About this file

This document contains the VHA Master Specifications, which provide technical specifications for construction and renovation projects undertaken by the Department of Veterans Affairs. It includes over 150 sections covering all divisions of construction work. Section titles address requirements for general conditions, sitework, concrete, masonry, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveyances, mechanical, and electrical work. It also relates to a federal contract opportunity from the VA for corrective HVAC work at Z1DA, with no further details provided on response date, award date, pricing terms, or incumbent. The master specifications establish technical standards that any contract undertaking work for the VA must meet.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CFM: CORRECT MISCELLANEOUS HVAC ISSUES, newest first.
File Type Posted
image20M-120AHU-120220louver.jpg JPG image
Correct Miscellaneous HVAC Issues Construction Waste Managment Spec.pdf PDF
image20M-720ex20stack202.jpg JPG image
M-4 Diagnostics and Testing Building 02 Section G Level 5 not to scale.pdf PDF
image20M-220RF-520Smoke20Damper20AHU-5.jpg JPG image
image20M-420Exhaust20Stack20120roof.jpg JPG image
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 00 00 General Requirements.pdf PDF
image20M-320ex20stack201.jpg JPG image
image20M-820AHU-620smoke20damper.jpg JPG image
DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS.pdf PDF
01 35 26 Safety Requirements.pdf PDF
image20M-1120AHU-5A.jpg JPG image
image20M-920Alt20No20220RF-6.jpg JPG image
Site Plan-AIR HANDLERS LOCATIONS.pdf PDF
ICRA and ILSM for CFM - Correct Miscellaneous HVAC Issues in Research and D and T.xlsx XLSX spreadsheet
image20M-620exhaust20stack201.jpg JPG image
M-6 Transitional Living and Rehabitilation Building 06 Section M3 Level 3 not to scale.pdf PDF
M-6 Transitional Living and Rehabitilation Building 06 Section M3 Level 3 not to scale 02.pdf PDF
image20M-1420RF-2.jpg JPG image
General Decision LA 20200041 01-24-2020 Building.pdf PDF
image20M-1320EF-12.jpg JPG image
M-5 Research louver.pdf PDF
DNT DOAS AHU-4A 5A 7A.pdf PDF
01 32 16 15 Project Schedules.pdf PDF
image20M-1020AHU-4A.jpg JPG image
S02 EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY .docx DOCX document
image20M-520Alt20No20120EF-120above.jpg JPG image
M-1 Research Building 08 Section P Level 5 not to scale.pdf PDF
M-2 Research Building 08 Section P Level 5 not to scale.pdf PDF
36C25620R0097_1.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05-01-20

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20 01 32 16.01 Architectural and Engineering CPM Schedules 03-20 01 32 16.13 Network Analysis Schedules – Major Construction Project

Design-Bid-Build 03-20

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20 01 32 16.16 Network Analysis Schedules (Design-Build Only) 03-20 01 32 16.17 Network Analysis Schedules – Major Design/Build

Projects 06-19

01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 05-20 01 42 19 Reference Standards 09-19 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 03-19 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 81 13.01 Sustainability Certification Requirements – LEED NC V3 09-15 01 81 13.02 Sustainability Certification Requirements – LEED NC V4 09-15 01 81 13.11 Sustainability Certification Requirements – LEED HC V3 09-15 01 81 13.21 Sustainability Certification Requirements – GREEN

GLOBES

09-15

01 91 00 General Commissioning Requirements 10-15 01 91 00.01 DVA/USACE Projects General Commissioning Requirements 08-19

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 08-16 02 41 00 Demolition 08-17 02 65 00 Underground Storage Tank Removal 08-16 02 82 11 Traditional Asbestos Abatement 04-19 02 82 13.13 Glovebag Asbestos Abatement 09-15 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 82 13.21 Asbestos Roofing Abatement 09-15 02 82 13.31 Asbestos Transite Abatement 09-15 02 82 13.41 Asbestos Abatement for Total Demolition Project 04-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

00 01 10-2

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 03 – CONCRETE

03 23 00 Stressing Tendons 07-11 03 30 00 Cast-in-Place Concrete 07-19 03 30 53 (Short-Form) Cast-in-Place Concrete 02-16 03 37 13 Shotcrete 07-19 03 41 13 Precast Concrete Hollow Core Planks 07-11 03 41 33 Precast Structural Pretensioned Concrete 02-19 03 45 00 Precast Architectural Concrete 02-19 03 51 13 Cementitious Wood Fiber Decks 09-11 03 51 16 Gypsum Concrete Roof Decks 09-11 03 52 00 Lightweight Concrete Roof Insulation 05-15 03 55 11 Gypsum Concrete Floor Decks 07-11

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 02-16 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 02-15

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 21 00 Steel Joist Framing 11-18 05 31 00 Steel Decking 02-16 05 36 00 Composite Metal Decking 10-15 05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 10-15

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 02-16 07 08 00 Facility Exterior Closure Commissioning 11-16 07 08 00.01 DVA/USACE Projects Facility Exterior Closure

Commissioning 08-19

07 11 13 Bituminous Dampproofing 02-16 07 12 00 Built-Up Bituminous Waterproofing 09-11 07 13 00 Sheet Waterproofing 04-13 07 13 52 Modified Bituminous Sheet Waterproofing 08-16 07 14 21 Latex Mastic Deck Covering 05-15 07 18 13 Pedestrian Traffic Coatings 05-15 07 21 13 Thermal Insulation 10-17

00 01 10-3

SECTION NO. DIVISION AND SECTION TITLES DATE

07 21 23 Loose-Fill Insulation 02-16 07 22 00 Roof and Deck Insulation 02-16 07 24 00 Exterior Insulation and Finish Systems 02-16 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 31 13 Asphalt Shingles 02-16 07 31 26 Slate Shingles 02-16 07 31 29.13 Wood Shingles 02-16 07 32 13 Clay Roof Tiles 02-16 07 40 00 Roofing and Siding Panels 10-15 07 51 00 Built-Up Bituminous Roofing 08-18 07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 08-16 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 08-16 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified

Bituminous Membrane Roofing 08-16

07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing

08-16

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16 07 54 16 Ethylene Interpolymer (KEE) Roofing 10-15 07 54 19 Polyvinyl-Chloride (PVC) Roofing 12-18 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16 07 56 00 Fluid-Applied Roofing 05-15 07 57 13 Sprayed Polyurethane Foam Roofing 10-15 07 60 00 Flashing and Sheet Metal 07-14 07 61 16 Batten Seam Copper Roofing 10-15 07 71 00 Roof Specialties 10-15 07 72 00 Roof Accessories 10-15 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 11 73 Sliding Metal Fire Doors 02-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 31 13 Access Doors and Frames 02-16 08 33 00 Coiling Doors and Grilles 02-16 08 33 13 Coiling Counter Doors 02-16 08 34 36 Darkroom Doors 07-15 08 34 53 Security Doors and Frames 05-15 08 34 59 Vault Doors and Day Gates 02-16 08 35 13.13 Accordion Folding Doors 05-15 08 36 13 Sectional Doors 05-15 08 38 16 Flexible Traffic Doors 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 42 33 Revolving Door Entrances 05-15 08 44 13 Glazed Aluminum Curtain Walls 04-20 08 51 13 Aluminum Windows 04-20

00 01 10-4

SECTION NO. DIVISION AND SECTION TITLES DATE

08 51 13.11 Side-Hinged Aluminum Windows 08-16 08 51 23 Steel Windows 02-16 08 51 69.11 Aluminum Storm Windows 05-15 08 56 19 Pass Windows 02-16 08 56 53 Blast Resistant Windows 02-16 08 56 59 Service and Teller Window Units 02-16 08 56 66 Detention Window Screens 02-16 08 63 00 Metal-Framed Skylights 10-15 08 71 00 Door Hardware 04-20 08 71 13 Automatic Door Operators 02-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 23 00 Gypsum Plastering 10-15 09 24 00 Portland Cement Plastering 10-15 09 26 00 Veneer Plastering 10-15 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-18 09 54 23 Linear Metal Ceilings 10-15 09 63 13 Brick Flooring 02-16 09 63 40 Stone Flooring 10-15 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 66 13 Portland Cement Terrazzo Flooring 10-15 09 66 16 Terrazzo Floor Tile 10-15 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 07-14 09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring

(RES-3)

07-14

09.67.23.40 Resinous Poured In Place Resilient Flooring (RES-4) 07-14 09 67 23.50 Resinous (Epoxy Terrazzo) Flooring (RES-5) 07-14 09 67 23.60 Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) 07-14 09 68 00 Carpeting 10-15 09 68 21 Athletic Carpeting 10-15 09 69 00 Access Flooring 10-15 09 72 16 Vinyl-Coated Fabric Wall Covering 10-15 09 72 31 Polypropylene Fabric Wall Covering 05-15 09 84 33 Sound-Absorbing Wall Units 10-15 09 91 00 Painting 01-16 09 94 19 Multicolor Interior Finishing 08-16 09 96 59 High-Build Glazed Coatings 07-14

DIVISION 10 – SPECIALTIES

00 01 10-5

SECTION NO. DIVISION AND SECTION TITLES DATE

10 11 13 Chalkboards and Markerboards 10-15 10 11 23 Tackboards 10-15 10 13 00 Directories 05-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 16 Shower and Dressing Compartments 08-16 10 21 23 Cubicle Curtain Tracks 05-15 10 22 13 Wire Mesh Partitions 10-15 10 22 19 Demountable Partitions 04-16 10 22 26.13 Accordion Folding Partitions 04-19 10 25 13 Patient Bed Service Walls 01-20 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18 10 75 00 Flagpoles 02-16

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 11-11 11 12 00 Parking Control Equipment 02-16 11 17 36 Package Transfer Units 02-13 11 26 00 Unit Kitchens 11-11 11 27 00 Photographic Processing Equipment 11-11 11 40 11 Custom Fabricated Food Service Equipment 11-11 11 40 21 Food Service Equipment-Utility Distribution System 11-11 11 41 00 Food Storage Equipment 11-11 11 41 21 Walk-In Coolers and Freezers 05-15 11 44 00 Food Cooking Equipment 11-11 11 48 00 Cleaning and Disposal Equipment 11-11 11 53 13 Laboratory Fume Hoods 05-15 11 53 23 Laboratory Refrigerators 11-11 11 53 53 Biological Safety Cabinets Laminar Airflow Stations 01-11 11 53 61 Custom Fabricated Laboratory Equipment 11-11 11 53 71 Solution Warming Cabinets 11-11 11 71 01 Medical Washing and Sterilizing Equipment 02-11 11 71 02 Laboratory Washing and Sterilizing Equipment 10-11 11 73 00 Ceiling Mounted Patient Lift System 01-17 11 78 00 Mortuary Equipment 11-11 11 78 13 Mortuary Refrigerators 11-11 11 79 13 Hydrotherapy Equipment 11-11 11 82 19 Packaged Incinerators 11-11

DIVISION 12 – FURNISHINGS

12 22 16 Drapery Track and Accessories 05-15 12 24 00 Window Shades 08-17 12 24 21 Lightproof Shades 05-15 12 31 00 Manufactured Metal Casework 05-15 12 32 00 Manufactured Wood Casework 09-15 12 34 00 Manufactured Plastic Casework 10-15 12 35 70.21 Medication Cabinet 02-16

00 01 10-6

SECTION NO. DIVISION AND SECTION TITLES DATE

12 36 00 Countertops 12-18 12 56 70.11 Suspended Table 02-16

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

13 17 23 Therapeutic Pools 05-15 13 17 23.11 Therapeutic Pool Accessories 05-15 13 19 13 Kennel Enclosures and Gates 02-16 13 21 29 Constant Temperature Rooms 08-16 13 34 19 Metal Building Systems 08-16 13 49 00 Radiation Protection 02-16

DIVISION 14– CONVEYING EQUIPEMENT

14 12 11 Traction and Winding Drum Dumbwaiter 03-20 14 21 00 New Traction Elevators 10-19 14 21 10 Modernization of Traction Elevators 10-19 14 21 11 Traction Cartlift 03-20 14 24 00 New Hydraulic Elevators 10-19 14 24 10 Modernization of Hydraulic Elevators 10-19 14 24 11 Hydraulic Cartlift 03-20 14 24 24 Renovation Hydraulic Elevator (Custom Written by VACO) 14 26 26 Renovation Traction Elevator (Custom Written by VACO) 14 91 33 Gravity Soiled Linen Chutes 03-20 14 91 82 Gravity Trash Chutes 03-20

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 08 00.01 DVA/USACE Projects Commissioning of Fire Suppression

Systems 08-19

21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 13 16 Dry-Pipe Sprinkler Systems 01-15 21-22-00 Clean Agent Fire Suppression Systems 05-15 21-30-13 Electric-Driven, Fire Pumps 05-15 21-30-16 Diesel-Driven, Fire Pumps 05-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 19 Meters and Gages for Plumbing Piping 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 05 33 Heat Tracing for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 08 00.01 DVA/USACE Projects Commissioning of Plumbing Systems 08-19 22 11 00 Facility Water Distribution 11-19

00 01 10-7

SECTION NO. DIVISION AND SECTION TITLES DATE

22 11 23 Domestic Water Pumps 09-15 22 12 16 Facility Elevated, Potable-Water Storage Tanks 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 13 23 Sanitary Waste Interceptors 09-15 22 13 29 Sanitary Sewerage Pumps 09-15 22 13 29.13 Wet-Pit Mounted, Vertical Sewerage Pumps 09-15 22 13 33 Packaged, Submersible Sewerage Pump Units 09-15 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 14 33 Packaged, Pedestal Drainage Pump Units 09-15 22 14 36 Packaged, Submersible, Drainage Pump Units 09-15 22 15 00 General Service Compressed-Air Systems 09-15 22 31 11 Water Softeners 09-15 22 33 00 Electric Domestic Water Heaters 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-15 22 35 00 Domestic Water Heat Exchangers 12-16 22 40 00 Plumbing Fixtures 09-15 22 42 26 Commercial Disposers 09-15 22 61 13.74 Dental Compressed-Air Piping 09-15 22 61 19.74 Dental Compressed-Air Equipment 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 62 19.74 Dental Vacuum and Evacuation Equipment 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare

Facilities 09-15

22 67 19.16 Reverse-Osmosis Water Equipment 09-15 22 67 21 Water Dealkalizing System 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 10 Common Work Results for Boiler Plant and Steam

Generation 04-20

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-20

23 05 51 Noise and Vibration Control for Boiler Plant 04-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 05 93.01 DVA/USACE Projects Testing, Adjusting, and Balancing for HVAC 08-19

23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 08 00.01 DVA/USACE Projects Commissioning of HVAC Systems 08-19 23 08 11 Demonstrations and Tests for Boiler Plant 04-20 23 09 11 Instrumentation and Control for Boiler Plant 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 10 00 Facility Fuel Systems 04-20 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 02-20

00 01 10-8

SECTION NO. DIVISION AND SECTION TITLES DATE

23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 38 13 Commercial-Kitchen Hoods 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 50 11 Boiler Plant Mechanical Equipment 11-17 23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 25 Low-Pressure Water Heating Boilers 04-20 23 52 28 Low Pressure Steam Boilers 04-20 23 52 33 Water-Tube Boilers 04-20 23 52 39 Fire-Tube Boilers 04-20 23 56 00 Solar Energy Heating System 03-20 23 57 33 Geothermal Energy – Direct Use (Heating Applications) 03-20 23 64 00 Packaged Water Chillers 03-20 23 65 00 Cooling Towers 03-20 23 72 00 Air-to-Air Energy Recovery Equipment 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 81 23 Computer-Room Air-Conditioners 03-20 23 81 43 Air-Source Unitary Heat Pumps 03-20 23 81 46 Water-Source Unitary Heat Pumps 03-20 23 81 49 Ground-Source Heat Pump 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20 23 84 00 Humidity Control Equipment 03-20

DIVISION 25 – INTEGRATED AUTOMATION

25 10 10 Advanced Utility Metering System 02-10

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 36 Wireways for Radiology Equipment 01-18 26 05 39 Underfloor Raceways for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 08 00.01 DVA/USACE Projects Commissioning of Electrical Systems 08-19

00 01 10-9

SECTION NO. DIVISION AND SECTION TITLES DATE

26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18 26 13 13 Medium-Voltage Circuit Breaker Switchgear 01-17 26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17 26 20 11 Isolated Power Systems 01-18 26 22 00 Low-Voltage Transformers 01-18 26 23 00 Low-Voltage Switchgear 01-17 26 23 13 Generator Paralleling Controls 01-17 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 24 19 Motor Control Centers 01-18 26 25 11 Busways 01-17 26 26 00 Power Distribution Units for Static Uninterruptible

Power Systems 01-18

26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 33 53 Static Uninterruptible Power Supply 01-17 26 35 26 Harmonic Filters 01-18 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 42 00 Cathodic Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 55 71 Medical and Surgical Lighting Fixtures 01-18 26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 05 61 Leased Space, Communication Equipment and Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 08 00.01 DVA/USACE Projects Commissioning of Communications

Systems 08-19

27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 00 Voice Communications Switching and Routing Equipment 06-15 27 31 31 Voice Communications Switching and Routing Equipment -

Extension 06-15

27 32 41 Two-Way Radio Equipment and Systems 10-18 27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-18 27 51 23 Intercommunications and Program Systems 06-15 27 52 23 Nurse Call and Code Blue Systems 10-18 27 52 41 Miscellaneous Medical Systems 06-15

00 01 10-10

SECTION NO. DIVISION AND SECTION TITLES DATE

27 53 19 Distributed Radio Antenna (Within Building) Equipment and System

10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 05 26 Grounding and Bonding for Electronic Safety and Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 08 00.01 DVA/USACE Projects Commissioning of Electronic Safety and Security Systems 08-19

28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 13 53 Security Access Detection 09-11 28 16 00 Intrusion Detection System 10-11 28 23 00 Video Surveillance 09-11 28 26 00 Electronic Personal Protection System 09-11 28 31 00 Fire Detection and Alarm 10-11 28 52 31 Emergency Call System 06-15

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16 31 20 11 Earthwork (Short Form) 10-12 31 23 19 Dewatering 10-12 31 23 23.33 Flowable Fill 10-12 31 32 23 Pressure Grouting Soil Stabilization 10-12 31 62 00 Driven Piles 10-12 31 63 16 Auger Cast Grout Piles 10-12 31 63 26 Drilled Caissons 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15 32 14 16 Brick Unit Paving 08-16 32 17 23 Pavement Markings 08-16 32 31 13 Chain Link Fences and Gates 06-18 32 31 40 High Security Fences and Gates 08-16 32 84 00 Planting Irrigation 08-16 32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems 11-16 33 08 00.01 DVA/USACE Projects Commissioning of Site Utility

Systems 08-19

00 01 10-11

SECTION NO. DIVISION AND SECTION TITLES DATE

33 10 00 Water Utilities 03-17 33 30 00 Sanitary Sewer Utilities 06-13 33 40 00 Storm Sewer Utilities 12-17 33 46 13 Foundation Drainage 10-11 33 51 00 Natural-Gas Distribution 10-11 33 63 00 Steam Energy Distribution 09-17

DIVISION 34 – TRANSPORTATION

34 71 13 Passive Vehicle Barriers 04-18 34 75 13.13 Active Vehicle Barriers 08-16

DIVISION 48 – Electrical Power Generation

48 14 00 Solar Energy Electrical Power Generation System 10-17 48 15 00 Wind Energy Electrical Power Generation System 10-17 48 16 23 Geothermal Energy Electrical Power Generation System 10-17

File details come from the government source that posted it. Updated .