VA AMR Elec Bid Set Drawings.pdf

PDF 5 MB Posted

Attached to
Z2DA--Provide Primary Electrical Feeder Building 1
Solicitation number
36C25723B0032
Issued by

About this file

This package includes construction drawings and specifications for an electrical upgrade project at the Thomas E. Creek VA Medical Center in Amarillo, Texas. The project involves replacing aging electrical infrastructure to provide a new primary electrical feed to Building 1 on the campus. Key project details include installing new pad-mounted transformers with integral loop-feed switches to supply 13.2kV power to the building from the existing utility service. Underground duct banks and cables will be installed to connect the new transformers to the existing electrical network. A new exterior switchboard and related equipment will be installed to distribute 480V power throughout the building. Additional work involves upgrading panels, transformers, and transfer switches within Building 1 to support the new electrical infrastructure. The project will be completed in multiple phases to maintain operational capacity while minimizing disruptions.

View the file

Other files

File Type Posted
36C25723B0032 0003_1.docx DOCX document
36C25723B0032 0003 VA Amarillo RFI Responses 040823.pdf PDF
36C25723B0032 0002_1.docx DOCX document
R311451 VA Amarillo - ADDENDUM A (RFI) 032923.pdf PDF
36C25723B0032 0001 Amendment.pdf PDF
36C25723B0032 0001_1.docx DOCX document
36C25723B0032 Solicitation.pdf PDF
VA AMR Elec Bid Set Specifications.pdf PDF
36C25723B0032_2.docx DOCX document
VA AMR Elec Bid Set Narrative.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

HUITT-ZOLLARS, INC.

500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com

ARCHITECT:

CB DESIGN GROUP

421 KING STREET

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

POC: PAUL W. BRIDGES

PROFESSIONAL SEAL:

6010 Amarillo Blvd.

Amarillo, TX 79106

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

THOMAS E. CREEK VA MEDICAL CENTER

22 DEC 2021

504-21-120

DLAL

PROVIDE PRIMARY

ELECTRICAL FEED TO

BUILDING 1

100% BID SET SUBMISSION

COVER SHEET

GI100

-2

-1

G I1

.p d f

Department of Veterans Affairs

A/E PROVIDE PRIMARY ELECTRICAL

FEED TO BUILDING 1

THOMAS E. CREEK VA MEDICAL CENTER

6010 AMARILLO BLVD.

AMARILLO, TX 79106

LOCATION MAP DRAWING LIST

Medical Center Director

Director of Facility Management Service

Medical Director

Project COR

Project CO

Infection Control

Safety Officer

APPROVALS

GENERAL INFORMATION

GI100 COVER SHEET

GI200 SYMBOLS, ABBREVIATIONS & NOTES

GI300 GENERAL NOTES

ELECTRICAL

E-001 ELECTRICAL ABBREVIATIONS, LEGEND, AND SYMBOLS

E-010 ELECTRICAL SITE PLAN

E-011 ENLARGED SITE PLAN

E-100 ELECTRICAL PLAN - BUILDINGS 1 & 4

ED-201 ENLARGED DEMOLITION PLAN - BUILDING 1

E-201 ENLARGED ELECTRICAL PLAN - BUILDING 1

E-202 ENLARGED PLANS - BUILDINGS 4 & 7

E-301 ELECTRICAL DETAILS

ED-401 ELECTRICAL DEMOLITION - RISER DIAGRAM

E-401 ELECTRICAL RISER DIAGRAM

E-402 ELECTRICAL ONE-LINE DIAGRAM

E-501 BUILDING 1 - PANEL SCHEDULES

E-502 BUILDING 1 - PANEL SCHEDULES

E-503 BUILDING 1 - PANEL SCHEDULES

E-504 BUILDING 1 - PANEL SCHEDULES

E-505 BUILDING 1 - PANEL SCHEDULES

E-506 BUILDING 7 - PANEL SCHEDULES

PROJECT DIRECTORY

CONTRACTING OFFICER REPRESENTATIVE (COR)

Samuel Hagins

Thomas E Creek VAMC 6010 Amarrilo Blvd. West Amarillo, TX 79106

PHONE: (432) 270-8124

Joshua.Junkin@va.gov

ARCHITECT

CB DESIGN GROUP

421 King Street Suite 301

PHONE: (703) 772-4213

Wes Bridges wbridges@cbdg-ae.com

MEP/FP/STRUCTURAL ENGINEER

HUITT-ZOLLARS INC.

500 W. 7th St. Ste. 300 Fort Worth, Texas 76102

PHONE: (817) 335-3000

Joel Colwell jcolwell@Huitt-Zollars.com

CONTRACTING OFFICER (CO)

Andres Garcia

VISN 17 NCO

2002 Scott Blvd.

Temple, TX 76504

PHONE: (254) 899-6028

Andres.Garcia@va.gov

N.T.S.

100% BID SET SUBMISSION

BLDG 1

WOOD

ALUMINUM

STEEL

EARTH

CONCRETE MASONRY UNITS

RIGID INSULATION

CONCRETE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE REMOVED

BRICK

WOOD-FINISHED

WOOD ROUGH

PLYWOOD

GYPSUM - PLASTER

ACOUSTIC TILE

CAST STONE

ALL METALS - SMALL SCALE

GLASS - LARGE SCALE

BATT INSULATION

CERAMIC TILE

CARPET

GRAVEL

CENTER LINE

DETAIL INDICATOR

DETAIL INDICATIOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DIMENSION LINE

NEW DOOR OPENING / BORROWED LIGHT

INDENTIFIER

DRAWING BLOCK TITLE, TYPICAL

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

ELEVATION INDICATOR, INTERIOR, SINGLE VIEW

SECTION INDICATOR

TYPICAL DETAIL INDICATOR

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

COLUMN GRID

KEYNOTE

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

NORTH ARROW

FEC

A

DETAIL NUMBER

SHEET WHERE

DRAWN

XXxxx

XXxxx

X

DRAWING TITLE

SCALE: 1 1/2" = 1'-0"

1 3/16"

D2

XX-XX

XXxxx

XXxxx

CL

XXxxx x'-x" VERTICAL HEIGHT INDICATOR

REVISION

REVISION CLOUD

NORTH

BREAK LINE

X

DEMOLITION KEYNOTE

NEW ROOM NAME AND NUMBERCORRIDOR

C2

XX

A

XXxxx

D

BC

COLUMN NUMBER

COLUMN LETTER

XXxxx

ELEVATION NUMBER

SHEET WHERE

DRAWN

ELEVATION NUMBER

SHEET WHERE

DRAWN

ELEVATION NUMBER

SHEET WHERE

DRAWN

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL NUMBER

SHEET WHERE DRAWN

WALL MOUNTED FIRE EXTINGUISHERFE

XX

SHEET WHERE

DRAWN

ELEVATION NUMBER

& AND

@ AT

C CENTERLINE

# NUMBER

AB ANCHOR BOLT

ABV ABOVE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH

DISABILITIES ACT

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALUM ALUMINUM

ALT ALTERNATE

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AUTO AUTOMATIC

AVG AVERAGE

BD BOARD

BLDG BUILDING

BLK BLOCK

BM BEAM

BOT BOTTOM

BRG BEARING

BEL BELOW

BR BUMPER RAIL

BRK BRICK

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CCT CUBICLE CURTAIN TRACK

CG CORNER GUARD

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CT CERAMIC TILE

CLG CEILING

CL CLOSET

COL COLUMN

CONC CONCRETE

CONF CONFERENCE

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CU CUBIC

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DOOR OPENING

DOZ DOZEN

DP DAMPPROOFING

DR DOOR

DWG DRAWING

DWGS DRAWINGS

DWR DRAWER

E EAST

EA EXHAUST AIR, EACH

EL ELEVATION

ELEV ELEVATION

ELEC ELECTRICAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EP ELECTRICAL PANELBOARD

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXP EXPANSION

EJ EXPANSION JOINT

EXIST EXISTING

EXT EXTERIOR

FA FIRE ALARM

FB FACE BRICK

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FF FINISH FACE

FHC FIRE HOSE CABINET

FIN FINISH

FLR FLOOR

FLUOR FLUORESCENT

FO __ FACE OF __

FOC FACE OF CONCRETE

FOS FACE OF STUD

FOW FACE OF WALL

FPRF FIREPROOF(ING)

FR FIRE RATING, FRAME

FRMG FRAMING

FS FULL SIZE

FT FOOT OR FEET

FTG FOOTING

FUR FURRING

FUT FUTURE

GC GENERAL CONTRACTOR

GA GAUGE

GAL GALLON

GALV GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM WALLBOARD

GYP BD GYPSUM WALLBOARD

HB HOSE BIBB

HC HOLLOW CORE

HD HEAD

HDWR HARDWARE

HDWD HARDWOOD

HT HEIGHT

HNDRL HANDRAIL

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMF HOLLOW METAL FRAME

HR HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HVAC HEATING, VENTILATION, AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER / DIMENSION

IN INCH

INCL INDLUDE(D)

INSUL INSULATION

INT INTERIOR

INV INVERT

JAN JANITOR

JST JOIST

JT JOINT

KP KICK PLATE

KO KNOCKOUT

L LENGTH

LAB LABORATORY

LAM LAMINATE

LAV LAVATORY

LBS POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LH LEFT HAND

LIN LINEAR

LIQ LIQUID

LKR LOCKER

LG LONG

LL LEAD LINED

LLV LONG LEG VERTICAL

LP LOW POINT

LRG LARGE

LT LIGHT

LT WT LIGHTWEIGHT

LVR LOUVER

MATL MATERIAL

MAS MASONRY

MAX MAXIMUM

MECH MECHANICAL

MTL METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MP MOP PLATE

MTD MOUNTED

N NORTH

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER / DIMENSION

OFF OFFICE

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OH OVERHEAD

OZ OUNCE

PAV PAVING

PC PRECAST CONCRETE

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PLBG PLUMBING

PMF PREMOLDED FILLER

PR PAIR

PT POINT

PTN PARTITION

QT QUARRY TILE

R RADIUS, RISER

RA RETURN AIR

RAD RADIUS

RB RESILIENT BASE, RUBBER

BASE

RD ROOF DRAIN

RL ROOF LEADER

REF REFERENCE

REFR REFRIGERATOR

REQ'D REQUIRED

REV REVISION

RFI REQUEST FOR

INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

S SOUTH

SA SUPPLY AIR

SAN SANITARY

SC SOLID CORE

SCHED SCHEDULE

SECT SECTION

SH SPRINKLER HEAD

SHT SHEET

SIM SIMILAR

SM SMOKE

SPEC SPECIFICATION

SPKR SPEAKER

SQ SQUARE

STA STATION

STD STANDARD

STO STORAGE

STL STEEL

SS STAINLESS STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TEL TELEPHONE

TEMP TEMPERED

T&G TONGUE AND GROOVE

THK THICK

TOC TOP OF CONCRETE

TOP TOP OF PAVEMENT

TOS TOP OF STEEL

TOW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UNFIN UNFINISHED

UON UNLESS OTHERWISE

NOTED

VB BAPOR BARRIER

VERT VERTICAL

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VTR VET THRU ROOF

W WEST

W/ WITH

WD WOOD

W/O WITHOUT

WP WATERPROOF

WT WEIGHT

WWF WELDED WIRE FRAME

NOTE: ALL ABBREVIATIONS SHOWN

MAY NOT BE USED ON THIS PROJECT.

CERTAIN COMMON ABBREVIATIONS

MAY NOT BE SHOWN.

L

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

HUITT-ZOLLARS, INC.

500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com

ARCHITECT:

CB DESIGN GROUP

421 KING STREET

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

POC: PAUL W. BRIDGES

PROFESSIONAL SEAL:

6010 Amarillo Blvd.

Amarillo, TX 79106

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

THOMAS E. CREEK VA MEDICAL CENTER

22 DEC 2021

504-21-120

DLAL

PROVIDE PRIMARY

ELECTRICAL FEED TO

BUILDING 1

100% BID SET SUBMISSION

SYMBOLS, ABBREVIATIONS & NOTES

GI200

-2

-1

G I2

.p d f

SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONSGENERAL CONDITION NOTES

1. THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A

JCAHO INSPECTION.

2. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF

ALTERATIONS WILL BE VACATED. ALL CONTRACTOR WORK WILL BE PERFORMED DURING NORMAL

DAYTIME WORKING HOURS.

3. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET- UP TEMPORARY/ PERMANENT CONSTRUCTION/ ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE

AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE

RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND

RESIDENCE.

4. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.

THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION AND

ERECTION.

5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE CONSTRUCTION MEANS, METHODS, PROCEDURES AND SEQUENCES TO INSURE THE SAFETY OF THE

EXISTING BUILDING AND OCCUPANTS.

6. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD

CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED

FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING

CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE COMPLETELY, FROM

PLANE TO PLANE. TREAT REMAINING SUBSURFACE TO RECEIVE NEW FINISHES SPECIFIED.

8. EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVABLE EQUIPMENT

NOT ALREADY DESIGNATED FOR REINSTALLATION/ REUSE, PRIOR TO COMMENCING WORK.

9. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS

OTHERWISE NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE.

10. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF

EXISTING CONDITIONS.

BLDG 1

G1 ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR

CONDITIONS ON THE JOB.

G2 SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE

SHOULD BE DIRECTED TO THE ARCHITECT DURING THE BID PERIOD.

G3 ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.

G4 REFER TO ELECTRICAL DRAWINGS FOR NOTED PERTAINING TO THEIR PARTICULAR TRADES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID CONFLICTS IN THE

FIELD.

G5 ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTED SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR

FUNCTION ELSEWHERE IN THE BUILDING.

G6 WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, AND PILASTERS.

G7 ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVRES, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.

G8 FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK, AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL." CONTRACTORS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER

INSTALLATION OF THE NEW WORK.

G9 SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR

SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.

G10 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.

G11 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPANCY DURING BID PHASE.

G12 WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.

G13 IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFORMED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.

G14 EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OBTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.

G15 AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.

G16 CONSULT ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT OR ANCHORING

G17 ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY

EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.

G18 ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPANCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF

DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.

G19 ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR

(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.

G20 SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENT OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.

G21 CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEDULE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION

OF THE WORK.

G22 PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.

G23 PATCH ALL HOLES IN FLOORS, WALLS, AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.

G24 UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC." IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP

DRAWINGS IN DIAGRAMMATIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE/DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.

G25 THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED.

IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION OF AN APPARENT DISCREPANCY BETWEEN DRAWINGS AND/OR SPECIFICATIONS DURING THE BIDDING PHASE. OTHERWISE, THE CONTRACTOR SHALL ASSUME THE MOST STRINGENT (TYPICALLY THE MOST

EXPENSIVE) REQUIREMENT SHALL APPLY

1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR

TO THE START OF THE PROJECT.

2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.

IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR E-CIGARRETES, VAPE PENS OR E-CIGARS.

UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND

VENDORS EFFECTIVE OCTOBER 1, 2019.

1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING

(EFFECTIVE FOR POLLEN, MOLD SPORES

1. VA DESIGN MANUAL (PG-18-0)

2. VA DESIGN, QUALITY, AND STANDARD ALERTS

3. VA DESIGN GUIDES (PG-18-12)

4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)

5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES

6. VA FIRE PROTECTION DESIGN MANUAL

7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)

8. VA SIGNAGE DESIGN GUIDE

9. VA MASTER SPECIFICATIONS

10. VA SUSTAINABLE DESIGN MANUAL

1. THESE PLANS DEPICT AREAS WHERE MATERIAL SAMPLES SHOWED THE PRESENCE OF ASBESTOS CONTAINING MATERIALS AND / OR LEAD- BASED PAINT. THESE PLANS ARE ONLY REPRESENTATIVE OF A LIMITED NUMBER OF SAMPLES AND SHALL NOT BE ASSUMED TO BE THE ONLY

LOCATIONS OF THESE MATERIALS.

2. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT CONTAIN LEAD-BASED PAINT (LBP):

2.1. OFF-WHITE PLASTER WALLS

2.2. WHITE METAL RADIATOR COVERS

2.3. CERAMIC TILE WALLS AND FLOORS

2.4. OFF-WHITE METAL DOOR FRAMES

2.5. BROWN PLASTER BASEBOARD

2.6. RED PLASTER FIRE CABINETS

2.7. OFF-WHITE METAL / PLASTER PIPE COLUMNS

2.8. OFF-WHITE BRICK / DRYWALL / PLASTER WALLS

3. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT ARE ASBESTOS CONTAINING MATERIALS

(ACM):

3.1. AIRCELL TSI INSULATION - WHITE AND GRAY

3.2. WHITE TSI

3.3. RAISED FLOOR FOOT MASTIC - BLACK

3.4. TAN VINYL FLOOR TILE (VFT)

3.5. BLACK MASTIC ASSOCIATED WITH BEIGE VFT

3.6. OFF-WHITE FIBERGLASS BRIDGING PAINT

3.7. MIXED CARPET MASTIC - BLACK / YELLOW

4. CONTRACTOR SHALL ASSUME THAT ACM'S ARE PRESENT WITHIN CONCEALED SPACES SUCH AS PIPE CHASES AND THE CRAWL SPACE AND

SHALL REMOVE AND DISPOSE OF ALL SUCH MATERIALS ENCOUNTERED.

5. MATERIALS INDICATED ON THIS PLAN SERVE ONLY TO ALERT THE CONTRACTOR TO THEIR PRESENCE ON THIS PROJECT. EPA REGULATIONS STIPULATE THAT IF ONE SAMPLE OF A MATERIAL IS FOUND TO CONTAIN ASBESTOS THEN THE ENTIRE QUANTITY OF THAT MATERIAL CONTAINS ASBESTOS, REGARDLESS OF ADDITIONAL ANALYSIS. CONTRACTOR SHALL REMOVE ALL SIMILAR MATERIALS WITHIN THE ENTIRE PROJECT

SCOPE.

6. THIS PLAN IS BASED ON THE "HAZARDOUS MATERIALS SURVEY REPORT DATED OCTOBER 25, 2019 BY ECS, LTD." AND SERVES ONLY AS A SUMMARY OF SOME INFORMATION FOUND IN THAT DOCUMENT. REFER TO SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT, 02 83 33.13 LEAD-BASED PAINT REMOVAL & DISPOSAL AND THE "HAZARDOUS MATERIALS SURVEY", INCLUDED IN THE PROJECT SPECIFICATION MANUAL, FOR ADDITIONAL INFORMATION AND REQUIREMENTS.

ICRA MATRIX

CONSTRUCTION PROJECT TYPE

A B C D

LOW I II II III/IV

MEDIUM I II III IV

HIGH I II III/IV IV

HIGHEST II III/IV III/IV IV

PATIENT

RISK GROUP

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT

1. Clean any dust/debris generated by project.

C

LA

S

I

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Contain construction waste before transport in tightly covered containers.

2. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.

3. Remove isolation of HVAC system when job is completed.

4. Clean tracked dust/debris in common areas as needed; clean area at the end if the work day.

5. Area should be terminally cleaned by Environmental Services prior to use.

C

LA

II

1. Remove or isolate HVAC system in areas where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum or vacuuming prior to exit) before construction begins).

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units; or HEPA air scrubber if unable to achieve negative pressure; filter changed as needed.

4. Maintain sticky mats at entrance. Avoid tracking dust/debris outside of work area, clean area as needed.

5. Contain construction waste before transport in tightly covered containers.

1. Do not remove barriers from work area until project is completed and dirt and debris has been removed.

2. Wet mop and/or vacuum work area with HEPA filtered vacuum.

3. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

4. Remove isolation of HVAC system in areas where work is being performed.

5. Area should be terminally cleaned by Environmental Management

Services Department prior to use

C

LA

III

1. Remove or isolate HVAC system in areas where work is being done to prevent contamination of duct system.

2. Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum or vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering work site area required to wear shoe covers.

Shoe covers must be changed each time the worker exits the work area.

7. Do not remove barriers from work area until project is completed project and inspected.

8. Area should be terminally cleaned by the owner’s Environmental Services Department prior to use.

1. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering unless solid lid.

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

C

LA

IV

F

FLUSH

D O

O R

H E

IG

H

T

AS SCHEDULE

DOOR WIDTH

TYPE 1

(HM - DOOR)

DOOR WIDTH

2" T

Y P

D O

O R

H E

IG

H

T

6" D

O O

R S

TO

P

W A

LL

T

H

IC

K N

E S

S

C O

O R

D W

9/

9/

" UON

4"

2" 5/8"

/1 6"

/1 6"

WALL WHERE SHOWN IN

PLAN

DOOR

JAMB ANCHOR

SEALANT TYP. BOTH SIDES,

FULL PERIMETER

5/8" GWB EA. SIDE

H.M. DOOR FRAME

WALL THICKNESS

COORD W/

9/16" 9/16"

2" 5/

8"

1 15/16"1 15/16"

DOOR

JAMB ANCHOR

METAL TRACK

SEALANT TYP. BOTH SIDES,

FULL PERIMITER

5/8" GWB EA. SIDE

METAL STUD BOX HEADER

H.M. DOOR FRAME

SECTION EXISTING FLOOR FINISH/ BASE

UNDERSIDE OF STRUCTURE

EXISTING FINISHED CEILING

SYSTEM

METAL "C-H" STUDS (20 GA.) @ 24" O.C. W/

1" GYP. BD. SHAFTLINER (UPPER SIDE) &

5/8" TYPE "X" GYP. BD. OPPOSITE SIDE.

FIRE RATED PARTITION U.L. DES. NO. U415

RUNNER CHANNEL SET IN TWO CONT. BEADS

OF SEALANT AND FASTENED TO STUDS

SOUND ATTENUATION BLANKET INSUL.

METAL STUDS W/ 5/8" TYPE "X" GYP. BD., EACH

SIDE. FIRE RATED PARTITION UL DES. NO 465

OUTLINE OF EXISTING WALL

RUNNER CHANNEL MECHANICALLY FASTENED

TO FLOOR, APPLY TWO CONT. BEADS OF FIRE/

ACOUSTICAL SEALANT AT EACH SIDE

HEAVY WEIGHT RESIN PAPER EXTEND 8" EACH

SIDE MIN. OF TEMPORARY PARTITION.

NOTE: IF NOT PHYSICALLY FEASIBLE TO EXTEND THE TEMPORARY

PARTITION FULL HEIGHT TO UNDERSIDE OF STRUCTURE ABOVE RETURN

PARTITION PERPENDICULAR TO WALL/ SOFFIT TO ENCLOSE WORK AREA

B

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

HUITT-ZOLLARS, INC.

500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com

ARCHITECT:

CB DESIGN GROUP

421 KING STREET

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

POC: PAUL W. BRIDGES

PROFESSIONAL SEAL:

6010 Amarillo Blvd.

Amarillo, TX 79106

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

THOMAS E. CREEK VA MEDICAL CENTER

22 DEC 2021

504-21-120

DLAL

PROVIDE PRIMARY

ELECTRICAL FEED TO

BUILDING 1

100% BID SET SUBMISSION

GENERAL NOTES

GI300

-2

-1

G I3

.p d f

GENERAL NOTESHAZARDOUS MATERIALS NOTES

REFERENCES

SMOKING POLICY

ENVIRONMENTAL CONTROL NOTES

MEDICAL WASTE NOTES

(THESE NOTES APPLY TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS)

APPLICABLE CODES

MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)

NFPA 101 - 2018 LIFE SAFETY CODE

NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS

NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE

AMERICAN SOCIETY OF CIVIL ENGINEERS - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES - ASCE7-16

INTERNATIONAL BUILDING CODE (IBC) - 2018

NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

ICRA NOTES

1. PROVIDE TEMPORARY/ PERMANENT RATED ICRA PARTITIONS AS REQUIRED. CONTRACTOR SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE COR PRIOR

TO BEGINNING ANY WORK.

2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM FUNCTION LOCKS, AND ALARMS. DOORS SHALL AUTOMATICALLY LOCK

UPON CLOSURE.

3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY" SIGN ON THE PUBLIC SIDE OF ALL ICRA DOORS.

4. CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS PERTAINING TO SILICA AND DUST CONTAINMENT/ REMEDIATION.

5. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.

6. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, AND PLASTIC) TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS.

7. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY

MONITORED. BALL IN THE WALL IS NOT ACCEPTABLE FOR MONITORING.

8. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/ OR FIRE SEAL AS REQUIRED.

9. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

10. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE

WORK AREA.

11. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS APPROVED BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

12. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.

13. CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR TRANSPORT OF CONTAINERS THROUGH THE FACILITY.

14. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.

15. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

16. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING

UNLESS SOLID LID.

17. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT.

BLDG 1

ICRA REFERENCE NOTES

1. Barrier Walls:

a. The construction areas MUST be kept separated from patient care areas by barriers that keep the dust and dirt inside the worksite.

b. The walls must provide a complete seal of the construction area from adjacent areas (walls may be rigid or 4 or 6 mil thickness plastic).

2. Environmental Control:

a. Negative air pressure must be maintained within the construction area when possible. If unable to maintain negative pressure a HEPA air-scrubber must be used and left on for the duration of the project (24/7).

b. Demolition debris is removed in tightly fitted covered carts – use specified traffic patterns.

c. Sticky or walk-off mats are placed immediately outside the construction zone and changed whenever necessary to control the spread of dust and dirt.

d. Exterior window seals are to be used to reduce the amount of outside excavation debris coming into the building.

e. If demolition chutes are used, they must be sealed when not in use; the chute and damper should be sprayed with water, as necessary to maintain dust control.

f. Control, collection and disposal must be provided for any drain liquid or sludge found when demolishing plumbing.

1. Traffic Control:

a. Use designated entry and exit procedures.

b. Keep all egress pathways free of debris.

c. No unauthorized personnel should be allowed to enter construction areas.

d. Use designated elevators only.

2. Cleaning:

a. Keep the construction area clean on a daily basis.

b. Dust and dirt must be kept to a minimum.

3. Workers:

a. Clothing must be free of loose soil and debris when exiting the construction area.

b. Use personal protective equipment (masks, face shields, etc.) as indicated for the task at hand.

DOOR TYPE DOOR FRAME TYPE LEGEND

EPY EPOXY FLOORING

EX EXISTING

HW HARDWARE SET (FINISH OR BUILDER'S HARDWARE)

P PAINT (EXTERIOR AND INTERIOR; TRANSPARENT, SEMI-TRANSPARENT, AND OPAQUE FINISHES) RB RESILIENT BASE (RUBBER OR VINYL WITH FACTORY FORMED INSIDE AND OUTSIDE CORNERS)

HM HOLLOW METAL

1 1/2" = 1'-0"H5

TYP. DOOR JAMB DTL.

1 1/2" = 1'-0"H3

TYP. DOOR HEAD DTL.

1 1/2" = 1'-0"3

WALL TYPE "B" @ ICRA BARRIER

DOOR NO. ROOM NAME

DOOR FRAME

DOOR LABEL

FIRE RATING HARDWARE SET REMARKS

NOMINAL SIZE

TYPE MATL MATL TYPE

SECTIONS

WIDTH HEIGHT THK. JAMB HEAD SILL

1 CORRIDOR 3' - 0" 7' - 0" 1 3/4" 1 H5 / GI300 H3 / GI300 DR: 45 HW - 5 TEMP. ICRA DOORM: HM, F: PM: HM, F: PF

* GC TO COORDINATE LOCATION OF TEMPORARY ICRA BARRIER IN FIELD WITH

COR OR VA REPRESENTATIVE. PROVIDE "STICKY WALK - OFF" DUST MAT

ELECTRICAL CONNECTION (NON-MOTOR); SQUARE

DENOTES CONNECTION TO WALL MOUNTED

DEVICE, CIRCLE DENOTES CONNECTION TO

CEILING OR FLOOR MOUNTED DEVICE.

JUNCTION BOX; SQUARE DENOTES WALL MOUNTED,

CIRCLE DENOTES CEILING OR FLOOR MOUNTED

BRANCH PANELBOARD WITH WORKING CLEARANCE,

208/120V

DISTRIBUTION PANELBOARD WITH WORKING

CLEARANCE, 480/277V

DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

COMBINATION MAGNETIC MOTOR STARTER

EMERGENCY POWER OFF MUSHROOM HEAD BUTTON

WITH CLEAR COVER

3/4" Ø x 10'L COPPER CLAD STEEL GROUNDING ROD

DUPLEX RECEPTACLE, 125V, 20A, 2P, 3W

NEMA 5-20R

SINGLE RECEPTACLE, 125V, 20A, 2P, 3W

NEMA 5-20R

CLOCK HANGER SINGLE RECEPTACLE, 125V, 20A, 2P, 3W

NEMA 5-20R

QUADRAPLEX RECEPTACLE, 125V, 20A, 2P, 3W

NEMA 5-20R

DUPLEX RECEPTACLE, MOUNTED 6" (0.15m) ABOVE

COUNTER OR BACKSPLASH,125V, 20A, 2P, 3W, NEMA 5-20R

5-30R

SPECIAL PURPOSE RECEPTACLE, 125V, 30A, 2P, 3W

NEMA 5-30R

E

ELECTRICAL SYMBOLSRECEPTACLE SYMBOLS

GFI

DUPLEX RECEPTACLE, 125V, 20A, 2P, 3W, NEMA 5-20R,

(GROUND FAULT CIRCUIT INTERRUPTER)

SINGLE OR THREE PHASE MOTOR ELECTRICAL

CONNECTION

WIRE/CONDUIT EXPOSED

UNDERGROUND DUCT BANK - ELECTRIC

GROUND BUS

J

LP-5:7

TYPICAL RECEPTACLE CIRCUIT DESIGNATION

TRANSFORMER, REFER TO TRANSFORMER SCHEDULE

ON E-504 FOR ADDITIONAL INFORMATION

WIRE/CONDUIT CONCEALED

J

VARIABLE FREQUENCY DRIVE WITH HORSEPOWER

DESIGNATION, REFER TO VFD SCHEDULE ON 2E-603

FOR ADDITIONAL INFORMATION

(LP-5) INDICATES PANEL DESIGNATION, (7) INDICATES

CIRCUIT BREAKER NUMBER. PROVIDE 20A/1P AND 2#12

FOR EACH CIRCUIT NUMBER & 1#12G, IN 3/4 " CONDUIT,

UNLESS OTHERWISE NOTED OR SCHEDULED.

WIRE/CONDUIT CONCRETE ENCASED OR DIRECT

BURIED

HOME RUN INDICATION WITH PANEL DESIGNATION

(LP-5) AND CIRCUIT No.(7). PROVIDE 20A/1P BREAKER

AND 2 #12 & 1 #12G IN 3/4" CONDUIT, UNLESS

OTHERWISE INDICATED.

T

VFD-#

LP-5:7

M

SINGLE POLE SWITCH, 20A, 120-277VACS

RECESSED FLOOR BOX

SINGLE RECEPTACLE, 125V, 20A, 2P, 3W

NEMA 5-15RL

SPECIAL PURPOSE RECEPTACLE, COORDINATE NEMA

CONFIGURATION WITH EQUIPMENT

BRANCH PANELBOARD WITH WORKING CLEARANCE,

480/277V

EPO

AUTOMATIC TRANSFER SWITCH WITH AMPERE

DESIGNATION

ATS-#

SWITCHBOARD WITH WORKING CLEARANCE, 480/277V

INDOOR 15KV METAL CLAD SWITCHGEAR WITH

WORKING CLEARANCE

INDOOR UNIT SUBSTATION WITH WORKING

CLEARANCE 480V

HANDHOLEHH

DEMOLITION SYMBOLS

EXISTING PANELBOARD

EXISTING SECURITY CONTROL BOX

EXISTING RECEPTACLE

E E

ELECTRICAL ABBREVIATIONS

A, AMP AMPERES

AC ALTERNATING CURRENT

AF AMPERE FRAME (CIRCUIT BREAKER)

AFF ABOVE FINISHED FLOOR

AFU AMPERE FUSE

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AL ALUMINUM

AT AMPERE TRIP (CIRCUIT BREAKER)

ATS AUTOMATIC TRANSFER SWITCH

AWG AMERICAN WIRE GAUGE

BAS BUILDING AUTOMATION SYSTEM

C CONDUIT

CAT CATERGORY

CC CONTROL COIL

CCTV CLOSED CIRCUIT TELEVISION

CIB CCTV INTERFACE BOX

CT CURRENT TRANSFORMER

DC DIRECT CURRENT

DEMO DEMOLITION

DIA DIAMETER

DPM DIGITAL POWER METER

AV AUDIO VISUAL

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

ELEV ELEVATOR

EMT ELECTRICAL METALLIC TUBING

DP DISTRIBUTION PANELBOARD

EO ELECTRICALLY OPERATED

EOL END OF LINE

EPO EMERGENCY POWER OFF

EQ EQUAL

EWC ELECTRIC WATER COOLER

EX EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FDS FUSED DISCONNECT SWITCH

FLA FULL LOAD AMPERE

FLR, FL FLOOR

FPB FAN POWERED BOX

FUT FUTURE

G GROUND (CONDUCTOR)

GCC GENERATOR CONNECTION CABINET

GEN GENERATOR

GF GROUND FAULT

GFI GROUND FAULT INTERRUPTER

GND, GRD GROUND

GPS GENERATOR PARALLELING SWITCHGEAR

GRS GALVANISED RIGID STEEL

H, HT HEIGHT

HDP 480V DISTRIBUTION PANELBOARD

HH HANDHOLE

HOA HAND-OFF AUTOMATIC CONTROLS

HP HORSE POWER

HV HIGH VOLTAGE

HWP HOT WATER PUMP

HZ HERTZ

IG ISOLATED GROUND

IMC INTERMEDIATE METAL CONDUIT

J JUNCTION BOX

KCM THOUSAND CIRCULAR MILS

KI KEY INTERLOCK

KV THOUSAND VOLTAGE, KILO-VOLTS

KVA THOUSAND VOLTAGE-AMPERE, KILO-VOLT-AMPERE

KW THOUSAND WATTAGE, KILO-WATTS

L LENGTH

LA LIGHTNING ARRESTOR

LAN LOCAL AREA NETWORK

LP 208V BRANCH PANELBOARD

LSIG LONG TIME, SHORT TIME, INSTANTANEOUS, GROUND FAULT

LTG LIGHTING

IDF INTERMEDIATE DISTRIBUTION FRAME

ELECTRICAL ABBREVIATIONS

NO NORMALLY-OPEN

NTS NOT TO SCALE

OL OVERLOAD(S)

OS OCCUPANCY SENSOR

P POLE

PA PUBLIC ADDRESS

PB PUSH BUTTON, PULLBOX

PC PHOTOCELL

PDU POWER DISTRIBUTION UNIT

PF POWER FACTOR

PH, Φ PHASE

PNL PANEL

PWR POWER

QTY QUANTITY

RE REFER

RECEPT RECEPTACLE

REQ REQUIRED

RF RETURN FAN

RM ROOM

RR RESTROOM

RTU ROOFTOP UNIT

SCCR SHORT CIRCUIT CURRENT RATING

PFC POWER FACTOR CORRECTION

SD SMOKE DETECTOR

SEC SECONDARY

SF SUPPLY FAN

SG SWITCHGEAR

SB SWITCHBOARD

SIB SECURITY INTERFACE BOX

SPD SURGE PROTECTIVE DEVICE

SPEC SPECIFICATION

SS STAINLESS STEEL

STP SHIELDED TWISTED PAIR

SYM SYMETRICAL

T TRANSFORMER

TELECOM TELECOMMUNICATIONS

TV TELEVISION

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION

TYP TYPICAL

UC UNDER-COUNTER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UP UNINTERRUPTIBLE POWER SUPPLY BRANCH

PANELBOARD

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

V VOLTAGE(S)

VA VOLT-AMPERE

VAV VARIABLE AIR VOLUME BOX

VFD VARIABLE FREQUENCY DRIVE

W WATTAGE, WIDTH

WP WEATHERPROOF

XFMR TRANSFORMER

XP EXPLOSION-PROOF

∆Y DELTA-WYE

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE

GENERAL PROJECT NOTES

A. BECOME FAMILIAR WITH THE SCOPE OF WORK REQUIRED BY THE DRAWING AND

SPECIFICATION DOCUMENTS. INCLUDE ALL DEMOLITION WORK IMPLIED OR REQUIRED

IN THE SCOPE OF THIS CONTRACT.

B. PERFORM ALL ELECTRICAL WORK IN ACCORDANCE WITH NFPA 70, VA BARRIER FREE

DESIGN STANDARD (ABAAS) WITH AMMENDMENTS, LIFE SAFETY, FIRE PROTECTION,

AND ANY APPLICABLE LOCAL STANDARDS WITH AMENDMENTS. IN THE EVENT OF A

CONFLICT BETWEEN STANDARDS, THE MORE STRINGENT STANDARD WILL GOVERN.

C. MANUFACTURER'S NAME AND MODEL NUMBERS INDICATED ON THE DRAWINGS ARE

BASIS OF DESIGN. SUBSTITUTIONS ARE PERMITTED PROVIDED THAT THE PROPOSED

SUBSTITUTIONS FULLY COMPLY WITH CONTRACT DOCUMENTS. CONFIRM THE

CORRECTNESS OF ALL MODEL NUMBERS SO AS TO MEET THE SPECIFIED PROJECT

REQUIREMENTS AND MINIMUM INDICATED PERFORMANCE.

D. PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR A

COMPLETE AND OPERABLE INSTALLATION AS SPECIFIED AND SHOWN ON THE

DRAWINGS, FULLY TESTED, ADJUSTED AND READY FOR USE.

E. THE DRAWING SHOW THE EXTENT OF THE WORK AND THE GENERAL ARRANGEMENT.

ALL CIRCUITS ARE SHOWN SCHEMATICALLY. FINAL ROUTING DECISIONS ARE BY THE

CONTRACTOR.

F. COORDINATE THE EXACT LOCATION OF THIS WORK WITH THE WORK OF THE OTHER

TRADES AND/OR EXISTING CONDITIONS PRIOR TO FABRICATION OR INSTALLATION OF

THE SAME. VERIFY ALL DIMENSIONS AND ELEVATIONS. PROVIDE ADDITIONAL OFFSETS

AND SECTIONS OF MATERIALS AS REQUIRED TO MEET THE APPLICABLE JOB

CONDITION REQUIREMENTS.

G. COORDINATE WITH THE SUPPLIERS AS TO WHICH DEVICES ARE SUPPLIED WITH THE

EQUIPMENT, REQUIRED WIRING, VOLTAGES, AND OTHER COORDINATION ITEMS AS

RELATED TO A PROPER AND OPERABLE INSTALLATION.

H. PROVIDE ALL CIRCUITS IN CONDUIT. PROVIDE A DEDICATED EQUIPMENT GROUNDING

CONDUCTOR, SIZED PER THE NEC, WITH EACH BRANCH CIRCUIT. SHARED NEUTRALS

ARE NOT ALLOWED; PROVIDE ALL 120 AND 277 VOLT CIRCUITS WITH A DEDICATED

NEUTRAL.

I. DIMENSIONAL LOCATIONS INCLUDING ELEVATIONS INDICATED ON THE DRAWINGS ARE

APPROXIMATE AND FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE TO

AVOID INTERFERENCES IN ROUTING OF CONDUITS.

J. LEAVE PULL STRING IN EMPTY CONDUITS. PLUG OR CAP BOTH ENDS OF EMPTY

CONDUITS AND LABEL AS TO THEIR INTENDED USE.

K. UNLESS OTHERWISE NOTED, ALL CONDUCTORS ARE SIZED FOR COPPER TYPE THWN,

THHN, AND RATED FOR 75 DEGREE C (MINIMUM).

L. UNLESS OTHERWISE NOTED, CIRCUITS ARE SIZED ASSUMING NO MORE THAN THREE

CURRENT CARRYING CONDUCTORS ARE INSTALLED IN A SINGLE CONDUIT.

M. VERIFY ALL REQUIREMENTS AND SIZES FOR OVERCURRENT PROTECTIVE DEVICE,

DISCONNECT SWITCH, CIRCUIT WIRE, AND CONDUIT SIZE WITH THE FINAL APPROVED

MECHANICAL EQUIPMENT TO BE INSTALLED. PROVIDE ALL ELECTRICAL COMPONENTS

AS REQUIRED.

N. FLUSH MOUNT ALL SWITCHES AND RECEPTACLES IN FINISHED AREAS. SWITCHES AND

RECEPTACLES MAY BE SURFACE MOUNTED IN EXPOSED SPACES. UNLESS OTHERWISE

NOTED, CONCEAL ALL CONDUIT IN WALLS, ABOVE ACCESSIBLE CEILING, OR IN FLOOR

SLAB. CONDUIT IN ROOMS WITH NO CEILING AND/OR ARE EXPOSED MAY BE MOUNTED

TO THE BUILDING STRUCTURE. DO NOT INSTALL CONDUITS IN CONCRETE FLOORS

WITH TOPPINGS LESS THAN 3" THICK.

O. CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REINSTALLING ANY EXISTING

CEILING TILES AS REQUIRED FOR THE WORK THAT IS REQUIRED IN THE EXISTING

FACILITY. SCHEDULE ALL INTERIOR WORK THAT MIGHT INTERFERE WITH DAILY

OPERATIONS WITH CONTRACTING OFFICER AT LEAST (2) WEEKS IN ADVANCE. ANY

DAMAGE TO EXISTING FACILITIES BY THE CONTRACTOR SHALL BE CORRECTED, AND

DAMAGED EQUIPMENT (CEILING TILES, ETC.) REPLACED WITH NEW.

P. SEAL ALL CONDUIT PENETRATIONS, USING A LISTED SEALANT FOR THE APPROPRIATE

APPLICATION, OF WALLS, PARTITIONS, FLOORS, ROOF, ETC.

Q. "PROVIDE", "FURNISH", AND "INSTALL", WHERE USED, ARE DEFINED HEREIN AS

CONTRACTOR-PROVIDED, AND CONTRACTOR-INSTALLED. WHERE EQUIPMENT IS TO BE

"PROVIDED," IT IS ALSO TO BE INSTALLED IN ITS ENTIRETY BY THE CONTRACTOR, AND

WHERE EQUIPMENT IS TO BE "INSTALLED," IT IS ALSO TO BE PROVIDED, OR

FURNISHED, IN ITS ENTIRETY BY THE CONTRACTOR. ALL EQUIPMENT INSTALLATIONS

SHALL BE COMPLETE AND OPERATIONAL.

R. WORKING SPACES ABOUT ELECTRICAL EQUIPMENT SHALL BE PER NEC 110.26, WITH

THE EXCEPTION THAT THE ELECTRICAL HEIGHT OF WORKING SPACE SHALL EXTEND

FROM THE FLOOR TO THE STRUCTURAL CEILING. NO PIPING, DUCTS, OR OTHER

EQUIPMENT FOREIGN TO ELECTRICAL SYSTEMS SHALL BE PERMITTED IN THE

WORKING SPACE ABOUT ELECTRICAL EQUIPMENT.

S. PROVIDE ALL SUPPLEMENTAL SUPPORTING DEVICES REQUIRED FOR ELECTRICAL

EQUIPMENT WHERE THE BUILDING STRUCTURE IS NOT SUITABLE FOR DIRECT

MOUNTING.

T. FLEXIBLE CONDUIT MAY ONLY BE USED FOR FINAL EQUIPMENT CONNECTIONS, AND

SHALL BE LIMITED TO 6'-0" IN LENGTH. VERIFY ALL MODULAR FURNITURE AND

EQUIPMENT

M METER (POWER), MANUAL PULL BOX (FIRE ALARM)

MAX MAXIMUM

MCB MAIN CIRCUIT BREAKER

MCCB MOLDED CASE CIRCUIT BREAKER

MDF MAIN DISTRIBUTION FRAME

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MV MEDIUM VOLTAGE

N NEUTRAL, NORMAL

NC NORMALLY-CLOSED

NEC NATIONAL ELECTRICAL CODE

NIC NOT IN CONTRACT

APPLICABLE CODES

A. NFPA 70, NATIONAL ELECTRICAL CODE (NEC)

B. INTERNATIONAL BUILDING CODE (IBC)

C. NFPA 101, LIFE SAFETY CODE

D. INTERNATIONAL ENERGY CONCERVATION CODE (IECC)

EXISTING CONDUIT

VA Project Number:

Building:

Drawing Number:

Project Title:

Project Location:

Issue Date:

Checked By: Drawn By:

Drawing Title:

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

Submission:

ARCHITECT / ENGINEER OF RECORD:

Revisions: Date:

CONSULTANTS:

/8

/4

/8

/2

/4

-1

/2

MEP ENGINEER:

HUITT-ZOLLARS, INC.

500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com

ARCHITECT:

CB DESIGN GROUP

421 KING STREET

SUITE 301

ALEXANDRIA, VA 22314

703-772-4213

POC: PAUL W. BRIDGES

PROFESSIONAL SEAL:

6010 Amarillo Blvd.

Amarillo, TX 79106

2345678910111213141516

B

C

D

E

F

G

H

I

J

12345678910111213141516

THOMAS E. CREEK VA MEDICAL CENTER

22 DECEMBER 2021

504-21-120

JTJR

PROVIDE PRIMARY FEED

TO BUILDING - 1

100% BID SET SUBMISSION

ELECTRICAL ABBREVIATIONS,

LEGEND, AND SYMBOLS

E-001

-2

-1

E

-0

J U

L Y

.p d f

FIRM REGISTRATION F-761

A

P N

L 7 3B

L

P N

L 7 B 3

A

P N

L 7 B 2

P N

L 7 −B1

EQ

S P

L IC

E B

O X

G R

O

UN

D B

AR

P N

L 7 −B3

EC

E N

G

IN

E E

R

IN

G

OI&T

SHOPS

BOILER

WARE-

HOUSE

G N

D S

WAREHOUSE

HBPC

HAS

WAREHOUSE

FISCAL/

CHILLER

F

U E

L

T

A N

K S

LOT E

LO

T I

LOT J LO

T J

AREA 1

LO

T I

LOT G

LOT H

LOT K

LOT L

LOT M

LOT N

LOT A

LO

T B

LOT C

LOT D

SWITCH

SERVICES

CLC

M

EDIC

AL

ARTS

LO

D G

E

Tank

P R

IM

A R Y C

A R E

H A

Z

RECOVERY a nd

THERAPY

CLC

REHAB &

P

ROSTH

ETI

CS

FU

TU

R E

SPECIA

LT

Y C

LI

NIC

CENTER fo r

H O S P

IT

A L

(O R

IG

(S

3°

'0 6"

W

8.

S 89°47'OO" E 1947.94'

L

8.

S

3°

'0 0"

W

.2

8'

(N

°2 '5

E

.4

R

.6 7'

(N 44°16'13" W

496.56')

(N 44°17'57" W

1000.33')

N

°1

'2

E

.2

N 44°15'49" W

496.50'

N 44°15'49" W

1000.00'

S.W. 9TH AVENUE

U .S

H

IG

H W

A Y

H E R N D O N

E . W

A

LK

E R

N . E

D M

A N

W E D M

A N

S . E

D M

A N

(A M

A R

IL

L O

B L V D

14 3

X F

M -2

-1

X F

M R

-2 -2

X F

M R

-2 -3

X F

M R

-2 -1

X

FM

R -2

8-

X

FM

R -2

8-

X

FM

R -2

8-

X

FM

R -4

-2 X

FM

R -4

-1

Separate Feed & Independent Meter

XFM

R -8-1

XFM

R -7-1

XFM

R -4-2

XFM

R -4-1

XFM

R -28-1

XFM

R -28-2

XFM

R -28-3

XFMR-34-1

XFMR-WT-1

XFMR-45-1

XFMR-26-1

XFMR-26-2

XFMR-26-3

XFMR-29-1

XFM

R -44-1

XFM

R

-IC

E

XFM

R -48-1

XFM

R -4

6-

W.

W

A L

K E

R

EXISTING PRIMARY

CIRCUIT FEEDERS

E-011

E-202

E-201

CONSTRUCTION PHASING

PHASE 1 – BUILDING 1 – EXERIOR WORK

1. BLOCK WINDOWS ON BUILDING 1.

2. INSTALL UNDERGROUND DUCT BANKS FROM EXISTING MANHOLE TO NEW TRANSFORMER PRIMARY LOCATIONS AND FROM

TRANSFORMER SECONDARY LOCATION AND NEW SWITCHBOARD LOCATION.

3. INSTALL UNDERGROUND DUCT BANK FROM NEW SWITCHBOARD LOCATION TO BUILDING 1 EXTERIOR WALL.

4. INSTALL NEW TRANSFORMER PADS AND SWITCHBOARD PAD.

5. INSTALL NEW BOLLARDS.

6. INSTALL NEW TRANSFORMERS AND SWITCHBOARD.

7. INSTALL NEW PRIMARY CABLES FROM EXISTING BULIDING 4 TRANSFORMERS TO NEW BUILDING 1 TRANSFORMERS.

8. INSTALL SECONDARY CABLES FROM NEW TRANSFORMERS TO NEW SWITCHBOARD.

PHASE 2 – BUILDING 1 – INTERIOR WORK

1. INSTALL NEW CIRCUIT JUNCTION BOX ABOVE CEILING IN CORRIDOR BETWEEN BUILDING 1 AND BUILDING 4 AND CONNECT TO

NEW CIRCUITS FROM NEW SWITCHBOARD.

2. BUILDING 1 – ELECTRICAL ROOM 1163.

a. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X2 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE

FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X2.

b. REPLACE TRANSFER SWITCH 1-X2.

c. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X3 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE

FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X3.

d. REPLACE TRANSFER SWITCH 1-X3.

e. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X4 IN ELECTRICAL ROOM 1163 AND INSTALL CABLE

FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X4.

f. REPLACE TRANSFER SWITCH 1-X4.

g. REPLACE REMAINING PANELS, TRANSFORMERS, DISCONNECT SWITCHES AND TRANSFER SWITCHES.

3. BUILIDNG 1 – ELECTRICAL ROOM 1129.

a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BC1 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE FROM NEW

SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BC1.

b. REPLACE PANEL 1-BC1.

c. CONNECT TO EXISTING CONDUITS FEEDING TRANSFER SWITCH 1-X1 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE

FROM NEW SWITCHBOARD CIRCUIT TO EXISTING TRANSFER SWITCH 1-X1.

d. REPLACE TRANSFER SWITCH 1-X1.

e. REPLACE REMAINING PANELS, TRANSFORMERS, DISCONNECT SWITCHES AND TRANSFER SWITCHES.

4. BUILDING 1 – ELECTRICAL ROOM 1113A.

a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BA4 IN ELECTRICAL ROOM 1113A AND INSTALL CABLE FROM NEW

SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BA4.

b. REPLACE PANEL 1-BA4.

c. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-BA6 IN ELECTRICAL ROOM 1129 AND INSTALL CABLE FROM NEW

SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-BA6.

d. REPLACE PANEL 1-BA6.

5. BUILDING 1

a. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-4B1 LOCATED ON THE FIFTH LEVEL AND INSTALL CABLE FROM NEW

SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-4B1.

b. REPLACE PANEL 1-4B1.

c. CONNECT TO EXISTING CONDUITS FEEDING PANEL 1-5C8 LOCATED ON THE PENTHOUSE LEVEL AND INSTALL CABLE

FROM NEW SWITCHBOARD CIRCUIT TO EXISTING PANEL 1-5C8.

d. REPLACE PANEL 1-5C8.

6. BUILDING 1 – REPLACE REMAINING PANELS NOT IN THE THREE ELECTRICAL ROOMS ABOVE.

PHASE 3 – BUILDING 7

a. INSTALL NEW ATS IN BUILDING 7.

b. EXTEND GENERATOR CIRCUIT FROM BUILDING 20 TO BUILDING 7 AND CONNECT TO EMERGENCY SIDE OF ATS.

c. EXTEND NORMAL CIRCUIT FROM ATS TO EXISTING BUILDING 7 TRANSORMER.

d. REPLACE SINGLE PHASE PANELS IN BUILDING 7.

e. EXTEND ATS LOAD CIRCUIT TO EXISTING MAIN PANEL IN BUILDING 7.

f. EXTEND CIRCUITS FROM ELEVATORS AND A/C UNITS TO NEW THREE PHASE PANELS.

g. REMOVE GENERATOR CIRCUIT FROM BUILDING 7 TO BUILDING 1 (FEEDS ELEVATORS AND A/C UNITS).

h. INSTALL UPS IN BUILDING 7 AND CONNECT TO NEW BUILDING 7 PANEL AND EXISTING UPS PANEL.

i. REMOVE UPS CIRCUIT FROM BUILDING 7 TO BUILDING 1.

j. REPLACE REMAINING PANELS IN…

This is the start of the file's text. The full file is on GovTribe.