VA STRATTON FACADE PHASE 2B DWG_Pt2.pdf

PDF 15 MB Posted

Attached to
Z1DA--528A8-19-802 HOSPITAL FACADE REPAIRS PHASE 2A
Solicitation number
36C24221B0050
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation number is 36C24221B0050 and is for Hospital Facade Repairs Phase 2A. The opportunity type is a solicitation for facade repairs under phase 2 of the project. The work will be performed for facilities within Veterans Integrated Service Network 2. Responses are due by the date specified in the solicitation document. The contract will be awarded to the responsible bidder whose offer conforms to the solicitation and is most advantageous to the government considering only price and other factors included in the solicitation.

View the file

Other files

File Type Posted
36C24221B0050 0002.docx DOCX document
36C24221B0050 0001.docx DOCX document
Wage Determinations.txt TXT text file
VA STRATTON FACADE PHASE 2B DWG_Pt1.pdf PDF
VA STRATTON 2A FACADE DRAWINGS_FINAL.pdf PDF
VA STRATTON 2A FACADE SPECS_FINAL.pdf PDF
36C24221B0050_2.docx DOCX document
VIEWS 03923953 DRAFT CD - VAAR 819 852 -OGC Concur (003).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

REPLACE CRACKED OR SPALLED MASONRY

STEP CRACKS, UNBONDED AND MISSING MORTAR

ABANDONED ANCHORS/FASTENERS & FILL VOID

REPOINT OPEN MASONRY JOINT,

PARAPET WALL & BRICK VENEER

RESET DISPLACED COPING STONE

REMOVE & REBUILD

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

GENERAL MORTAR NOTES:

PROVIDE NEW SCUPPER

EXTERIOR VIEW CORRESPONDING SIDE

REPAIR PROCEDURE:

INSUFFICIENT STONE REPAIR

REPAIR SPALLED STONE OR

PATCH STONE UNIT

REPLACE OR ADD NEW SEALANT

BACKER ROD & SEALANT

REMOVE & REPLACE

MORTAR & SEALANT

REMOVE & REPLACE

REPAIR PROCEDURE:

REPLACE STONE UNIT & BRICK

REPAIR PROCEDURE:

PATCH CRACKED STONE UNIT

REPAIR PROCEDURE:

Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

RESET DISPLACED LINTEL

FIRE ESCAPES,BALCONIES, RAILINGS, ETC.)

FLASHING TO COVER EXPOSED WOOD

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

CONCRETE IN LIGHT WELLS

REINFORCEMENT DETERIORATION

REPAIR SPALLED CONCRETE

EXPOSED METAL ELEMENTS (COLUMNS,

CLEAN & REPAINT CORROSION AT

SEAL CRACKS IN EXPOSED

REPAIR SPALLED CONCRETE DUE TO

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

SECTION VIEWPLAN VIEW

CONCRETE REPAIR NOTES:

PROVIDE NEW COUNTER-

AND PLATE STEEL FILLER STRIP

DAMAGED/ CORRODED LINTEL

REPAIR CRACKS IN CONCRETE

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

GENERAL FACADE CLEANING

Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

BROKEN OR MISSING, PROVIDE NEW

CABLING / GROUNDING IS DAMAGED /

REPAIR PROCEDURE:

SEAL AROUND ANCHORS

REPAIR PROCEDURE:

REPAIR DAMAGED WINDOW FRAME

FASTENERS ON STUCCO

REPAIR EXPOSED WOOD AND

REPAIR MARRED STUCCO FINISH

REPAIR PROCEDURE:

REPAIR PROCEDURE:

REPAIR PROCEDURE:

ROOF REPAIR AREA

REPAIR PROCEDURE:

REPLACE MISMATCHED EIFS FINISH AREA

AREAS ON ROOF

REPAIR PONDING

REPAIR ROOF DRAIN

RESECURE MECHANICAL EQUIPMENT

REPAIR PROCEDURE:

REPAIR PROCEDURE:

ROOF & PONDING REPAIR:

¾” ”

MECHANICAL EQUIPMENT REPAIR PROCEDURE:

REPAIR PROCEDURE:

DEDUCT ALTERNATE

REMOVE VEGETATION ON BUILDING

REPAIR PROCEDURE:

REPAIR PITCH POCKET

AIR TERMINAL /

SCAFFOLD PLANKS:

ERECTION, ALTERATION AND DISMANTLING:

SUPERVISION:

CERTIFICATES OF COMPETENCY:

SCAFFOLDING REGISTER AND INSPECTION OF SCAFFOLDS:

PROTECTION AND MAINTENANCE:

DUTIES OF PRINCIPALS, CONTRACTORS, SCAFFOLDING

ERECTORS AND USERS OF SCAFFOLDS:

SCAFFOLDING OVER VERANDAHS, GANTRIES OR ROOFS:

LIFTING APPLIANCES MOUNTED ON SCAFFOLDING:

SUSPENDED SCAFFOLDS:

TYPES OF SUSPENDED SCAFFOLDS:

MECHANICAL OPERATION:

ANCHORAGES:

BRACKETS AND PARAPET HOOKS:

WORKING PLATFORMS, GUARDRAILS, MIDRAILS AND TOEBOARDS:

SAFETY HARNESSES AND LIFELINES:

ANTI-TILT SWITCH DEVICES:

ACCESS, WARNING NOTICES AND PROTECTION OF THE PUBLIC:

ENGINEER’S CERTIFICATE:

SCAFFOLD REGISTER:

INSPECTION RECORD:

COUNTERWEIGHTING OF OUTRIGGERS:

FOUNDATIONS:

SUSPENDED SCAFFOLDS:

SIDEWALK SHEDS:

REQUIRED TRAINING:

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

GENERAL NOTE:

SECTION AT PARAPET WALL

8A

SCUPPER

MORTAR & SEALANT

WARD WING AREA

REPLACE

ROD & SEALANT

3A

REPLACE BACKER

ROTATED STONE REPAIR

EXPANSION JOINT AT CORNER

SECTION AT PARAPET WALL

PATCH STONE UNIT DETAIL

MASONRY REPAIR DETAIL

CRACKED OR SPALLED

MASONRY REPAIR DETAIL

CRACKED OR SPALLED

BRICK JOINT REPOINTING DETAIL

BRICK JOINT REPOINTING DETAIL

REPLACE STONE UNIT DETAIL

DETAIL AT BASE OF PARAPET WALL

9A

STONE DIMENSIONS DETAIL

SECTION

VIEW

PLAN

VIEW

DUTCHMAN REPAIR NOTES:

DUTCHMAN REPAIR DETAIL

DETAIL AT STONE/BRICK SUPPORT

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

TYPICAL CONCRETE WALL

PENETRATION DETAIL

TYPICAL SECTION AT SCUPPER

8B

TYPICAL SCUPPER ROOF VIEW

8C

FIRE RATED MASONRY PARTITION

CONDUIT PENETRATION IN

PENETRATION DETAIL

EXTERIOR WALL

NOT USED

SECTION AT WARD PARAPET WALL

MECHANICAL

ROOM

MECHANICAL

ROOM

SECTION AT STAIRWELL SIDE WALL

SECTION AT STAIRWELL END WALL

EIFS PANEL REPLACEMENT

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

NOTES:

TYPICAL SECTION AT LOUVER LINTEL

NOTES:

TYPICAL SECTION AT WINDOW LINTEL

KEY PLAN

A

A

EPDM MEMBRANE SPLICES

4'

COVERBOARD ATTACHMENT DETAIL

4" BEAD SPACING ADHESIVE INSULATION/

ALPHAGUARD BIO BASE COAT

W/ REINFORCEMENT

ALPHAGUARD BIO TOP COAT

(3) THREE PLIES TREMCO ROOF MEMBRANE

SET IN COLD ADHESIVE MENDED WITH

EXISTING ROOF SURFACE AND TERMINATED AT CLEAT

ON PARAPET WALL. REFER TO ROOF PLANS.

TERMINATION BAR

TWO PIECE COUNTERFLASHING

BASE FLASHING - TRA ELASTOMERIC MEMBRANE

PROVIDE & INSTALL NEW POLYISO

INSULATION, THICKNESS AND

SLOPE TOP MATCH EXISTING

EXISTING CONCRETE DECK

TREMSEAL D

R-MER WALL PAN, REMOVED AND RE-INSTALLED

MIN. 22 GA HAT SECTION CLIP

60 MIL. SELF ADHERING UNDERLAYMENT

R-MER WALL PAN CLIP

REMOVE ANY RUST OR LOOSE DEBRIS

AND PRIME WITH M-PRIME BEFORE

APPLYING ALPHAGUARD BIO

ALPHAGUARD BIO W/

REINFORCEMENT

ALPHAGUARD BIO BASE

W/ REINFORCEMENT

EXISTING TREMCO

BUILT-UP ROOF

MEMBRANE

EXISTING INSULATION

EXISTING CONCRETE DECK

TWO PIECE COUNTERFLASHING

Min. 8"

REMOVE ANY RUST

OR LOOSE DEBRIS

AND PRIME WITH

M-PRIME BEFORE

APPLYING

ALPHAGUARD BIO

EXISTING RIGID INSULATION

ALPHAGUARD BIO W/

REINFORCEMENT

4"

ALPHAGUARD BIO BASE

W/ REINFORCEMENT

ALPHAGUARD BIO TOP COAT

EXISTING TREMCO

BUILT-UP ROOF

MEMBRANE

EXISTING CONCRETE DECK

ALPHAGUARD BIO BASE

W/ REINFORCEMENT

ALPHAGUARD BIO TOP COAT

EXISTING TREMCO

BUILT-UP ROOF

MEMBRANE

EXISTING CLAMPING RING AND

ROOF DRAIN DOME TO BE

REMOVED & REPLACED WITH

NEW OR PAINTED AS NOTED.

ALL DOMES SHALL BE METAL &

PAINTED BLACK.

EXISTING 2.5" +/-

RIGID INSULATION

EXISTING 4" +/-

CONCRETE DECK

REPLACE BOLTS WITH S.S. TYPE

WATER CUT-OFF MASTIC

TREMSEAL PITCH

POCKET SEALER, OR

EQUIVALENT.

COMPLETELY FILL

POCKET TO PREVENT

PONDING OF WATER.

METAL PITCH PAN

MINIMUM 4'' HEIGHT w/

METAL HOOD

EXISTING

CONCRETE DECK

EXISTING INSULATION

TREMSEAL D

EXISTING PITCH

POCKET ENCLOSURE

MEMBRANE SPLICE

COMPATIBLE WITH

EXISTING ROOFING

EXISTING BUILT-UP

ROOF MEMBRANE

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

RECONSTRUCTION SECTION

CARLISLE ROOFING

EQUIPMENT PLATFORM DETAIL

TREMCO

VENT STACK DETAIL

TREMCO

ROOF DRAIN DETAIL

TREMCO

ROOF REPAIR DETAIL

TREMCO PARAPET WALL/

PITCH POCKET DETAIL

FIELD TIE-IN DETAIL

GARLAND ROOFING

ROOFING FIELD TIE-IN DETAIL

GARLAND WALL PANEL/

SCUPPER OVERFLOW DETAIL

GARLAND ROOFING

SCUPPER OVERFLOW DETAIL

6A

TREMCO ROOFING

GENERAL NOTES:

GARLAND ROOF & PONDING REPAIR:

¾” ”

ROOFING FIELD TIE-IN DETAIL

5A

COPING/GARLAND

ROOFING FIELD TIE-IN DETAIL

5B

BLDG WALL/GARLAND

Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

PIPING SUPPORT ON ROOF

COOPER B-LINE COOPER B-LINE

COOPER B-LINECOOPER B-LINE

DURABLOK BASE DETAILS

CONSTRUCTION SIGN

SAFETY SIGN

TERMINAL DETAIL

ADHESIVE AIR

SPLICE

TERMINAL DETAIL

TYPICAL RE-INSTALLATION DETAIL

MINIMUM CLASS 1 MATERIAL REQUIREMENTS

LEGEND & SCHEDULE OF

EQUIPMENT TYPICAL OF

MANUFACTURER "HARGER"

Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

GENERAL NOTES (DETAILS 1&3/1-MH-101):

TEMPORARY LOUVER SNORKEL/ EXTENSION DETAILS - TYPICAL1

TYPICAL AC UNIT DETAIL2

GENERAL NOTES:

FRONT VIEWS SIDE VIEW

TEMPORARY LOUVER SNORKEL/ EXTENSION @ ROOF LEVEL (TYPICAL)3

GENERAL EQUIPMENT PROTECTION NOTES:

TEMPORARY BRIDGING OVER EQUIPMENT - TYPICAL4

AIR INTAKE LOUVER PROTECTION FOR USE WITH MAST SCAFFOLDING SYSTEM::

Sheets and Views
2B (1) 1-GI-001-_TS
2B (2) 1-GI-002-1-GI-002
2B (3) 1-AS-001-1-AS-001
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-201
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-202
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-203
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-204
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-205
2B (9) 1-AS-401 (D WING ROOF)-1-AS-401
2B (10) 1-AS-501 DEFICIENCY EXAMPLES-1-AS-501
2B (11) 1-AS-502 DEFICIENCY EXAMPLES-1-AS-502
2B (12) 1-AS-503 DEFICIENCY EXAMPLES-1-AS-503
2B (13) 1-AS-601 SCAFFOLDING DETAILS-1-AS-601
2B (14) 1-AS-602 DETAILS-1-AS-602
2B (15) 1-AS-602A DETAILS-1-AS-602A
2B (16) 1-AS-603 ROOF DETAILS-1-AS-603
2B (17) 1-AS-604 ROOF DETAILS-1-AS-604
2B (18) 1-MH-101 (MECHANICAL SHEETS)-1-MH-101