About this file

VA69D-17-B-1294 A00005 VA69D-17-B-1294 A00005.docx

View the file

Other files

File Type Posted
36C25218C0048-000.docx DOCX document
VA69D-17-B-1294-A00004003.pdf PDF
VA69D-17-B-1294-A00004000.docx DOCX document
VA69D-17-B-1294-A00004002.pdf PDF
VA69D-17-B-1294-A00004004.pdf PDF
VA69D-17-B-1294-A00004001.pdf PDF
VA69D-17-B-1294-A00004005.pdf PDF
VA69D-17-B-1294-P00003001.pdf PDF
VA69D-17-B-1294-P00003000.docx DOCX document
VA69D-17-B-1294-A00002000.docx DOCX document
VA69D-17-B-1294-A00002001.pdf PDF
VA69D-17-B-1294-A00001002.pdf PDF
VA69D-17-B-1294-A00001001.pdf PDF
VA69D-17-B-1294-A00001004.pdf PDF
VA69D-17-B-1294-A00001003.pdf PDF
VA69D-17-B-1294-A00001000.docx DOCX document
VA69D-17-B-1294-A00001007.pdf PDF
VA69D-17-B-1294-A00001005.pdf PDF
VA69D-17-B-1294-A00001006.pdf PDF
VA69D-17-B-1294-004.pdf PDF
VA69D-17-B-1294-006.pdf PDF
VA69D-17-B-1294-001.docx DOCX document
VA69D-17-B-1294-008.pdf PDF
VA69D-17-B-1294-003.pdf PDF
VA69D-17-B-1294-002.pdf PDF
VA69D-17-B-1294-005.pdf PDF
VA69D-17-B-1294-007.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A00005 12-13-2017 585-18-1-6985-0001 585-12-113 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite Milwaukee WI 53214-1476 To all Offerors/Bidders

VA69D-17-B-1294

11-16-2017

X X X

585-3680162-6985-854200-3220 23NRNR000

X

A00005 - Additional Contractor Questions and Answers

See SF30 Continuation Page for details

Anne Vossler Contracting Officer PROJECT DESCRIPTION: Renovate 5-West at the Oscar G. Johnson VA Medical Center, Iron Mountain, Michigan

PROJECT NUMBER: 585-12-113

SOLICITATION NUMBER: VA69D-17-B-1294

Pre-Bid Questions and Answers

1. Question: Room 5124 has a type G light fixture but it is not on the schedule. Please advise

Answer: 5124 should be type M

2. Question: Are the Navisworks coordination drawings going to be required for the 5-West project?

Answer: No, Navisworks drawing are not required

3. Question: Specification section 26-05-02 – 3.3C states: Remove, relocate, and extend existing installations to accommodate new construction. Is it possible for this language to be remove from the specifications, it is impossible to bid this statement as there is no way of knowing how much if any existing installation will be required to be removed relocated and/or extended. There are a couple of reasons that it difficult to quantify what existing installation would require some sort of modification such as installations that are hidden in walls, or above ceilings. Even if existing installations can be viewed through access panels or ceiling tiles, it is still impossible to determine with any accuracy what installations would require modification for the installation of new construction such as duct work or plumbing piping based on the project plans.

Answer: Specification 26 05 02 – Electrical Demolition for Remodeling; Remove 3.3C from the Section. Any existing electrical work required to be relocated shall be completed as indicated on the drawings.