M-1 Research Building 08 Section P Level 5 not to scale.pdf

PDF 13 MB Posted

Attached to
Z1DA--CFM: CORRECT MISCELLANEOUS HVAC ISSUES Federal contract opportunity
Solicitation number
36C25620R0097
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document contains a scope of work for correcting miscellaneous HVAC issues at a Veterans Affairs facility and the associated federal contract opportunity on beta.SAM.gov. The scope of work involves designing and building an access platform and catwalk for maintenance of equipment, preventing water intrusion into air handling units from louvers, sealing water leaks at roof duct penetrations, and designing and building an access platform for maintenance of a duct smoke damper and return air fan. The related federal contract opportunity on Solicitation Number 36C25620R0097 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 seeks to address these miscellaneous HVAC issues.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--CFM: CORRECT MISCELLANEOUS HVAC ISSUES, newest first.
File Type Posted
image20M-120AHU-120220louver.jpg JPG image
Correct Miscellaneous HVAC Issues Construction Waste Managment Spec.pdf PDF
image20M-720ex20stack202.jpg JPG image
M-4 Diagnostics and Testing Building 02 Section G Level 5 not to scale.pdf PDF
image20M-220RF-520Smoke20Damper20AHU-5.jpg JPG image
image20M-920Alt20No20220RF-6.jpg JPG image
Site Plan-AIR HANDLERS LOCATIONS.pdf PDF
ICRA and ILSM for CFM - Correct Miscellaneous HVAC Issues in Research and D and T.xlsx XLSX spreadsheet
image20M-620exhaust20stack201.jpg JPG image
M-6 Transitional Living and Rehabitilation Building 06 Section M3 Level 3 not to scale.pdf PDF
M-6 Transitional Living and Rehabitilation Building 06 Section M3 Level 3 not to scale 02.pdf PDF
image20M-1420RF-2.jpg JPG image
General Decision LA 20200041 01-24-2020 Building.pdf PDF
image20M-1320EF-12.jpg JPG image
M-5 Research louver.pdf PDF
DNT DOAS AHU-4A 5A 7A.pdf PDF
01 32 16 15 Project Schedules.pdf PDF
image20M-1020AHU-4A.jpg JPG image
S02 EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY .docx DOCX document
image20M-520Alt20No20120EF-120above.jpg JPG image
M-2 Research Building 08 Section P Level 5 not to scale.pdf PDF
36C25620R0097_1.docx DOCX document
image20M-420Exhaust20Stack20120roof.jpg JPG image
01 33 23 Shop Drawings Product Data and Samples.pdf PDF
01 00 00 General Requirements.pdf PDF
image20M-320ex20stack201.jpg JPG image
image20M-820AHU-620smoke20damper.jpg JPG image
DB-ATTACH ATTACHMENT I - RELEASE OF CLAIMS.pdf PDF
01 35 26 Safety Requirements.pdf PDF
image20M-1120AHU-5A.jpg JPG image
VHA Master Specification.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHANOLChinE Typewritten Text

SCOPE OF WORK IN THIS AREA:

PRICE AS ALTERNATE NO. 1,

DESIGN AND BUILD AN ACCESS

PLATFORM / CATWALK FOR

MAINTENANCE OF EF-1.

VHANOLChinE Typewritten Text

SCOPE OF WORK IN THIS AREA:

DESIGN AND BUILD A SYSTEM

TO PREVENT WATER INTRUSIOIN

FROM THE LOUVERS INTO THE

AIR HANDLING UNITS, AHU-1/2.

VHANOLChinE Typewritten Text

SCOPE OF WORK IN THIS AREA:

DESIGN AND BUILD REQUIRED

WORK TO PREVENT AND SEAL

WATER LEAKING INTO THE

BUILDING FROM DUCT

PENETRATIONS AT ROOF

LEVEL, EXHAUST STACK #1.

VHANOLChinE Typewritten Text

SCOPE OF WORK IN THIS AREA:

DESIGN AND BUILD AN ACCESS

PLATFORM / CATWALK FOR

MAINTENANCE OF THE DUCT

SMOKE DAMPER AND

ADJACENT RETURN

AIR FAN

VHANOLChinE Line

VHANOLChinE Line

VHANOLChinE Line

VHANOLChinE Line

VHANOLChinE Typewritten Text M-1

File details come from the government source that posted it. Updated .