VA-CWV RHS Bid Documents - Submittal Register - Copy.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Z2DA-- Repair Hillside Slip 540-23-104 Clarksburg VAMC
Solicitation number
36C24524B0023
Issued by

About this file

This is a submittal register spreadsheet for a hillside slip repair project at the Clarksburg VA Medical Center (Project #540-23-104). The document outlines required contractor submissions across multiple specification sections including general requirements, project schedules, safety requirements, quality control, and technical specifications.

Key technical submittals include security plans, warranty management, testing/commissioning plans, accident prevention plans, environmental protection plans, and specific engineering submissions for earthwork, dewatering, and geopier plate pile installation. The register is organized by specification section and includes fields for submittal description, scheduled submission date, actual submission date, and action taken. While specific dates are referenced (last updated 7/24/24), most submission dates are blank as this appears to be a planning document. The project manager is identified as Claire O'Connor, AIA, and the work involves both construction and landscaping components based on the inclusion of planting specifications.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SUBMITTAL REGISTER

Project Name:REPAIR HILLSIDE SLIP
Project Number:540-23-104
Project Manager:CLAIRE O'CONNOR, AIA
Last Updated:7/24/24

SUBMITTAL NUMBER SPECIFICATION TITLE SPECIFICATION SECTION SUBSECTION SUBMITTAL DESCRIPTION SCHEDULED DATE OF SUBMITTAL ACTUAL DATE SUBMITTED DATE RETURNED ACTION TAKEN ON SUBMITTAL COMMENTS

GENERAL REQUIREMENTS01 00 001.5.ASecurity Plan
1.5.E.1Electronic Security Memorandum
1.5.F.1Vehicle Authorization Request
1.6.K.2Service Interruption Requests
1.15.AWarranty Management Plan
1.15.DWarranty Item Repair Report
1.15.EWarranty Tag Record Copies
1.24.ATesting and Commissioning Plan
1.25.AMaintenance and Operating Manuals
1.25.CVA Employee Training
PROJECT SCHEDULES01 32 16.151.3.ASub Contractor Qualifications
1.4.AMonthly Time/Cost Schedules/Reports
1.5.Project Schedule
1.6.CResponsibility Code
1.7.BWorking Days/Shift Information
1.7.DSchedule Data Electonic File
1.8.APayment Application and Certification
1.11.ARevised Schedule Data Electronic File
1.12.CAdjustment of Contract Completion Request

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 33 23 1.3 Submittal Register

SAFETY REQUIREMENTS01 35 261.4.A.Accident Prevention Plan
1.5.A.Activity Hazard Analysis
1.7.A.SSHO
1.8.ETraining Records
1.14.AFire Safety Plan
1.19.CDetailed Lift Plan
1.21.BConfined Space Entry Plan

REFERENCE STANDARDS 01 42 19 n/a

QUALITY CONTROL01 45 001.3.1.Preconstruction Submittals
1.3.2.Design Data
1.3.3.Test Reports
TESTING LABORATORY SERVICES01 45 291.3.AAccreditation Requirements
1.3.CTest Reports

TEMPORARY ENVIRONMENTAL CONTROLS 01 57 19 1.4.1. Environmental Protection Plan

CONSTRUCTION WASTE MANAGEMENT01 74 191.5.B.Demolition Debris Management Plan
1.5.DMonthly Debris Diversion Summary

SITE SURVEY 02 21 13 1.3.B. Survey Drawings

EARTHWORK31 20 111.7.CSubmittals
3.2.BWeekly Excavation Drainage Performance Records
DEWATERING31 23 191.5.BDrawings and Design Data
1.5.CInspection Reports
1.5.DRequired Permits
GEOPIER SRT PLATE PILE INSTALLATION31 62 001.05.ADesign Calculations
1.05.BProfessional Liability Insurance
1.05.CDaily SRT Plate Piles Progress Reports
PLANTING32 90 001.6.BManufacturer's Literature and Data
1.6.CTest Reports
1.6.DCertificates
1.6.EQualifications
1.6.FOperation and Maintenance Data