Volume II - Contract Forms and Conditions Bid Issue 1.9.24~1.doc

DOC document 461 KB Posted

Attached to
CRCBF-14 Transmission Line & Switchyard Interconnection Project
Solicitation number
69CRC-S2658
Issued by
Clark County, Nevada

About this file

This document is the Contract Forms and Conditions for the Boulder Flats Solar Interconnection Project Contract No. CRCBF-14, Transmission Line & Switchyard Construction, issued by the Colorado River Commission of Nevada. The project involves furnishing all labor, equipment, materials, and services required for the transmission line and switchyard construction at the Boulder Flats site in Clark County, Nevada. The contract documents include the request for bids, bid instructions, award procedures, bid forms, bond requirements, general conditions, and technical specifications. The contract duration is not specified, but the work must be completed within the timelines outlined in the general conditions.

The contract price will be paid to the successful contractor based on the bid schedule. No specific pricing terms, set asides, or funding sources are provided. The contract opportunity is open to all qualified bidders, and there is no mention of an incumbent contractor. The general conditions outline the insurance, bonding, and indemnification requirements for the contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Colorado River Commission of Nevada

555 East Washington Avenue, Suite 3100

Las Vegas, Nevada 89101-1065

Boulder Flats Solar Interconnection Project

Contract No. CRCBF-14 Transmission Line & Switchyard Construction Volume II – Contract Forms and Conditions

PWP-CL-2006-241

Issue: For Bid

January 9, 2024 Boulder Flats Solar Interconnection Project

Contract No. CRCBF-14 Transmission Line & Switchyard Construction Contract Documents Table of Contents Volume I – Bidding Documents

Section

Request for Bids

Bid Instructions

Procedures for Award of Construction Contracts

Bid Form

Bid Schedule

Bid Bond

Qualification Statement

Subcontractor Information

Volume II – Contract Form and Conditions Contract No. CRCBF-14, Switchyard Construction

Performance Bond

Payment Bond

Guarantee Bond

Certificated of Insurance

General Conditions

Volume III – Specifications

Summary of Work

Permits and Environmental Compliance

Environmental Compliance Requirements 1150A

Project Meetings, Schedules and Reports

Submittals

Security

Field Offices and Sheds

Temporary Barriers and Controls

Temporary Utilities and Facilities

Project Identification and Signs

Contractor Furnished Equipment and Materials

Owner Furnished Equipment and Materials

Equipment and Material Substitutions

Manufacturer’s Field Service

Contract Closeout

Record Documents and Spare Parts

Boulder Flats Solar Interconnection Project

Contract No. CRCBF-14 Transmission Line & Switchyard Construction

Contract Documents Table of Contents

Volume III – Specifications Section

Final Cleaning

Warranties

Site Preparation and Earthwork

Fences and Gates

Crushed Rock Surface

Concrete Formwork

Concrete Reinforcement

Concrete

Spread Footer Foundations

Drilled Foundation Piers

Control Cables, Low Voltage Cables, Ground Cables, and Accessories

Conduits and Accessories

Cable Trench Installation

Lighting and Low Voltage Power

Switchyard Grounding

Signs

Installation of Owner Furnished Switchyard Steel 10100

Installation of Owner Furnished Switchyard Equipment 10200

Switchyard Bus, Connectors, Materials and Hardware 11100

Switchyard Testing 14100

Volume IV – Technical Specifications Volume V – Drawings

SECTION 700

Contract NO. CRCBF-14 Transmission Line & Switchyard Construction THIS CONTRACT is made and entered into by and between the Colorado River Commission of Nevada, hereinafter referred to as the “Owner,” and _________________ _____________________________, hereinafter referred to as the “Contractor.” The Owner and the CONTRACTOR are sometimes individually referred to as “Party” and collectively referred to as the “Parties.”

IN CONSIDERATION of the mutual covenants contained herein, the Parties hereto agree as follows:

1.

The Contractor shall perform and complete in a good and workmanlike manner all of the Work as defined in the Contract Documents, shall furnish all equipment and materials and all the tools and labor necessary to properly perform and complete the Work such that it shall be ready for use in strict accordance with the Contract Documents and the attached bonds, which are hereby declared and accepted as essential parts of this Contract and to accept the Contract Price as defined in the Contract Document as full compensation therefore.

2.

The Owner shall pay Contractor the Contract Price in full compensation for Contractor’s full performance in the manner and upon the conditions set forth in the Contract Documents.

3.

The Contract Documents, which comprise the entire Contract between the Owner and the Contractor for the performance of the Work, consist of everything included in Volumes I, II, III, IV, V and VI, which by this reference are incorporated and made a part hereof. The Contractor hereby certifies that the Contractor has read and understands every provision contained in the Contract Documents. The Contractor shall be bound and shall comply with each and every term, condition and covenant set forth in the Contract Documents.

4.

Each individual signing this Contract represents and warrants that the Party represented has duly authorized such individual to execute this Contract with the intent that the Party be bound and obligated hereby.

IN WITNESS WHEREOF, the Contractor and the Owner have executed five duplicate originals of this Contract this _________________ day of _____________________, 2023. The Owner will retain four counterparts and one counterpart will be delivered to the Contractor .

By:_______________________________________

Its:_______________________________________

ATTEST

COLORADO RIVER COMMISSION OF NEVADA

By:_______________________________________

Puoy K. Premsrirut

Chairman

ATTEST

Eric Witkoski

Executive Director

Approved as to Form:

Michelle Briggs Special Counsel for Attorney General

SECTION 750

PERFORMANCE BOND

CONTRACTOR (Name and Address):

SURETY (Name and Principal Place of Business):

OWNER (Name and Address):

555 E. Washington Avenue

Suite 3100

CONTRACT

Date: ______________________________________

Amount: $_________________________________

Description: Contract No. CRCBF-14 Boulder Flats Interconnection Project Transmission Line & Switchyard Construction

Location: Clark County, Nevada

BOND

Date (Not earlier than Contract Date): ___________

Modifications to this Bond Form:

CONTRACTOR AS PRINCIPAL (Seal below)

Company: __________________________________

Signature:

Name and Title:

Attest:

SURETY (Seal below)

Signature:

1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Contract, which is incorporated herein by reference.

2. If the Contractor performs the Contract, the Surety and the Contractor have no obligation under this Bond, except to participate in conferences as provided in paragraph 3.1.

3. If there is no Owner Default, the Surety’s obligation under this Bond arises after:

3.1 The Owner has notified the Contractor and the Surety at its address described in subsection 9 below, that the Owner is considering declaring the Contractor in default and has requested and attempted to arrange a conference with the Contractor and Surety, to be held not later than fifteen (15) days after receipt of such notice, to discuss methods of performing the Contract. If the Owner, the Contractor and the Surety agree, the Contractor must be allowed a reasonable time to perform the Contract, but such an agreement does not waive the Owner’s right, if any, subsequently to declare a Contractor Default; and

3.2 The Owner has declared a Contractor Default and formally terminated the Contractor’s right to complete the Contract. Such Contractor Default must not be declared earlier than twenty (20) days after the Contractor and the Surety have received notice as provided in paragraph 3.1; and

3.3 The Owner has agreed to pay the balance of the Contract Price to the Surety in accordance with the terms of the Contract or to a contractor selected to perform the Contract in accordance with the terms of the Contract with the Owner.

4. When the Owner has satisfied the conditions of subsection 3, the Surety shall promptly and at the Surety’s expense take one of the following actions:

4.1 Arrange for the Contractor, with the consent of the Owner, to perform and complete the Contract; or

4.2 Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or

4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner’s concurrence, to be secured with a performance bond executed by a qualified Surety equivalent to the bond issued on the Contract, and paid to the Owner the amount of damages as described in subsection 6 of the Balance of the Contract Price incurred by the Owner resulting from the Contractor’s Default; or

4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances:

4.4.1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, tender payment therefore to the Owner; or

4.4.2 Deny liability in whole or in part and notify the Owner citing the reasons therefore. If the Surety does not proceed as provided in subsection 4, with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen (15) days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner is entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in paragraph 4.4, and the Owner returns the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner is entitled to bring an action to enforce any remedy available to the Owner.

5. After the Owner has terminated the Contractor’s right to complete the Contract, and if the Surety elects to act under paragraph 4.1, 4.2 or 4.3 above, then the responsibilities of the Surety to the Owner must not be greater than those of the Contractor under the Contract and the responsibilities of the Owner to the Surety must not be greater than those of the Owner under the Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to the mitigation of costs and damages on the Contract, the Surety is obligated without duplication for:

5.1 The responsibilities of the Contractor for correction of defective work and completion of the Contract;

5.2 Additional legal, design professional and delay costs resulting from the Contractor’s Default, and resulting from the action or failure to act of the Surety under subsection 4; and

5.3 Liquidated damages, or if no liquidated damages are specified in the Contract, actual damages caused by delayed performance or nonperformance of the Contractor.

6. The Surety is not liable to the Owner or others for obligations of the Contractor that are unrelated to the Contract, and the Balance of the Contract Price must not be reduced or set off on account of any such unrelated obligations. No right of action accrues on this Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors.

7. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts, purchase orders and other obligations.

8. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work is performed under the Contract and must be initiated within two years after the Contractor’s Default, or within two years after the Contractor ceased working, or within two years after the Surety refuses or fails to perform its obligation under this Bond, whichever occurs first. If the provisions of this subsection are void or prohibited by law, the minimum of limitation available to sureties as a defense in the jurisdiction of the court is applicable.

9.

Notice to the Surety, the Owner or the Contractor must be mailed or delivered to the address shown on the signature page of this performance bond.

10. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the work is performed any provision of this bond conflicting with such statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

11. Definitions.

11.1 “Balance of the Contract Price” means the total amount payable by the Owner to the Contractor under the Contract after all proper adjustments have been made, including allowances to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Contract.

11.2 “Contract” means the agreement between the Owner and the Contractor identified on the signature page, including all the Contract documents and changes thereto.

11.3 “Contractor Default” means a failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract.

11.4 “Owner Default” means a failure of the Owner, which has neither been remedied nor waived, to pay the Contractor or to perform in complete or comply with the other terms of this Contract.

SECTION 800

PAYMENT BOND

CONTRACTOR (Name and Address):

SURETY (Name and Principal Place of Business):

OWNER (Name and Address):

555 E. Washington Avenue

Suite 3100

CONTRACT

Date: ______________________________________

Amount: $_________________________________

Description: Contract No. CRCBF-14

Boulder Flats Interconnection Project Transmission Line &

Switchyard Construction

Location: Clark County, Nevada

BOND

Date (Not earlier than Contract Date): ___________

Modifications to this Bond Form:

CONTRACTOR AS PRINCIPAL (Seal below)

Signature:

SURETY (Seal below)

Signature:

1.

The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner solely for the protection from claimants supplying labor or materials to the Contractor or to any of its subcontractors, for use in the performance of the Construction Contract, which is incorporated herein by reference.

2.

With respect to the Owner, this obligation shall be null and void if the Contractor:

2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and

2.2 Defends, indemnifies and holds harmless the Owner from all claims, demands, liens or suits by any person or entity who furnished labor, materials, or equipment for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default.

3.

With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly, for all sums due.

4.

The Surety shall have no obligation to Claimants under this Bond until:

4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.

4.2 Claimants who do not have direct contract with the Contractor:

4.2.1 Have furnished written notice to the Contractor and sent a copy, or notice thereof, to the Owner, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and

4.2.2 Have either received a rejection in whole or in part from the Contractor, or not received within thirty (30) days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and

4.2.3 Not having been paid within the above thirty (30) days, have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Contractor.

5.

If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that is sufficient compliance.

6.

When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions:

6.1 Send an answer to the Claimant, with a copy to the Owner, within forty-five (45) days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed.

6.2 Pay or arrange for payment of any undisputed amounts. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.

7.

The Surety’s total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety.

8.

Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work.

9.

The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond.

10.

The Surety hereby waives notice of any change, including changes in time, to the Construction Contract or to related subcontracts, purchase orders and other obligations.

11.

No suit or action shall be commenced by Claimant under this Bond other than in a court of competent jurisdiction in the location in which the work or part of the work is located or after the expiration of one year from the date (1) on which the Claimant gave notice required by Subparagraph 5.1 or Clause 4.2 (iii), or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.

12.

Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page.

13.

When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the work is performed, any provision of this Bond conflicting with such statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond.

14.

Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made.

15.

Definitions.

15.1 Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include, without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished.

15.2 Contract or Construction Contract: The Contract between the Owner and the Contractor identified on the signature page including all the Contract documents and changes thereto.

15.3 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor or to perform in complete or comply with the other terms thereof.

SECTION 850

GUARANTY BOND

GUARANTEE of:

(Name and Address of Prime Contractor)

We hereby guarantee that all work performed under the Contract Documents entitled, Contract CRCBF-14, Transmission Line & Switchyard Construction, which we have constructed, has been done in accordance with the Contract Documents. We agree to repair or replace any or all of our Work, together with any other adjacent work which may be damaged in so doing, that may prove to be defective in workmanship or material within a period of one year after the Substantial Completion of the Work without any expense whatsoever to the Colorado River Commission of Nevada, ordinary wear and unusual abuse or neglect excepted.

In the event of our failure to comply with the above-mentioned conditions within ten (10) calendar days after being notified in writing by the Colorado River Commission of Nevada, we collectively or separately, do hereby authorize the Colorado River Commission of Nevada to proceed to have said defects repaired and made good at our expense and we will honor and pay the costs and charges therefore upon demand. When correction Work is started, it shall be carried through to completion.

Date:

Date of Substantial Completion

Amount:

(5% Final Contract Price)

(Contractor)

By:

(Signature)

(continued next page) Countersigned Resident Agent in Nevada:

(Agent)

(Surety)

Address:

Address:

ADVANCE \x39

ADVANCE \x291

Phone No.

Phone No.

(SEAL AND NOTARIZE ACKNOWLEDGMENT OF SURETY)

SECTION 900

CERTIFICATES OF INSURANCE

Colorado River Commission of Nevada Boulder Flats Solar Interconnection Project Contract No. CRCBF-14 (Insert Certificates after this page)

SECTION 1000

GENERAL CONDITIONS

1.

Definitions

1.1 “Acceptance” or “Final Acceptance” - The formal action by the Owner accepting the Work, or any portion thereof, as complete and satisfactory, subject to Contractor’s warranties.

1.2 “Acceptance Testing” - Any testing required by the Owner prior to, and as a prerequisite of, Owner’s Acceptance.

1.3 “Addenda” ‑ Written or graphic instruments issued by the Owner prior to the opening of Bids that clarify, correct or change the Contract Documents.

1.4 “Application for Payment” ‑ The form acceptable to Owner’s Representative which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents.

1.5 “Asbestos” ‑ Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

1.6 “As indicated” - Refers to references in the Drawings.

1.7 “As specified” - Refers to references in the Contract Documents.

1.8 “Bid” ‑ The formal offer or proposal of the Bidder submitted on the prescribed Bid Form and Bid Schedule together with the required Bid security and all information submitted with the Bid that pertains to performance of the Work.

1.9 “Bid Security” - A certified or cashier’s check or Bid Bond accompanying the Bid in the amount of 5% of the Total Bid Price payable to the Owner as a guarantee that the Bidder, if its Bid is accepted, will promptly execute the Contract, and provide the necessary bonds, insurance certificates, and other required documentation.

1.10 “Bidder” - The person, firm, or corporation submitting a Bid for the Work to be performed.

1.11 “Bonds” ‑ Performance and Payment Bonds and other instruments of security.

1.12 “Change Order” ‑ A document signed by Owner and Contractor authorizing an addition, deletion or revision in the Work and, if warranted, an adjustment in the Contract Price or the Contract Times issued on or after the Effective Date of the Contract.

1.13 “Construction Site, Project Site, Site” - The Boulder Flats Switchyard and the land upon which it is located which shall be utilized by the Contractor in the performance of the construction, storage and access.

1.14 “Contract Documents” ‑ All of the documents contained in Volumes I, II, III and IV, V, VI and any addenda thereto, of the Colorado River Commission of Nevada, Boulder Flats Solar Interconnection Project, Contract No. CRCBF-14. The term includes the Contractor’s Bonds, any Notice of Award or Notice to Proceed issued by the Owner, Contractor’s Bid and any documentation submitted by the Contractor and accepted by the Owner prior to the execution of this Contract, and all Change Orders amending, modifying, or supplementing this Contract which may be delivered or issued after the effective date of this Contract and are not attached hereto. Submittals are not Contract Documents. Shop Drawings and the reports and drawings referred to in Volume II, Section 1000, subsection 4.2.1 are not Contract Documents.

1.15 “Contract Price” ‑ The monies payable by Owner to Contractor for completion of the Work in accordance with the Contract Documents and subject to all adjustments made in accordance with the Contract Documents, including but not limited to any amendments hereto, and subject to the provisions of Volume II, Section 1000, subsection 10.9 in the case of Unit Price Work, and subject to the assessment of liquidated damages.

1.16 “Contract Times” ‑ The number of days or the dates stated in the General Requirements to: (I) achieve Substantial Completion; (ii) to achieve final completion, and (iii) achieve any interim milestones.

1.17 “Contractor” ‑ The person, firm or corporation with whom Owner has entered into the Contract.

1.18 “Day” ‑ A calendar day of twenty‑four hours measured from midnight to the next midnight.

1.19 “Defective” ‑ An adjective which when modifying the word Work refers to Work that is unsatisfactory, faulty or deficient, in that it does not conform to the Contract Documents, or does not meet the requirement of any inspection, reference standard, test or approval referred to in the Contract Documents, or has been damaged prior to Owner’s Representative recommendation of final payment (unless responsibility for the protection thereof has been assumed by Owner at Substantial Completion).

1.20 “Drawings” ‑ The drawings which show the scope, extent and character of the Work to be furnished and performed by Contractor and which have been prepared by the Owner and are provided in Volume IV of the Contract Documents. Shop Drawings are not Drawings as so defined.

1.21 “Effective Date of the Contract” ‑ The date the Contract is executed by the Owner.

1.22 “Equipment” ‑ Products with operational or non-operational parts, regardless of whether motorized or manually operated, and particularly including products with service connections (wiring, piping, and other like items), excluding machinery and equipment used for preparation, fabrication, conveying and erection of the Work.

1.23 “Executive Director” - The executive director of the Colorado River Commission of Nevada.

1.24 “Field Order” ‑ A written order issued by Owner which orders minor changes in the Work in accordance with Volume II, Section 1000, subsection 9.1 but which does not involve a change in the Contract Price or the Contract Times.

1.25 “Furnish, Install or Provide” - To pay for, deliver to site, unload and uncrate, assemble, place in position, install, adjust, clean and otherwise make Materials and Equipment fit for their intended use.

1.26 “Hazardous Waste” ‑ The term "hazardous waste" shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903), as amended from time to time.

1.27 “Indemnitees and Insureds” ‑ The Colorado River Commission of Nevada, the Southern Nevada Water Authority, their affiliated governmental agencies, their respective members, directors, officers and employees, the water users of the Southern Nevada Water Authority: Las Vegas Valley Water District, Boulder City, City of North Las Vegas, City of Henderson, and each of their directors, officers, employees, and subcontractors.

1.28 “Labor Commissioner” ‑ The person appointed and functioning pursuant to NRS Chapter 607 who is charged with enforcing the labor laws of the State of Nevada.

1.29 “Laws and Regulations; Laws or Regulations” ‑ Any and all applicable laws, rules, regulations, ordinances, codes and orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction over the Contract.

1.30 “Liens” ‑ Liens, charges, security interests or encumbrances on Project funds, real property or personal property.

1.31 “Materials” ‑ Products which must be substantially cut, shaped, worked, mixed, finished, refined, or otherwise fabricated, processed, installed, or applied to form a part of the Work, excluding machinery and equipment used for preparation, fabrication, conveying and erection of the Work.

1.32 “Milestone” ‑ A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work.

1.33 “Notice of Award” ‑The written notice by the Owner to the apparent successful Bidder stating that upon compliance by the apparent successful Bidder with the conditions.

1.34 “Notice to Proceed” ‑ The written notice given by Owner to Contractor fixing the date on which the Contract Times will commence to run and on which Contractor shall start to perform Contractor’s obligations under the Contract Documents.

1.35 “Owner” – For purposes of the Contract Documents means the Colorado River Commission of Nevada. In this regard the Colorado River Commission is serving as an agent of the Southern Nevada Water Authority whom shall retain ownership of the facilities and equipment comprising the Boulder Flats Switchyard.

1.36 “Partial Utilization” ‑ Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work.

1.37 “PCBs” ‑ Polychlorinated biphenyls.

1.38 “Petroleum” ‑ Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non‑hazardous wastes and crude oils.

1.39 “Procurement Contractor” ‑ The corporation, company, partnership, firm or individual who has entered into an agreement with the Owner to furnish equipment for this Project.

1.40 “Products” ‑ Purchased items for incorporation into the Work, regardless of whether specifically purchased for the project or taken from Contractor’s stock of previously purchased products, excluding machinery and equipment used for preparation, fabrication, conveying and erection of the Work.

1.41 “Project”- The Owner’s Boulder Flats Switchyard Upgrade Project.

1.42 “Radioactive Material” ‑ Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time.

1.43 “Reference Drawings” - Drawings not specifically prepared for this Contract, but which contain information pertinent to the Work.

1.44 “Samples” ‑ Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged.

1.45 “Shop Drawings”‑ All diagrams, detail design calculations, fabrication, installation, and erection drawings, lists, graphs, catalog sheets, data sheets, and similar items, illustrations, schedules and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.

1.46 “Specifications” ‑ Those portions of the Contract Documents consisting of written technical descriptions of the Work, and materials, equipment, construction systems, standards, workmanship, and certain administrative details applicable thereto.

1.47 “Subcontractor” ‑ An individual, firm or corporation having a direct contract with the Contractor or with another Subcontractor for the performance of a part of the Work at the Site.

1.48 “Submittals” - All Shop Drawings, product data, Samples, reports, and records which are prepared by the Contractor, a Subcontractor, manufacturer, or Supplier, and submitted by the Contractor to the Owner as a basis for approval of the use of Equipment and Materials proposed for incorporation in the Work or needed to describe proper installation, operation and maintenance, or technical properties.

1.49 “Substantial Completion” ‑ The status of the Work (or a specified part thereof) when it has progressed to the point where, in the opinion of the Owner’s Representative as evidenced by his definitive certificate of Substantial Completion, it is sufficiently complete, in accordance with the Contract Documents, so that the Work (or specified part) can be used for the purposes for which it is intended; or if no such certificate is issued, when the Work is complete and ready for final payment as evidenced by the Owner’s Representative written recommendation for final payment. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. To be considered substantially complete, all electrical power, controls, and instrumentation facilities must be operational and ready for the Owner’s continuous use as intended.

1.50 “Substitutions” - Changes in products, Materials, Equipment, and methods of construction required by the Contract Documents proposed by the Contractor after award of the Contract are considered to be requests for substitutions. The following are not considered to be requests for substitutions (i) substitutions requested during the bidding period, and accepted by Addendum prior to award of the Contract, are included in the Contract Documents and are not subject to requirements specified in Volume III, section 1600 for substitutions, (ii) revisions to the Contract Documents requested by Owner, and (iii) specified options of Products and construction methods included in the Contract Documents.

1.51 “Successful Bidder” - The best bid as evaluated by the Owner pursuant to the Owner’s Procedure for Award of Construction Contracts for the Power Delivery Project as provided in Volume I, Section 300 of the Contract Documents and to whom the Owner makes an award on the basis thereof.

1.52 “Superintendent” ‑ The Contractor’s representative at the Site with authority to act on behalf of the Contractor.

1.53 “Supplier” ‑ A manufacturer, fabricator, supplier, distributor, materialman or vendor having a direct contract with the Contractor or with a Subcontractor to furnish materials or equipment to be incorporated in the Work by the Contractor or a Subcontractor.

1.54 “Underground Facilities” ‑ All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and encasements containing such facilities, which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquids, petroleum products, telephone or other communications, cable television, sewage, drainage removal, control systems, or water.

1.55 “Unit Price Work” ‑ Work to be paid for on the basis of unit prices.

1.56 “Work” ‑ The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. Work includes and is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents.

1.57 “Work Day” ‑ Any day the Contractor is performing Work under the Contract.

1.58 “Written Amendment” ‑ A written amendment of the Contract Documents, signed by the Owner and the Contractor on or after the Effective Date of the Contract.

2.

Preliminary Matters, Contract Times.

2.1 Copies of Documents. The Owner shall furnish to the Contractor copies of the Contract Documents as stated in Volume II, Section 700.

2.2 Commencement of Contract Times, Notice to Proceed. After receipt of all executable agreements, bonds, and certificates of insurance required hereunder, the Owner will issue a Notice to Proceed. The Contract Times will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within thirty (30) days after the Effective Date of the Contract.

2.3 Commencement of Work. The Contractor shall begin to perform the Work on the day indicated in the Notice to Proceed, but no Work shall be done at the Site prior to the date on which the Contract Times commence to run.

2.4 Completion of Work. The Contractor shall complete all required Work within the times specified in Volume II, Section 1000, subsection 13.9.

2.5 Contractor’s Preconstruction Responsibilities. Before undertaking each part of the Work, the Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The Contractor shall promptly report in writing to the Owner any conflict, error, ambiguity or discrepancy which the Contractor may discover and shall obtain a written interpretation or clarification from the Owner before proceeding with any Work affected thereby.

2.6 Certificates of Insurance. Before any Work at the Site is started, the Contractor shall deliver to the Owner, with copies to each additional insured identified in Volume II, Section 1000, subsection 5, certificates of insurance (and other evidence of insurance which the Owner may reasonably request) which the Contractor is required to purchase and maintain in accordance with the Contract Documents.

2.7 Preconstruction Conference. Within ten (10) days after the Effective Date of the Contract, but prior to the commencement of Work at the Site, a preconstruction conference shall be held. The purpose of the preconstruction conference shall be to designate responsible personnel, discuss contract requirements and procedures, and establish a working relationship. Matters requiring coordination shall be discussed and procedures for handling such matters established. The conference attendees, location and agenda are set forth in Volume III, Section 1200. The Contractor shall bring to the conference:

2.7.1 An estimated construction progress schedule indicating the starting and completion dates of the various stages of the Work.

2.7.2 A preliminary procurement schedule.

2.7.3 A preliminary schedule of Submittal submissions.

2.7.4 A list of all permits and licenses the Contractor shall obtain indicating the agency granting the permit, the expected date of submittal for the permit, and the date by which the permit must be received.

3.

Contract Documents.

3.1 Integration. The Contract Documents comprise the entire agreement between the Owner and the Contractor concerning the Work. The Contract Documents shall be construed in accordance with the laws of the State of Nevada.

3.1.1 It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. All Work, materials or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage, as being required to produce the intended result, will be furnished and performed by the Contractor at the Contractor’s sole expense whether or not specifically called for.

3.1.2 When words or phrases which have a well‑known technical, construction industry, or trade meaning are used to describe Work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning.

3.1.3 Reference to standard specifications, manuals, or codes of any technical society, organization, or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual, or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of the Owner, or the Contractor, or any of their consultants, agents, or employees from those set forth in the Contract Documents.

3.1.4 In case of any conflict between manufacturers’ data and the Contract Documents, the Contract Documents will take precedence unless the manufacturer’s data conforms to data submitted with the Bid with a statement that the Bid is conditioned upon furnishing the Equipment and Materials defined in the manufacturers’ data submitted therewith.

3.1.5 Applicable codes and standards referenced in these Contract Documents establish minimum requirements for Equipment, Materials, and Work and are superseded by more stringent requirements of Contract Documents when and where they occur.

3.1.6 The Specifications are separated into Sections for convenience in defining the Work. Drawings are separated according to engineering disciplines and other classifications. This sectionalizing and the arrangement of the Specifications and Drawings shall not control the Contractor in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade.

3.1.7 If, during the performance of the Work, the Contractor finds a conflict, error, or discrepancy in the Contract Documents, the Contractor shall so report to the Owner’s Representative in writing at once and before proceeding with the Work affected thereby shall obtain a written interpretation or clarification; however, the Contractor shall not be liable to the Owner for failure to report any conflict, error, or discrepancy in the Contract Documents unless the Contractor had actual knowledge thereof or should reasonably have known thereof.

3.2 Amending Contract Documents. The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof only by formal Written Amendment or Change Order.

3.3 Supplementing Contract Documents. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, only by Field Order or the Owner’s written interpretation or clarification.

3.4 Ownership of Contract Documents, Drawings and Specifications. The Contractor and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by the Owner, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of the Owner.

4.

Availability Of Lands, Subsurface And Physical Conditions, Reference Points.

4.1 Availability of Lands. The lands and rights‑of‑way that are available for the Contractor’s use to prosecute the Work is the area within the Boulder Flats Switchyard fence as identified in the Drawings. Areas outside of the perimeter of the Boulder Flats Switchyard as shown on the Drawings may only be used by the Contractor if first approved by the Owner’s Representative. The Contractor shall make his own arrangements and pay all expenses for additional Work area required by him outside the limits of land and right-of‑way provided by the Owner. The Contractor shall confine his operations to the construction limits identified. Any Work performed in public rights‑of‑way, in addition to conforming to the Contract Documents, shall be done in accordance with the requirements of the permit issued by the public agency in whose right‑of‑way the Work is located.

4.2 Subsurface and Physical Conditions.

4.2.1 Reports and Drawings. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site and those drawings of physical conditions in or relating to existing surface or subsurface conditions at or contiguous to the Site have been utilized by the Owner solely for design purposes in preparing the Contract Documents and may not be relied upon by the Contractor in its performance of the Contract. The information contained in those documents may not be indicative of actual subsurface conditions that may be encountered and the Owner does not warrant and hereby disclaims responsibility for the accuracy of that information. The Contractor must conduct, and has conducted, its own pre‑bid inspection in order to thoroughly familiarize itself with conditions at the Site. The determination of the actual character of subsurface material is the Contractor’s sole responsibility and no claims for changes of any kind, for differing site conditions will be entertained by the Owner.

4.2.2 Limited Reliance by Contractor on Technical Data. The reports, tests and drawings referred to in Volume II, Section 1000, subsection 4.2.1, if any, were generated to aid the Owner in assessing the suitability of facility locations, to compare the relative advantages of alternative design approaches, to develop structural requirements, and for other related design purposes. Such documents contain two types of information: Type A) factual technical data derived from direct observation, examination or testing of physical samples or specimens with descriptions or measurements of such samples and specimens derived from direct examination or testing by persons acting on behalf of the Owner; and Type B) interpretations, interpolations, extrapolations, conclusions, or opinions made or derived from available evidence, including Type A data. The Owner accepts responsibility only for the accuracy of Type A data but hereby warns the Contractor that such data does not purport to represent and may not be indicative of all subsurface conditions that may be encountered by the Contractor. The Owner does not warrant and hereby disclaims all responsibility for Type B data and all other information other than the accuracy of Type A data, and all such information is to be used by the Contractor at the Contractor’s sole risk. The obligation is upon the Contractor, before making its Bid, to make its own investigation as to all subsurface conditions and make its own interpretation of the character and condition of the materials which will be encountered. To this end the Contractor may excavate test holes as it deems necessary. The Contractor may not rely upon or make any claim against Owner, or any of their consultants with respect to:

4.2.2.1 the completeness of geotechnical information;

4.2.2.2 the completeness of such reports and drawings for the Contractor’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by the Contractor and safety precautions and programs incident thereto;

4.2.2.3 any interpretations, interpolations, extrapolations, conclusions, or opinions made or derived from any evidence by any person; and

4.2.2.4 any Type B information.

4.3 Physical Conditions - Underground Facilities.

4.3.1 Shown or Indicated. The information and data shown or indicated in the Contract Documents with respect to existing underground facilities at or contiguous to the site is based on information and data furnished to the Owner by the owners of the underground facilities or by others.

4.3.1.1 The Owner shall not be responsible for the accuracy or completeness of any Underground Facilities Information;

4.3.1.2 The cost of all of the following will be included in the Contract Price and the Contractor shall have full responsibility for (i) reviewing and checking all Underground Facilities Information, (ii) locating all underground facilities shown or indicated in the Contract Documents, (iii) coordination of the Work with the owners of underground facilities during construction, and (iv) the safety and protection of all underground facilities and repairing any damage thereto resulting from the Work.

4.3.2 Not Shown or Indicated. If an underground facility is uncovered or revealed at or contiguous to the Site which was not shown or indicated in the Contract Documents, the Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by Volume II, Section 1000, subsection 6.23), identify the owner of the underground facility and give written notice to the Owner. The Owner’s Representative shall promptly review the underground facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence of the underground facility. If the Owner concludes that a change in the Work is required, a Change Order shall be issued. The Contractor shall be responsible for the safety and protection of the underground facility.