This document is a Request for Bids (RFB) issued by the Colorado River Commission of Nevada (CRCN) for the Boulder Flats Solar Interconnection Project under Contract No. CRCBF-14, Transmission Line & Switchyard Construction. The proposed work generally consists of the construction of a 230kV three breaker ring bus switchyard and approximately ten mile long 230kV transmission line and associated cut-ins to the new switchyard. Sealed bids will be received until 2:00 p.m. local time on February 16, 2024. A pre-bid meeting is scheduled for January 31, 2024. The Contract will be awarded at a later publicly-noticed CRCN meeting. The work is defined as a public works project under Nevada Revised Statutes Chapter 338, and all bidders must comply with the requirements therein.

Bids will be received on a unit price basis as indicated in the Bid Form. Bidders must provide 5% bid security and are required to have a full A or full AB Nevada contractor's license, or at a minimum an A-17 license with other appropriate sub-contractor licenses. Prevailing wages apply, and a performance bond, payment bond, and one-year guaranty bond will be required. The CRCN reserves the right to reject any or all bids and will award the contract to the best bid based on the criteria outlined in the Procedure for Award of Construction Contracts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Colorado River Commission of Nevada 555 East Washington Avenue, Suite 3100 Las Vegas, Nevada 89101-1065

Boulder Flats Solar Interconnection Project

Contract No. CRCBF-14 Transmission Line & Switchyard Construction

Volume I – Bidding Documents

PWP-CL-2006-241

Issue: For Bid January 9, 2024

Boulder Flats Solar Interconnection Project Contract No. CRCBF-14

Contract Documents

Table of Contents

Volume I – Bidding DocumentsSection
Request for Bids100
Bid Instructions200
Procedures for Award of Construction Contracts300
Bid Form400
Bid Schedule450
Bid Bond500
Qualification Statement550
Subcontractor Information600

Volume II – Contract Form and Conditions

Contract No. CRCBF-14, Transmission Line & Switchyard Construction700
Performance Bond750
Payment Bond800
Guarantee Bond850
Certificated of Insurance900
General Conditions1000

Volume III – Specifications

Summary of Work1100
Permits and Environmental Compliance1150
Environmental Compliance Requirements1150A
Project Meetings, Schedules and Reports1200
Submittals1250
Security1300
Field Offices and Sheds1350
Temporary Barriers and Controls1400
Temporary Utilities and Facilities1450
Project Identification and Signs1500
Contractor Furnished Equipment and Materials1550
Owner Furnished Equipment and Materials1600
Equipment and Material Substitutions1650
Manufacturer’s Field Service1700
Contract Closeout1750
Record Documents and Spare Parts1800

Boulder Flats Solar Interconnection Project

Contract No. CRCBF-14

Contract Documents

Table of Contents

Volume III – SpecificationsSection
Final Cleaning1850
Warranties1900
Site Preparation and Earthwork2100
Fences and Gates2200
Crushed Rock Surface2300
Concrete Formwork3100
Concrete Reinforcement3200
Concrete3300
Spread Footer Foundations3400
Drilled Foundation Piers3500
Control Cables, Low Voltage Cables, Ground Cables, and Accessories5100
Conduits and Accessories6100
Cable Trench Installation6200
Lighting and Low Voltage Power7200
Switchyard Grounding8100
Signs9500
Installation of Owner Furnished Switchyard Steel10100
Installation of Owner Furnished Switchyard Equipment10200
Switchyard Bus, Connectors, Materials and Hardware11100
Switchyard Testing14100

Volume IV – Technical Specifications

Volume V – Drawings

SECTION 100

REQUEST FOR BIDS

1. Notice.

1.1 The Colorado River Commission of Nevada (Owner) hereby requests sealed Bids for furnishing all labor, equipment, materials and services required for the performance of the Work for the Boulder Flats Solar Interconnection Project as specified by the Owner under Contract No. CRCBF-14, Transmission Line & Switchyard Construction.

1.2 Qualification of Bidders will be required. Due to the specialized nature of construction, the experience and qualifications of Bidders will be evaluated by the Owner. Only those Bids submitted by Bidders determined by the Owner to be qualified shall be considered.

1.3 Sealed Bids must be made in accordance with the Bid Form and Bid Schedule. Sealed Bids will be received by the Owner at the desk of the Owner’s receptionist, 555 East Washington Avenue, Suite 3100, Las Vegas, Nevada 89101 until 2:00 p.m., local time, February 16, 2024

1.4 At above stated place and time, and promptly thereafter, all Bids that have been duly received will be opened and read aloud. The award of the Contract will be made at a later publicly-noticed meeting of the Owner.

2. Proposed Work.

2.1 The proposed Work is generally described as the construction of a 230kV three breaker ring bus switchyard and approximately ten mile long 230kV transmission line and associated cut-ins to the new switchyard.

2.2 The Work is a public works project as defined by Chapter 338 of Nevada Revised Statutes (NRS) and all Bidders are required to comply with, and the Contract shall be awarded and administered in accordance with, the laws contained in that Chapter.

3. Questions Regarding Request for Bid. Questions concerning this Request for Bid should be directed to:

Mr. Robert Reese

Colorado River Commission of Nevada
555 East Washington Ave, Suite 3100
Las Vegas, Nevada 89101-1065
Telephone:(702) 856-3611
Cell Phone:(702) 682-6972
Email:breese@crc.nv.gov

4. Contract Documents.

4.1 Copies of the Contract Documents are available for review at the Colorado River Commission offices at 555 East Washington Avenue, Suite 3100, Las Vegas, Nevada 89101.

5. Pre-Bid Conference.

5.1 A pre-bid meeting will be scheduled on January 31, 2024, Newport Conference Room at the River Mountain Water Treatment Facility. 10AM PST for Presentation and Scope Walkthrough, Site Visit to Follow.

6. Pricing and Security.

6.1 Bids will be received on a unit price basis as indicated in the Bid Form. Specific bid items may specify pricing on a lump sum basis.

6.2 The initial Contract Price shall equal the Total Extended Price based upon estimated quantities in the Bid Form. The initial Contract Price shall be used to obtain required performance and payment security. The final Contract Price shall be subject to the Extended Price limitations and shall be adjusted according to final delivered and installed quantities.

6.3 Bid Security in the amount of 5% of the Bid Price must accompany each Bid.

6.4 The Contractor will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and payment of all bills and obligations arising from the performance of the Contract in accordance with Chapter 339 of the Nevada Revised Statutes. The Contractor will also be required to furnish a Guaranty Bond upon Substantial Completion of the Work guaranteeing all Work performed.

7. Contractor License.

7.1 Pursuant to NRS 624.230, Bidders must be licensed contractors in the State of Nevada.

7.2 The Owner is seeking a Contractor with a classification with a full A or full AB Nevada contractor’s license. The Owner will accept Bids from Bidders that do not have full A or AB license, if the Bidder possesses, at a minimum, a sub-classification A-17 and is licensed or proposes Subcontractors who are appropriately licensed in other relevant work areas.

7.3 In the event of joint ventures, each venture partner must be licensed, and unless each joint venturer has an unlimited license, the joint venture must have an additional license for acting in the capacity of such joint venture.

7.4 The State of Nevada makes no distinction regarding Subcontractors, who must also be licensed in Nevada.

8. Labor Standards. Contractor and all Subcontractors will be required to conform to the labor standard set forth in the Contract Documents. These standards include the employment provisions of NRS 338 (Public Works Projects).

9. Insurance. Contractor and all Subcontractors will be required to provide insurance as set forth in the Contract Documents. This issuance shall include coverages required by NRS 616 (Industrial Insurance), NRS 617 (Occupational Diseases), and NRS 612 (Unemployment Compensation).

10. Bid Acceptance.

10.1 Pursuant to NRS 338.143, Owner reserves the right to reject any or all Bids, including without limitation to the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional Bids, and to reject the Bid or any Bidder if Owner believes that it would not be in the best interest of Owner to make an award to that Bidder. Owner also reserves the right to waive formalities.

10.2 Bids will be evaluated as prescribed in Owner’s Procedure for Award of Construction Contracts for the Power Delivery Project.

10.3 All Bids shall remain subject to acceptance by the Owner for sixty (60) days, but the Owner may, in its sole discretion, release any Bid and return the Bid Security prior to that date.

10.4 If the Owner elects to accept Bidder’s Bid, Owner shall give the Bidder notice thereof within the number of days set forth in the Bid Form.

11.Issued for Bid.
Date:
January 9, 2024
By:

Robert D. Reese

Assistant Director for Engineering and Operations

BID RESPONSE DEADLINE:
February 20, 2024

SECTION 200

BID INSTRUCTIONS

1. Bid Form and Bid Schedule.

1.1 The Bid Form is found in Section 400 and the Bid Schedule is found in section 450. The Bid Form and Bid Schedule must be completed in ink. The names of all persons signing must be legibly printed below their signatures.

1.2 All blanks in the Bid Form must be filled. A Bid price shall be indicated for each Bid item, allowance item, and adjustment unit price listed therein. If a Bidder elects not to submit a bid for a specific item listed in the Bid Form, indicate such intent with the words “No Bid” in lieu of a proposed price.

1.3 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers and dates of which must be filled in on the Bid Form.

1.4 No alteration in Bids, or in the printed forms therefore, by erasures, interpolations, or otherwise will be acceptable.

1.5 Bids by corporations must be executed in the corporate name by the president or vice-president (or other corporate officer accompanied by evidence of authority to sign for the corporation). Bids by partnerships must be executed in the partnership name and signed by a partner. Bids by joint ventures shall be signed by each participant in the joint venture or by a representative of the joint venture accompanied by evidence of authority to sign for the joint venture.

1.6 The names of all persons signing shall be legibly printed below their signatures. A Bid by a person who affixes to his signature the word “president”, “secretary”, “agent”, or other designation without disclosing his principal may be held to be the Bid of the individual signing. When requested by the Owner, evidence of the authority of the person signing shall be furnished.

2. Bid Security.

2.1 Each Bid must be accompanied by a security made payable without condition to the Owner in an amount of five percent (5%) of the Bidder’s maximum Bid and in the form of a Bid Bond issued by a surety meeting the requirements set forth in the General Conditions. The Bid Bond shall be submitted using a form in substantial compliance with the form provided in section 500.

2.2 The Bid Security of the Successful Bidder will be retained until such Bidder has executed the Contract, furnished the required Contract Security, and met the other conditions of the Notice of Award, whereupon the Bid Security will be returned. If the Successful Bidder fails to execute and deliver the Contract and to furnish the required Contract Security within the number of days set forth in the Bid Form, the Owner may annul the Notice of Award and the Bid Security of that Bidder will be forfeited.

2.3 The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of fourteen (14) days after the effective date of the Contract or the day after the last day the Bids remain subject to acceptance as set forth in the Bid Form, whereupon Bid Securities furnished by such Bidders will be returned. Bid Security accompanying Bids which are deemed by the Owner to be noncompetitive will be returned within fourteen (14) days after the Bid opening.

3. Work Plan.

3.1 Bidder shall submit a Work Plan with the Bid. The Work Plan shall describe proposed methods of construction. If any method does not meet the requirements of this Specification, the Bid may be held to be unresponsive and may be rejected.

3.2 Descriptions of proposed methods shall be complete and detailed enough to demonstrate full conformance with the Specifications. The methods described in the Work Plan shall not be modified during construction except as authorized by Owner.

3.3 The Work Plan shall contain a schedule for the Work prepared in a bar chart format with sufficient detail to demonstrate successful achievement of Milestone dates.

4. Contractor License Requirement.

4.1 The Bidder and Bidder’s Subcontractors shall be licensed as indicated in section 100 Request for Bids.

4.2 The Bidder and Bidder’s Subcontractors shall provide evidence of licensure with the Bid.

4.3 In accordance with NRS 338.145, the Contract may be awarded to another Bidder if the person to whom the Bid was awarded is not licensed or if the amount of the Bid exceeds the limits of the Bidder’s license.

5. Bids as Public Records.

5.1 The Owner is a public agency as defined by state law. As such, it is subject to the Nevada Public Records Law (Chap. 239 of Nevada Revised Statutes [NRS]). All of the Owner’s records are public records (unless otherwise declared by law to be confidential), which are subject to inspection and copying by any person. Bidders are advised that after a Bid is received by the Owner, its contents will become a public record and nothing contained in the Bid will be deemed to be confidential.

5.2 All Bidders are therefore advised to not include any information in their Bid that is proprietary in nature or that they would not want to be released to the public.

6. Submission of Bids.

6.1 Bids must be submitted at the time indicated in section 100, Request for Bid, or at the modified time indicated by Addendum.

6.2 The Bidder shall submit two (2) duplicate copies of the bound Volume I, Bidding Documents, and other documents, as required, in a sealed bid envelope marked “CRCBF-14 – BID ENCLOSED”.

6.3 The Bid envelope must be marked with the name and address of the Bidder.

6.4 The Bid may be hand delivered or sent through the mail or other delivery system. Bids must be submitted to:

Colorado River Commission of Nevada 555 E. Washington Avenue, Suite 3100 Las Vegas, NV 89101-1065

Attention: Robert Reese

6.5 Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids. Bids received after the time and date identified in the Invitation to Bid shall be returned unopened.

6.6 No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association. Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids and pre-qualification documents. Bids received after the time and date identified in the Invitation to Bid shall be returned unopened.

7. Evaluation of Bids.

7.1 The Owner may conduct such investigations as the Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to Owner’s satisfaction within the prescribed time.

7.2 The initial Work Plan submitted with the Bids will be reviewed by the Owner to determine the Bidder’s comprehension of the Work and the Bidder’s experience and expertise in the construction of electrical Switchyard facilities. The methods described in Work Plan will also be reviewed for conformance with the Specifications.

7.3 The Owner may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents.

7.4 The Owner also may consider the technical proposal of the Bidder, including the operating costs, maintenance requirements, performance data, and guarantees of items of materials and equipment proposed for incorporation in the Work when such data are required.

7.5 The Owner will then determine the best bid of the qualified Bidders pursuant to the Procedure for Award of Construction Contracts adopted for the Power Delivery Project.

7.6. The Contract will be awarded and administered in accordance with the laws of the State of Nevada.

8. Modification and Withdrawal of Bids

8.1 Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids. After the Bid opening, Bids may not be modified for any reason.

8.2 If, within 48 hours after Bids are opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid and the Bid Security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.

9. Rejection of Bids.

9.1 The Owner reserves the right to reject any or all bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced, or conditional bids, and to reject the bid of any Bidder if the Owner believes that it would not be in the best interest of the Owner to make an award to that Bidder.

9.2 The Owner also reserves the right to waive formalities.

10. Bid Protest.

10.1 If any Bidder or person wishes to protest the award of the Contract, such protest will be considered by Owner’s statutory Commission at a public meeting.

10.2 Written argument supporting any protest must be provided to the Colorado River Commission, Attn: Senior Deputy Attorney General, no later than ten (10) working days before the meeting of the Owner’s statutory Commission at which time and place the Contract is scheduled to be awarded.

10.3 At the meeting where the Contract is scheduled to be awarded, a hearing on the protest will be conducted and the protestant will be afforded an opportunity to be heard and make any argument relative to its protest.

10.4 The decision by the Owner’s statutory Commission on any protest made and the award of the Contract, if so approved, shall be final.

11. Signing of Contract.

11.1 The Owner will issue five (5) copies of the Contract Documents to the successful Bidder.

11.2 Within the number of days set forth in the Bid Form, the successful Bidder must sign all copies of the Contract, leaving the dates blank, must insert the required Bonds and power of attorney in the appropriate places and deliver all copies to the Owner.

11.3 The Owner will, thereafter, execute all copies of the Contract and return one original copy to the Contractor.

11.4 Executed Contract Documents will be accompanied by a complete set of the Drawings, with appropriate identification.

11.5 If the Successful Bidder fails to comply with the requirements of this section, the Owner may nullify its award of the Contract and thereafter accept the Bid of another Bidder.

12. Examination of Contract Documents and Site. It is the responsibility of each Bidder, before submitting a Bid, to: (a) thoroughly examine the Contract Documents and all requirements therein; (b) visit the Site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work; (c) consider federal, state, and local laws and regulations that may affect cost, progress, performance, or furnishing of the Work; (d) study and carefully correlate Bidder’s observations with the Contract Documents; and (e) promptly notify the Owner of all conflicts, errors, or discrepancies discovered by Bidder in the Contract Documents. Submission of a Bid shall be conclusive evidence that the Bidder has complied with the requirements of the preceding sentence.

13. Subsurface Conditions and Physical Conditions.

13.1 Reference is made to Volume II, Section 1000 for identification of, and the extent to which Bidder is entitled to rely on, the following:

13.1.1 Reports of explorations and test of subsurface conditions at the Site which have been utilized by Owner in preparation of the Contract Documents.

13.1.2 Drawings of physical conditions in or relating to existing surface and subsurface conditions (except underground facilities) which are at or contiguous to the Site that have been utilized by Owner in preparation of the Contract Documents.

13.2 Copies of such reports and drawings will be made available by the Owner to Bidders who request such subsurface information and sign a receipt therefore. Such reports and drawings do not form a part of this or any Contract Document issued by the Owner. Subsurface information issued by Owner shall be returned by unsuccessful Bidders within thirty (30) days after Notice of Award.

13.3 Bidders are warned that the information contained in the Contract Documents relating to subsurface conditions may not be indicative of actual subsurface conditions that may be encountered while performing the Work. The Owner does not warrant and hereby disclaims responsibility for the accuracy of this information except factual technical data derived from direct observation, examination or testing of physical samples or specimens with descriptions or measurements of such samples and specimens derived from direct examination or testing by persons acting on behalf of the Owner.

14. Underground Facilities. Information and data reflected in the Contract Documents, if any, with respect to underground facilities at or contiguous to the Site are based upon information and data furnished to Owner by owners of such underground facilities or others, and Owner disclaims responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in these Contract Documents.

15. Bidder’s Additional Site Investigations.

15.1 Before submitting a Bid, each Bidder shall at Bidder’s own expense, make or obtain any additional examinations, investigations, explorations, tests, and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface, and underground facilities) at or contiguous to the Site or otherwise which may affect cost, progress, performance, or furnishing of the work and which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contract Documents.

15.2 On request, 48 hours in advance, the Owner will seek to provide each Bidder access to property on which the Work is to be performed, under such terms of permission as Owner may then prescribe, as each Bidder deems necessary for submission of a Bid.

16. Easements.

16.1 The lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents.

16.2 All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by the Contractor.

17. Subcontractors, Suppliers, and Others.

17.1 Each Bidder shall provide, on the form in Volume I, Section 600, entitled “Subcontractor Information”, the name of each Subcontractor who will provide labor for the portion of the Work indicated, the percentage of the Total Bid anticipated to be paid each Subcontractor, and the Nevada license number of each Subcontractor named.

17.2 If requested by the Owner, the Bidder shall provide an experience statement of Subcontractor(s) with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, supplier, person or organization.

17.3 If the Owner, after due investigation, has reasonable objection to any proposed Subcontractor, supplier, or other person or organization, the Owner may, before the Notice of Award is given, request the apparent Successful Bidder to submit an acceptable substitute without an increase in the Bid. If the apparent Successful Bidder declines to make any such substitution, the Owner may award the Contract to the next best Bidder, in the Owner’s judgment, that proposes to use acceptable Subcontractors, suppliers, and other persons and organizations. Declining to make requested substitutions will not constitute grounds for sacrificing the Bid Security of any Bidder.

17.4 Any Subcontractor, supplier, or other person or organization listed and to whom the Owner does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to the Owner, subject to the Owner’s revocation.

17.5 A Contractor whose Bid is accepted shall not substitute any person for a Subcontractor who is named in the Bid unless:

17.5.1 the Owner objects to the Subcontractor, requests in writing a change in the Subcontractor and pays any increase in cost resulting from the change; or

17.5.2 a change is proposed by the Contractor because the Subcontractor, after having a reasonable opportunity, fails or refuses to execute a written subcontract which was offered to the Subcontractor with the same terms that all other Subcontractors on the Project were offered; or

17.5.3 a change is proposed by the Contractor because the named Subcontractor files bankruptcy or becomes insolvent; or

17.5.4 a change is proposed by the Contractor because the named Subcontractor fails or refuses to perform his subcontract within a reasonable time or is unable to furnish a performance bond and payment bond pursuant to NRS 339.025.

17.6 A Contractor whose Bid is accepted shall not contract with any Subcontractor not listed in its Subcontractor Information forms to perform the Work indicated, without the written approval of the Owner.

18. Bid Preference.

18.1 In accordance with the Owner’s Procedure for Award of Construction Contracts, the Owner shall award the Contract to the qualified Bidder who submits the best Bid. In the event two Bidders have submitted Bids evaluated as equal, preference may be given to the Bidder who provides proof of payment of taxes to the State of Nevada in accordance with NRS 338.147.

18.2 A Bidder requesting Bidder preference shall provide with its Bid a certificate of eligibility to receive preference in bidding on public works projects issued to the Bidder by the State Contractors’ Board.

18.3 The monetary amount of the bid preference shall be evaluated as five percent of the Bidder’s Bid.

19. Substitute or “Or-Equal” Items.

19.1 The procedure for submission of any application for review of substitute or “or-equal” items by Contractor and consideration by Owner is set forth in the Volume II, Section 1000.

19.2 The Contract, if awarded, will be on the basis of materials and equipment indicated on the Drawings or specified in the Specifications. Application for review of substitute or “or-equal” materials or equipment will not be considered by Owner until after the effective date of the Contract.

19.3 Proposed substitute and “or-equal” items will be considered in accordance with NRS 338.140.

20. Permits.

20.1 The Bid Price shall include the cost of all required permits and the cost of all measures required to comply with all permit requirements.

20.2 Certain Permits have been or will be obtained by Owner, as indicated in Volume II, Section 1000. Contractor shall obtain and include in the Bid Price the cost of all other permits which are required for the Work.

21. Taxes. All taxes that are lawfully assessed against the Owner or Contractor in connection with the Work shall be paid by Contractor. The Bid Price shall include all such taxes.

22. Performance Bond. The successful Bidder will be required to furnish Performance and Payment Bonds as security for the faithful performance of the Contract, which must be at least as protective as those bonds otherwise required pursuant to NRS 339.025.

23. Retainage. Provisions concerning retainage are set forth in Volume II, Section 1000.

24. Extended Work Week. Owner may require a mandatory 6 day workweek as directed by Owner for work activities which are on the critical path of job completion.

25. Prevailing Wage Rates.

25.1 Pursuant to Chapter 338 of the Nevada Revised Statutes, the prevailing wage rates established by the State of Nevada Labor Commissioner must be paid to all workmen engaged in the performance of any public works construction contracts awarded for the amount of $100,000.00 or more. Prevailing wage rates effective are available from the State of Nevada, Office of Labor Commissioner, and may be found on their web site.

25.2 Prevailing wage rates are subject to change and it is the Bidder’s responsibility to ensure that it is aware of and will pay the prevailing wage rates in effect at the time of Bid closing.

26. Schedule Milestones and Liquidated Damages. Schedule milestones and liquidated damages are required as stated in Volume II, Section 1000.

27. Guaranty Bond.

27.1 The Contractor will be required to submit a Guaranty Bond, in the amount of five percent (5%) of the final Contract Price, after completion of the Project which warrants the Work for a period of one year after final acceptance of the Work.

27.2 The cost of this Guaranty Bond shall be included in the Contractor’s Bid.

28. Bidder’s Representation. The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement concerning examination of the Contract Documents and the Site, that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents, and that the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

29. Addenda.

29.1 All questions about the meaning or intent of the Contract Documents shall be addressed to the Owner.

29.2 Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the Owner as having received the Contract Documents.

29.3 Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. Only answers issued by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

30. Use of Contract Documents.

30.1 Complete sets of Contract Documents must be used in preparing Bids; the Owner does not assume any responsibility for errors or misrepresentations resulting from the use of incomplete sets of Contract Documents.

30.2 The Owner, in making copies of Contract Documents available, does so only for the purpose of obtaining Bids for the Work and does not confer a license or grant for any other use of the Contract Documents.

SECTION 300

PROCEDURES FOR AWARD OF CONSTRUCTION CONTRACTS

Pursuant to the Colorado River Commission’s authority under NRS 538.161 (2) to:

Represent and act for the State of Nevada in the negotiation and execution of contracts, leases or agreements for the use, exchange, purchase or transmission of power from any source, or for the planning, development or ownership of any facilities for the generation or transmission of electricity for the greatest benefit to this state, and present such contracts, leases or agreements to the governor for his information. [Emphasis supplied.] and pursuant to the Colorado River Commission’s authority under NRS 538.166 (1).(c) to:

Acquire an interest in, finance, construct, reconstruct, operate, maintain, repair and dispose of any facility for water or power, including, without limitation, a facility for the storage or conveyance of water and a facility for the generation or transmission of electricity. [Emphasis supplied.] and subject to the requirements of NRS chapter 338;

The Colorado River Commission hereby adopts the following procedures for award of construction contracts for construction of its Power Delivery Project.

1. The phrase “construct . . . any facility for . . . power, including . . . a facility for the . . . transmission of electricity” shall include the erection or installation, at grade, above or below ground, of electrical transmission and transformation equipment including major power transformers and transmission equipment, power circuit breakers, Switchyard steel, building, fencing and all related components, transmission lines, including cables, insulator, poles, fixtures, fittings, grounding, lighting, fiber-optics systems, communications equipment, relaying equipment, supervisory control and data acquisition equipment (including control and data acquisition computers), distribution transformers, distribution breakers, distribution cabling and all associated components, and all other components and equipment necessary to construct and complete an operational and fully functioning power transmission and electrical distribution system.

2. The Commission’s staff shall obtain from the Commission’s engineer the recommended design specifications for the construction of electrical transmission facilities.

3. At such time as approved plans and specifications for bids are on file at the offices of the Commission, the Commission’s staff shall advertise for bids in a newspaper of general circulation in the State of Nevada, and in such other media that the Commission’s staff determines would inform potential construction contractors. The advertisement shall inform prospective construction contractors of:

(1).A general description of the electrical facilities to be constructed;
(2)the location and availability of the approved plans and specifications for the electrical transmission facilities to be constructed;
(3)the documents, requirements and process for qualification of bidders;
(4)the documents, requirements and process for consideration of bids from qualified bidders;
(5)the date and time not later than which bids must be received;
(6)the date and time when bids will be opened;
(7)the factors that the Commission shall consider in selecting the best bid.

4. Upon receipt of bids, the Commission’s staff shall consider the bids. The Commission’s staff may meet with any bidder in order to ensure that the Commission understands each bid.

5. The Commission’s staff shall recommend the best bid to the Commission for consideration. The best bid shall be that bid which, in the opinion of the Commission:

(1)complies with NRS chapter 338;
(2)proposes the construction of the Commission’s electrical system, or any part thereof, in a manner which meets the design specifications provided by the engineer and the contract requirements provided by the bid specifications;
(3)proposes the construction of the Commission’s electrical system, or any part thereof, in a timely manner so as not to interrupt the completion of the Project or its later normal operation;
(4)proposes contract prices, either in lump sum or per item as specified in the engineer’s design specifications, which are competitively priced in the market place;
(5)provides the most certain and stable quality assurance;
(6)provides the most substantial fiscal accountability and performance guarantee in the event of the construction contractor’s failure to perform as contracted;
(7)demonstrates the construction contractor’s general ability to provide substantial post-construction support to the Commission in the operation of its electrical facilities;
(8)demonstrates that the construction contractor is experienced in constructing electrical facilities of the nature intended to be constructed by the Commission;
(9)demonstrates that the construction contractor is knowledgeable about the engineering, manufacture, assembly, testing and shipping or other ancillary services related to the delivery of major electrical equipment;
(10)demonstrates that the construction contractor has experience in the construction of electrical facilities in climatological, topographic and geological situations similar to those within which the Commission intends to construct electric facilities (at grade, above or below ground as the case may be);
(11)demonstrates that the construction contractor’s subcontractors, suppliers, and other persons and organizations proposed for various portions of the work are qualified and experienced;
(12)demonstrates that the construction contractor has satisfied other owners with the quality and timeliness of its work.

None of the above-listed criteria shall be an exclusive determinant of the best bid. Unless the preference required by NRS 338.147 (2) applies, the lowest bid shall be the best bid when all non-cost criteria are equal.

6. Any or all of the bids received may be rejected if the Commission, upon recommendation of the Commission staff, determines that:

(1)the bidder is not responsive or responsible;
(2)the apparent quality of the services, materials, equipment or labor offered does not conform to the approved plan or specifications; or
(3)the public interest would be served by such a rejection.

7. No contract with any bidder shall be executed or become effective without the prior approval of the Commission. The Commission’s staff shall notify all of the bidders prior to any meeting of the Commission at which the Commission may act to approve any contract with any bidder. Any bidder may appear at the Commission meeting and shall be entitled to speak in behalf of its own bid. The decision of the Commission approving any contract with any bidder shall be a final action of the Commission.

8. Any contract for the construction of electrical facilities shall require that the contractor provide a) a performance bond in an amount of 100% of the contract amount, conditioned upon the faithful performance of the contract in accordance with its terms and exclusively for the protection of the Commission; and b) a payment bond in an amount not less than 100% of the contract amount, for the protection of claimants supplying labor or materials to the contractor or to any of his subcontractors, in the construction of electrical facilities for the Commission. The performance bond and payment bond shall be issued by a surety company authorized to do business in the State of Nevada.

SECTION 400

BID FORM

1. Project Identification:

Boulder Flats Solar Interconnection Contract No. CRCBF-14 Transmission Line & Switchyard Construction

2. This Bid is Submitted By:

Name:

Address:

3. This Bid is Submitted To:

Colorado River Commission of Nevada 555 E. Washington Avenue, Suite 3100 Las Vegas, Nevada 89101-1065

4. Bid Terms and Conditions.

4.1 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Contract with the Owner in the form included in Volume II, Section 700 of the Contract Documents and to perform and furnish all Work as specified or indicated in the Contract Documents within the specified time and for the amount indicated in the attached Bid Schedule and in accordance with the other terms and conditions incorporated by the Contract.

4.2 Bidder accepts all of the terms and conditions of the Bid Instructions. This Bid remains subject to acceptance for sixty (60) days after the day the bids are due. Bidder will sign and submit the documents required by the Contract Documents within fifteen (15) days after the date of Owner’s Notice of Award.

4.3 In submitting this Bid, Bidder represents that:

4.3.1 Bidder has examined copies of the Contract Documents and all the documents referenced therein, and copies of the following Addenda (receipt of which is hereby acknowledged):

No.Dated __________________
No.Dated __________________
No.Dated __________________

4.3.2. Bidder has visited the Site and become familiar with and satisfied itself as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work.

4.3.3 Bidder is familiar with and has satisfied itself as to all federal, state, and local laws and regulations that may affect the cost, progress, performance, and furnishing of the Work.

4.3.4 Bidder is aware of the general nature of the Work to be performed by the Owner or others at the Site that relates to Work for which this Bid is submitted.

4.3.5 Bidder has given Owner written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Contract Documents and the written resolution thereof by Owner is acceptable to Bidder. The Contract Documents are sufficient to indicate and convey understanding to Bidder of all its terms and conditions for performing and furnishing the Work for which this Bid is submitted.

4.3.6 This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. Bidder has not solicited or induced any person, firm, or corporation to refrain from bidding. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

4.3.7 Bidder is aware of the warranty provisions of the Contract and will guaranty the Work, if awarded the Contract, for the time required in the Contract Documents.

4.3.8 Bidder is familiar with and has satisfied itself as to licensing requirements and Bidder licensing limits in accordance with the State of Nevada regulatory requirements, including NRS 624.230 (licensing) and NRS 338.145 (license limits).

4.3.9 Bidder hereby acknowledges that the Work Plan submittals are enclosed with this Bid as required herein.

(continued next page)

5. Bid Authorization. The undersigned is authorized to execute and offer this Bid to the Owner on behalf of the Bidder.

By:

(Corporation Name)

By:

(Signature of Authorized Person)

(Printed Name and Title)

Business Address:

Phone No.

Fax No.

Email:

This Bid is Submitted On: ,2023 or 2024

SECTION 450

BID SCHEDULE

1. Price Conditions.

1.1 Bidder will perform the Work and provide ancillary services relating to the project in accordance with the Contract Documents and in the amounts stated for unit prices. Conditions may arise which will necessitate changes in the quantities identified herein. The prices quoted per unit must be firm and not dependent on the final quantity of items. The Bidder agrees that increases or decreases in the estimated quantities will not justify unit price revisions.

1.2 Unit prices must be stated as firm. Escalation or adjustment factors will not be accepted by the Owner.

1.3 Unit prices must include labor, equipment, tools, vehicles, materials, supplies, permits, markups, supervision and all related costs.

1.4 Each Bid Item shall consist of a complete installation of the designated portion of the Switchyard as indicated in the specifications and the drawings. Each Bid Item represents all labor, equipment, and material, including necessary accessories, completely installed. A brief description of each Bid Item is provided below. The description is not intended to limit the scope of work. The scope of work shall be as defined by the Contract Documents.

1.5 Items of materials in each Bid Item shall be of the designated size, rating, type, voltage, or other specification in accordance with the Specifications and the Drawings. The bill of material drawing for the switchyard shows those items of material that are Owner-furnished materials. The Contractor shall be responsible for furnishing all materials, equipment and structures not designated as Owner-furnished. The Contractor shall be responsible for coordination of all equipment to structure connections, and structure to foundation connections. The Contractor shall be responsible for all equipment mounting and connection hardware including bolts, nuts, washers, lock washers and lock nuts. The Contractor shall be responsible for handling and installing all material and equipment.

1.6 Owner-furnished materials shall be available as described in Volume III.

2. Switchyard Schedule.

Bid Item No.

Description

Qty.

Unit Equipment & Labor

Material Unit Labor, Equipment, & Material

Total Extended Cost

A1
MOBILIZATION – Contractor is responsible for making all arrangements for all equipment, office space, yard space, power, water, telephone and fax service, and for delivery of all miscellaneous material to the site, unless otherwise stated in these Contract Documents. Contractor shall obtain all construction related permits including dust control.
Lump Sum
B1
SITE PREPARATION – Contractor shall furnish all labor, equipment and material required for site clearing, grading, fill and compaction to obtain the specified subgrade and final grade elevations shown. Contractor shall layout station from Owner provided baselines and from the information shown on the drawings.
Lump

Sum

C1
SWITCHYARD FOUNDATIONS – Contractor shall perform all excavation, forming, finishing, and shall furnish all rebar, concrete, and backfill required for complete installation. Contractor shall furnish and install all anchor bolts.
See Volume V - Drawings
D1
SWITCHYARD STRUCTURAL STEEL – Contractor shall install all structures. Contractor shall furnish and install all miscellaneous mounting hardware, labor and equipment required for complete installation.
See Volume V - Drawings

Unit Labor, Equipment, & Material

Total Extended Cost

E1
SWITCHYARD EQUIPMENT AND MATERIAL – Contactor shall furnish and install all equipment and material as described in these Contract Documents. Contractor shall be responsible for complete assembly of all switchyard components including installation, and adjustment in accordance with the specifications, drawings, and manufacturer’s instructions. Contractor shall furnish and install all miscellaneous material, labor and equipment required for a complete installation. Contractor will be responsible for procurement of station bus support insulators.
See Volume V - Drawings
F1
SWITCHYARD ELECTRICAL RACEWAY SYSTEM AND CABLE TRENCH – Contractor shall furnish and install the cable trench and the below and above ground raceway system as described in these Contract Documents and as required for a complete installation.
See Volume V - Drawings
G1
SWITCHYARDCABLE, POWER/CONTROL – Contractor shall furnish and install all cables for all power and control circuits as indicated on these Contract Documents, including the switchyard equipment, lights and receptacles, relay panels, AC panel and DC panel. Contractor shall terminate all cables. Contractor shall furnish all terminating, marking, labeling (machine printed), and tying materials required for a complete installation.
See Volume V - Drawings
H1
FENCING AND GATES – Contractor shall furnish all labor, equipment and materials required to construct chain link fence with barbed wire and gates.
See Volume V - Drawings

Unit Labor, Equipment, & Material

Total Extended Cost

J1
SWITCHYARD STATION GROUNDING – Contractor shall furnish and install the grounding system as described in these Contract Documents. Contractor shall furnish all copper ground conductor, ground rods, connectors, clamps, fittings and miscellaneous materials. Contractor shall furnish all labor, equipment and material required to provide a complete station grounding system, including fencing, equipment, cabinet and structure grounds. Contractor shall make connections as shown on the drawings.
See Volume V - Drawings
K1
SWITCHYARD POWER DISTRIBUTION CENTER - Contractor shall install the power distribution center and shall furnish all miscellaneous materials for a complete and operational system. Contractor shall furnish all labor, equipment, and materials required for a complete PDC system installation including mounting of gutters, additional caulking, exterior light mounting, etc. per the manufacturers recommendations.
See Volume V - Drawings
L1
SWITCHYARD LIGHTING, OUTDOOR – Contractor shall furnish an install the outdoor floodlights and luminaries as described in these Contract Documents. Contractor shall furnish and install all ancillary materials including install angle support brackets for floodlights, structure mounted junction boxes, and liquid tight flexible conduit. Contractor shall furnish all labor, equipment, and materials required for a complete outdoor lighting system.
See Volume V - Drawings
M1
SWITCHYARD CRUSHED ROCK SURFACING – Contractor shall furnish all labor, equipment, and materials required for finish grading, soil sterilization and crushed rock surfacing.
See Volume V - Drawings

CONTRACT PRICE (Sum of Total Extended Cost):

3. Transmission Line Schedule.

Unit Labor, Equipment, & Material

Total Extended Cost

A1
MOBILIZATION – Contractor is responsible for making all arrangements for all equipment, office space, yard space, power, water, telephone and fax service, and for delivery of all miscellaneous material to the site, unless otherwise stated in these Contract Documents. Contractor shall obtain all construction related permits including dust control.
Lump Sum
B1
SITE PREPARATION – Contractor shall furnish all labor, equipment and material required for site clearing, grading, fill and compaction to obtain the specified subgrade and final grade elevations shown. Contractor shall layout station from Owner provided baselines and from the information shown on the drawings.
Lump

Sum

C1
TRANSMISSION LINE STRUCTURE FOUNDATIONS – Contractor shall perform all excavation, forming, finishing, and shall furnish all rebar, concrete, and backfill required for complete installation of drilled shaft foundations and direct embed foundations Contractor shall furnish and install all anchor bolts.
See Volume V - Drawings
D1
TRANSMISSION LINE STRUCTURAL STEEL – Contractor shall install all structures. Contractor shall furnish and install all miscellaneous mounting hardware, labor and equipment required for complete installation.
See Volume V - Drawings

Unit Labor, Equipment, & Material

Total Extended Cost

E1
TRANSMISSION LINE EQUIPMENT AND MATERIAL – Contactor shall furnish and install all equipment and material as described in these Contract Documents. Contractor shall be responsible for complete assembly of all transmission line components including installation, and adjustment in accordance with the specifications, drawings, and manufacturer’s instructions. Contractor shall furnish and install all miscellaneous material, labor and equipment required for a complete installation.
See Volume V - Drawings