique and actual line counts may differ. For purpose of the ROM, assume the following circuits count at the system level: Two (2) PRIs , Four (4) 9-1-1 (CAMA), Four (4) FXO and Four (4) FXS. The quantity of gateways will be at the individual Companies discretion. | |||||
| 81 | 9/11/25 | Statement of Objectives | Section 2.3, NG-911 Call Handling System Performance Objectives, Page I-5 | The SOO states that the solution must “Direct Connect to Multiple and Disparate Voice Systems.” | To allow offerors to develop an accurate ROM, will the Government please specify the type and quantity of legacy telephone circuit connections required at each site? | Each Installation will be unique and actual line counts may differ. For purpose of the ROM, assume the following circuits count at the system level: Two (2) PRIs , Four (4) 9-1-1 (CAMA), Four (4) FXO and Four (4) FXS. |