VA255-17-R-0134-008.pdf
PDF 3 MB Posted
- Attached to
- PN 589-CA3-370 Construct Inpatient Parking Garage D/B Federal contract opportunity
- Solicitation number
- VA25517R0134
About this file
VA255-17-R-0134 Attachment B- KCVA Parking Garage Basis of Design Specifications Vol. 1 (610 Pages).pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VA255-17-R-0134-00003000.docx | DOCX document | |
| VA255-17-R-0134-00002001.pdf | ||
| VA255-17-R-0134-00002000.docx | DOCX document | |
| VA255-17-R-0134-00002003.pdf | ||
| VA255-17-R-0134-00002002.pdf | ||
| VA255-17-R-0134-00001001.pdf | ||
| VA255-17-R-0134-00001000.docx | DOCX document | |
| VA255-17-R-0134-007.pdf | ||
| VA255-17-R-0134-012.pdf | ||
| VA255-17-R-0134-009.pdf | ||
| VA255-17-R-0134-005.docx | DOCX document | |
| VA255-17-R-0134-011.pdf | ||
| VA255-17-R-0134-010.pdf | ||
| VA255-17-R-0134-006.docx | DOCX document | |
| VA255-17-R-0134-004.docx | DOCX document | |
| VA255-17-R-0134-002.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construct Patient Parking Garage
Kansas City VA Medical Center
4801 Linwood Blvd, Kansas City, Missouri
Specifications
Volume 1 of 2
100% Construction Documents Submittal
October 28, 2014
Updated January 4, 2016
Patient Parking Garage 01-01-14
Project Number: 589-370
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets 09-11
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-13
01 33 23 Shop Drawings, Product Data, and Samples 11-08
01 42 19 Reference Standards 09-11
01 45 29 Testing Laboratory Services 07-13
01 57 19 Temporary Environmental Controls 01-11
01 74 19 Construction Waste Management 09-13
01 81 11 Sustainable Design Requirements 02-13
01 91 00 General Commissioning Requirements 06-13
DIVISION 02 – EXISTING CONDITIONS
02 21 00 Site Surveys 05-13
02 41 00 Demolition 04-13
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 10-12
03 38 00 Post-Tensioned Concrete
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 09-11
04 05 16 Masonry Grouting 09-11
04 20 00 Unit Masonry 05-12
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-12
05 31 00 Steel Decking 10-12
05 50 00 Metal Fabrications 09-11
05 51 00 Metal Stairs 09-11
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 09-11
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing 05-12
07 40 00 Roofing and Siding Panels 10-11
11-01-13
00 01 10-2
07 60 00 Flashing and Sheet Metal 12-13
07 72 00 Roof Accessories 10-11
07 92 00 Joint Sealants 12-11
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-13
08 44 13 Glazed Aluminum Curtain Walls 10-11
08 71 00 Door Hardware 12-13
08 80 00 Glazing 10-12
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 10-11
09 91 00 Painting 07-13
DIVISION 10 – SPECIALTIES
10 14 00 Signage 11-11
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
14 21 00 Electric Traction Elevators 09-11
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results for Fire Suppression 11-09
21 12 00 Fire-Suppression Standpipes 12-05
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 04-11
22 05 12 General Motor Requirements for Plumbing Equipment 12-09
22 13 23 Sanitary Waste Interceptors 12-09
22 14 00 Facility Storm Drainage 12-09
22 14 29 Sump Pumps 01-11
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 11-10
23 05 93 Testing, Adjusting, and Balancing for HVAC 05-11
23 08 00 Commissioning of HVAC Systems 06-13
23 23 00 Refrigerant Piping 02-10
23 34 00 HVAC Fans 11-09
23 81 00 Decentralized Unitary HVAC Equipment 02-11
00 01 10-3
VOLUME TWO
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 12-12
26 05 13 Medium-Voltage Cables 12-12
26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13
26 05 26 Grounding and Bonding for Electrical Systems 12-12
26 05 33 Raceway and Boxes for Electrical Systems 09-10
26 05 41 Underground Electrical Construction 12-12
26 05 73 Overcurrent Protective Device Coordination Study 12-12
26 08 00 Commissioning of Electrical Systems 06-13
26 09 23 Lighting Controls 09-10
26 22 00 Low-Voltage Transformers 12-12
26 24 16 Panel boards 12-12
26 27 26 Wiring Devices 12-12
26 29 11 Motor Controllers 12-12
26 29 21 Enclosed Switches and Circuit Breakers 12-12
26 36 23 Automatic Transfer Switches 12-12
26 41 00 Facility Lightning Protection 12-12
26 42 00 Cathodic Protection 12-12
26 43 13 Surge Protector Devices 12-12
26 51 00 Interior Lighting 12-12
26 56 00 Exterior Lighting 09-10
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 11-09
27 05 26 Grounding and Bonding for Communications Systems 10-06
27 05 33 Raceways and Boxes for Communications Systems 12-05
27 08 00 Commissioning of Communications Systems 06-13
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 09-11
28 05 13 Conductors and Cables for Electronic Safety and
Security
09-11
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 33 Raceways and Backboxes for Electronic Safety and
Security
28 08 00 Commissioning of Electronic Safety and Security Systems 06-13
28 23 00 Video Surveillance 09-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 10-12
31 23 23.33 Flowable Fill 10-12
31 63 26 Drilled Caissons 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 05-13
00 01 10-4
32 12 16 Asphalt Paving 10-09
32 17 23 Pavement Markings 04-10
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 01-14
33 40 00 Storm Sewer Utilities 10-11
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
Patient Parking Garage 09-11
Project Number: 589-370
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER SHEET
GI002 LIFE SAFETY & CODE ANALYSIS
CIVIL
C-001 GENERAL NOTES - LEGENDS - ABBREVIATIONS
C-002 SURVEY CONTROL AND MISC INFORMATION
C-003 SURVEY
C-101 DEMOLITION PLAN
C-102 SITE LAYOUT PLAN
C-103 GRADING PLAN
C-104 SITE UTILITY PLAN
C-105 STORM SEWER PLAN
C-106 WATER LINE PLAN
C-107 SWPPP PLAN
C-201 UTILITY PROFILES
C-501 SITE PLAN DETAILS
C-502 STORM SEWER DETAILS
C-503 STORM SEWER DETAILS
C-504 WATER LINE DETAILS
C-505 SWPPP DETAILS
C-701 EXISTING DRAINAGE AREA MAP
C-702 DRAINAGE AREA MAP
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-003 STRUCTURAL SYMBOLS & ABBREVIATIONS
S-004 CONCRETE COVER REQUIREMENTS
S-005 REINFORCING STEEL DETAILS
S-006 REINFORCING STEEL DETAILS
S-007 LOAD KEY PLANS
S-008 LOAD KEY PLANS
S-101 LEVEL 1 FOUNDATION PLAN
S-102 LEVEL 2 FRAMING PLAN
S-103 LEVEL 3 FRAMING PLAN
S-104 LEVEL 4 FRAMING PLAN
S-105 S-106
LEVEL 5 FRAMING PLAN
CANOPY PLANS AND DETAILS
S-201 S-202
AXONOMETRICS
AXONOMETRICS
S-211 BUILDING SECTIONS
S-212 BUILDING SECTIONS
Project Number: 589-370
00 01 15 - 2
S-221 WALL SECTIONS
S-222 WALL SECTIONS
S-223 WALL SECTIONS
S-224 WALL SECTIONS
S-225 WALL SECTIONS
S-301 FOUNDATION & SLAB-ON-GRADE TYPICAL DETAILS
S-302 FOUNDATION & SLAB-ON-GRADE TYPICAL DETAILS
S-303 FOUNDATION & SLAB-ON-GRADE TYPICAL DETAILS
S-311 FOUNDATION DETAILS
S-312 FOUNDATION DETAILS
S-313 FOUNDATION DETAILS
S-401 FRAMING TYPICAL DETAILS-CONCRETE
S-402 FRAMING TYPICAL DETAILS-CONCRETE
S-403 FRAMING TYPICAL DETAILS-CONCRETE
S-404 S-405
FRAMING TYPICAL DETAILS-CONCRETE
FRAMING TYPICAL DETAILS
S-411 FRAMING DETAILS
S-412 FRAMING DETAILS
S-413 S-414
FRAMING DETAILS
FRAMING DETAILS
S-501 COLUMN TYPICAL DETAILS
S-502 COLUMN TYPICAL DETAILS
S-611 S-612
BEAM AND GIRDER SCHEDULES
BEAM AND GIRDER SCHEDULES
S-621 S-622
COLUMN SCHEDULES
COLUMN SCHEDULES
ARCHITECTURAL
AS101 GROUND LEVEL - FLOOR PLAN
AS102 LEVEL 2 - FLOOR PLAN
AS103 LEVEL 3 - FLOOR PLAN
AS104 LEVEL 4 - FLOOR PLAN
AS121 ROOF PLAN
AS201 EXTERIOR ELEVATIONS
AS202 EXTERIOR ELEVATIONS
AS301 BUILDING SECTIONS
AS302 BUILDING SECTIONS
AS311 WALL SECTIONS
AS312 WALL SECTIONS & DETAILS
AS401 ENLARGED FLOOR PLANS
AS402
AS403
AS404
AS405
AS521
AS522
AS531
AS601
AS611
AS612
CANOPY PLANS AND DETAILS
CANOPY SECTIONS & DETAILS
PRECAST CONCRETE ELEVATIONS
PRECAST CONCRETE ELEVATIONS
ROOF DETAILS
WALKWAY CANOPY DETAILS
PRECAST CONRETE DETAILS
PARTITION TYPES & DOOR SCHEDULE + TYPES
STAIR SECTIONS & DETAILS
STAIR & ELEVATOR DETAILS
PARKING
PK101 LEVEL 1 PAVEMENT MARKING PLAN
Project Number: 589-370
00 01 15 - 3
PK102 LEVEL 2 PAVEMENT MARKING PLAN
PK103 LEVEL 3 PAVEMENT MARKING PLAN
PK104 LEVEL 4 PAVEMENT MARKING PLAN
PK121 PAVEMENT MARKING DETAILS
PK201 LEVEL 1 SIGNAGE PLAN
PK202 LEVEL 2 SIGNAGE PLAN
PK203 LEVEL 3 SIGNAGE PLAN
PK204 LEVEL 4 SIGNAGE PLAN
PK220 SIGNAGE SCHEDULE
PK221 SIGN FACE DETAILS
PK222 SIGN FACE DETAILS
PK223 SIGN MOUNTING DETAILS
PK224 CLEARANCE BAR MOUNTING DETAILS
PK301 PARKING EQUIPMENT DETAIL PLAN
GENERAL MECHANICAL/ELECTRICAL/PLUMBING
M-000 MEP SYMBOLS LIST
MECHANICAL
M-101 M-103
MECHANICAL - GROUND LEVEL - FLOOR PLAN
MECHANICAL – LEVEL 3 – FLOOR PLAN
M-104 MECHANICAL - LEVEL 4 - FLOOR PLAN
PLUMBING
P-101 PLUMBING - GROUND LEVEL - FLOOR PLAN
P-102 PLUMBING - LEVEL 2 - FLOOR PLAN
P-103 PLUMBING - LEVEL 3 - FLOOR PLAN
P-104 PLUMBING - LEVEL 4 - FLOOR PLAN
P-601 PLUMBING SCHEDULES AND DETAILS
ELECTRICAL
DE001
E-001 E-101
ELECTRICAL DEMOLITION
ELECTRICAL SITE PLAN
ELECTRICAL - GROUND LEVEL- FLOOR PLAN
E-102 ELECTRICAL - LEVEL 2 - FLOOR PLAN
E-103 ELECTRICAL - LEVEL 3 - FLOOR PLAN
E-104 ELECTRICAL - LEVEL 4 - FLOOR PLAN
E-601 ELECTRICAL SCHEDULES & DETAILS
E-602 ELECTRICAL RISER DIAGRAM
E-603 ELECTRICAL PANEL BOARD SCHEDULES
ELECTRICAL LIGHTING
EL101 LIGHTING - GROUND LEVEL - FLOOR PLAN
EL102 LIGHTING - LEVEL 2 - FLOOR PLAN
EL103 LIGHTING - LEVEL 3 - FLOOR PLAN
EL104 LIGHTING - LEVEL 4 - FLOOR PLAN
- - - E N D - - -
Project Number: 589-370
00 01 15 - 4
This page left blank intentionally.
Patient Parking garage 10-01-13
Project Number: 589-370 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 GENERAL INTENTION
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 CONSTRUCTION SECURITY REQUIREMENTS
1.5 FIRE SAFETY
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 PHYSICAL DATA
1.12 PROFESSIONAL SURVEYING SERVICES
1.13 LAYOUT OF WORK
1.14 AS-BUILT DRAWINGS
1.15 USE OF ROADWAYS
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.17 TEMPORARY USE OF EXISTING ELEVATORS
1.18 TEMPORARY USE OF NEW ELEVATORS
1.19 TEMPORARY TOILETS
1.20 AVAILABILITY AND USE OF UTILITY SERVICES
1.21 NEW TELEPHONE EQUIPMENT
1.22 TESTS
Patient Parking garage 10-01-13 ii
1.23 INSTRUCTIONS
1.24 CONSTRUCTION SIGN
1.25 SAFETY SIGN
1.26 PHOTOGRAPHIC DOCUMENTATION
1.27 FINAL ELEVATION Digital Images
1.28 HISTORIC PRESERVATION
Patient Parking Garage 05-01-13 Kansas City VA Medical Center
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for a new patient parking structure located at the Kansas City VA Hospital as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Engineering Officer.
C. Offices of GLMV Architecture, Inc., as Architect, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with
VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
F. Prior to commencing work, general contractor shall provide proof that a
OSHA designated “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
G. Training:
1. All employees of general contractor or subcontractors shall have the
10-hour or 30-hour OSHA Construction Safety course and other relevant
01 00 00 -2 competency training, as determined by RE/COR with input from the facility Construction Safety Committee.
2. Submit training records of all such employees for approval before the start of work.
H. VHA Directive 2011-36, Safety and Health during Construction, dated
9/22/2011 in its entirety is made a part of this section
1.2 STATEMENT OF BID ITEM(S)
A. Bid Item 1, Base Bid, Work includes general construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, utility systems and elevators, necessary removal of existing structures, and certain other items.
Bid Item 2, Guarantee Period Services: Maintenance services for 2 elevators for 12 months.
Bid Item 3 (ALTERNATE NO. 1): All work for BID ITEM 1 and 2 except remove all Brick Veneer and Metal Panel Walls and CMU Backup Wall and replace with Pre-Cast Concrete Panels in all locations that were to receive Brick Veneer.
Bid Item 4 (ALTERNATE NO. 2): All work for BID ITEM 3 except remove one half level of the parking structure.
Bid Item 5 (ALTERNATE NO. 3): All work for BID ITEM 4 except remove one additional half level of the parking structure.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, the selected contractor is responsible for printing hard copy sets as needed. Additional sets of specifications and drawings may be available from those drawings and specifications returned by prospective bidders. All non-successful bidders are to return all documents, in all formats to the VA.
B. Additional sets of drawings may be made by the Contractor, at
Contractor's expense, from electronic documents provided by Issuing
Office.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
01 00 00 -3
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. Prime Contractor is responsible for all Non-VA personnel whether employed directly by the Prime Contractor or a sub-contractor hired to perform work on project 589-370, Construct Patient Parking Garage.
a. All personnel hired to perform work on the project 589-370 will be scheduled by the Prime Contractor with the VA Project Manager in groups no larger than 15, for Safety and Infection Control
Orientation.
b. Submit schedules 3 weeks in advance of need for their performance of work at the VA Medical Center. Lead-time is necessary for an adequate interval for background check, Safety Training, and Badging.
2. Contract personnel shall not enter the project site or perform work at the medical center without an appropriate badge issued by the VA.
3. Contract personnel may be subject to inspection of their personal effects when entering or leaving the project site.
4. For working outside the “regular hours” as defined in the contract, The Prime Contractor shall give 3-day notice to the Contracting
Officer and Project Manager, to make security arrangements for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer and the Project Manager.
4. VA reserves the right to close down or shut down the project site and order Prime Contractor and Contract Personnel off the premises in the event of a national emergency. The Prime Contractor and Contract
Personnel may return to the site only with the written approval of the Contracting Officer.
01 00 00 -4
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
01 00 00 -5
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. Separate permits shall be issued for General Contractor and its employees for parking in designated areas only.
1.5 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this
Article to extent referenced. Publications are referenced in text by basic designations only.
1. American Society for Testing and Materials (ASTM):
E84-2009.............Surface Burning Characteristics of Building
Materials
2. National Fire Protection Association (NFPA):
10-2010..............Standard for Portable Fire Extinguishers
30-2008..............Flammable and Combustible Liquids Code
51B-2009.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2011..............National Electrical Code
101-2012.............Life Safety Code
241-2009.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
01 00 00 -6
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926..........Safety and Health Regulations for Construction
4. VHA Directive 2005-007
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to COR for review for compliance with VHA
Directive 2005-007, NFPA 101 and NFPA 241.Prior to beginning work, all employees of the contractor and/or any subcontractors shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.
Provide documentation to the COR that all construction workers have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
E. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR.
F. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to
COR.
G. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA
241 and NFPA 10.
H. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
01 00 00 -7
I. Standpipes: Install and extend standpipes up with each floor in accordance with 29 CFR 1926 and NFPA 241
J. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with COR. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COR.
K. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with COR.
L. Hot Work: Perform and safeguard hot work operations in accordance with
NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from COR at least 1 day in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work.
M. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to COR.
N. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas, coordinate with COR.
O. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
P. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.
Q. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.
01 00 00 -8
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the
Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for temporary buildings and storing materials shall be limited to the limits of construction described on the drawings unless otherwise determined by the COR.
E. Construction personnel are prohibited from parking on the Medical Center property. The Contractor will need to make arrangements for parking elsewhere.
F. Workmen are subject to rules of Medical Center applicable to their conduct.
01 00 00 -9
G. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
H. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
I. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J. Phasing: To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR and Contractor.
K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands
01 00 00 -10 and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
L. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.
When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
and 28 05 11, REQUIREMENTS FOR ELECTRONIC SAFETY AND SECURITY
INSTALLATIONS for additional requirements.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, 2 weeks in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
01 00 00 -11
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Medical
Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both to the Contracting Officer.
This report shall list by rooms and spaces:
01 00 00 -12
1. Shall note any discrepancies between drawings and existing conditions at site.
2. Shall designate areas for working space, materials storage and routes of access to areas where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or
Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by
Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR
852.236-88).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, 01 00 00 -13 floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures above and below grade, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by the COR as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third
01 00 00 -14 party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and
"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge
Elimination System (NPDES) permit is required for this project. The
Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements. Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the Contractor's method of operations and operations planning and the Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:
- Designating areas for equipment maintenance and repair;
- Providing waste receptacles at convenient locations and provide regular collection of wastes;
- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;
- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and
01 00 00 -15
- Providing adequately maintained sanitary facilities.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR
52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the
Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
01 00 00 -16
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Professional
Services Industries.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits.
Logs of subsurface exploration are shown diagrammatically on drawings.
C. A copy of the soil report will be made available for inspection by bidders upon request to the COR at the VA Medical Center, and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of
Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The
Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The
Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.
01 00 00 -17
If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, parking lots, are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.
Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
01 00 00 -18
3. Lines and elevations of sewers and of all outside distribution systems.
4. Lines of elevations of all swales and interment areas.
5. Lines and elevations of roads, streets and parking lots.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. Upon completion of the work, the Contractor shall furnish the COR, reproducible and electronic drawings at the scale of the contract drawings, showing the finished grade on the grid developed for constructing the work, including burial monuments and fifty foot stationing along new road centerlines. These drawings shall bear the seal of the registered land surveyor or registered civil engineer.
G. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of
Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.15 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense. When
01 00 00 -19 necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.
C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.
1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to compliance with the following provisions:
1. Permission to use each unit or system must be given by COR. If the equipment is not installed and maintained in accordance with the following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.
Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.
The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
01 00 00 -20
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
1.17 TEMPORARY USE OF EXISTING ELEVATORS
A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.
1.18 TEMPORARY USE OF NEW ELEVATORS
A. The Contractor and his personnel shall be permitted use of new elevator(s) subject to the following provisions:
1. Contractor shall make arrangements with the COR for use of elevator(s). Contractor may obtain elevator(s) for exclusive use.
2. Prior to the use of elevator(s), the Contractor shall have the elevator(s) inspected and accepted by an ASME accredited, certified elevator safety inspector. The acceptance report shall be submitted to the COR.
3. Submit to the COR the schedule and procedures for maintaining equipment. Indicate the day or days of the week and total hours required for maintenance. A report shall be submitted to the COR
01 00 00 -21 monthly indicating the type of maintenance conducted, hours used, and any repairs made to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.