VA AMR Elec Bid Set Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25723B0032
About this file
This package includes construction drawings and specifications for an electrical upgrade project at the Thomas E. Creek VA Medical Center in Amarillo, Texas. The project involves replacing aging electrical infrastructure to provide a new primary electrical feed to Building 1 on the campus. Key project details include installing new pad-mounted transformers with integral loop-feed switches to supply 13.2kV power to the building from the existing utility service. Underground duct banks and cables will be installed to connect the new transformers to the existing electrical network. A new exterior switchboard and related equipment will be installed to distribute 480V power throughout the building. Additional work involves upgrading panels, transformers, and transfer switches within Building 1 to support the new electrical infrastructure. The project will be completed in multiple phases to maintain operational capacity while minimizing disruptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0032 0003_1.docx | DOCX document | |
| 36C25723B0032 0003 VA Amarillo RFI Responses 040823.pdf | ||
| 36C25723B0032 0002_1.docx | DOCX document | |
| R311451 VA Amarillo - ADDENDUM A (RFI) 032923.pdf | ||
| 36C25723B0032 0001 Amendment.pdf | ||
| 36C25723B0032 0001_1.docx | DOCX document | |
| 36C25723B0032 Solicitation.pdf | ||
| VA AMR Elec Bid Set Specifications.pdf | ||
| 36C25723B0032_2.docx | DOCX document | |
| VA AMR Elec Bid Set Narrative.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
6010 Amarillo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
THOMAS E. CREEK VA MEDICAL CENTER
22 DEC 2021
504-21-120
DLAL
PROVIDE PRIMARY
ELECTRICAL FEED TO
BUILDING 1
100% BID SET SUBMISSION
COVER SHEET
GI100
-2
-1
G I1
.p d f
Department of Veterans Affairs
A/E PROVIDE PRIMARY ELECTRICAL
FEED TO BUILDING 1
THOMAS E. CREEK VA MEDICAL CENTER
6010 AMARILLO BLVD.
AMARILLO, TX 79106
LOCATION MAP DRAWING LIST
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
APPROVALS
GENERAL INFORMATION
GI100 COVER SHEET
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
ELECTRICAL
E-001 ELECTRICAL ABBREVIATIONS, LEGEND, AND SYMBOLS
E-010 ELECTRICAL SITE PLAN
E-011 ENLARGED SITE PLAN
E-100 ELECTRICAL PLAN - BUILDINGS 1 & 4
ED-201 ENLARGED DEMOLITION PLAN - BUILDING 1
E-201 ENLARGED ELECTRICAL PLAN - BUILDING 1
E-202 ENLARGED PLANS - BUILDINGS 4 & 7
E-301 ELECTRICAL DETAILS
ED-401 ELECTRICAL DEMOLITION - RISER DIAGRAM
E-401 ELECTRICAL RISER DIAGRAM
E-402 ELECTRICAL ONE-LINE DIAGRAM
E-501 BUILDING 1 - PANEL SCHEDULES
E-502 BUILDING 1 - PANEL SCHEDULES
E-503 BUILDING 1 - PANEL SCHEDULES
E-504 BUILDING 1 - PANEL SCHEDULES
E-505 BUILDING 1 - PANEL SCHEDULES
E-506 BUILDING 7 - PANEL SCHEDULES
PROJECT DIRECTORY
CONTRACTING OFFICER REPRESENTATIVE (COR)
Samuel Hagins
Thomas E Creek VAMC 6010 Amarrilo Blvd. West Amarillo, TX 79106
PHONE: (432) 270-8124
Joshua.Junkin@va.gov
ARCHITECT
CB DESIGN GROUP
421 King Street Suite 301
PHONE: (703) 772-4213
Wes Bridges wbridges@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
HUITT-ZOLLARS INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102
PHONE: (817) 335-3000
Joel Colwell jcolwell@Huitt-Zollars.com
CONTRACTING OFFICER (CO)
Andres Garcia
VISN 17 NCO
2002 Scott Blvd.
Temple, TX 76504
PHONE: (254) 899-6028
Andres.Garcia@va.gov
N.T.S.
100% BID SET SUBMISSION
BLDG 1
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT
INDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
NORTH ARROW
FEC
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 3/16"
D2
XX-XX
XXxxx
XXxxx
CL
XXxxx x'-x" VERTICAL HEIGHT INDICATOR
REVISION
REVISION CLOUD
NORTH
BREAK LINE
X
DEMOLITION KEYNOTE
NEW ROOM NAME AND NUMBERCORRIDOR
C2
XX
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
WALL MOUNTED FIRE EXTINGUISHERFE
XX
SHEET WHERE
DRAWN
ELEVATION NUMBER
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN
MAY NOT BE USED ON THIS PROJECT.
CERTAIN COMMON ABBREVIATIONS
MAY NOT BE SHOWN.
L
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
6010 Amarillo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
THOMAS E. CREEK VA MEDICAL CENTER
22 DEC 2021
504-21-120
DLAL
PROVIDE PRIMARY
ELECTRICAL FEED TO
BUILDING 1
100% BID SET SUBMISSION
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-2
-1
G I2
.p d f
SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONSGENERAL CONDITION NOTES
1. THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A
JCAHO INSPECTION.
2. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF
ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL
DAYTIME WORKING HOURS.
3. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET- UP TEMPORARY/ PERMANENT CONSTRUCTION/ ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE
AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE
RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND
RESIDENCE.
4. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION AND
ERECTION.
5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE CONSTRUCTION MEANS, METHODS, PROCEDURES AND SEQUENCES TO INSURE THE SAFETY OF THE
EXISTING BUILDING AND OCCUPANTS.
6. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD
CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.
7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED
FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING
CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE COMPLETELY, FROM
PLANE TO PLANE. TREAT REMAINING SUBSURFACE TO RECEIVE NEW FINISHES SPECIFIED.
8. EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVABLE EQUIPMENT
NOT ALREADY DESIGNATED FOR REINSTALLATION/ REUSE, PRIOR TO COMMENCING WORK.
9. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS
OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.
10. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF
EXISTING CONDITIONS.
BLDG 1
G1 ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR
CONDITIONS ON THE JOB.
G2 SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE
SHOULD BE DIRECTED TO THE ARCHITECT DURING THE BID PERIOD.
G3 ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
G4 REFER TO ELECTRICAL DRAWINGS FOR NOTED PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID CONFLICTS IN THE
FIELD.
G5 ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTED SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR
FUNCTION ELSEWHERE IN THE BUILDING.
G6 WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, AND PILASTERS.
G7 ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVRES, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
G8 FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK, AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL." CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER
INSTALLATION OF THE NEW WORK.
G9 SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
G10 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
G11 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.
G12 WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
G13 IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G14 EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
G15 AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
G16 CONSULT ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR ANCHORING
G17 ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
G18 ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF
DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
G19 ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
G20 SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENT OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G21 CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION
OF THE WORK.
G22 PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
G23 PATCH ALL HOLES IN FLOORS, WALLS, AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
G24 UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC." IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP
DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE/DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
G25 THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED.
IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION OF AN APPARENT DISCREPANCY BETWEEN DRAWINGS AND/OR SPECIFICATIONS DURING THE BIDDING PHASE. OTHERWISE, THE CONTRACTOR SHALL ASSUME THE MOST STRINGENT (TYPICALLY THE MOST
EXPENSIVE) REQUIREMENT SHALL APPLY
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR
TO THE START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR E-CIGARRETES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND
VENDORS EFFECTIVE OCTOBER 1, 2019.
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING
(EFFECTIVE FOR POLLEN, MOLD SPORES
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA MASTER SPECIFICATIONS
10. VA SUSTAINABLE DESIGN MANUAL
1. THESE PLANS DEPICT AREAS WHERE MATERIAL SAMPLES SHOWED THE PRESENCE OF ASBESTOS CONTAINING MATERIALS AND / OR LEAD- BASED PAINT. THESE PLANS ARE ONLY REPRESENTATIVE OF A LIMITED NUMBER OF SAMPLES AND SHALL NOT BE ASSUMED TO BE THE ONLY
LOCATIONS OF THESE MATERIALS.
2. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT CONTAIN LEAD-BASED PAINT (LBP):
2.1. OFF-WHITE PLASTER WALLS
2.2. WHITE METAL RADIATOR COVERS
2.3. CERAMIC TILE WALLS AND FLOORS
2.4. OFF-WHITE METAL DOOR FRAMES
2.5. BROWN PLASTER BASEBOARD
2.6. RED PLASTER FIRE CABINETS
2.7. OFF-WHITE METAL / PLASTER PIPE COLUMNS
2.8. OFF-WHITE BRICK / DRYWALL / PLASTER WALLS
3. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT ARE ASBESTOS CONTAINING MATERIALS
(ACM):
3.1. AIRCELL TSI INSULATION - WHITE AND GRAY
3.2. WHITE TSI
3.3. RAISED FLOOR FOOT MASTIC - BLACK
3.4. TAN VINYL FLOOR TILE (VFT)
3.5. BLACK MASTIC ASSOCIATED WITH BEIGE VFT
3.6. OFF-WHITE FIBERGLASS BRIDGING PAINT
3.7. MIXED CARPET MASTIC - BLACK / YELLOW
4. CONTRACTOR SHALL ASSUME THAT ACM'S ARE PRESENT WITHIN CONCEALED SPACES SUCH AS PIPE CHASES AND THE CRAWL SPACE AND
SHALL REMOVE AND DISPOSE OF ALL SUCH MATERIALS ENCOUNTERED.
5. MATERIALS INDICATED ON THIS PLAN SERVE ONLY TO ALERT THE CONTRACTOR TO THEIR PRESENCE ON THIS PROJECT. EPA REGULATIONS STIPULATE THAT IF ONE SAMPLE OF A MATERIAL IS FOUND TO CONTAIN ASBESTOS THEN THE ENTIRE QUANTITY OF THAT MATERIAL CONTAINS ASBESTOS, REGARDLESS OF ADDITIONAL ANALYSIS. CONTRACTOR SHALL REMOVE ALL SIMILAR MATERIALS WITHIN THE ENTIRE PROJECT
SCOPE.
6. THIS PLAN IS BASED ON THE "HAZARDOUS MATERIALS SURVEY REPORT DATED OCTOBER 25, 2019 BY ECS, LTD." AND SERVES ONLY AS A SUMMARY OF SOME INFORMATION FOUND IN THAT DOCUMENT. REFER TO SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT, 02 83 33.13 LEAD-BASED PAINT REMOVAL & DISPOSAL AND THE "HAZARDOUS MATERIALS SURVEY", INCLUDED IN THE PROJECT SPECIFICATION MANUAL, FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
ICRA MATRIX
CONSTRUCTION PROJECT TYPE
A B C D
LOW I II II III/IV
MEDIUM I II III IV
HIGH I II III/IV IV
HIGHEST II III/IV III/IV IV
PATIENT
RISK GROUP
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
1. Clean any dust/debris generated by project.
C
LA
S
I
1. Provide active means to prevent airborne dust from dispersing into atmosphere.
2. Water mist work surfaces to control dust while cutting.
3. Seal unused doors with duct tape.
4. Block off and seal air vents.
5. Place dust mat at entrance and exit of work area.
6. Remove or isolate HVAC system in areas where work is being performed.
1. Contain construction waste before transport in tightly covered containers.
2. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
3. Remove isolation of HVAC system when job is completed.
4. Clean tracked dust/debris in common areas as needed; clean area at the end if the work day.
5. Area should be terminally cleaned by Environmental Services prior to use.
C
LA
II
1. Remove or isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum or vacuuming prior to exit) before construction begins).
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units; or HEPA air scrubber if unable to achieve negative pressure; filter changed as needed.
4. Maintain sticky mats at entrance. Avoid tracking dust/debris outside of work area, clean area as needed.
5. Contain construction waste before transport in tightly covered containers.
1. Do not remove barriers from work area until project is completed and dirt and debris has been removed.
2. Wet mop and/or vacuum work area with HEPA filtered vacuum.
3. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
4. Remove isolation of HVAC system in areas where work is being performed.
5. Area should be terminally cleaned by Environmental Management
Services Department prior to use
C
LA
III
1. Remove or isolate HVAC system in areas where work is being done to prevent contamination of duct system.
2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum or vacuuming prior to exit) before construction begins.
3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
4. Seal holes, pipes, conduits, and punctures appropriately.
5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.
6. All personnel entering work site area required to wear shoe covers.
Shoe covers must be changed each time the worker exits the work area.
7. Do not remove barriers from work area until project is completed project and inspected.
8. Area should be terminally cleaned by the owner’s Environmental Services Department prior to use.
1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering unless solid lid.
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
C
LA
IV
F
FLUSH
D O
O R
H E
IG
H
T
AS SCHEDULE
DOOR WIDTH
TYPE 1
(HM - DOOR)
DOOR WIDTH
2" T
Y P
D O
O R
H E
IG
H
T
6" D
O O
R S
TO
P
W A
LL
T
H
IC
K N
E S
S
C O
O R
D W
9/
9/
" UON
4"
2" 5/8"
/1 6"
/1 6"
WALL WHERE SHOWN IN
PLAN
DOOR
JAMB ANCHOR
SEALANT TYP. BOTH SIDES,
FULL PERIMETER
5/8" GWB EA. SIDE
H.M. DOOR FRAME
WALL THICKNESS
COORD W/
9/16" 9/16"
2" 5/
8"
1 15/16"1 15/16"
DOOR
JAMB ANCHOR
METAL TRACK
SEALANT TYP. BOTH SIDES,
FULL PERIMITER
5/8" GWB EA. SIDE
METAL STUD BOX HEADER
H.M. DOOR FRAME
SECTION EXISTING FLOOR FINISH/ BASE
UNDERSIDE OF STRUCTURE
EXISTING FINISHED CEILING
SYSTEM
METAL "C-H" STUDS (20 GA.) @ 24" O.C. W/
1" GYP. BD. SHAFTLINER (UPPER SIDE) &
5/8" TYPE "X" GYP. BD. OPPOSITE SIDE.
FIRE RATED PARTITION U.L. DES. NO. U415
RUNNER CHANNEL SET IN TWO CONT. BEADS
OF SEALANT AND FASTENED TO STUDS
SOUND ATTENUATION BLANKET INSUL.
METAL STUDS W/ 5/8" TYPE "X" GYP. BD., EACH
SIDE. FIRE RATED PARTITION UL DES. NO 465
OUTLINE OF EXISTING WALL
RUNNER CHANNEL MECHANICALLY FASTENED
TO FLOOR, APPLY TWO CONT. BEADS OF FIRE/
ACOUSTICAL SEALANT AT EACH SIDE
HEAVY WEIGHT RESIN PAPER EXTEND 8" EACH
SIDE MIN. OF TEMPORARY PARTITION.
NOTE: IF NOT PHYSICALLY FEASIBLE TO EXTEND THE TEMPORARY
PARTITION FULL HEIGHT TO UNDERSIDE OF STRUCTURE ABOVE RETURN
PARTITION PERPENDICULAR TO WALL/ SOFFIT TO ENCLOSE WORK AREA
B
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
6010 Amarillo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
THOMAS E. CREEK VA MEDICAL CENTER
22 DEC 2021
504-21-120
DLAL
PROVIDE PRIMARY
ELECTRICAL FEED TO
BUILDING 1
100% BID SET SUBMISSION
GENERAL NOTES
GI300
-2
-1
G I3
.p d f
GENERAL NOTESHAZARDOUS MATERIALS NOTES
REFERENCES
SMOKING POLICY
ENVIRONMENTAL CONTROL NOTES
MEDICAL WASTE NOTES
(THESE NOTES APPLY TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS)
APPLICABLE CODES
MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)
NFPA 101 - 2018 LIFE SAFETY CODE
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE
AMERICAN SOCIETY OF CIVIL ENGINEERS - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES - ASCE7-16
INTERNATIONAL BUILDING CODE (IBC) - 2018
NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
ICRA NOTES
1. PROVIDE TEMPORARY/ PERMANENT RATED ICRA PARTITIONS AS REQUIRED. CONTRACTOR SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR
TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS SHALL AUTOMATICALLY LOCK
UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL ICRA DOORS.
4. CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS PERTAINING TO SILICA AND DUST CONTAINMENT/ REMEDIATION.
5. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
6. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, AND PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS.
7. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY
MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE FOR MONITORING.
8. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/ OR FIRE SEAL AS REQUIRED.
9. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
10. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE
WORK AREA.
11. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
12. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.
13. CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS THROUGH THE FACILITY.
14. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
15. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
16. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING
UNLESS SOLID LID.
17. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT.
BLDG 1
ICRA REFERENCE NOTES
1. Barrier Walls:
a. The construction areas MUST be kept separated from patient care areas by barriers that keep the dust and dirt inside the worksite.
b. The walls must provide a complete seal of the construction area from adjacent areas (walls may be rigid or 4 or 6 mil thickness plastic).
2. Environmental Control:
a. Negative air pressure must be maintained within the construction area when possible. If unable to maintain negative pressure a HEPA air-scrubber must be used and left on for the duration of the project (24/7).
b. Demolition debris is removed in tightly fitted covered carts – use specified traffic patterns.
c. Sticky or walk-off mats are placed immediately outside the construction zone and changed whenever necessary to control the spread of dust and dirt.
d. Exterior window seals are to be used to reduce the amount of outside excavation debris coming into the building.
e. If demolition chutes are used, they must be sealed when not in use; the chute and damper should be sprayed with water, as necessary to maintain dust control.
f. Control, collection and disposal must be provided for any drain liquid or sludge found when demolishing plumbing.
1. Traffic Control:
a. Use designated entry and exit procedures.
b. Keep all egress pathways free of debris.
c. No unauthorized personnel should be allowed to enter construction areas.
d. Use designated elevators only.
2. Cleaning:
a. Keep the construction area clean on a daily basis.
b. Dust and dirt must be kept to a minimum.
3. Workers:
a. Clothing must be free of loose soil and debris when exiting the construction area.
b. Use personal protective equipment (masks, face shields, etc.) as indicated for the task at hand.
DOOR TYPE DOOR FRAME TYPE LEGEND
EPY EPOXY FLOORING
EX EXISTING
HW HARDWARE SET (FINISH OR BUILDER'S HARDWARE)
P PAINT (EXTERIOR AND INTERIOR; TRANSPARENT, SEMI-TRANSPARENT, AND OPAQUE FINISHES) RB RESILIENT BASE (RUBBER OR VINYL WITH FACTORY FORMED INSIDE AND OUTSIDE CORNERS)
HM HOLLOW METAL
1 1/2" = 1'-0"H5
TYP. DOOR JAMB DTL.
1 1/2" = 1'-0"H3
TYP. DOOR HEAD DTL.
1 1/2" = 1'-0"3
WALL TYPE "B" @ ICRA BARRIER
DOOR NO. ROOM NAME
DOOR FRAME
DOOR LABEL
FIRE RATING HARDWARE SET REMARKS
NOMINAL SIZE
TYPE MATL MATL TYPE
SECTIONS
WIDTH HEIGHT THK. JAMB HEAD SILL
1 CORRIDOR 3' - 0" 7' - 0" 1 3/4" 1 H5 / GI300 H3 / GI300 DR: 45 HW - 5 TEMP. ICRA DOORM: HM, F: PM: HM, F: PF
* GC TO COORDINATE LOCATION OF TEMPORARY ICRA BARRIER IN FIELD WITH
COR OR VA REPRESENTATIVE. PROVIDE "STICKY WALK - OFF" DUST MAT
ELECTRICAL CONNECTION (NON-MOTOR); SQUARE
DENOTES CONNECTION TO WALL MOUNTED
DEVICE, CIRCLE DENOTES CONNECTION TO
CEILING OR FLOOR MOUNTED DEVICE.
JUNCTION BOX; SQUARE DENOTES WALL MOUNTED,
CIRCLE DENOTES CEILING OR FLOOR MOUNTED
BRANCH PANELBOARD WITH WORKING CLEARANCE,
208/120V
DISTRIBUTION PANELBOARD WITH WORKING
CLEARANCE, 480/277V
DISCONNECT SWITCH
FUSED DISCONNECT SWITCH
COMBINATION MAGNETIC MOTOR STARTER
EMERGENCY POWER OFF MUSHROOM HEAD BUTTON
WITH CLEAR COVER
3/4" Ø x 10'L COPPER CLAD STEEL GROUNDING ROD
DUPLEX RECEPTACLE, 125V, 20A, 2P, 3W
NEMA 5-20R
SINGLE RECEPTACLE, 125V, 20A, 2P, 3W
NEMA 5-20R
CLOCK HANGER SINGLE RECEPTACLE, 125V, 20A, 2P, 3W
NEMA 5-20R
QUADRAPLEX RECEPTACLE, 125V, 20A, 2P, 3W
NEMA 5-20R
DUPLEX RECEPTACLE, MOUNTED 6" (0.15m) ABOVE
COUNTER OR BACKSPLASH,125V, 20A, 2P, 3W, NEMA 5-20R
5-30R
SPECIAL PURPOSE RECEPTACLE, 125V, 30A, 2P, 3W
NEMA 5-30R
E
ELECTRICAL SYMBOLSRECEPTACLE SYMBOLS
GFI
DUPLEX RECEPTACLE, 125V, 20A, 2P, 3W, NEMA 5-20R,
(GROUND FAULT CIRCUIT INTERRUPTER)
SINGLE OR THREE PHASE MOTOR ELECTRICAL
CONNECTION
WIRE/CONDUIT EXPOSED
UNDERGROUND DUCT BANK - ELECTRIC
GROUND BUS
J
LP-5:7
TYPICAL RECEPTACLE CIRCUIT DESIGNATION
TRANSFORMER, REFER TO TRANSFORMER SCHEDULE
ON E-504 FOR ADDITIONAL INFORMATION
WIRE/CONDUIT CONCEALED
J
VARIABLE FREQUENCY DRIVE WITH HORSEPOWER
DESIGNATION, REFER TO VFD SCHEDULE ON 2E-603
FOR ADDITIONAL INFORMATION
(LP-5) INDICATES PANEL DESIGNATION, (7) INDICATES
CIRCUIT BREAKER NUMBER. PROVIDE 20A/1P AND 2#12
FOR EACH CIRCUIT NUMBER & 1#12G, IN 3/4 " CONDUIT,
UNLESS OTHERWISE NOTED OR SCHEDULED.
WIRE/CONDUIT CONCRETE ENCASED OR DIRECT
BURIED
HOME RUN INDICATION WITH PANEL DESIGNATION
(LP-5) AND CIRCUIT No.(7). PROVIDE 20A/1P BREAKER
AND 2 #12 & 1 #12G IN 3/4" CONDUIT, UNLESS
OTHERWISE INDICATED.
T
VFD-#
LP-5:7
M
SINGLE POLE SWITCH, 20A, 120-277VACS
RECESSED FLOOR BOX
SINGLE RECEPTACLE, 125V, 20A, 2P, 3W
NEMA 5-15RL
SPECIAL PURPOSE RECEPTACLE, COORDINATE NEMA
CONFIGURATION WITH EQUIPMENT
BRANCH PANELBOARD WITH WORKING CLEARANCE,
480/277V
EPO
AUTOMATIC TRANSFER SWITCH WITH AMPERE
DESIGNATION
ATS-#
SWITCHBOARD WITH WORKING CLEARANCE, 480/277V
INDOOR 15KV METAL CLAD SWITCHGEAR WITH
WORKING CLEARANCE
INDOOR UNIT SUBSTATION WITH WORKING
CLEARANCE 480V
HANDHOLEHH
DEMOLITION SYMBOLS
EXISTING PANELBOARD
EXISTING SECURITY CONTROL BOX
EXISTING RECEPTACLE
E E
ELECTRICAL ABBREVIATIONS
A, AMP AMPERES
AC ALTERNATING CURRENT
AF AMPERE FRAME (CIRCUIT BREAKER)
AFF ABOVE FINISHED FLOOR
AFU AMPERE FUSE
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
AT AMPERE TRIP (CIRCUIT BREAKER)
ATS AUTOMATIC TRANSFER SWITCH
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
C CONDUIT
CAT CATERGORY
CC CONTROL COIL
CCTV CLOSED CIRCUIT TELEVISION
CIB CCTV INTERFACE BOX
CT CURRENT TRANSFORMER
DC DIRECT CURRENT
DEMO DEMOLITION
DIA DIAMETER
DPM DIGITAL POWER METER
AV AUDIO VISUAL
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
DP DISTRIBUTION PANELBOARD
EO ELECTRICALLY OPERATED
EOL END OF LINE
EPO EMERGENCY POWER OFF
EQ EQUAL
EWC ELECTRIC WATER COOLER
EX EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FDS FUSED DISCONNECT SWITCH
FLA FULL LOAD AMPERE
FLR, FL FLOOR
FPB FAN POWERED BOX
FUT FUTURE
G GROUND (CONDUCTOR)
GCC GENERATOR CONNECTION CABINET
GEN GENERATOR
GF GROUND FAULT
GFI GROUND FAULT INTERRUPTER
GND, GRD GROUND
GPS GENERATOR PARALLELING SWITCHGEAR
GRS GALVANISED RIGID STEEL
H, HT HEIGHT
HDP 480V DISTRIBUTION PANELBOARD
HH HANDHOLE
HOA HAND-OFF AUTOMATIC CONTROLS
HP HORSE POWER
HV HIGH VOLTAGE
HWP HOT WATER PUMP
HZ HERTZ
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
J JUNCTION BOX
KCM THOUSAND CIRCULAR MILS
KI KEY INTERLOCK
KV THOUSAND VOLTAGE, KILO-VOLTS
KVA THOUSAND VOLTAGE-AMPERE, KILO-VOLT-AMPERE
KW THOUSAND WATTAGE, KILO-WATTS
L LENGTH
LA LIGHTNING ARRESTOR
LAN LOCAL AREA NETWORK
LP 208V BRANCH PANELBOARD
LSIG LONG TIME, SHORT TIME, INSTANTANEOUS, GROUND FAULT
LTG LIGHTING
IDF INTERMEDIATE DISTRIBUTION FRAME
ELECTRICAL ABBREVIATIONS
NO NORMALLY-OPEN
NTS NOT TO SCALE
OL OVERLOAD(S)
OS OCCUPANCY SENSOR
P POLE
PA PUBLIC ADDRESS
PB PUSH BUTTON, PULLBOX
PC PHOTOCELL
PDU POWER DISTRIBUTION UNIT
PF POWER FACTOR
PH, Φ PHASE
PNL PANEL
PWR POWER
QTY QUANTITY
RE REFER
RECEPT RECEPTACLE
REQ REQUIRED
RF RETURN FAN
RM ROOM
RR RESTROOM
RTU ROOFTOP UNIT
SCCR SHORT CIRCUIT CURRENT RATING
PFC POWER FACTOR CORRECTION
SD SMOKE DETECTOR
SEC SECONDARY
SF SUPPLY FAN
SG SWITCHGEAR
SB SWITCHBOARD
SIB SECURITY INTERFACE BOX
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SS STAINLESS STEEL
STP SHIELDED TWISTED PAIR
SYM SYMETRICAL
T TRANSFORMER
TELECOM TELECOMMUNICATIONS
TV TELEVISION
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION
TYP TYPICAL
UC UNDER-COUNTER
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UP UNINTERRUPTIBLE POWER SUPPLY BRANCH
PANELBOARD
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
V VOLTAGE(S)
VA VOLT-AMPERE
VAV VARIABLE AIR VOLUME BOX
VFD VARIABLE FREQUENCY DRIVE
W WATTAGE, WIDTH
WP WEATHERPROOF
XFMR TRANSFORMER
XP EXPLOSION-PROOF
∆Y DELTA-WYE
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
GENERAL PROJECT NOTES
A. BECOME FAMILIAR WITH THE SCOPE OF WORK REQUIRED BY THE DRAWING AND
SPECIFICATION DOCUMENTS. INCLUDE ALL DEMOLITION WORK IMPLIED OR REQUIRED
IN THE SCOPE OF THIS CONTRACT.
B. PERFORM ALL ELECTRICAL WORK IN ACCORDANCE WITH NFPA 70, VA BARRIER FREE
DESIGN STANDARD (ABAAS) WITH AMMENDMENTS, LIFE SAFETY, FIRE PROTECTION,
AND ANY APPLICABLE LOCAL STANDARDS WITH AMENDMENTS. IN THE EVENT OF A
CONFLICT BETWEEN STANDARDS, THE MORE STRINGENT STANDARD WILL GOVERN.
C. MANUFACTURER'S NAME AND MODEL NUMBERS INDICATED ON THE DRAWINGS ARE
BASIS OF DESIGN. SUBSTITUTIONS ARE PERMITTED PROVIDED THAT THE PROPOSED
SUBSTITUTIONS FULLY COMPLY WITH CONTRACT DOCUMENTS. CONFIRM THE
CORRECTNESS OF ALL MODEL NUMBERS SO AS TO MEET THE SPECIFIED PROJECT
REQUIREMENTS AND MINIMUM INDICATED PERFORMANCE.
D. PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR A
COMPLETE AND OPERABLE INSTALLATION AS SPECIFIED AND SHOWN ON THE
DRAWINGS, FULLY TESTED, ADJUSTED AND READY FOR USE.
E. THE DRAWING SHOW THE EXTENT OF THE WORK AND THE GENERAL ARRANGEMENT.
ALL CIRCUITS ARE SHOWN SCHEMATICALLY. FINAL ROUTING DECISIONS ARE BY THE
CONTRACTOR.
F. COORDINATE THE EXACT LOCATION OF THIS WORK WITH THE WORK OF THE OTHER
TRADES AND/OR EXISTING CONDITIONS PRIOR TO FABRICATION OR INSTALLATION OF
THE SAME. VERIFY ALL DIMENSIONS AND ELEVATIONS. PROVIDE ADDITIONAL OFFSETS
AND SECTIONS OF MATERIALS AS REQUIRED TO MEET THE APPLICABLE JOB
CONDITION REQUIREMENTS.
G. COORDINATE WITH THE SUPPLIERS AS TO WHICH DEVICES ARE SUPPLIED WITH THE
EQUIPMENT, REQUIRED WIRING, VOLTAGES, AND OTHER COORDINATION ITEMS AS
RELATED TO A PROPER AND OPERABLE INSTALLATION.
H. PROVIDE ALL CIRCUITS IN CONDUIT. PROVIDE A DEDICATED EQUIPMENT GROUNDING
CONDUCTOR, SIZED PER THE NEC, WITH EACH BRANCH CIRCUIT. SHARED NEUTRALS
ARE NOT ALLOWED; PROVIDE ALL 120 AND 277 VOLT CIRCUITS WITH A DEDICATED
NEUTRAL.
I. DIMENSIONAL LOCATIONS INCLUDING ELEVATIONS INDICATED ON THE DRAWINGS ARE
APPROXIMATE AND FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE TO
AVOID INTERFERENCES IN ROUTING OF CONDUITS.
J. LEAVE PULL STRING IN EMPTY CONDUITS. PLUG OR CAP BOTH ENDS OF EMPTY
CONDUITS AND LABEL AS TO THEIR INTENDED USE.
K. UNLESS OTHERWISE NOTED, ALL CONDUCTORS ARE SIZED FOR COPPER TYPE THWN,
THHN, AND RATED FOR 75 DEGREE C (MINIMUM).
L. UNLESS OTHERWISE NOTED, CIRCUITS ARE SIZED ASSUMING NO MORE THAN THREE
CURRENT CARRYING CONDUCTORS ARE INSTALLED IN A SINGLE CONDUIT.
M. VERIFY ALL REQUIREMENTS AND SIZES FOR OVERCURRENT PROTECTIVE DEVICE,
DISCONNECT SWITCH, CIRCUIT WIRE, AND CONDUIT SIZE WITH THE FINAL APPROVED
MECHANICAL EQUIPMENT TO BE INSTALLED. PROVIDE ALL ELECTRICAL COMPONENTS
AS REQUIRED.
N. FLUSH MOUNT ALL SWITCHES AND RECEPTACLES IN FINISHED AREAS. SWITCHES AND
RECEPTACLES MAY BE SURFACE MOUNTED IN EXPOSED SPACES. UNLESS OTHERWISE
NOTED, CONCEAL ALL CONDUIT IN WALLS, ABOVE ACCESSIBLE CEILING, OR IN FLOOR
SLAB. CONDUIT IN ROOMS WITH NO CEILING AND/OR ARE EXPOSED MAY BE MOUNTED
TO THE BUILDING STRUCTURE. DO NOT INSTALL CONDUITS IN CONCRETE FLOORS
WITH TOPPINGS LESS THAN 3" THICK.
O. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING
CEILING TILES AS REQUIRED FOR THE WORK THAT IS REQUIRED IN THE EXISTING
FACILITY. SCHEDULE ALL INTERIOR WORK THAT MIGHT INTERFERE WITH DAILY
OPERATIONS WITH CONTRACTING OFFICER AT LEAST (2) WEEKS IN ADVANCE. ANY
DAMAGE TO EXISTING FACILITIES BY THE CONTRACTOR SHALL BE CORRECTED, AND
DAMAGED EQUIPMENT (CEILING TILES, ETC.) REPLACED WITH NEW.
P. SEAL ALL CONDUIT PENETRATIONS, USING A LISTED SEALANT FOR THE APPROPRIATE
APPLICATION, OF WALLS, PARTITIONS, FLOORS, ROOF, ETC.
Q. "PROVIDE", "FURNISH", AND "INSTALL", WHERE USED, ARE DEFINED HEREIN AS
CONTRACTOR-PROVIDED, AND CONTRACTOR-INSTALLED. WHERE EQUIPMENT IS TO BE
"PROVIDED," IT IS ALSO TO BE INSTALLED IN ITS ENTIRETY BY THE CONTRACTOR, AND
WHERE EQUIPMENT IS TO BE "INSTALLED," IT IS ALSO TO BE PROVIDED, OR
FURNISHED, IN ITS ENTIRETY BY THE CONTRACTOR. ALL EQUIPMENT INSTALLATIONS
SHALL BE COMPLETE AND OPERATIONAL.
R. WORKING SPACES ABOUT ELECTRICAL EQUIPMENT SHALL BE PER NEC 110.26, WITH
THE EXCEPTION THAT THE ELECTRICAL HEIGHT OF WORKING SPACE SHALL EXTEND
FROM THE FLOOR TO THE STRUCTURAL CEILING. NO PIPING, DUCTS, OR OTHER
EQUIPMENT FOREIGN TO ELECTRICAL SYSTEMS SHALL BE PERMITTED IN THE
WORKING SPACE ABOUT ELECTRICAL EQUIPMENT.
S. PROVIDE ALL SUPPLEMENTAL SUPPORTING DEVICES REQUIRED FOR ELECTRICAL
EQUIPMENT WHERE THE BUILDING STRUCTURE IS NOT SUITABLE FOR DIRECT
MOUNTING.
T. FLEXIBLE CONDUIT MAY ONLY BE USED FOR FINAL EQUIPMENT CONNECTIONS, AND
SHALL BE LIMITED TO 6'-0" IN LENGTH. VERIFY ALL MODULAR FURNITURE AND
EQUIPMENT
M METER (POWER), MANUAL PULL BOX (FIRE ALARM)
MAX MAXIMUM
MCB MAIN CIRCUIT BREAKER
MCCB MOLDED CASE CIRCUIT BREAKER
MDF MAIN DISTRIBUTION FRAME
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MV MEDIUM VOLTAGE
N NEUTRAL, NORMAL
NC NORMALLY-CLOSED
NEC NATIONAL ELECTRICAL CODE
NIC NOT IN CONTRACT
APPLICABLE CODES
A. NFPA 70, NATIONAL ELECTRICAL CODE (NEC)
B. INTERNATIONAL BUILDING CODE (IBC)
C. NFPA 101, LIFE SAFETY CODE
D. INTERNATIONAL ENERGY CONCERVATION CODE (IECC)
EXISTING CONDUIT
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
6010 Amarillo Blvd.
Amarillo, TX 79106
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
THOMAS E. CREEK VA MEDICAL CENTER
22 DECEMBER 2021
504-21-120
JTJR
PROVIDE PRIMARY FEED
TO BUILDING - 1
100% BID SET SUBMISSION
ELECTRICAL ABBREVIATIONS,
LEGEND, AND SYMBOLS
E-001
-2
-1
E
-0
J U
L Y
.p d f
FIRM REGISTRATION F-761
A
P N
L 7 3B
L
P N
L 7 B 3
A
P N
L 7 B 2
P N
L 7 −B1
EQ
S P
L IC
E B
O X
G R
O
UN
D B
AR
P N
L 7 −B3
EC
E N
G
IN
E E
R
IN
G
OI&T
SHOPS
BOILER
WARE-
HOUSE
G N
D S
WAREHOUSE
HBPC
HAS
WAREHOUSE
FISCAL/
CHILLER
F
U E
L
T
A N
K S
LOT E
LO
T I
LOT J LO
T J
AREA 1
LO
T I
LOT G
LOT H
LOT K
LOT L
LOT M
LOT N
LOT A
LO
T B
LOT C
LOT D
SWITCH
SERVICES
CLC
M
EDIC
AL
ARTS
LO
D G
E
Tank
P R
IM
A R Y C
A R E
H A
Z
RECOVERY a nd
THERAPY
CLC
REHAB &
P
ROSTH
ETI
CS
FU
TU
R E
SPECIA
LT
Y C
LI
NIC
CENTER fo r
H O S P
IT
A L
(O R
IG
(S
3°
'0 6"
W
8.
S 89°47'OO" E 1947.94'
L
8.
S
3°
'0 0"
W
.2
8'
(N
°2 '5
E
.4
R
.6 7'
(N 44°16'13" W
496.56')
(N 44°17'57" W
1000.33')
N
°1
'2
E
.2
N 44°15'49" W
496.50'
N 44°15'49" W
1000.00'
S.W. 9TH AVENUE
U .S
H
IG
H W
A Y
H E R N D O N
E . W
A
LK
E R
N . E
D M
A N
W E D M
A N
S . E
D M
A N
(A M
A R
IL
L O
B L V D
14 3
X F
M -2
-1
X F
M R
-2 -2
X F
M R
-2 -3
X F
M R
-2 -1
X
FM
R -2
8-
X
FM
R -2
8-
X
FM
R -2
8-
X
FM
R -4
-2 X
FM
R -4
-1
Separate Feed & Independent Meter
XFM
R -8-1
XFM
R -7-1
XFM
R -4-2
XFM
R -4-1
XFM
R -28-1
XFM
R -28-2
XFM
R -28-3
XFMR-34-1
XFMR-WT-1
XFMR-45-1
XFMR-26-1
XFMR-26-2
XFMR-26-3
XFMR-29-1
XFM
R -44-1
XFM
R
-IC
E
XFM
R -48-1
XFM
R -4
6-
W.
W
A L
K E
R
EXISTING PRIMARY
CIRCUIT FEEDERS
E-011
E-202
E-201
CONSTRUCTION PHASING
PHASE 1 – BUILDING 1 – EXERIOR WORK
1. BLOCK WINDOWS ON BUILDING 1.
2. INSTALL UNDERGROUND DUCT BANKS FROM EXISTING MANHOLE TO NEW TRANSFORMER PRIMARY LOCATIONS AND FROM
TRANSFORMER SECONDARY LOCATION AND NEW SWITCHBOARD LOCATION.
3. INSTALL UNDERGROUND DUCT BANK FROM NEW SWITCHBOARD LOCATION TO BUILDING 1 EXTERIOR WALL.
4. INSTALL NEW TRANSFORMER PADS AND SWITCHBOARD PAD.
5. INSTALL NEW BOLLARDS.
6. INSTALL NEW TRANSFORMERS AND SWITCHBOARD.
7. INSTALL NEW PRIMARY CABLES FROM EXISTING BULIDING 4 TRANSFORMERS TO NEW BUILDING 1 TRANSFORMERS.
8. INSTALL SECONDARY CABLES FROM NEW TRANSFORMERS TO NEW SWITCHBOARD.
PHASE 2 – BUILDING 1 – INTERIOR WORK
1. INSTALL NEW CIRCUIT JUNCTION BOX ABOVE CEILING IN CORRIDOR BETWEEN BUILDING 1 AND BUILDING 4 AND CONNECT TO
NEW CIRCUITS FROM NEW SWITCHBOARD.
2. BUILDING 1 – ELECTRICAL ROOM 1163.
a. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X2 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE
FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X2.
b. REPLACE TRANSFER SWITCH 1-X2.
c. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X3 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE
FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X3.
d. REPLACE TRANSFER SWITCH 1-X3.
e. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X4 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE
FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X4.
f. REPLACE TRANSFER SWITCH 1-X4.
g. REPLACE REMAINING PANELS, TRANSFORMERS, DISCONNECT SWITCHES AND TRANSFER SWITCHES.
3. BUILIDNG 1 – ELECTRICAL ROOM 1129.
a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BC1 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE FROM NEW
SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BC1.
b. REPLACE PANEL 1-BC1.
c. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X1 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE
FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X1.
d. REPLACE TRANSFER SWITCH 1-X1.
e. REPLACE REMAINING PANELS, TRANSFORMERS, DISCONNECT SWITCHES AND TRANSFER SWITCHES.
4. BUILDING 1 – ELECTRICAL ROOM 1113A.
a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BA4 IN ELECTRICAL ROOM 1113A AND INSTALL CABLE FROM NEW
SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BA4.
b. REPLACE PANEL 1-BA4.
c. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BA6 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE FROM NEW
SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BA6.
d. REPLACE PANEL 1-BA6.
5. BUILDING 1
a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-4B1 LOCATED ON THE FIFTH LEVEL AND INSTALL CABLE FROM NEW
SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-4B1.
b. REPLACE PANEL 1-4B1.
c. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-5C8 LOCATED ON THE PENTHOUSE LEVEL AND INSTALL CABLE
FROM NEW SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-5C8.
d. REPLACE PANEL 1-5C8.
6. BUILDING 1 – REPLACE REMAINING PANELS NOT IN THE THREE ELECTRICAL ROOMS ABOVE.
PHASE 3 – BUILDING 7
a. INSTALL NEW ATS IN BUILDING 7.
b. EXTEND GENERATOR CIRCUIT FROM BUILDING 20 TO BUILDING 7 AND CONNECT TO EMERGENCY SIDE OF ATS.
c. EXTEND NORMAL CIRCUIT FROM ATS TO EXISTING BUILDING 7 TRANSORMER.
d. REPLACE SINGLE PHASE PANELS IN BUILDING 7.
e. EXTEND ATS LOAD CIRCUIT TO EXISTING MAIN PANEL IN BUILDING 7.
f. EXTEND CIRCUITS FROM ELEVATORS AND A/C UNITS TO NEW THREE PHASE PANELS.
g. REMOVE GENERATOR CIRCUIT FROM BUILDING 7 TO BUILDING 1 (FEEDS ELEVATORS AND A/C UNITS).
h. INSTALL UPS IN BUILDING 7 AND CONNECT TO NEW BUILDING 7 PANEL AND EXISTING UPS PANEL.
i. REMOVE UPS CIRCUIT FROM BUILDING 7 TO BUILDING 1.
j. REPLACE REMAINING PANELS IN…