About this file

VA69D-17-B-1294 S02 - Att - Drawings - Pgs 26-50.pdf

View the file

Other files

File Type Posted
36C25218C0048-000.docx DOCX document
VA69D-17-B-1294-A00005000.docx DOCX document
VA69D-17-B-1294-A00004003.pdf PDF
VA69D-17-B-1294-A00004000.docx DOCX document
VA69D-17-B-1294-A00004002.pdf PDF
VA69D-17-B-1294-A00004004.pdf PDF
VA69D-17-B-1294-A00004001.pdf PDF
VA69D-17-B-1294-A00004005.pdf PDF
VA69D-17-B-1294-P00003001.pdf PDF
VA69D-17-B-1294-P00003000.docx DOCX document
VA69D-17-B-1294-A00002000.docx DOCX document
VA69D-17-B-1294-A00002001.pdf PDF
VA69D-17-B-1294-A00001002.pdf PDF
VA69D-17-B-1294-A00001001.pdf PDF
VA69D-17-B-1294-A00001004.pdf PDF
VA69D-17-B-1294-A00001003.pdf PDF
VA69D-17-B-1294-A00001000.docx DOCX document
VA69D-17-B-1294-A00001007.pdf PDF
VA69D-17-B-1294-A00001005.pdf PDF
VA69D-17-B-1294-A00001006.pdf PDF
VA69D-17-B-1294-006.pdf PDF
VA69D-17-B-1294-001.docx DOCX document
VA69D-17-B-1294-008.pdf PDF
VA69D-17-B-1294-003.pdf PDF
VA69D-17-B-1294-002.pdf PDF
VA69D-17-B-1294-005.pdf PDF
VA69D-17-B-1294-007.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MULLION

1 2 3 F FL FV G FG

Hollow metal (steel) Hollow metal - insulated Hollow metal - thermally broken Aluminum Solid core wood veneer

HM

HMI

HMT

AL

SCW

1. Provide door operator per 08 71 13.

2. Provide card reader with PIN pad.

3. Install new card reader and door hardware to existing door before phase 3 work begins.

FRAME

NUMBER TYPE MATERIAL WIDTH HEIGHT THICKNESS GLAZING

DOOR

MATERIALTYPE NUMBER

DETAILS

HEAD JAMB SILL

FIRE

RATING

HDW.

SET REMARKS

5111.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 2 --

Tempered glass Insulated glass Insulated spandrel glass 90 minute fire rated glazing

Fixed Inswing casement

G-1 G-2 G-3 G-4

FIX

CSMT

MULLIONJAMBHEAD

DETAILS

NOMINAL SIZEGLAZINGFUNCTION FRAME

WINDOW

TYPE SILL

REMARKS

a FIX AL G-2 3'-2" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 -

NOTESTRIMWALLSFLOORCEILING

ROOMS

NUMBER ROOM NAME

N

6"

3'- 0"

5'-4" R.O.

3'-6"

4"

1'-8"

3'- 0"

5111 Program Assistant ATC-1 CPT-1 PNT-1 RB-1 -- 5111A Group Practice Manager ATC-1 CPT-1 PNT-1 RB-1 -- 5111B CBOC Nurse Manager ATC-1 CPT-1 PNT-1 RB-1 -- 5111C Chief of Medicine ATC-1 CPT-1 PNT-1 RB-1 --

5114 OI&T Open Office ATC-1 CPT-1 PNT-1 RB-1 --

1. Provide wainscot of WT-1 with WT-2 accent band to 4'-0" with painted finish on gypsum board above.

2. No ceiling in this room, open to structure above.

3. See floor plan for pattern of SVT-1 with SVT-2 accents.

4. Provide wood trim per detail 2/A500 with PNT-1 above and PNT-4 below.

5. At walls with casework provide PNT-1 finish without wood trim.

6. Provide new finishes at modified portion of stair. Paint to match existing finishes.

1. Paint all new and existing hollow metal doors and frames in project area PNT-4.

2. Paint all access doors to match surface they are installed in.

3. Paint all existing convector covers to match wall color finish.

1. Window to be exterior glazed with spandrel glass on inboard lite. Eliminate window stool on interior.

2. Bottom 1/2 of window is operable for emergency and construction ventilation. Top 1/2 is fixed.

3'-4"

5111B.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5111C.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5118.0 1 HM F SCW 1 3'-6" 7'-0" 1 3/4" - 8/A501 8/A501 -- - 20 13 --

5114.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 4 2

5114A.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5114B.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5180.0 1 HM F SCW 1 3'-6" 7'-0" 1 3/4" - 8/A501 8/A501 -- - 45 4 2

5180.1 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 6/A501 6/A501 -- - 45 17 --

5122.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 8/A501 8/A501 -- - - 16 --

5124.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 6/A501 6/A501 -- - - 15 --

5120.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 8/A501 8/A501 -- - - 3 --

5199E1.0 3 AL FG AL 1 3'-6" 7'-0" 1 3/4" G-1 12/A500 SIM.12/A500 SIM. -- - - 8 --

5143.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 6/A501 6/A501 -- - 45 7 --

5199B1.0 3 AL FG AL 1 3'-6" 7'-0" 1 3/4" G-1 12/A500 12/A500 SIM. -- - - 5 1

5162.0 1 HM N SCWV 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5163.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5165.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5164.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

ST-5.0 1 HM FV SCW 1 3'-8" 7'-0" 1 3/4" G-4 9/A501 9/A501 -- - 90 6 --

5199F1.0 3 AL FG AL 1 3'-6" 7'-0" 1 3/4" G-1 12/A500 SIM.12/A500 SIM. -- - - 5 1

5128.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 2 --

5129.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5131.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

ST-1.0 1 HM FV SCW 1 3'-8" 7'-0" 1 3/4" G-4 9/A501 9/A501 -- - 90 12 --

5114A Lead IT Tech ATC-1 CPT-1 PNT-1 RB-1 -- 5114B OI&T Chief ATC-1 CPT-1 PNT-1 RB-1 --

5160 Staff Lounge ATC-1 VCT-1 PNT-1 RB-1 --

5118 OI&T Storage ATC-1 VCT-1 PNT-1 RB-1 -- 5119 Men's Restroom ATC-1 PT-1 WT-1,2 / PNT-1 CB-1 1

5122 Data Phone -- VCT-1 PNT-1 RB-1 2

5163 Office ATC-1 CPT-1 PNT-1 RB-1 -- 5162 Privacy Officer ATC-1 CPT-1 PNT-1 RB-1 --

5199B-1 Hallway ATC-1 CPT-1 PNT-1 RB-1 --

ST-5 Stair 5 EXIST EXIST EXIST EXIST 6

5120 Housekeeping ATC-2 PT-1 WT-1,2 / PNT-1 CB-1 1

5171 Workroom ATC-1 VCT-1 PNT-1 RB-1 --

5150 Conference ATC-1 CPT-1 PNT-1/PNT-4 RB-1/WT-1 4,5 5143 Storage ATC-1 VCT-1 PNT-1 RB-1 --

5124 Storage ATC-1 VCT-1 PNT-1 RB-1 --

5121 Women's Restroom ATC-1 PT-1 WT-1,2 / PNT-1 CB-1 1

5199C-1 Corridor ATC-1 SVT-1 PNT-1 RB-1 3

ST-1 Stair 1 EXIST EXIST EXIST EXIST 6

5127 Program Assistant ATC-1 CPT-1 PNT-1 RB-1 -- 5128 Team Room ATC-1 CPT-1 PNT-1 RB-1 -- 5129 Chief Accountant ATC-1 CPT-1 PNT-1 RB-1 -- 5130 File Storage ATC-1 CPT-1 PNT-1 RB-1 -- 5131 Finance Officer ATC-1 CPT-1 PNT-1 RB-1 -- 5135 Finance Open Office ATC-1 CPT-1 PNT-1 RB-1 -- 5136 Workroom ATC-1 CPT-1 PNT-1 RB-1 -- 5137 DSS/VSN Open Office ATC-1 CPT-1 PNT-1 RB-1 --

5199F-1 Hallway ATC-1 CPT-1 PNT-1 RB-1 --

5299A-1 Elevator Lobby ATC-1 SVT-1 PNT-1 RB-1 --

5199A-1 Corridor ATC-1 SVT-1 PNT-1 RB-1 3

CEILING FINISHES

Acoustical tile ceiling 1.

Vinyl faced gypsum board ceiling tile.

FLOOR FINISHES

Wood pattern vinyl tile, Color 1.

Wood pattern vinyl tile, Color 2.

Vinyl composition tile, color 1.

Carpet, color and pattern 1.

2x2 porcelain mosaic tile.

WALL FINISHES

Latex paint, color 1.

Not used.

Latex paint, color 3.

Latex paint, color 4.

6x6 wall tile, color 1.

6x6 wall tile, color 2.

TRIM

Resilient coved base, color 1.

Cove tile base, color 1.

ATC-1

ATC-2

SVT -1

SVT-2

VCT-1

CPT-1

PT-1

PNT-1

PNT-2

PNT-3

PNT-4

WT-1

WT-2

RB-1

CB-1

NUMBER ROOM NAME

LOCATION IN-04.02 Text if different than Room Name

Secondary Rm ID

Room Number ID

Room Sign w/ Indicator

Speciality Sign

Wall Mtd.

Directional

Ceiling Mtd.

Directory

IN-14.04,

.05 RemarksIN-15.51, .52

SIGN TYPES

IN-03.01 IN-07.01-.03

1. Existing sign, remove and reinstall.

2. Provide (2) signs. Mount above door operator push plate per VA guidelines.

3. See Interior Elevations for text for ceiling mounted signs. Verify information on both sides with Owner. See Reflected Ceiling plans for locations. Two sided sign.

4. 6" x 9" Red w/ White 3 dimensional sign equal to Prinzing model no. V1FE15A. See Sign

Specifications. Mount above fire extinguisher cabinet per VA guidelines.

5. Contractor to coordinate location of directional signage and information to be on the directional signage with the owner.

6. Mount above door operator push plate per VA guidelines.

7. Install sign on corridor side of door per VA signage guidelines. Coordinate location with

Owner.

8. Provide (2) signs. One at each door location.

9. Mount adjacent to AED unit per VA signage guidelines. See Detail 1/A600 for wording and layout.

10.Mount above F.E. cabinet per VA signage guidelines.

11.Mount IN-11.01 sign below room sign with text reading MAXIMUM OCCUPANCY 49

PEOPLE.

Note: All signage to be fabricated and installed per latest version of VA signage guidelines as referenced in specification 10 14 00.

5111 Program Assistant X Chief of Medicine 7 5111A Group Practice Manager X . . .

5111B CBOC Nurse Manager X . . .

5111C Chief of Medicine X . . .

5114 OI&T Open Office X . OI & T .

5114A Lead IT Tech X . . .

5114B OI&T Chief X . . .

5118 OI&T Storage X IN-08.02C Storage .

5119 Mens Restroom IN09.01 . .

5121 Womens Restroom IN09.02 . .

5122 Data & Phone X . . .

5124 Storage X . . .

5127 Program Assistant X . . .

5128 Team Room X . . .

5129 Chief Accountant X . . .

5130 File Storage X . . .

5131 Finance Officer X . . .

5136 Workroom X . . .

5137 DSS/VSN Open Office X . DSS/VSN .

5120 Housekeeping X . . .

5199A-1 Corridor IN-04.01 Conference 7 5143 Storage X

5160 Staff Lounge X

5199C-1 Corridor IN-04.01 Finance 7

5162 Privacy Officer X

5175 Assist Chief HR X 5176 Program Assistant X 5177 Chief HR X

5171 Workroom X

5299A-1 Elevator Lobby 5

5199C-1 Corridor IN 20.01 6

5299A-1 Elevator Lobby V1FE15A 4

5199C-1 Corridor V1FE15A 4

Nurse Manager ED/ICU Nurse Manager CBOC

5119 Mens Restroom IN-20.01 . 2

5121 Womens Restroom IN-20.01 . 2

IN 14.04

IN 15.51C

5199B-1 Hallway IN 20.01 6

5136.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" - 8/A501 8/A501 -- - - 1 --

5199A-1 Corridor IN-11.02 9

5299A-1 Elevator Lobby 3Finance

5199A-1 Corridor 3IN 15.51C

5171.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 2 --

5199C-1 Corridor IN01.02 10

5299A-1 Elevator Lobby IN 01.02 10

Human Resources Finance

5143.1 EXIST. HM EXIST HM 1 -- -- -- - EXIST EXIST -- - 90 -- --

5121.0 1 HM F SCW 1 3'-6" 7'-0" 1 3/4" - 8/A501 7/A501 -- - - 11 1

5119.0 1 HM F SCW 1 3'-6" 7'-0" 1 3/4" - 8/A501 7/A501 -- - - 11 1

b CSMT AL G-2 3'-2" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 2 c FIX AL G-3 2'-2" W x 5'-3" H 1/A502 2/A502 1/A502 SIM. 2/A502 1 d FIX AL G-2 2'-9" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 -e FIX AL G-2 2'-2" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 -f FIX AL G-2 2'-11" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 -g CSMT AL G-2 2'-11" W x 5'-3" H 1/A502 2/A502 1/A502 2/A502 2 a G-2

G-2

3'-2"±

5'- 3"

8'- 95 8"

Fifth Floor Finish Floor

StoneTrim Stone Sill b

G-2 G-2

3'-2"± c G-3

G-3 d G-2

G-2

2'-9"± e G-2

G-2

2'-2"± f G-2

G-2

2'-11"± g

G-2 G-2

2'-11"±

ST2-5.1 EXIST HM EXIST EXIST 1 3'-8" 7'-0" 1 3/4" - EXIST EXIST -- - 90 14 3

5160.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 8/A501 8/A501 -- - - 1 --

5167.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5169.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5175.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5177.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5111A.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5111D.0 1 HM N SCW 1 3'-0" 7'-0" 1 3/4" G-1 8/A501 8/A501 -- - - 1 --

5205D.0 1 HM F SCW 1 3'-0" 7'-0" 1 3/4" - 8/A501 8/A501 -- - - 2 --

5105.0 EXIST HM EXIST SCW 1 2'-8" 7'-0" 1 3/4" - -- -- -- - - - --

5105.1 EXIST HM EXIST SCW 1 2'-8" 7'-0" 1 3/4" - -- -- -- - - - --

5281.0 EXIST HM EXIST SCW 1 3'-6" 7'-0" 1 3/4" - -- -- -- - - - --

2'-2"±

5205D Union Conference Room ATC-1 CPT-1 PNT-1 RB-1 --

5111D Assoc. Chief Primary Care ATC-1 CPT-1 PNT-1 RB-1 --

5164 Office ATC-1 CPT-1 PNT-1 RB-1 -- 5165 Office ATC-1 CPT-1 PNT-1 RB-1 -- 5167 Team Room ATC-1 CPT-1 PNT-1 RB-1 -- 5169 Workers Comp Specialist ATC-1 CPT-1 PNT-1 RB-1 --

5172 Open Office ATC-1 CPT-1 PNT-1 RB-1 -- 5173 Open Office ATC-1 CPT-1 PNT-1 RB-1 -- 5175 Assist. Chief HR ATC-1 CPT-1 PNT-1 RB-1 -- 5176 Program Assist ATC-1 CPT-1 PNT-1 RB-1 -- 5177 Chief HR ATC-1 CPT-1 PNT-1 RB-1 --

5111D Assoc. Chief Primary Care X . . .

5135 Finance Open Office X . . .

5150 Conference X IN-11.01 11

5164 Office X 5165 Office X 5167 Team Room X

5169 Workers Comp Specialist X

5172 Open Office X 5173 Open Office X

5180 Computer Specialist X

5199F-1 Hallway

5205D Union Conference Room X

ST-1 Stair 1 IN-01.05 1 ST-5 Stair 5 IN-01.05 1

5163 Office X

5180 Computer Specialists ATC-1 VCT-1 PNT-1 RB-1 --

10"

Human Resources Conference

ElevatorDirector's Suite

Conference Human ResourcesFinance Elevator

AED STEPS

1. Check for unresponsiveness (shake / tap the shoulder)

2. Make sure the person is not breathing and has no signs of circulation.

3. 2 persons present:

a. One person should call 35000 and repeat 3 times "Code BLUE (and the area)".

b. The other person should get the AED.

4. One person present:

a. Call 35000 and repeat 3 times "Code BLUE (and the area)" or

b. Call 911 (our police) and ask them to call "Code

BLUE"

c. Get the AED

5. Open the lid and follow the AED directions.

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key to Door ScheduleDoor Schedule

Door Schedule Remarks

Door Types

Key to Window Schedule

Window Schedule Remarks

Window Schedule

Key to Finish Schedule

Finish Schedule

Finish Schedule Remarks

Finish Schedule General Notes Window Types

MEP PROJECT NO.: N08.13.04

Signage Schedule Remarks

Signage Schedule

SCALE:

Sign Detail

3" = 1'-0"

A600

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Door, Window and

AutoCAD SHX Text Room Finish Schedules

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/21/2016

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text A600

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Healthcare Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate new work.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x blocking at all wall mounded equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

DN

MECH. SHAFT

PP

PP

FE

CR CR

002 002

002002002

006006

006006

006006

006006

006 006

006 006

006006 006006

006006

007 007 007 007

007007007007

006 006

006006

018018

004004

013 013

013 013

020 020

017 012 021 021

017012

017 012

020012

CR

HALLWAY

5199B-1

CORRIDOR

5199C-1

STAIR 5

1. See Specification 11 28 00 for relocation instructions.

2. Provide fire retardant treated wood blocking in wall for Owner provided video monitors from 5'-6" a.f.f. to 7'-6" a.f.f.

3. Provide fire retardant treated wood blocking in wall for Owner provided equipment. Coordinate height of blocking with Owner.

1. V.V. - VA furnished, VA installed.

2. V.C. - VA furnished, contractor installed.

3. C.C. - Contractor furnished, contractor installed.

PART "A"

PART "B"

PART "C"

PART "A"

PRIVACY

OFFICER

OFFICE

ASSIST.

CHIEF HR

OFFICE

HALLWAY

5199B-1

OI&T

STORAGE

CONFERENCE

HOUSEKEEPING

5120STAFF LOUNGE

DATA

PHONE

WORKROOM

PROGRAM

ASSIST.

CHIEF

HR

TEAM

ROOM

WORKERS COMP

SPECIALIST

OFFICE

OPEN

OFFICE

OPEN

OFFICE

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Equipment Plan Part A

1/4" = 1'-0"

N

Fifth Floor

A

B C

MEP PROJECT NO.: N08.13.04

Equipment Schedule Legend

Equipment Schedule

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8A

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Equipment Plan

AutoCAD SHX Text Part A & Schedule

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/21/2016

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text Q100

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DN

UP

LDRY

CHUTE

MECH. SHAFT

FE

PP

PP

K-4330 KINGSTON

C_TOILETS VITREOUS CHINA

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

PP

PP

CR CR

002 002

002 002 002

002 002 002

006 006

006006

006 006

006 006

006006

006006

006 006

006 006

007 007 007 007

007007007007

007 007 007 007

017 012

012025

012025

025 012

024 012

PP

N

NN

N

PP

CR

CORRIDOR

5199A-1

CORRIDOR

5199C-1

STAIR 1

PART "A"

PA

RT "

B"

PA

RT "

C"

PART "B"

PROGRAM

ASSISTANT

FINANCE

OFFICER

CHIEF

ACCOUNTANT

HALLWAY

5199F-1

WORKROOM

DSS/VSN

OPEN OFFICE

MENS

RESTROOM

WOMENS

RESTROOM

CONFERENCE

STORAGE

FINANCE

OPEN OFFICE

STORAGE

TEAM ROOM

CBOC NURSE

MANAGER

5111B

GROUP PRACTICE

MANAGER

5111A

FILE STORAGE

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Healthcare Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate new work.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x blocking at all wall mounded equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

1. See Specification 11 28 00 for relocation instructions.

2. Provide fire retardant treated wood blocking in wall for Owner provided video monitors from 5'-6" a.f.f. to 7'-6" a.f.f.

3. Provide fire retardant treated wood blocking in wall for Owner provided equipment. Coordinate height of blocking with Owner.

1. V.V. - VA furnished, VA installed.

2. V.C. - VA furnished, contractor installed.

3. C.C. - Contractor furnished, contractor installed.

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Equipment Plan-West Part B

1/4" = 1'-0"

N

Fifth Floor

A

B C

MEP PROJECT NO.: N08.13.04

Equipment Schedule Legend

Equipment Schedule

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Equipment Plan-West

AutoCAD SHX Text Part B & Schedule

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/21/2016

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text Q101

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETSVITREOUS CHINA

K-4330KINGSTONC_TOILETS

VITREOUS CHINA

PP

PP

CR

STEP

UP

STEP

UP

DN

UP

RAMP

UP

FE

CR CR

006 006

006 006

006006

006 006006 006

006 006

007 007

017 012

024 024

024 024

004 004

004 004

017012

017017

CR

N

NN

N

ELEVATOR

LOBBY

5299A-1

CORRIDOR

5199A-1

STAIR 2

PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

SERVICE

ELEVATOR

N O

T

IN

C O

N

TR

AC

T-

U N

O

PA

RT

"C

N O

T

IN

C O

N

TR

AC

T-

U N

O

PA

RT

"C

PART "C"

PART "A"

PA

RT "

B"

PA

RT "

C"

OI&T

STORAGE

OI&T

CHIEF

5114B

OI&T

OPEN OFFICE

LEAD IT

TECH

5114A

CHIEF OF

MEDICINE

5111C

ASSOC. CHIEF

PRIMARY CARE

5111D

CBOC NURSE

MANAGER

5111B SECRETARY

GROUP PRACTICE

MANAGER

5111A

UNION

CONF ROOM

5205D

COMPUTER

SPECIALIST

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Healthcare Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate new work.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x blocking at all wall mounded equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

1. See Specification 11 28 00 for relocation instructions.

2. Provide fire retardant treated wood blocking in wall for Owner provided video monitors from 5'-6" a.f.f. to 7'-6" a.f.f.

3. Provide fire retardant treated wood blocking in wall for Owner provided equipment. Coordinate height of blocking with Owner.

1. V.V. - VA furnished, VA installed.

2. V.C. - VA furnished, contractor installed.

3. C.C. - Contractor furnished, contractor installed.

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Equipment Plan Part C

1/4" = 1'-0"

N

Fifth Floor

A

B C

MEP PROJECT NO.: N08.13.04

Equipment Schedule Legend

Equipment Schedule

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Equipment Plan

AutoCAD SHX Text Part C & Schedule

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/21/2016

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text Q102

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCHEDULE

SPECIFICATIONS

TEMPORARY

TYPICAL

WITH

MECHANICAL

MINIMUM

EQUAL

FLOOR

FLOOR DRAIN

FOOT (FEET)

ADDITIONAL

ALTERNATE

COLUMN

DOWN

PC

MC MECHANICAL CONTRACTOR

PLUMBING

ABOVE FINISH FLOOR

ABOVE FINISH GRADE

ELECTRICAL CONTRACTOR

F

PLBG

PLUMBING CONTRACTOR

CLEANOUT

FCO

VTR

HW

CO

CW COLD WATER

GPM

GAL

GALLONS PER MINUTE

GALLON

GENERAL CONTRACTOR

FURNACE

ADDL

ADD ADDENDUM

ADJ ADJUSTABLE

PRES PRESSURE

QTY QUANTITY

SAN SANITARY

TEMP

TYP

SPEC

HOT WATER

GC

MECH

MIN

W/

AFG

AFF

ALT

COL

DN

EC

EQ

FT

FD

FLR

SCH

FLOOR CLEANOUT

WCO WALL CLEANOUT

VENT THRU ROOF

STAINLESS STEELSS

NOT TO SCALENTS

BELOW GRADEBG

AG ABOVE GRADE

NON POTABLE COLD WATERNPCW

WC WATER CLOSET

FUEL OIL VENT

FUEL OIL SUPPLY

FOR

FOS

FOV

FUEL OIL RETURN

COMPRESSED AIRCA

FIRE PROTECTION RENOVATION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

WHERE EXISTING SURFACES ARE DISRUPTED DUE TO

THE REMOVAL OF EXISTING EQUIPMENT OR PIPING,

THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE

REPAIR OF DISRUPTED SURFACES TO MATCH

EXISTING ADJACENT SURFACES.

EXISTING CONDITIONS AS SHOWN ON THE DRAWINGS

ARE TAKEN FROM ORIGINAL AND AS-BUILT DRAWINGS

OF THE BUILDING AND IN PART ARE UNVERIFIED.

FIELD CONDITIONS SHALL GOVERN. ALL EXISTING

CONDITIONS MUST BE VERIFIED PRIOR TO INITIATION

OF WORK.

ALL EXISTING FIRE PROTECTION PIPING SHALL BE

RELOCATED TO CREATE REQUIRED SPACE FOR

INSTALLATION OF ALL NEW SERVICES FOR NEW

CONSTRUCTION, INCLUDING BUT NOT LIMITED TO

H.V.A.C., ELECTRICAL, AND PLUMBING TRADES.

CONTRACTOR SHALL INCLUDE ALL NEW PIPING AND

FITTINGS REQUIRED AND RELOCATE ANY AND ALL

EXISTING SERVICES.

ALL EXISTING FIRE PROTECTION PIPING, NOT

REMAINING IN SERVICE AFTER NEW CONSTRUCTION,

SHALL BE REMOVED.

PIPING WHICH IS TO REMAIN IN SERVICE SHALL NOT

BE DISTURBED. EXISTING PIPING DAMAGED DURING

CONSTRUCTION SHALL BE REPLACED WITH NEW

PIPING OF THE SAME SIZE AND MATERIAL.

COORDINATE WITH GENERAL CONTRACTOR TO PATCH

ALL EXISTING WALLS, FLOORS, CEILINGS, ETC., AS

REQUIRED BY NEW WORK.

CONTRACTOR SHALL NOTIFY THE COR TWO WEEKS IN

ADVANCE OF ANY PROPOSED SHUTDOWN OF THE FP

SYSTEM. ALL FP SHUTDOWNS WILL REQUIRE COR

AUTHORIZATION. THE EXISTING FP SYSTEM SHALL

REMAIN IN SERVICE AS LONG AS POSSIBLE THROUGH

DEMOLITION AS DETERMINED BY OWNER.

ENSURE INTERIM LIFE SAFETY MEASURES ARE IN

PLACE WHEN THE SPRINKLER SYSTEM IS TAKEN OUT

OF SERVICE.

ABBREVIATIONS

1. COORDINATE INSTALLATION OF SPRINKLER PIPING

AND ALL COMPONENTS WITH OTHER TRADES, OWNER,

AND GENERAL CONTRACTOR.

2. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND

REINSTALLING ALL CEILING COMPONENTS AS REQUIRED

TO INSTALL SPRINKLER PIPING AND HEADS IN.

3. FIRE PROTECTION SYSTEM TO COMPLY WITH NFPA

#13, INSURANCE CARRIER AND ALL APPLICABLE

STATE AND LOCAL CODES.

4. FIRE PROTECTION CONTRACTOR SHALL VISIT SITE

PRIOR TO BID VERIFY ALL EXISTING CONDITIONS

PRIOR TO BIDDING TO INSURE THE COORDINATION OF

THE FIRE SERVICES WITH EXISTING CONDITIONS.

WORK INDICATED ON THE DRAWINGS IS BASED ON

THE BEST AVAILABLE INFORMATION CONCERNING

LOCATIONS AND SIZES OF SPRINKLER PIPING.

5. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL

MEMBERS TO BE DONE ONLY WITH THE WRITTEN

APPROVAL OF THE ARCHITECT AND STRUCTURAL

ENGINEER.

6. SPRINKLER HEAD LOCATIONS ARE FOR SCHEMATIC

USE AND ANY ADDITIONAL HEADS REQUIRED PER

CODE SHALL BE INSTALLED. VERIFY STRUCTURAL,

MECHANICAL, ELECTRICAL INSTALLATIONS AND AVOID

OBSTRUCTIONS OR INTERFERENCES.

7. PROVIDE MINIMUM 5 PSI SAFETY FACTOR.

8. WORKING DRAWINGS INDICATING SPRINKLER HEAD

LOCATIONS AND EXPOSED AND CONCEALED PIPING

ROUTING SHALL BE PROVIDED TO THE

ARCHITECT/ENGINEER PRIOR TO INSTALLATION FOR

APPROVAL.

9. FIRE PROTECTION CONTRACTOR SHALL BE REQUIRED

TO PARTICIPATE IN THE COORDINATION MEETINGS AND

COORDINATION PLAN DEVELOPMENT WITH OTHER

TRADES AND THE GC PRIOR TO INSTALLATION IN

ORDER TO INSTALL FP PIPING AND OTHER FP

COMPONENTS IN OPTIMUM LOCATION FOR DRAINING

THE FP SYSTEM AND MAINTAINING ACCESSIBILITY

ABOVE THE CEILING.

10. ALL SPRINKLER HEADS SHALL BE INSTALLED CENTER

OF TILE.

11. THE USE OF U-BOLT MECHANICAL TEES ALSO KNOW

AS "JACK TEES" IS PROHIBITED.

12. SPRINKLER HEADS ARE TO BE COORDINATED WITH

ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES,

CEILING SYSTEMS AND STRUCTURAL SYSTEM.

13. FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE

WALLS, CEILINGS, AND FLOORS.

FIRE PROTECTION GENERAL NOTES

DESCRIPTIONLINETYPE

FIRE PROTECTION PIPING LINETYPES

DEMOLITION

NEW - ABOVE GRADE

EXISTING - ABOVE GRADE

FIRE PROTECTION SYMBOL LEGEND

SHUTOFF VALVE

END CAP

FLOW SWITCH

NEW TO EXISTING POINT OF CONNECTION SYMBOL

CONCEALED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

14. CONTRACTOR SHALL REMOVE AND REINSTALL EXISTING

ATC CEILING AS REQUIRED FOR DEMOLITION AND NEW

WORK. CONTRACTOR TO REPLACE ANY DAMAGED

CEILING TILES TO MATCH EXISTING.

15. WORK IN CORRIDORS SHALL BE PERFORMED AFTER

NORMAL BUSINESS HOURS.

CONCEALED CLEAN ROOM SPRINKLER HEADCR

16. ALL SPRINKLER PIPING SHALL BE SCHEDULE 40.

17. COORDINATE SHUTDOWN AND INTERUPTIONS WITH OWNER

A MINIMUM OF 10 DAYS IN ADVANCE.

18. AUXILIARY DRAINS IN CEILING SPACE SHALL BE PROVIDED

WITH CAPPED HOSE CONNECTIONS.

19. REFER TO ARCHITECTURAL PHASING PLAN FOR PROJECT

PHASING. COORDINATE REQUIRED WORK WITH ALL OTHER

TRADES FOR EACH PHASE. CONTRACTOR SHALL MAINTAIN

PROJECT DEADLINES FOR EACH PHASE AND COORDINATE

AREA OF WORK AND SHUTDOWNS WITH OWNER AND

ARCHITECT.

FIRE PROTECTION SHEET INDEX

FP102

FP103

FPD103

FP100

FP101

FPD100 5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - OVERALL (FOR REFERENCE ONLY)

FPD101

FPD102

FP001 FIRE PROTECTION LEAD SHEET

5TH FLOOR FIRE PROTECTION PLAN - OVERALL (FOR REFERENCE ONLY)

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART A

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART B

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART C

5TH FLOOR FIRE PROTECTION PLAN - PART A

5TH FLOOR FIRE PROTECTION PLAN - PART B

5TH FLOOR FIRE PROTECTION PLAN - PART C

20. CONTRACTOR SHALL PROVIDE VA WITH 12 ADDITIONAL

SPARE SPRINKLER HEADS WITH COVER PLATES.

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

FIRE PROTECTION LEAD SHEET -

WEST

06/12/2017 TCC NCF

FP001

NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

PHASE 4

PHASE 3

N O

T I

N C

O N

T R

A C

T

FIVE EAST PROJECT

P A

R T

C

P A

R T

C

N O

T I N

C O

N T

R A

C T

FIVE EAST PROJECT

FIVE WEST PROJECT

FIVE WEST PROJECT

PAR

T C

PA

R T A

PART B

PART A

P

AR

T B

P

AR

T C

PART B

PART A

UNION

OFFICE

5205A

UNION

OFFICE

PERFORMANCE

IMPRVMNT/QA/IC

STORAGE

5138A

STORAGE

5137A

PERFORMANCE

IMPRVMNT/QA

PERFORMANCE

IMPRVMNT/QA

PREFORMANCE

IMPRVMNT/QA

STORAGE

5132A

STORAGE

5133A

EMPLOYEE

EDUCATION

PATIENT

SAFETY

OI&T

POLICE

PIV BADGES

PATIENT

ADVOCATE/EEO

RELEASE OF

INFORMATION

CHIROPRACTOR

OFFICE

5123A

STORAGE

5129A

POLICE

PIV BADGES

5130A

PROSTHETICS

CLERK

PROSTHETICS

OFFICE/STRG.

PROSTHETICS

OFFICE/STRG

STAFF

TOILET

OXYGEN

STORAGE

CORRIDOR

5199E-1

LIBRARY

STORAGE

SOILED

LINEN

HSKG

UTILITY

5142A

MENS

TOILET

WOMENS

TOILET

TELE-HEALTH

CLERKS

PT

STORAGE

DATA &

PHONE

TELE-HEALTH

STORAGE

ALCOVE

CHIROPRACTOR

EXAM ROOM

CHIRO/PT/TELE-

HEALTH WAITING RM

SPEECH

PATHOLOGIST

PRI. CARE

CLASSROOM

MENS

TOILET

STORAGE

OI&T

5111A

CHIEF,

PROSTHETICS

HOME RESP.

COORD.

MRS

SUPERVISOR

OI&T

PERFORMANCE

IMPRVMNT/QA

PROSTHETICS

OFFICE

HYDRO

THERAPY

TREATMENT

TREATMENT

EXCERCISE

ROOM

PT

OFFICE

CONFERENCE

CORRIDOR

5162-1

CHIEF

PHYSICAL MEDICINE

DN

LDRY

CHUTE

MECH.

SHAFT

MECH.

SHAFT

RAMP

UP

DN

UP

FLOOR

RAISED 9"

SERVERS

PASSENGER ELEVATOR

CORRIDOR

5199C-1

CORRIDOR

5199A-1

STAIR 1

STAIR 5

COMPUTER

SPECIALIST

ELEVATOR

LOBBY

5299A-1

OI&T

SERVICE

ELEVATOR PASSENGER

ELEVATOR

COMPUTER

SPECIALIST

UNION

OFFICE

A

B

C

E

F

G

H

J

K

L

M

N

O

P

Q

R

S

171615141312112 3 5 7 8 91

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

5TH FLOOR FIRE PROTECTION

DEMOLITION PLAN - OVERALL (FOR

REFERENCE ONLY) - WEST

06/12/2017 TCC NCF

FPD100

1/8" = 1'-0"

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - OVERALL (FOR REFERENCE ONLY)

NORTH

NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

GENERAL NOTES

PROJECT IS SPLIT INTO FOUR DIFFERENT PHASES.

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR MORE INFORMATION.

PHASE #1 INCLUDES REMOVING ALL SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART

'A', 'B' AND 'C' TO ACCOMMODATE NEW PIPING,

DUCTWORK, AND ELECTRICAL. PROVIDE

TEMPORARY CAPS AND SERVICE PIPING AS

REQUIRED FOR FIRE PROTECTION IN PHASES #2,

#3, AND #4 TO REMAIN IN SERVICE.

PHASE #2 INCLUDES REMOVING ALL SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART

'B' AND 'C' TO ACCOMMODATE NEW PIPING,

DUCTWORK, AND ELECTRICAL. PROVIDE

TEMPORARY CAPS AND SERVICE PIPING AS

REQUIRED FOR FIRE PROTECTION IN PHASES #1,

#3 AND #4 TO REMAIN IN SERVICE.

PHASE #3 INCLUDES REMOVING ALL SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART

'C' TO ACCOMMODATE NEW PIPING, DUCTWORK,

AND ELECTRICAL. PROVIDE TEMPORARY CAPS

AND SERVICE PIPING AS REQUIRED FOR FIRE

PROTECTION IN PHASES #1, #2 AND #4 TO REMAIN

IN SERVICE.

PHASE #4 WORK IN PHASE #4 SHALL OCCUR

THROUGHOUT THE PROJECT DURATION. WORK IN

THIS AREA MUST BE COORDINATED WITH THE

MEDICAL CENTER AND PERFORMED OUTSIDE OF

MEDICAL CENTER BUSINESS HOURS. ELEVATOR,

CORRIDOR AND STAIR ACCESS SHALL BE

MAINTAINED AT ALL TIMES DURING MEDICAL

CENTER BUSINESS HOURS.

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

PA

R T C

PA

R T A

PART B

PART A

PART B

PART A

AUXILIARY

DRAIN #112

TEST AND DRAIN

PROSTHETICS

OFFICE/STRG

STAFF

TOILET

CORRIDOR

5199E-1

HSKG

UTILITY

5142A

MENS

TOILET

WOMENS

TOILET

TELE-HEALTH

CLERKS

PT

STORAGE

DATA &

PHONE

TELE-HEALTH

STORAGE

ALCOVE

CHIEF,

PROSTHETICS

PROSTHETICS

OFFICE

HYDRO

THERAPY

TREATMENT

TREATMENT

EXCERCISE

ROOM

PT

OFFICE

CONFERENCE

CORRIDOR

5162-1

DN

MECH.

SHAFT

STAIR 5

J

K

L

M

N

O

P

Q

R

S

2 3 5 7 8 91

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

5TH FLOOR FIRE PROTECTION

DEMOLITION PLAN - PART A - WEST

06/12/2017 TCC NCF

FPD101

1/4" = 1'-0"

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART A NORTH

NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

GENERAL NOTES

1. COORDINATE WITH ALL OTHER TRADES AND

PROVIDE REQUIRED FIRE PROTECTION DURING

PHASES OF CONSTRUCTION IN ALL AREAS OF WORK.

2. COORDINATE ALL SPRINKLER HEADS WITH

TEMPORARY WALLS FOR CONSTRUCTION ZONE.

KEYED NOTES

VERIFY FIRE PROTECTION TEST AND DRAIN

RISER. REMOVE VALVES AND CAPS AND ALL

ASSOCIATED PIPING SERVING TEST AND DRAINS

ON 5TH FLOOR. CAP PIPING IN CEILING SPACE

OF 4TH FLOOR. HAND 2 1/2" VALVE OVER TO VA.

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

PART B

PART A

PA

R

T B

PA

R

T C

PART B

PART A

1 1/2" & 2 1/2"

FIRE HOSE VALVES

TEMP CAP

TEMP CAP

5 WEST

FLOW SWITCH

TEMP CAP

WEST SIDE

SPRINKLER RISER

TEST AND DRAIN

TAMPER SWITCH

ZONE VALVE W/

SPRINKLER

RISER UP

TEST AND

DRAIN UP

5 WEST

PERFORMANCE

IMPRVMNT/QA/IC

STORAGE

5138A

STORAGE

5137A

PERFORMANCE

IMPRVMNT/QA

PERFORMANCE

IMPRVMNT/QA

PREFORMANCE

IMPRVMNT/QA

STORAGE

5132A

STORAGE

5133A

EMPLOYEE

EDUCATION

PATIENT

SAFETY

OI&T

POLICE

PIV BADGES

PATIENT

ADVOCATE/EEO

RELEASE OF

INFORMATION

CHIROPRACTOR

OFFICE

5123A

STORAGE

5129A

POLICE

PIV BADGES

5130A

PROSTHETICS

CLERK

PROSTHETICS

OFFICE/STRG.

OXYGEN

STORAGE

CORRIDOR

5199E-1

LIBRARY

STORAGE

SOILED

LINEN

DATA &

PHONE

CHIROPRACTOR

EXAM ROOM

CHIRO/PT/TELE-

HEALTH WAITING RM

PERFORMANCE

IMPRVMNT/QA

LDRY

CHUTE

MECH.

SHAFT

DN

UP

CORRIDOR

5199C-1

STAIR 1

A

B

C

E

F

G

H

J

2 3 5 7 8 91

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

5TH FLOOR FIRE PROTECTION

DEMOLITION PLAN - PART B - WEST

06/12/2017 TCC NCF

FPD102

1/4" = 1'-0"

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART B

NORTH NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

GENERAL NOTES

1. COORDINATE WITH ALL OTHER TRADES AND

PROVIDE REQUIRED FIRE PROTECTION DURING

PHASES OF CONSTRUCTION IN ALL AREAS OF WORK.

2. COORDINATE ALL SPRINKLER HEADS WITH

TEMPORARY WALLS FOR CONSTRUCTION ZONE.

KEYED NOTES

REMOVE 1 1/2" AND 2 1/2" HOSE CONNECTIONS

AND VALVES. CAP PIPING AT RISER. KEEP 2

1/2" VALVE AND HAND OVER TO VA.

COORDINATE EXISTING PIPING WITH ALL OTHER

TRADES AND RELOCATE AS REQUIRED.

REMOVE FLOW SWITCH AND CAP PIPING AS

SHOWN. COORDINATE SHUTDOWN WITH

OWNER.

CAP DRAIN PIPING AT RISER.

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

T I N

C O

N T

R A

C T

FIVE EAST PROJECT

P A

R T

C

P A

R T

C

N O

T I N

C O

N T

R A

C T

FIVE EAST PROJECT

FIVE WEST PROJECT

FIVE WEST PROJECT

PA

R T C

PA

R T A

PA

R

T B

PA

R

T C

BOUNDARY FOR

PRE-ACTION SYSTEM

BOUNDARY FOR

PRE-ACTION SYSTEM

FLOW SWITCH

TAMPER SWITCH

ZONE VALVE W/

1 1/2" & 2 1/2"

FIRE HOSE VALVES

BOUNDARY FOR

PRE-ACTION SYSTEM

BOUNDARY FOR

PRE-ACTION SYSTEM

5 CENTER

5 CENTER

TEST AND

DRAIN UP

CENTRAL

SPRINKLER RISER

TEST AND DRAIN

UNION

OFFICE

5205A

UNION

OFFICE

CHIROPRACTOR

OFFICE

5123A

PT

STORAGE

DATA &

PHONE

TELE-HEALTH

STORAGE

ALCOVE

CHIROPRACTOR

EXAM ROOM

CHIRO/PT/TELE-

HEALTH WAITING RM

SPEECH

PATHOLOGIST

PRI. CARE

CLASSROOM

MENS

TOILET

STORAGE

OI&T

5111A

CHIEF,

PROSTHETICS

HOME RESP.

COORD.

MRS

SUPERVISOR

OI&T

HYDRO

THERAPY

CHIEF

PHYSICAL MEDICINE

RAMP

UP

FLOOR

RAISED 9"

SERVERS

PASSENGER ELEVATOR

CORRIDOR

5199A-1

COMPUTER

SPECIALIST

ELEVATOR

LOBBY

5299A-1

OI&T

SERVICE

ELEVATOR PASSENGER

ELEVATOR

COMPUTER

SPECIALIST

UNION

OFFICE

F

G

H

J

K

L

M

N

O

P

171615141312119

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

5TH FLOOR FIRE PROTECTION

DEMOLITION PLAN - PART C - WEST

06/12/2017 TCC NCF

FPD103

1/4" = 1'-0"

5TH FLOOR FIRE PROTECTION DEMOLTION PLAN - PART C NORTH NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

GENERAL NOTES

1. COORDINATE WITH ALL OTHER TRADES AND

PROVIDE REQUIRED FIRE PROTECTION DURING

PHASES OF CONSTRUCTION IN ALL AREAS OF WORK.

2. COORDINATE ALL SPRINKLER HEADS WITH

TEMPORARY WALLS FOR CONSTRUCTION ZONE.

KEYED NOTES

EXISTING PRE-ACTION SYSTEM SHALL REMAIN.

COORDINATE SHUTDOWN WITH OWNER. VERIFY

REQUIRED EXTENT OF PRE-ACTION SYSTEM.

REMOVE PRE-ACTION SYSTEM HEADS AND

PIPING AS SHOWN AND TEMPORARILY CAP FOR

CONNECTION DURING NEW CONSTRUCTION.

TEMPORARILY CAP EXISTING FIRE PROTECTION

MAIN AS SHOWN FOR CONNECTION DURING NEW

CONSTRUCTION.

CAP FIRE PROTECTION PIPING AS SHOWN AT

MAIN.

REMOVE 1 1/2" AND 2 1/2" HOSE CONNECTIONS

AND VALVES. CAP PIPING AT RISER. KEEP 2 1/2"

VALVE AND HAND OVER TO VA.

REPLACE CENTER FLOW SWITCH AND ZONE

VALVE. COORDINATE TAMPER AND FLOW

SWITCHES WITH EC. COORDINATE SHUTDOWN

WITH OWNER.

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

PHASE 4

PHASE 3

T I

N C

O N

T R

A C

T

FIVE EAST PROJECT

P A

R T

C

P A

R T

C

N O

T I N

C O

N T

R A

C T

FIVE EAST PROJECT

FIVE WEST PROJECT

FIVE WEST PROJECT

PAR

T C

PA

R T A

PART B

PART A

P

AR

T B

P

AR

T C

PART B

PART A

PROGRAM

ASSISTANT

FINANCE

OFFICER

CHIEF

ACCOUNTANT

HALLWAY

5199F-1

WORKROOM

5136 DSS/VSN

OPEN OFFICE

PRIVACY

OFFICER

OFFICE

ASSIST.

CHIEF HR

OFFICE

HALLWAY

5199B-1

OI&T

STORAGE

OI&T

5114B

OI&T

OPEN OFFICE

MENS

RESTROOM

WOMENS

RESTROOM

CONFERENCE

HOUSEKEEPING

5120STAFF LOUNGE

STORAGE

DATA

PHONE

FINANCE

OPEN OFFICE

LEAD IT

TECH

5114A

STORAGE

TEAM ROOM

WORKROOM

PROGRAM

ASSIST.

CHIEF

HR

CHIEF OF

MEDICINE

5111C

ASSOC. CHIEF

PRIMARY CARE

5111D

CBOC NURSE

MANAGER

5111B SECRETARY

GROUP PRACTICE

MANAGER

5111A

TEAM

ROOM

WORKERS COMP

SPECIALIST

OFFICE

OPEN

OFFICE

OPEN

OFFICE

FILE STORAGE

UNION

CONF ROOM

5205D

CORRIDOR

5199C-1

CORRIDOR

5199A-1

SERVERS

COMPUTER

SPECIALIST

ELEVATOR

LOBBY

5299A-1

OI&T

COMPUTER

SPECIALIST

UNION

OFFICE

UNION

OFFICE

5205A

UNION

OFFICE

DN

LDRY

CHUTE

MECH.

SHAFT

MECH.

SHAFT

FE

FE

FE

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

K-4330 KINGSTON C_TOILETS VITREOUS CHINA

RAMP

UP

DN

UP

CR

PP

PP

PP

PP

CR

PP

PP

CR

CR CR

A

B

C

E

F

G

H

J

K

L

M

N

O

P

Q

R

S

171615141312112 3 5 7 8 91

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100% Construction 06/12/2017

5TH FLOOR FIRE PROTECTION PLAN

- OVERALL (FOR REFERENCE ONLY)

- WEST

06/12/2017 TCC NCF

FP100

1/8" = 1'-0"

5TH FLOOR FIRE PROTECTION PLAN - OVERALL (FOR REFERENCE ONLY)

NORTH

NORTH

NOT TO SCALE

KEY PLAN

NOT IN CONTRACT

A

B

C

PHASING NOTE:

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR ALL PROJECT PHASING.

NORTH

NOT TO SCALE

PHASING KEY PLAN

NOT IN CONTRACT

PHASE 1

PHASE 2

PHASE 4

PHASE 3

GENERAL NOTES

PROJECT IS SPLIT INTO FOUR DIFFERENT PHASES.

REFER TO ARCHITECTURAL SHEET A003 - FIFTH

FLOOR PHASING PLAN FOR MORE INFORMATION.

PHASE #1 INCLUDES PROVIDING NEW SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART 'A',

'B' AND 'C' PER NFPA #13. PROVIDE TEMPORARY

CAPS AND SERVICE PIPING AS REQUIRED FOR FIRE

PROTECTION IN PHASES #2, #3, AND #4 TO REMAIN IN

SERVICE.

PHASE #2 INCLUDES PROVIDING NEW SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART 'B'

AND 'C' PER NFPA #13. PROVIDE TEMPORARY CAPS

AND SERVICE PIPING AS REQUIRED FOR FIRE

PROTECTION IN PHASES #1, #3 AND #4 TO REMAIN IN

SERVICE.

PHASE #3 INCLUDES PROVIDING NEW SPRINKLER

PIPING AND COMPONENTS IN PORTIONS OF PART 'C'

PER NFPA #13. PROVIDE TEMPORARY CAPS AND

SERVICE PIPING AS REQUIRED FOR FIRE

PROTECTION IN PHASES #1, #2 AND #4 TO REMAIN IN

SERVICE.

PHASE #4 WORK IN PHASE #4 SHALL OCCUR

THROUGHOUT THE PROJECT DURATION. WORK IN

THIS AREA MUST BE COORDINATED WITH THE

MEDICAL CENTER AND PERFORMED OUTSIDE OF

MEDICAL CENTER BUSINESS HOURS. ELEVATOR,

CORRIDOR AND STAIR ACCESS SHALL BE

MAINTAINED AT ALL TIMES DURING MEDICAL CENTER

BUSINESS HOURS.

SP

F

SP

F

SP

SP

SP

SP

SP

A

A

AA

A2A2

A2A2

H2

H2

A2 A2

AA

AA

AA

AA

A2A2

AA

AA

AA

A2

A2A2

A2 H2

H2

MM

AAAA

A

B2 B2

B2 B2

B2 B2

B2 B2

A2 A2

A2

A2

M

M

A2

A

A A

A2

A2 A2

Z Z

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

M

M M

M M

M

PA

R T C

PA

R T A

PART B

PART A

PART B

PART A

PRIVACY

OFFICER

OFFICE

ASSIST.

CHIEF HR

OFFICE

HALLWAY

5199B-1

OI&T

STORAGE

CONFERENCE

HOUSEKEEPING

5120STAFF LOUNGE

DATA

PHONE

WORKROOM

PROGRAM

ASSIST.

CHIEF

HR

TEAM

ROOM

WORKERS COMP

SPECIALIST

OFFICE

OPEN

OFFICE

OPEN

OFFICE

DN

MECH.

SHAFT

F E

PP

PP

CR CR

J

K

L

M

N

O

P

Q

R

S

2 3 5 7 8 91 PROVIDE

AUXLIARY DRAIN

PROVIDE

AUXLIARY DRAIN

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER: 1210

N08.13.04

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

IRON MOUNTAIN, MICHIGAN

Renovate Five West Office of Construction and Facilities Management

585-12-113

B

A

C

D

E

F

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

MEP PROJECT NO.:

100%…