36C25723B0032 0003 VA Amarillo RFI Responses 040823.pdf
PDF 58 KB Posted
- Solicitation number
- 36C25723B0032
About this file
This document contains responses to pre-bid requests for information (RFIs) related to a federal solicitation to provide primary electrical feed to Building 1 at the VA medical center in Amarillo, Texas. The RFI responses clarify that panels 1-3A2, 1-4B1, and 1-2A1E on drawings E-401 and E-503 should remain in place, panel 11C2 is being replaced as indicated on drawing E-401 with specifications provided on drawing E-503, and specifications for the replacement distribution switchboard are included in Addendum A drawings along with the original description on drawing E-402. Clarification is also provided regarding keynotes 13 and 15 on drawing E-100 relating to removing and replacing an existing panel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25723B0032 0003_1.docx | DOCX document | |
| 36C25723B0032 0002_1.docx | DOCX document | |
| R311451 VA Amarillo - ADDENDUM A (RFI) 032923.pdf | ||
| 36C25723B0032 0001 Amendment.pdf | ||
| 36C25723B0032 0001_1.docx | DOCX document | |
| 36C25723B0032 Solicitation.pdf | ||
| VA AMR Elec Bid Set Drawings.pdf | ||
| VA AMR Elec Bid Set Specifications.pdf | ||
| 36C25723B0032_2.docx | DOCX document | |
| VA AMR Elec Bid Set Narrative.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Amarillo, TX – Provide Primary Feed to Building – 1.
Pre-bid RFIs received 4/4/3023
1. Sheet E-401 shows panels 1-3A2 in bold and with no note. Does this panel remain or replace, please provide new panel schedule if replacement.
Panel 1-3A2 should remain. It is shown incorrectly as bold on Sheet E-401. The circuit directory in the panel mistakenly indicates this is panel 1-3CA2. The panel should be 208/120V, 3 phase, 4 wire.
2. Sheet E- 401 shows 1-4B1 in bold as to replace, note 7 states to connect new feeder to exis2ng panel. Please clarify to remain or replace, please provide new panel schedule if replaced.
Panel 1-4B1 should remain and the feeder will be replaced.
3. Sheet E- 401 shows panel 11C2 in bold and note 4 states new panel, no panel schedule is present in any drawings. Please provide new panel schedule.
Panel 11C2 is being replaced as indicated on Sheet ED-401. Keynote No. 6 should be associated with this panel on Sheet ED-401. Sheet E-401 indicates this panel as new. The new panel schedule is located on Sheet E-503. This schedule incorrectly denotes this panel as “1-1C2”.
4. Sheet E- 401 shows new panel 1-12A1E and Sheet E-502 shows new panel schedule for 1-12A1E
"C".... are these the same panel??
Panel “1-12A1E” does not exis2ng on Sheet E-401 or E-502. Perhaps you are referring to Panel
“1-2A1E” on Sheet E-401 and Schedule “1-2A1EC” on Sheet E-503. These are the same panel.
The panel is incorrectly labeled on Sheet E-401.
5. RFI's - Set 2 & Set 4 RFI's Note #1 states Distribu2on Switchboard Specs are in this response and in Addendum A drawings... NO SPECS are to be found. Please provide drawing sheet # and RFI sheet # for Distribu2on Switchboard specifica2ons. Breaker ra2ngs for feeders are needed. ALL informa2on for switchboard is needed.
Switchboard wriAen specifica2on is included in Addendum A. The switchboard descrip2on is included in the original drawings on Sheet E-402.
6. Sheet E -100 Note 13... states remove and replace exis2ng panel "1-BC10". Note 13 is in 2 different places. Please clarify which note 13 is correct.
The keynote 13 near sheet grid F/10 should be Keynote 15. Keynote 15 should read, “Provide new wireway above ceiling for rou2ng new circuits to exis2ng electrical rooms in Building 1.”