VA69D-17-B-1294 A00004 S06 - A00003 - Plans, Specs - Part1of5.pdf

View the file

Other files

File Type Posted
36C25218C0048-000.docx DOCX document
VA69D-17-B-1294-A00005000.docx DOCX document
VA69D-17-B-1294-A00004003.pdf PDF
VA69D-17-B-1294-A00004000.docx DOCX document
VA69D-17-B-1294-A00004002.pdf PDF
VA69D-17-B-1294-A00004004.pdf PDF
VA69D-17-B-1294-A00004005.pdf PDF
VA69D-17-B-1294-P00003001.pdf PDF
VA69D-17-B-1294-P00003000.docx DOCX document
VA69D-17-B-1294-A00002000.docx DOCX document
VA69D-17-B-1294-A00002001.pdf PDF
VA69D-17-B-1294-A00001002.pdf PDF
VA69D-17-B-1294-A00001001.pdf PDF
VA69D-17-B-1294-A00001004.pdf PDF
VA69D-17-B-1294-A00001003.pdf PDF
VA69D-17-B-1294-A00001000.docx DOCX document
VA69D-17-B-1294-A00001007.pdf PDF
VA69D-17-B-1294-A00001005.pdf PDF
VA69D-17-B-1294-A00001006.pdf PDF
VA69D-17-B-1294-004.pdf PDF
VA69D-17-B-1294-006.pdf PDF
VA69D-17-B-1294-001.docx DOCX document
VA69D-17-B-1294-008.pdf PDF
VA69D-17-B-1294-003.pdf PDF
VA69D-17-B-1294-002.pdf PDF
VA69D-17-B-1294-005.pdf PDF
VA69D-17-B-1294-007.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

420 Rail Street Negaunee, MI 49866

906-475-6616 906-475-6954 Fax

WWW.NDW.US

AddenduM

Number: 1 NDW Project #: 1210

Project: Renovate 5 West 585-12-113

Date: December 8, 2017 (Rev. Dec. 11, 2017)

The contractor shall acknowledge receipt of all addenda by listing the number where indicated on the bid form.

Drawings, specifications, and / or proposals are herein amended, expanded, and / or modified, and become a part of the Contract Documents with the same effect as if incorporated in the original documents. Any contrary provisions contained, or referred to, in Drawings and / or Specifications, shall remain applicable unless overridden by this Addendum. Revised provisions herein shall include all labor, materials, methods, modifications, etc. required for the completion of the Work.

Specification Modifications:

1. 01 00 00 - General Conditions: 1.6.H: Change Phasing Plan.

2. 02 82 13.13 - Glovebag Asbestos Abatement: 1.1.2.B - Change quantity to include 525 linear feet of pipe insulation associated fittings and an additional 100 linear feet of pipe insulation and associated fittings presumed to be present in concealed locations.

3. 02 82 13.19 - Asbestos Floor Tile and Mastic Abatement: 1.1.2.B - Change quantity of floor tile to 1,760 square feet of tile only.

4. 09 06 00 - Finish Schedule: 2.3.D: Change SVT-2 color to Cerisier Heirloom TP049.

Specified color was discontinued.

Drawing Modifications:

1. AD100, AD101, AD102 - Fifth Floor Demolition Plans:

a. Keynote 5 is removed and keynotes on asbestos containing floor tile are corrected.

b. Add notes indicating removal of temporary canteen sinks and partition wall in

5165 and 5169.

c. Modify wording of keynote 30 and 32.

d. Modify keynote 10 and 17 to clarify soffits are to be removed with windows.

2. A003 - Phasing Plan: South wing is now included in phase 1A. Revise notes on phases.

3. A103 - Fifth Floor Reflected Ceiling Plan - Part A: Add keynote 6 at windows without that note in Open Office 5173 and Program Assistant 5176.

4. A104 (not re-issued) - Fifth Floor Reflected Ceiling Plan - Part B: Eliminate keynote 6 at west windows in Conference 5150.

5. ALL FIRE PROTECTION SHEETS: Remove Phasing Key Plan in its entirety. Contractor shall refer to Architectural sheet A003 – Fifth Floor Phasing Plan for all project phasing.

6. ALL PLUMBING SHEETS: Remove Phasing Key Plan in its entirety. Contractor shall refer to Architectural sheet A003 – Fifth Floor Phasing Plan for all project phasing.

7. PL202 5TH FLOOR PLUMBING PLAN – PART B – WEST:

a. Add plan 2/PL202 6th Floor Plumbing Plan to sheet showing new domestic hot and cold water mains serving 5th floor west to be routed up to 6th floor chase and connecting to existing water mains.

b. Add keyed note #5: ‘Connect new 2 1/2” CW to existing CW main in chase on 6th floor. Provide shutoff valve.’

c. Add keyed note #6: ‘Connect new 1 1/4” HW to existing HW main in chase on 6th floor.Provide shutoff valve.’

8. PL203 5TH FLOOR PLUMBING PLAN – PART C – WEST:

a. Revise plan 1/PL203 existing conditions of domestic water mains at dumb waiter shaft.

b. Revise plan 1/PL203 to show new domestic hot and cold water mains serving 5th floor west to be routed up to 6th floor chase to connect to existing water mains on 6th floor.

c. Revise plan 1/PL203 to show new domestic hot water return main serving 5th floor west to be connected to existing hot water return main in dumb waiter shaft, above existing circulation pump.

d. Revise keyed note #4 to read ‘Connect new 3/4" HWR to existing HWR main in chase above circulation pump. Verify size and location of existing main.’

9. PL401 PLUMBING ISOMETRICS – WEST:

a. Revise 2/PL401 Domestic Water Plumbing Isometric to reflect changes to plans.

10. ALL MECHANICAL SHEETS: Remove Phasing Key Plan in its entirety. Contractor shall refer to Architectural sheet A003 – Fifth Floor Phasing Plan for all project phasing.

11. MECHANICAL REVISION NO SHEETS:

a. Add smoke detector to 4th floor return duct at shaft.

12. MD104 MECHANICAL DUCTWORK DEMO PLAN – PART C:

a. Add note to remove damper at shaft wall.

13. MP103 5TH FLOOR MECHANICAL PIPING PLAN – PART B:

a. Add tag to TU-5122.

14. MH104 5TH FLOOR MECHANICAL DUCTWORK – PART C:

a. Revise TU-5180A & TU-5180B inlet duct connection.

15. M601 MECHANICAL EQUIPMENT SCHEDULES:

a. Revise TU-5180A & TU-5180B selections.

16. ED103 ELECTRICAL DEMOLITION PLAN FIFTH FLOOR WEST PART C:

a. Addition of demolition along shaft wall.

b. Addition of keyed note for Panel ADP.

17. EL100 ELECTRICAL LIGHTING PLAN FITTH FLOOR WEST:

a. Revise project boundary

18. EL103 ELECTRICAL LIGHTING PLAN FITTH FLOOR WEST:

a. Revise project boundary

19. EP100 ELECTRICAL POWER PLAN FIFTH FLOOR WEST:

a. Revised title box text

b. Revise project boundary

20. EP101 ELECTRICAL POWER PLAN FIFTH FLOOR WEST PART A:

a. Revision of circuit number for receptacle.

21. EP102 ELECTRICAL POWER PLAN FIFTH FLOOR WEST PART B:

a. Revision of circuit number for receptacle.

22. EP103 ELECTRICAL POWER PLAN FIFTH FLOOR WEST PART C:

a. Addition of new receptacles and motor connections on shaft wall.

b. Addition of note on panel ADP.

c. Revise title block text and project boundary.

23. ET 100 ELECTRICAL SYSTEMS PLAN FIFTH FLOOR WEST:

a. Revise title block text and project boundary

24. ET101 ELECTRICAL SYSTEMS PLAN FIFTH FLOOR WEST PART A:

a. Revise title block text

25. ET102 ELECTRICAL SYSTEMS PLAN FIFTH FLOOR WEST PART B:

a. Revise title block text

26. ET103 ELECTRICAL SYSTEMS PLAN FIFTH FLOOR WEST PART C:

a. Addition of new speaker in room 5111.

b. Revise titleblock text and project boundary

27. EY501 ELECTRICAL RISER DIAGRAM:

a. Revision of panel schedules.

28. FA100 ELECTRICAL FIRE ALARM PLAN FIFTH FLOOR WEST:

a. Revise project boundary

29. FA103 ELECTRICAL FIRE ALARM PLAN FIFTH FLOOR WEST PART C:

a. Revise project boundary

Clarifications:

None

Attachments: 01 00 00 - General Conditions, AD100, AD101, AD102, A003, A103, PL202, PL203, PL401, M601, MD104, MH104, MP103, ED103, EL100, EL103, EP100, EP101, EP102, EP103, ET100, ET101, ET102, ET103, EY501, FA100, FA103

End of Addendum

1. Provide temporary construction partition per 01 01 10 during phase 1, maintaining 44" clear minimum corridor width.

2. Provide temporary construction partition per 01 01 10 during phase 2, maintaining 44" clear minimum corridor width.

3. Provide temporary construction partition per 01 01 10 during phase 3, maintaining 44" clear minimum corridor width.

4. Complete door removal and wall infill at this location before beginning other work in room 5180.

5. Provide card reader and new door hardware at this door prior to start of phase 3 work.

6. Install new door, wall and hardware at commencement of construction. Coordinate extent of finish work with corridor before Phase 3.

1. Fifth floor project area is a Business occupancy per NFPA 101 - 2015.

2. Floor structure is two-hour rated concrete construction. Maintain fire rating and provide firestopping at all penetrations.

3. Corridor work outside of enclosed (limited access) work zones shall be at night, between the hours of 4:30

PM and 10:00 PM.

4. Provide temporary one hour fire rated construction partitions at boundary between phase under construction and adjacent occupied areas. Existing or new partition walls may be used as portion of barrier provided construction provides one hour fire rating and is maintained in that condition during construction.

Temporary partitions shall also meet the requirements of Section 01 01 10 for Infection Control.

5. Refer to 01 00 00 General Conditions, Section 1.6H for specific phase requirements and milestones.

6. Any Mechanical or Electrical work in occupied areas that may be in a future phase and is required to commission the current phase shall be done in accordance with General Note 3.

PHASE 1 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE

COMPLETION OF NEW RESTROOMS IN PHASE 1A. DURING WORK IN THIS AREA

THE REMAINDER OF THE FIFTH FLOOR WILL BE OCCUPIED. A 44 INCH CORRIDOR

WILL BE MAINTAINED AS SHOWN.

PHASE 3 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AFTER 14 DAYS

AFTER COMPLETION OF PHASE 2. DURING WORK IN THIS AREA THE REMAINDER

OF THE FIFTH FLOOR WILL BE OCCUPIED.

PHASE 2 - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION 14 DAYS AFTER

COMPLETION OF PHASE 1. DURING WORK IN THIS AREA THE REMAINDER OF THE

FIFTH FLOOR WILL BE OCCUPIED.

PHASE 4 - WORK IN PHASE 4 SHALL OCCUR THROUGHOUT THE PROJECT

DURATION. WORK IN THIS AREA MUST BE COORDINATED WITH THE MEDICAL

CENTER AND PERFORMED OUTSIDE OF MEDICAL CENTER BUSINESS HOURS.

ELEVATOR , CORRIDOR AND STAIR ACCESS SHALL BE MAINTAINED AT ALL TIMES

DURING MEDICAL CENTER BUSINESS HOURS.

PHASE 1A - THESE SPACES WILL BE AVAILABLE FOR CONSTRUCTION AT THE

COMPLETION OF PHASE 0. DURING WORK IN THIS AREA THE REMAINDER OF THE

FIFTH FLOOR WILL BE OCCUPIED. A 44 INCH CORRIDOR WILL BE MAINTAINED AS

SHOWN.

PHASE 0 - WILL COMMENCE WITH THE ISSUANCE OF THE NOTICE TO PROCEED

AND SHALL CONSIST OF SCHEDULE PREPARATION AND APPROVAL.A1

DN

UP

DN

LDRY

CHUTE

MECH. SHAFT

CORRIDOR

5199C-1

CORRIDOR

5199A-1

STAIR 1

MECH. SHAFT

STAIR 5

CORRIDOR

5299B-1

PROGRAM

ASSISTANT

FINANCE

OFFICER

CHIEF

ACCOUNTANT

HALLWAY

5199F-1

WORKROOM

5136 DSS/VSN

OPEN OFFICE

PRIVACY

OFFICER

OFFICE

ASSIST.

CHIEF HR

OFFICE

HALLWAY

5199B-1

OI&T

STORAGE

OI&T

CHIEF

5114B

OI&T

OPEN OFFICE

MENS

RESTROOM

WOMENS

RESTROOM

CONFERENCE

HOUSEKEEPING

5120STAFF LOUNGE

STORAGE

DATA

PHONE

FINANCE

OPEN OFFICE

LEAD IT

TECH

5114A

STORAGE

TEAM ROOM

WORKROOM

PROGRAM

ASSIST.

CHIEF

HR

CHIEF OF

MEDICINE

5111C

ASSOC. CHIEF

PRIMARY CARE

5111D

CBOC NURSE

MANAGER

5111B SECRETARY

GROUP PRACTICE

MANAGER

5111A

TEAM

ROOM

WORKERS COMP

SPECIALIST

OFFICE

OPEN

OFFICE

OPEN

OFFICE

FILE STORAGE

UNION

CONF ROOM

5205D

STEP

UP

STEP

UP

DN

UP

SERVERS

COMPUTER

SPECIALIST

ELEVATOR

LOBBY

5299A-1

OI&T

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

CORRIDOR

5299B-1

STORAGE

5281A

BIO-MED DATA

MECH

ROOM

5281B

STAIR 2

COMPUTER

SPECIALIST

RAMP

UP

FLOOR

RAISED 9"

UNION

OFFICE

UNION

OFFICE

5205A

UNION

OFFICE

WOMENS

TOILET

STORAGE

5211A

TOILET

5207A

CAC

OFFICE

PAS PT.

ADMIN ASSIST

STORAGE

5215A

UNISEX

TOILET

A1

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Floor Phasing Plan

1/8"=1'-0"

N

MEP PROJECT NO.: N08.13.04

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8A

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate 5 West

AutoCAD SHX Text Fifth Floor Phasing Plan

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

RU

AutoCAD SHX Text

RU

AutoCAD SHX Text A003

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 95% Construction Document Review

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/2016

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 6/12/2017

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 8/14/2017

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 8/23/2017

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 9/12/2017

AutoCAD SHX Text Addendum 1

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Healthcare Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate new work.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x12 blocking at all wall mounted equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

8. Seal around all penetrations above the ceiling in existing walls where new Plumbing, Mechanical, or Electrical work occurs.

9. Patch all abandoned holes above the ceiling in existing walls to remain to match existing wall ratings or conditions.

DN

MECH. SHAFT

PRIVACY

OFFICER

OFFICE

ASSIST.

CHIEF HR

OFFICE

HALLWAY

5199B-1

OI&T

STORA

HOUSEKEEPING

STAFF LOUNGE

DATA

PHONE

WORKROOM

PROGRAM

ASSIST.

CHIEF

HR

TEAM

ROOM

WORKERS COMP

SPECIALIST

OFFICE

OPEN

OFFICE

OPEN

OFFICE

CONFERENCE

HALLWAY

5199B-1

STAIR 5

7'-0"

CR

FIRE PROTECTION SPRINKLER HEAD - CONCEALED

SUPPLY AIR CEILING DIFFUSER

RETURN AIR GRILLE

EXHAUST AIR GRILLE

HEPA SUPPLY DIFFUSER

TROFFER STYLE FIXTURE, 2x4

SURFACE MTD FIXTURE, 2x4

LIGHT FIXTURE - CEILING MOUNTED

STRIP LIGHT

TROFFER STYLE FIXTURE, 2x2

2x2 SURFACE MOUNTED

TROFFER SYLE FIXTURE ON EMERGENCY POWER OR

BATTERY BACK-UP

PENDANT MOUNTED FIXTURE

SPEAKER, FIRE ALARM

SPEAKER

NURSECALL STATION

2 = DOME LIGHT ABOVE DOOR

D = CORRIDOR DOME LIGHT

I = AUXILIARY INTERSECTIONAL DOME LIGHT

FIRE PROTECTION SPRINKLER HEAD - UPRIGHT

FIRE PROTECTION SPRINKLER HEAD - UPRIGHT - 212 DEGREE

FIRE PROTECTION SPRINKLER HEAD - CONCEALED - CLEAN ROOM

FIRE PROTECTION SPRINKLER HEAD - SIDEWALL

CEILING POWER CONNECTION

1. 5/8" gypsum board bulkhead per Detail 3/A501. Paint finish to match wall finish as noted on Finish Schedule.

2. Provide 5/8" gypsum board soffit over light gage framing at 24" o.c. above upper cabinets 1'-1" wide.

Paint finish to match wall finish as noted on Finish Schedule.

3. No ceiling in this space, open to structure above.

4. Provide wood Venetian blinds per specification 12 24 00.

5. Gypsum board arched bulkhead, see Detail 11/A500.

6. Provide window shades per Specification 12 24 00.

7. Provide structural steel channel above ceiling for toilet partition support per Detail 1/A500.

8. Ceiling hung toilet partitions attached to support above through ceiling.

9. VA Ceiling mounted Signage IN-15.51C. See Sign Schedule and Interior Elevations for further information. Mount from ATC ceiling.

10.Provide 5/8" gypsum board soffit per Detail 4/A501. Paint finish to match wall finish as shown on Finish

Schedule.

11.Provide steel angle bracing for toilet partition support above ceiling per Detail 1/A500.

7'-6"

7'-6"

7'-6"

7'-10"

7'-8" 8'-0"

7'-8"

7'-8"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

7'-10"7'-0"

EXP

1 1 1 1

4 4 4 4 4

6 6

4'-0"

PART "A"

PART "B"

PART "C"

PART "A"

1'-0"1'-0"

1'-0"

1'-0"

1'- 0"

8'-0"

7'-0"

8'-6"

7'-10"

7'-10"

8'-0"

A500

A500

A1

A1

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Floor Reflected Ceiling Plan- Part A

1/4" = 1'-0"

N

Fifth Floor

A

B C

MEP PROJECT NO.: N08.13.04

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8A

AutoCAD SHX Text

SP

AutoCAD SHX Text F

AutoCAD SHX Text

SP

AutoCAD SHX Text F

AutoCAD SHX Text

SP

AutoCAD SHX Text

SP

AutoCAD SHX Text

SP

AutoCAD SHX Text

SP

AutoCAD SHX Text

SP

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

SP

AutoCAD SHX Text F

AutoCAD SHX Text

SP

AutoCAD SHX Text N

AutoCAD SHX Text X

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Floor Reflected Ceiling Plan

AutoCAD SHX Text Part A

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text A103

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text Addendum 1

AutoCAD SHX Text 12/8/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Business Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate work to be removed.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x12 blocking at all wall mounted equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

DN

PROSTHETICS

OFFICE/STRG

STAFF

TOILET

CORRIDOR

5199E-1

HSKG

UTILITY

5142A

MENS

TOILET

WOMENS

TOILET

TELE-HEALTH

CLERKS

PT

STORAGE

DATA &

PHONE

TELE-HEALTH

STORAGE

ALCOVE

CORR

CHIEF,

PROSTHETICS

HOME RESP.

COORD.

M

SUPER

PROSTHETICS

OFFICE

MECH. SHAFT

HYDRO

THERAPY

TREATMENT

TREATMENT

EXCERCISE

ROOM

PT

OFFICE

CONFERENCE

CORRIDOR

5162-1

STAIR 5

1. Fire rated door assumed to contain asbestos, remove and dispose of as asbestos containing material.

2. Remove casework.

3. Remove asbestos containing resilient floor tile and mastic in this area per 02 82 13.19. Remove associated wall base.

4. Remove carpet and vinyl wall base over floor tile.

5. Not Used.

6. Remove ceramic tile flooring and base. Remove setting bed down to concrete slab. Infill with concrete topping mix to match adjacent floor.

7. Remove VCT tile and vinyl wall base.

8. Remove suspended acoustical ceiling and supports. Remove associated ceiling bulkheads and soffits.

9. Remove plaster ceiling and supports. Remove associated ceiling bulkheads and soffits.

10.Remove existing wood windows and soffits at windows.

11.See plumbing drawings for plumbing fixture demolition.

12.Remove painted wainscot and trim.

13.Remove paint from floor as required to prepare for new flooring installation.

14.Remove ceramic floor tile and base.

15.Remove ceramic floor tile and wall tile wainscot.

16.Remove carpet and vinyl wall base.

17.Remove aluminum window and soffit at window.

18.Remove plastic laminate window stool.

19.Remove vinyl wall base.

20.Remove ceramic wall tile and backing.

21.Remove vinyl wall covering and prepare wall for new paint finish.

22.Remove access floor ramp.

23.Remove door frame and wall above.

24.Remove door and frame.

25.Remove door and frame and cut wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

26.Cut and remove wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

27.Remove existing convector, cover and enclosure. Provide new enclosure per Detail 3/A502. Infill area remaining per Detail 8/A500. See Mechanical.

28.Remove partition wall. Typical partition construction is structural clay tile and plaster. Some areas have gypsum board and steel stud construction from previous renovations. Grind and patch concrete topping slab at base of wall as required to provide a suitable surface for new construction shown.

29.Remove partition wall. This partition construction is gypsum board over steel studs. Grind and patch concrete at base of wall as required to provide a suitable surface for new construction shown.

30.Remove existing wall construction to access piping to adjacent wall. Remove asbestos containing pipe insulation per specification 02 82 13.13. Refer to mechanical for re-insulation of piping.

31.Remove asbestos containing pipe insulation on horizontal piping per specification 02 82 13.13.

32.Remove furring around existing column to wall.

33.Remove handrail.

34.Remove existing door operator, see electrical drawings for power demolition.

35.VA to remove existing AED and cabinet.

36.Remove 4" curb and patch floor topping to be flush with adjacent floor.

37.Remove stairwell wall and door. Salvage existing fire door sign for re-installation. Schedule work to include removal and reinstallation of new wall and door in one shift to maintain fire rating of stairwell.

38.Sawcut and remove topping slab in this area. Do not overcut into structural slab below. Center removed area on new floor drain locations.

39.Remove existing shaft walls. Schedule work to include removal and reinstallation of walls in one shift to maintain fire rating of vertical shaft.

5 5

7 8

1010 10

PART "A"

PART "B"

PART "C"

PART "A"

24 242424

11 11

34 34

A1

A1

A1

A1

A1

A1

A1

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

Fifth Floor

SCALE:

Fifth Floor Demolition Part "A"

1/4" = 1'-0"

N

MEP PROJECT NO.: N08.13.04

A

B C

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8A

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Floor Demolition Plan

AutoCAD SHX Text Part "A"

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text

AD100

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text Addendum 1

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DN

UP

LDRY

CHUTE

MECH. SHAFT

PERFORMANCE

IMPRVMNT/QA/IC

STORAGE

5138A

STORAGE

5137A

PERFORMANCE

IMPRVMNT/QA

PERFORMANCE

IMPRVMNT/QA

PREFORMANCE

IMPRVMNT/QA

STORAGE

5132A

STORAGE

5133A

EMPLOYEE

EDUCATION

PATIENT

SAFETY

5132 OI&T

CORRIDOR

5199C-1

POLICE

PIV BADGES

PATIENT

ADVOCATE/EEO

RELEASE OF

INFORMATION

CHIROPRACTOR

OFFICE

5123A

STORAGE

5129A

POLICE

PIV BADGES

5130A

PROSTHETICS

CLERK

PROSTHETICS

OFFICE/STRG.

OXYGEN

STORAGE

CORRIDOR

5199E-1

LIBRARY

STORAGE

SOILED

LINEN

DATA &

PHONE

CHIROPRACTOR

EXAM ROOM

CHIRO/PT/TELE-

HEALTH WAITING RM

STAIR 1

PERFORMANCE

IMPRVMNT/QA

CHIEF

PHYSICAL ME

N

NN

N

6 6

7 7

8 13

8 3

10 10

PART "A"

PA

RT "

B"

PA

RT "

C"

PART "B"

28 2828

3333 33 33

32 32

6'- 0"

12'-7"

A1

A1

A1

A1

A1

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Business Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate work to be removed.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x12 blocking at all wall mounted equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

1. Fire rated door assumed to contain asbestos, remove and dispose of as asbestos containing material.

2. Remove casework.

3. Remove asbestos containing resilient floor tile and mastic in this area per 02 82 13.19. Remove associated wall base.

4. Remove carpet and vinyl wall base over floor tile.

5. Not Used.

6. Remove ceramic tile flooring and base. Remove setting bed down to concrete slab. Infill with concrete topping mix to match adjacent floor.

7. Remove VCT tile and vinyl wall base.

8. Remove suspended acoustical ceiling and supports. Remove associated ceiling bulkheads and soffits.

9. Remove plaster ceiling and supports. Remove associated ceiling bulkheads and soffits.

10.Remove existing wood windows and soffits at windows.

11.See plumbing drawings for plumbing fixture demolition.

12.Remove painted wainscot and trim.

13.Remove paint from floor as required to prepare for new flooring installation.

14.Remove ceramic floor tile and base.

15.Remove ceramic floor tile and wall tile wainscot.

16.Remove carpet and vinyl wall base.

17.Remove aluminum window and soffit at window.

18.Remove plastic laminate window stool.

19.Remove vinyl wall base.

20.Remove ceramic wall tile and backing.

21.Remove vinyl wall covering and prepare wall for new paint finish.

22.Remove access floor ramp.

23.Remove door frame and wall above.

24.Remove door and frame.

25.Remove door and frame and cut wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

26.Cut and remove wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

27.Remove existing convector, cover and enclosure. Provide new enclosure per Detail 3/A502. Infill area remaining per Detail 8/A500. See Mechanical.

28.Remove partition wall. Typical partition construction is structural clay tile and plaster. Some areas have gypsum board and steel stud construction from previous renovations. Grind and patch concrete topping slab at base of wall as required to provide a suitable surface for new construction shown.

29.Remove partition wall. This partition construction is gypsum board over steel studs. Grind and patch concrete at base of wall as required to provide a suitable surface for new construction shown.

30.Remove existing wall construction to access piping to adjacent wall. Remove asbestos containing pipe insulation per specification 02 82 13.13. Refer to mechanical for re-insulation of piping.

31.Remove asbestos containing pipe insulation on horizontal piping per specification 02 82 13.13.

32.Remove furring around existing column to wall.

33.Remove handrail.

34.Remove existing door operator, see electrical drawings for power demolition.

35.VA to remove existing AED and cabinet.

36.Remove 4" curb and patch floor topping to be flush with adjacent floor.

37.Remove stairwell wall and door. Salvage existing fire door sign for re-installation. Schedule work to include removal and reinstallation of new wall and door in one shift to maintain fire rating of stairwell.

38.Sawcut and remove topping slab in this area. Do not overcut into structural slab below. Center removed area on new floor drain locations.

39.Remove existing shaft walls. Schedule work to include removal and reinstallation of walls in one shift to maintain fire rating of vertical shaft.

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Floor Demolition Part "B"

1/4" = 1'-0"

N

Fifth Floor

MEP PROJECT NO.: N08.13.04

A

B C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Floor Demolition Plan

AutoCAD SHX Text Part "B"

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text

AD101

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text Addendum 1

AutoCAD SHX Text 12/8/17

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHIROPRACTOR

OFFICE

5123A

PT

STORAGE

DATA &

PHONE

TELE-HEALTH

STORAGE

ALCOVE

CHIROPRACTOR

EXAM ROOM

CHIRO/PT/TELE-

HEALTH WAITING RM

SPEECH

PATHOLOGIST

5113 PRI. CARE

CLASSROOM

MENS

TOILET

STORAGE

OI&T

5111A

CORRIDOR

5199A-1

CHIEF,

PROSTHETICS

HOME RESP.

COORD.

MRS

SUPERVISOR

5114 OI&T

HYDRO

THERAPY

COMPUTER

SPECIALIST

ELEVATOR

LOBBY

5299A-1

OI&T

SERVICE

ELEVATOR PASSENGER

ELEVATOR

PASSENGER

ELEVATOR

COMPUTER

SPECIALIST

RAMP

UP

FLOOR

RAISED 9"

UNION

OFFICE

UNION

OFFICE

5205A

CHIEF

PHYSICAL MEDICINE

N

NN

N

30 30

7 7

21 228

8 8

N O

T

IN

C O

N

TR

AC

T-

U N

O

PA

RT

"C

N O

T

IN

C O

N

TR

AC

T-

U N

O

PA

RT

"C

PART "C"

PART "A"

PA

RT "

B"

PA

RT "

C"

24 24

10 10

27 27

28 28

31 3130

30 30 30

33 33 33

33333333

24 24 24

A1

A1

A1

A1

A1

1. Fifth floor project area is a Business Occupancy per NFPA 101-2015.

2. Fouth floor project area is a Business Occupancy per NFPA 101-2015.

3. Light lines indicate existing construction to remain. Dark lines indicate work to be removed.

4. Field verify all dimensions and clearances prior to beginning of construction.

5. Provide fire retardant treated 2x12 blocking at all wall mounted equipment and accessories.

6. Floor structure is Two-Hour Rated Concrete Construction. Maintain fire rating and provide firestopping at all penetrations.

7. Patch all abandoned holes in floors with concrete to match existing construction.

1. Fire rated door assumed to contain asbestos, remove and dispose of as asbestos containing material.

2. Remove casework.

3. Remove asbestos containing resilient floor tile and mastic in this area per 02 82 13.19. Remove associated wall base.

4. Remove carpet and vinyl wall base over floor tile.

5. Not Used.

6. Remove ceramic tile flooring and base. Remove setting bed down to concrete slab. Infill with concrete topping mix to match adjacent floor.

7. Remove VCT tile and vinyl wall base.

8. Remove suspended acoustical ceiling and supports. Remove associated ceiling bulkheads and soffits.

9. Remove plaster ceiling and supports. Remove associated ceiling bulkheads and soffits.

10.Remove existing wood windows and soffits at windows.

11.See plumbing drawings for plumbing fixture demolition.

12.Remove painted wainscot and trim.

13.Remove paint from floor as required to prepare for new flooring installation.

14.Remove ceramic floor tile and base.

15.Remove ceramic floor tile and wall tile wainscot.

16.Remove carpet and vinyl wall base.

17.Remove aluminum window and soffit at window.

18.Remove plastic laminate window stool.

19.Remove vinyl wall base.

20.Remove ceramic wall tile and backing.

21.Remove vinyl wall covering and prepare wall for new paint finish.

22.Remove access floor ramp.

23.Remove door frame and wall above.

24.Remove door and frame.

25.Remove door and frame and cut wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

26.Cut and remove wall as required for new door rough opening. Remove wall to structural concrete slab below and patch concrete floor topping as required.

27.Remove existing convector, cover and enclosure. Provide new enclosure per Detail 3/A502. Infill area remaining per Detail 8/A500. See Mechanical.

28.Remove partition wall. Typical partition construction is structural clay tile and plaster. Some areas have gypsum board and steel stud construction from previous renovations. Grind and patch concrete topping slab at base of wall as required to provide a suitable surface for new construction shown.

29.Remove partition wall. This partition construction is gypsum board over steel studs. Grind and patch concrete at base of wall as required to provide a suitable surface for new construction shown.

30.Remove existing wall construction to access piping to adjacent wall. Remove asbestos containing pipe insulation per specification 02 82 13.13. Refer to mechanical for re-insulation of piping.

31.Remove asbestos containing pipe insulation on horizontal piping per specification 02 82 13.13.

32.Remove furring around existing column to wall.

33.Remove handrail.

34.Remove existing door operator, see electrical drawings for power demolition.

35.VA to remove existing AED and cabinet.

36.Remove 4" curb and patch floor topping to be flush with adjacent floor.

37.Remove stairwell wall and door. Salvage existing fire door sign for re-installation. Schedule work to include removal and reinstallation of new wall and door in one shift to maintain fire rating of stairwell.

38.Sawcut and remove topping slab in this area. Do not overcut into structural slab below. Center removed area on new floor drain locations.

39.Remove existing shaft walls. Schedule work to include removal and reinstallation of walls in one shift to maintain fire rating of vertical shaft.

Keynotes

General Notes

420 RAIL STREET

NEGAUNEE, MI 49866

PHONE: 906-475-6616

FAX: 906-475-6954

NDW PROJECT NUMBER:1210

Key Plan

SCALE:

Fifth Floor Demolition Part "C"

1/4" = 1'-0"

N

Fifth Floor

A

B C

MEP PROJECT NO.: N08.13.04

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8A

AutoCAD SHX Text F

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text J

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text L

AutoCAD SHX Text M

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text SMOKE RESISTIVE WALL SMOKE BARRIER WITH ONE HOUR FIRE RATING ONE HOUR FIRE RATED WALL TWO HOUR FIRE WALL

AutoCAD SHX Text

SMOKE/ FIRE/ RATED PARTITION TYPES

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

IRON MOUNTAIN, MICHIGAN

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text Renovate Five West

AutoCAD SHX Text Fifth Floor Demolition Plan

AutoCAD SHX Text Part "C"

AutoCAD SHX Text 585-12-113

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

RU

AutoCAD SHX Text

PW

AutoCAD SHX Text

AD102

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 50% Design Development Review

AutoCAD SHX Text 10/29/2013

AutoCAD SHX Text 95% Construction Documents

AutoCAD SHX Text 1/22/2014

AutoCAD SHX Text 75% Review

AutoCAD SHX Text 11/22/16

AutoCAD SHX Text 95% Review

AutoCAD SHX Text 12/21/16

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 1/31/17

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 6/5/2017

AutoCAD SHX Text 100% Construction

AutoCAD SHX Text 9/25/17

AutoCAD SHX Text Addendum 1

AutoCAD SHX Text 12/8/2017

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1210-Addendum1-Rev1
Part1of5
1210-A003-Addendum1
Sheets and Views
A003
1210-A103-Addendum1
1210-AD100-Addendum1
1210-AD101-Addendum1
1210-AD102-Addendum1

File details come from the government source that posted it.