VA STRATTON FACADE PHASE 2B DWG_Pt1.pdf

PDF 7 MB Posted

Attached to
Z1DA--528A8-19-802 HOSPITAL FACADE REPAIRS PHASE 2A
Solicitation number
36C24221B0050
Issued by

About this file

This document package includes construction drawings and specifications for facade repairs at a Department of Veterans Affairs medical center. The drawings detail repair needs across ten elevations, including cracked masonry, failed sealants, deteriorated roof elements, and cleaning of the overall facade. Repairs are divided into four phases to be completed over a 20-week performance period. Infection control protocols are specified depending on the risk level of adjacent patient areas.

View the file

Other files

File Type Posted
36C24221B0050 0002.docx DOCX document
36C24221B0050 0001.docx DOCX document
Wage Determinations.txt TXT text file
VA STRATTON 2A FACADE DRAWINGS_FINAL.pdf PDF
VA STRATTON 2A FACADE SPECS_FINAL.pdf PDF
36C24221B0050_2.docx DOCX document
VA STRATTON FACADE PHASE 2B DWG_Pt2.pdf PDF
VIEWS 03923953 DRAFT CD - VAAR 819 852 -OGC Concur (003).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE LOCATION

VAMC SIGNATURE BLOCK

DIRECTOR OF MEDICAL CENTER - SIGNATURE BLOCK

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

BUILDING 1

O₂

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

SITE SAFETY & PROPOSED STAGING PLAN

SAFETY NOTES:

LEGEND:

GENERAL NOTES:

O₂

REFERENCE RADIO FREQUENCY EXPOSURE MAPS (NTS):

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

100% CONSTRUCTION DOCUMENTS

PARTIAL KEY PLAN

OVERHEAD VIEW

LEGEND

GENERAL PROJECT PHASING NOTE:

GENERAL NOTES:

CONSTRUCTION PHASING PLAN

20 WEEKS TOTAL

Description of Required Infection Control Precautions by Class

During Construction Project Upon Completion of

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with

HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety

Section and Infection Control Department, and thoroughly cleaned by the owner's Environment

Services Department.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transportation in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C l a s

I V

C l a

I

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers, i.e., sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with

HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Contain construction waste before transport in tightly covered containers.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until completed project is inspected by the owner's Safety

Section and Infection Control Department, and thoroughly cleaned by the owner's Environment

Services Department.

1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety

Department and Infection Control Department, and thoroughly cleaned by the owner’s Environmental

Services Department.

2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

3. Vacuum work area with HEPA filtered vacuums.

4. Wet mop area with disinfectant.

5. Remove isolation of HVAC system in areas where work is being performed.

NOTES:

PATIENT RISK GROUP FOR "TYPE D" CONSTRUCTION

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

Class IV

Class III / IV

Class IV

Class IV

CLEANING BRICKWORK / MASONRY PROCEDURE:

PERFORMANCE SPECIFICATION:

FACADE CLEANING (KEYED NOTES 60, 61 & 62)

DURATION DESCRIPTION

Weeks 1-3 Submittals & Mobilization

Weeks 4-7 PHASE 1 (D-Wing Parapet)

Weeks 8-11 PHASE 2 (D-Wing Roof)

Weeks 12-15 PHASE 3 (D-Wing Repairs & Cleaning - AS-201 & AS-202)

Weeks 16-19 PHASE 4 (D-Wing Repairs & Cleaning - AS-203 & AS-204)

Week 20 Project Closeout:

Including: Closeout Documents, demobilization, etc.

Project Duration: 100 Days

Notes:

1. Certain activities may be combined for expediency.

2. All phasing and work is subject to the owner occupancy schedule.

3. All work needs to be coordinated with the COR in advance.

4. There will be no re-mobilization cost permitted. All work must be completed in allotted time frame.

5. Refer to spec section 01 32 16.15 for more information on Project

Scheduling Requirements.

11 4

4 5

ELEVATION D-1

ELEVATION D-2

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

PROVIDE NEW COUNTERFLASHING TO COVER

EXPOSED WOOD

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

LARGE BRICK AREA REPAIR DETAIL3

GENERAL NOTES:

ELEVATION D-3

979797

DEDUCT ALTERNATE

DEDUCT ALTERNATE

ELEVATION D-4

2 3

11 11

15 72

97 97 97 97 97 97 97 97 97

DEDUCT ALTERNATE

DEDUCT ALTERNATE

DEDUCT ALTERNATE

11 10

A

A

A-A

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

TYPICAL DETAIL3

GENERAL NOTE:

GENERAL NOTES:

QUOTATION & REPAIR:

TYPICAL DETAIL3

ELEVATION D-6

ELEVATION D-5

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

GENERAL NOTES:

ELEVATION D-7

11 1111

11 1

3 15

ELEVATION D-8

2 50

A

A

A-A

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

GENERAL NOTE:

GENERAL NOTES:

ELEVATION D-9

3 15

11 11

10 11

A

A

ELEVATION D-10

A-A

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

GENERAL NOTE:

GENERAL NOTES:

RA 30

RA 28

RA 27

RA 29

ROOF #5D

CORE

ROOF #4A

CORE

ROOF #3C

CORE

ROOF #3C

CORE

ROOF #5C

R

O

O

F

D

N

O

T

N

S

C

O

P

E

NOT IN SCOPE

D-WING ROOF PLAN

ENGINEERING LLPFE PROJECT NO: 19-092

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601

REPAIR CRACKS IN CONCRETE.

REPAIR SPALLED CONCRETE

REPAIR DAMAGED WINDOW FRAME

NOT USED

NOT USED

REPAIR EXPOSED WOOD AND FASTENERS ON STUCCO

REMOVE VEGETATION ON BUILDING95

96 REPAIR MARRED STUCCO FINISH

100% CONSTRUCTION DOCUMENTS

97 REPLACE MISMATCHED EIFS FINISHED AREA

112 RESECURE MECHANICAL EQUIPMENT

MASONRY

SEALANT

SEAL ROUND ANCHORS

STONE

KEYED NOTE LEGEND

ROOF EQUIPMENT

1 REPLACE CRACKED, BROKEN OR SPALLED MASONRY

REPOINT OPEN MASONRY JOINTS, STEP CRACKS OR

UNBOUNDED & MISSING MORTAR

REMOVE ABANDONED ANCHORS/FASTENERS & FILL VOID

REMOVE & REBUILD PARAPET WALL & BRICK VENEER

PATCH STONE UNIT, SEE DETAIL 6/AS-602.

REPLACE STONE UNIT & BRICK

PATCH CRACKED STONE UNIT

REPAIR SPALLED STONE OR INSUFFICIENT PAST STONE REPAIR

REPLACE OR ADD NEW SEALANT

REMOVE & REPLACE MORTAR & SEALANT

SEAL CRACKS IN EXPOSED CONCRETE IN LIGHT WELLS

REPAIR SPALLED CONCRETE DUE TO REINFORCEMENT

DETERIORATION

WINDOWS

NOT USED.

CONCRETE

ROOF REPAIR AREA

REPAIR PITCH POCKET

ROOF

NOT USED

111 AIR TERMINAL / CABLING / GROUNDING IS DAMAGED /

BROKEN OR MISSING, PROVIDE NEW

PROVIDE NEW SCUPPER

CLEAN & REPAINT CORROSION AT EXPOSED METAL

ELEMENTS (COLUMNS, STAIRS & LADDERS, RAILINGS, ETC.)

REPAIR PONDING AREAS ON ROOF

REPAIR ROOF DRAIN

DESCRIPTIONREPAIR

PROCEDURE

& DETAILS

1/1-AS-501 &

1/1-AS-602

LINTELS /

SHELF ANGLES

RESET DISPLACED LINTEL

METAL WORK

CLEANING

CLEAN ALGAE & DIRT BUILDUP

CLEAN CORROSION STAINING ON SURFACE

GENERAL FACADE CLEANING62

MISCELLANEOUS

DAMAGED / CORRODED LINTEL AND PLATE

STEEL FILLER STRIP

NOT USED

NOT USED

2/1-AS-501 &

2/1-AS-602

3/1-AS-501

4/1-AS-501 &

8A, 8B &

8C/1-AS-602

5/1-AS-501, 9 &

9A/1-AS-602 &

2-4/1-AS-602A

10/1-AS-501

& 6/1-AS-602

11/1-AS-501

& 7/1-AS-602

13/1-AS-501

& 16/1-AS-602

15/1-AS-501

& 16/1-AS-602

30/1-AS-501 &

10-12/1-AS-602

31/1-AS-501

& 3/1-AS-602

41/1-AS-502 &

4,5&13/1-AS-602

42/1-AS-502 &

5&6/1-AS-602A

50/1-AS-502

60/1-AS-502

61/1-AS-502

62/1-AS-502

70/1-AS-502

72/1-AS-502

90/1-AS-503

100/1-AS-503 &

4&7/1-AS-603

101/1-AS-503

& 11/1-AS-603

103/1-AS-503 &

3,4&7/1-AS-603

110/AS-503 &

10/AS-603

111/1-AS-503 &

3-5/1-AS-604

32 REMOVE & REPLACE BACKER ROD & SEALANT32/1-AS-501 &

3A/1-AS-602

51 NOT USED.

71/1-AS-502

73/1-AS-502

82/1-AS-503

112/1-AS-503

94/1-AS-503

96/1-AS-503

97/1-AS-503 &

1/1-AS-602A

52/1-AS-502

COPING

20 RESET DISPLACED COPING STONE20/1-AS-501

NOT USED.

NOT USED

95/1-AS-503

GENERAL NOTES:

LEGEND

AREA OF WORK

RA-30 STAIRWELL ELEVATIONS

RA-29 STAIRWELL ELEVATIONS

NOTE:

Sheets and Views
2B (1) 1-GI-001-_TS
2B (2) 1-GI-002-1-GI-002
2B (3) 1-AS-001-1-AS-001
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-201
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-202
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-203
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-204
2B (4-8) 1-AS-201 THRU 1-AS-205 (D WING FACADE)-1-AS-205
2B (9) 1-AS-401 (D WING ROOF)-1-AS-401
2B (10) 1-AS-501 DEFICIENCY EXAMPLES-1-AS-501
2B (11) 1-AS-502 DEFICIENCY EXAMPLES-1-AS-502
2B (12) 1-AS-503 DEFICIENCY EXAMPLES-1-AS-503
2B (13) 1-AS-601 SCAFFOLDING DETAILS-1-AS-601
2B (14) 1-AS-602 DETAILS-1-AS-602
2B (15) 1-AS-602A DETAILS-1-AS-602A
2B (16) 1-AS-603 ROOF DETAILS-1-AS-603
2B (17) 1-AS-604 ROOF DETAILS-1-AS-604
2B (18) 1-MH-101 (MECHANICAL SHEETS)-1-MH-101

File details come from the government source that posted it. Updated .