(USS RAMAGE) Attachment J-10 20 percent Open and Inspect Milestone Reports Due.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
USS RAMAGE (DDG 61) FY24 Docking Selected Restricted Availability (DSRA)
Solicitation number
N00024-23-R-4417
Issued by

View the file

Other files

File Type Posted
N0002423R4417_CONFORMED through A0007.pdf PDF
N0002423R4417_A0007.pdf PDF
N0002423R4417_CONFORMED through A0006.pdf PDF
N0002423R4417_A0006.pdf PDF
N0002423R4417_A0005.pdf PDF
N0002423R4417_CONFORMED through A0005.pdf PDF
N0002423R4417_A0004.pdf PDF
N0002423R4417_CONFORMED through A0004.pdf PDF
N0002423R4417_A0003.pdf PDF
N0002423R4417_CONFORMED through A0003.pdf PDF
N0002423R4417_CONFORMED through A0002.pdf PDF
N0002423R4417_A0002.pdf PDF
(USS RAMAGE) Attachment J-8 Government Furnished Material (GFM) List_Rev1.xlsx XLSX spreadsheet
N0002423R4417_A0001.pdf PDF
(USS RAMAGE) Attachment S-3 Pre-Proposal Information (PPI) Form_Rev1.xlsx XLSX spreadsheet
CDRL A016 Enc (1) End of Avail Report Template.xlsx XLSX spreadsheet
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-7 IPTD Events SMR_Rev1.docx DOCX document
N0002423R4417_CONFORMED through A0001.pdf PDF
(USS RAMAGE) Attachment J-5 Quality Assurance Surveillance Plan_Rev1.docx DOCX document
USS Ramage N0002423R4417_RFP.pdf PDF
(USS RAM-BAT) CDRL Exhibit B_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment S-2 Past Performance CPARS References.docx DOCX document
(USS RAMAGE) Attachment S-9 Past Performance Questionnaire.docx DOCX document
(USS RAMAGE) Attachment S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
(USS RAM-BAT) CDRL Exhibit A_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment S-4 Manpower Performance Data Sheet.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment S-3A Pre-Proposal Information (PPI) Form.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-5A Quality Assurance Surveillance Plan.docx DOCX document
(USS RAM-BAT) CDRL Exhibit C_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment J-8A Government Furnished Material (GFM) List.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-7A IPTD Events and SMR.docx DOCX document
(USS RAMAGE) Attachment S-5A Eligibility Criteria Data Sheet.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prioritized List

USS RAMAGE (DDG 61) FY24 DSRA - Attachment J-10: 20% Open/Inspect Milestone Reports Due
Work Item No.Work Item TitleParagraph Ref.20% Open/Inspect (Early)

(Insert date from J-3) 20% Open/Inspect (Docking) (Insert date from J-3)

20% Open/Inspect (All)
May 15, 202420% Open/Inspect (Exception)

(Insert date from J-3)

110-11-001Auxiliary Machinery Room Number One Structure; repair3.1 , 3.5
110-11-002Engine Room Number One Structure; repair and preserve3.1.1 , 3.5
110-11-003Engine Room Number 2 Structure; repair and preserve3.1.1 , 3.6
110-11-004Auxiliary Room Number 2 Structure; repair and preserve3.1.1 , 3.6
110-11-005Vacuum Collecting Holding Tank Room Number One Structure; repair and preserve3.1.1 , 3.3
110-11-006Air Conditioning Machinery and Pump Room Structure; repair and preserve3.1.1 , 3.6
110-11-007Generator Room Structure; repair and preserve3.1.1 , 3.2 , 3.4
110-11-008Steering Gear Bilge; repair and preserve3.1.1 , 3.2 , 3.5
110-11-009Sonar Cooling Equipment Room Structure; repair3.1.1 , 3.5
110-11-010Auxiliary Machinery Room Number One Escape Trunk Structure; repair and preserve3.1.1 , 3.2 , 3.5
110-11-011Passage Structure; repair and preserve3.1.1
110-11-012Escape Trunk Structure; repair and preserve3.1.1 ,3.2 , 3.4
110-11-014Underwater Hull; inspect and repair3.2.1 , 3.4.1
110-11-015Supply Department Storeroom Structure; repair and preserve3.2.1
110-11-016Boatswain Storeroom Structure; repair and preserve3.2.1
110-11-017Shell and Margin Plate; repair and preserve3.1.1
110-11-020Underwater Hull; repair3.1.1
110-11-023Auxiliary Machinery Room Number One Transverse Bulkhead and Tank Top; inspect and repair3.2.1
113-11-001Drain Well; repair3.1.1
122-20-001Number 3 Generator Room Bulkhead; repair3.1.1
123-10-001Tank and Void Cleaning and Pumping; accomplish3.1.1
123-11-001Fuel Oil Tank Equalizing Pipe; repair3.2.1 , 3.4.1
123-11-003Compensated Fuel Tank; repair3.2.1 , 3.3.4
123-11-004Compensated Fuel Tank; preserve3.1.2
123-11-005Fuel Oil Service Tank; preserve
123-11-006Fuel Oil Service and Gravity Head Tank; repair3.1.1
123-11-007Auxiliary Machinery Room Number One Bilge; repair3.1.1.1 , 3.4.4
123-11-008Fuel Oil Gravity Head Tank; preserve3.1.4 , 3.3
123-11-009Fuel Oil Tank Equalizing Pipe; replace3.2.1
123-12-001JP-5 Tank; preserve3.2.1
123-12-002JP-5 Tank; repair3.1.2.1
123-14-001Potable Water Tank; repair3.1.2
123-14-002Potable Water Tank; preserve3.2.1
123-15-001Lube Oil Tank; repair and preserve3.4.1
123-17-001Contaminated Oil Tank; preserve3.2
123-17-001Contaminated Oil Tank; preserve3.3
123-17-002Contaminated Oil Tank; repair3.2.1
123-17-003Contaminated Oil Tank; preserve (touch up)3.2
123-19-001Waste Water Tank; preserve3.2.1
123-19-001Waste Water Tank; preserve3.2
123-19-002Waste Water Tank; repair3.2.1
123-19-002Waste Water Tank; repair3.5
123-19-005Refrigeration Drain Collecting Tank; replace
3.2.1
123-21-001Accessible Void; preserve3.2.1
123-21-002Accessible Void; repair3.1.1
123-21-003Accessible Void; preserve (touch up)3.2.1
123-21-004Underwater Log Trunk; repair and preserve3.2.1
123-21-005Fathometer Trunk; repair and preserve3.2.1
123-22-001Chain Locker and Chain Locker Sump; preserve3.2.1
123-22-002Chain Locker and Chain Locker Sump; repair3.1.1
163-11-001Sea Chest; inspect and repair3.3
165-11-001Sonar Dome Pressurization System Valve; replace3.2.1
165-11-002Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish3.10.1
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.3
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.1.1
243-11-002Starboard Stern Tube Shaft Seal; overhaul3.1,1
243-11-003Starboard Waterborne Propulsion Shafting Replacement; accomplish3.2.1
243-12-001Port Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.1,1
243-12-002Port Stern Tube Shaft Seal; overhaul3.2.1
243-12-003Port Waterborne Propulsion Shafting Replacement; accomplish3.1.1
243-12-003Port Waterborne Propulsion Shafting Replacement; accomplish
244-10-001Strut Bearing Thru-Hole Plug; install3.1.1
244-10-002Bearing Reaction Measurement; accomplish3.1.1
244-10-003Stern Tube and Strut Bearing Strap Replacement; accomplish3.1.1
244-11-001Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish3.2.1
244-12-001Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish
245-11-001Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish
245-11-002Number One Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish3.1.1
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.1.1
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.1.1
245-12-001Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish3.1.1
245-12-002Number 2 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish3.1.1
245-12-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair
251-30-001Air Intake and Exhaust Louver; preserve
251-30-001Air Intake and Exhaust Louver; preserve3.2.1
251-30-002Number One Gas Turbine Intake; repair3.1.1
251-30-003Number 2 Gas Turbine Intake; repair3.3.2.1
251-30-003Number 2 Gas Turbine Intake; repair3.3
251-30-004Number One Gas Turbine Module (GTM) Clean Air Intake; repair3.4.8.1
251-30-005Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair3.3.4.1
256-51-001Air Conditioning Condenser Number 4 Inlet Seawater Cooling System Valve; replace3.3.4.1
259-10-001Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair
259-10-002Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair3.1.1
259-10-003Gas Turbine (GTRB) Exhaust Duct Collector; repair3.1.1
259-10-004Uptake CRES Exhaust Ring Deck Insert; install3.4.3.1
262-11-002Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect
264-32-001Number 2 Lube Oil Purifier Heater; clean3.1
321-80-001DDG51 Class AER 92464D, Modify Shore Power Station; accomplish3.1.1
426-22-002Fathometer Cutout Valve; replace
432-80-001ShipAlt DDG51-76922D Composite Electrical Enclosure Installation; accomplish3.1.1
437-21-001Contaminated Oil Tank Level Indicator (TLI), Cable and Transmitter; inspect and replace3.2.1
456-01-001HD-1140/SPY-1D Cooling Skid; repair and preserve3.5.1
456-01-002Spy Array Flange; repair3.2.2.1 , 3.3.1 , 3.4.1
463-89-001AN/SQQ-89 Sonar Transducer, Stave Cable Connectorization and Transducer Element Replacement; accomplish3.2.2.1 , 3.3.1 , 3.4.2
471-90-001ShipAlt DDG51-93687K, Liquid Conditioning Unit (LCU) for the AN/SLQ-32(V)6 Design Modernization; accomplish (OPTION ITEM)3.2.2.1 , 3.3.1
472-11-001Passive Countermeasure System (PCMS) Material Replacement; accomplish3.1.1
474-90-001ShipAlt DDG51-90495K, AWS/SEWIP Remove NTDS to Single Mode Fiber Converter; accomplish (OPTION ITEM)3.1.1
505-10-001Flexible Hose Assembly Replacement; accomplish3.2.2.1
505-11-001Flexible Hose Assembly Replacement; accomplish3.1.1
505-11-002Flexible Hose Assembly Replacement; accomplish
508-11-001Inside Machinery Space Lagging and Insulation Replacement; accomplish3.1
508-12-001Outside Machinery Space Lagging and Insulation Replacement; accomplish3.1
512-11-001Main Deck Fan Room; repair3.1.4
512-11-002Galley and Laundry Ventilation; clean3.1.4
512-11-004Cooling Coil Drain Pan Clean; accomplish3.1.4
512-11-005Ventilation Spool and Vent Screen; replace3.2.3
512-11-006Supply Ventilation Duct; replace3.2.2
514-11-001Chill Water Valve; replace3.2.1.1
514-11-002Fan Coil Assembly (1-352-2) Chill Water Supply and Return Piping; replace
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean3.1.4
520-11-001Sea Valve and Waster Sleeve, Repair and Replace; accomplish3.5.2
520-11-002Underwater Log Sea Valve Assembly; replace3.2.1.1
521-11-001Firemain Valve; replace3.4.1.1
522-90-001ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)3.4.1.1
523-11-001Countermeasure Washdown (CMWD) Piping; repair3.3.1
526-11-001Deck Drain; repair3.3.1
528-10-001Plumbing Drain Piping and Fitting Replacement; accomplish3.3.1
531-80-001DDG51 Class AER 66040D, Navy Standard Reverse Osmosis (NSRO) Desalinator High Pressure Pump Stuffing Box Modernization; accomplish3.3.1
532-11-001Electronic Cooling Water Supply and Return Flexible Hose; repair3.3.1
532-11-002Command and Decision HD-1077/SSQ Cooling Water Skid and Electronic Cooling Water (ECW) Isolation Valve; replace
3.3.1
533-11-001Hot Potable Water Pipe; replace3.3.1
534-61-001Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.3.1
534-61-002Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.4
551-51-001High Pressure Air Compressor (HPAC) Number One and Number 2, Class B Overhaul; repair3.3.1
551-60-001Bleed Air Flexible Hose Assembly Replacement; accomplish3.5.1
551-80-001DDG51 Class AER 64099D Anchor Chain Compressor Control Corrosion; accomplish3.3.1
561-11-001Hydraulic Power Unit Cooler, Cascade Orificial Restrictive Device (CORD); replace3.3
561-80-001DDG51 Class AER 66058D, Steering Hydraulic Power Unit (HPU) Pressure Switch Replacement and Installation of Isolation Mounting HPU Gauge; accomplish3.1
562-11-001Rudder; inspect and repair3.1
562-11-002Rudder Bearing Seal and Rudderstock Seal; replace3.1
562-11-003Rudder Stock Bearing Replacement; accomplish3.1
571-11-001Tilting Sliding Padeye; overhaul and preserve3.1
573-21-001Package Conveyor Structure; repair and preserve3.1
581-11-001Anchor Hawse Pipe and Deck Bolster; repair and preserve3.1
581-11-002Anchor Windlass Wildcat-Capstan; repair3.1
583-11-001Boat Handling and Stowage System; repair3.1
583-11-002Life Raft Cradle Structure; repair3.1
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; install3.5
593-11-002Vacuum, Collection, Holding, and Transfer (VCHT) Valve Remote Operator Welded Deck Box; replace3.2 , 3.3
593-11-003Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean
593-11-004Vacuum Collection Holding Tank (VCHT) Vacuum Pressure Switch and Valve; repair3.3
612-11-001Lifeline Rail Support Pedestal and Hold Down Replacement; accomplish3.4.1
622-12-001Nomex Deck Panel; replace3.5.1
622-12-002Close In Weapon System (CIWS) Grating Platform; replace3.2
623-21-001Accommodation Ladder Bracket; replace and test3.4.1
623-80-001DDG51 Class AER 66048, Accommodation Ladder Feathering Bar Securing Pin; accomplish3.5.9.3
624-11-001Balanced Joiner Door; repair
631-11-001Bilge; preserve
631-13-001Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve3.1.6
631-13-002Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve3.1.6
631-31-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish3.1.6
631-41-001Freeboard; preserve
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repair
512-11-001Main Deck Fan Room; repair3.2
512-11-002Galley and Laundry Ventilation; clean
512-11-003Pallet Truck Stowage Ventilation; replace
512-11-004Cooling Coil Drain Pan Clean; accomplish
512-11-005Ventilation Spool and Vent Screen; replace
512-11-006Supply Ventilation Duct; replace3.1
514-11-001Chill Water Valve; replace3.4.4.1
514-11-002Fan Coil Assembly (1-352-2) Chill Water Supply and Return Piping; replace3.3.2.1
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean3.1.5 , 3.4.3.1
520-11-001Sea Valve and Waster Sleeve, Repair and Replace; accomplish3.2.1.1 , 3.6.6 3.12
520-11-002Underwater Log Sea Valve Assembly; replace3.1.1 , 3.3
521-11-001Firemain Valve; replace3.4
522-90-001ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)
523-11-001Countermeasure Washdown (CMWD) Piping; repair
526-11-001Deck Drain; repair
528-10-001Plumbing Drain Piping and Fitting Replacement; accomplish
531-80-001DDG51 Class AER 66040D, Navy Standard Reverse Osmosis (NSRO) Desalinator High Pressure Pump Stuffing Box Modernization; accomplish
532-11-001Electronic Cooling Water Supply and Return Flexible Hose; repair3.2.1
532-11-002Command and Decision HD-1077/SSQ Cooling Water Skid and Electronic Cooling Water (ECW) Isolation Valve; replace
3.2.1
533-11-001Hot Potable Water Pipe; replace
534-61-001Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.2.1.1
534-61-002Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.2.1.1
551-51-001High Pressure Air Compressor (HPAC) Number One and Number 2, Class B Overhaul; repair3.4.4
551-60-001Bleed Air Flexible Hose Assembly Replacement; accomplish3.1.1.1
551-61-001Masker Air Emitter Belt Flange; repair3.1.1
551-66-001Gas Turbine Bleed Air Regulating Valve; replace3.3
551-80-001DDG51 Class AER 64099D Anchor Chain Compressor Control Corrosion; accomplish
551-80-001DDG51 Class AER 64099D Anchor Chain Compressor Control Corrosion; accomplish3.2.1
561-11-001Hydraulic Power Unit Cooler, Cascade Orificial Restrictive Device (CORD); replace3.2
561-80-001DDG51 Class AER 66058D, Steering Hydraulic Power Unit (HPU) Pressure Switch Replacement and Installation of Isolation Mounting HPU Gauge; accomplish
562-11-001Rudder; inspect and repair3.2.2.1 ,3.4.1 , 3.6.1.1
562-11-002Rudder Bearing Seal and Rudderstock Seal; replace3.2.3.1 , 3.3.3.1
562-11-003Rudder Stock Bearing Replacement; accomplish3.5.1,1 , 3.8.2.1
571-11-001Tilting Sliding Padeye; overhaul and preserve
573-21-001Package Conveyor Structure; repair and preserve3.1.1
581-11-001Anchor Hawse Pipe and Deck Bolster; repair and preserve3.2.1
581-11-002Anchor Windlass Wildcat-Capstan; repair
581-11-003Ground Tackle; inspect and preserve
581-11-003Ground Tackle; inspect and preserve
582-11-001Aft Capstan; repair
583-11-001Boat Handling and Stowage System; repair3.3.3.1 , 3.10.1
583-11-002Life Raft Cradle Structure; repair3.1.1
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; install
593-11-002Vacuum, Collection, Holding, and Transfer (VCHT) Valve Remote Operator Welded Deck Box; replace
593-11-003Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean
593-11-004Vacuum Collection Holding Tank (VCHT) Vacuum Pressure Switch and Valve; repair
612-11-001Lifeline Rail Support Pedestal and Hold Down Replacement; accomplish
612-21-001Helo Safety Net and Frame; repair and replace
612-21-001Helo Safety Net and Frame; repair and replace
622-12-001Nomex Deck Panel; replace
622-12-002Close In Weapon System (CIWS) Grating Platform; replace
623-21-001Accommodation Ladder Bracket; replace and test3.1.1
623-80-001DDG51 Class AER 66048, Accommodation Ladder Feathering Bar Securing Pin; accomplish3.1
624-11-001Balanced Joiner Door; repair
631-11-001Bilge; preserve3.1.1.1
631-13-001Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve3.5.1
631-13-002Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve3.5.1
631-13-004Collective Protection System (CPS) Zone One Fan Room; repair and preserve3.5.1
631-13-004Collective Protection System (CPS) Zone One Fan Room; repair and preserve3,5.1
631-13-005Collective Protection System (CPS) Zone 4 Fan Room; repair3.3.1
631-13-005Collective Protection System (CPS) Zone 4 Fan Room; repair3.2.1
631-13-006Wardroom Fan Coil Unit Enclosure; preserve
631-13-007Cable Trunk; preserve3.2.1
631-13-008Cross Flood Trunk; preserve3.2.1
631-13-009Trash Disposal Room; preserve
631-11-001Bilge; preserve3.1.1.1
631-21-001Mast Preservation; accomplish3.1.2
631-21-002Forward Stack and Superstructure; preserve3.1.1
631-31-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish3.2.1
631-41-001Freeboard; preserve3.1.1
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repair3.2.2
110-11-001Auxiliary Machinery Room Number One Structure; repair3.1 , 3.5
110-11-002Engine Room Number One Structure; repair and preserve3.1.1 , 3.5
110-11-003Engine Room Number 2 Structure; repair and preserve3.1.1 , 3.6
110-11-004Auxiliary Room Number 2 Structure; repair and preserve3.1.1 , 3.6
110-11-005Vacuum Collecting Holding Tank Room Number One Structure; repair and preserve3.1.1 , 3.3
110-11-006Air Conditioning Machinery and Pump Room Structure; repair and preserve3.1.1 , 3.6
110-11-007Generator Room Structure; repair and preserve3.1.1 , 3.2 , 3.4
110-11-008Steering Gear Bilge; repair and preserve3.1.1 , 3.2 , 3.5
110-11-009Sonar Cooling Equipment Room Structure; repair3.1.1 , 3.5
110-11-010Auxiliary Machinery Room Number One Escape Trunk Structure; repair and preserve3.1.1 , 3.2 , 3.5
110-11-011Passage Structure; repair and preserve3.1.1
110-11-012Escape Trunk Structure; repair and preserve3.1.1 ,3.2 , 3.4
110-11-014Underwater Hull; inspect and repair3.2.1 , 3.4.1
110-11-015Supply Department Storeroom Structure; repair and preserve3.2.1
110-11-016Boatswain Storeroom Structure; repair and preserve3.2.1
110-11-017Shell and Margin Plate; repair and preserve3.1.1
110-11-020Underwater Hull; repair3.1.1
110-11-023Auxiliary Machinery Room Number One Transverse Bulkhead and Tank Top; inspect and repair3.2.1
113-11-001Drain Well; repair3.1.1
122-20-001Number 3 Generator Room Bulkhead; repair3.1.1
123-10-001Tank and Void Cleaning and Pumping; accomplish3.1.1
123-11-001Fuel Oil Tank Equalizing Pipe; repair3.2.1 , 3.4.1
123-11-003Compensated Fuel Tank; repair3.2.1 , 3.3.4
123-11-004Compensated Fuel Tank; preserve3.1.2
123-11-005Fuel Oil Service Tank; preserve3.1.3
123-11-006Fuel Oil Service and Gravity Head Tank; repair3.1.1
123-11-007Auxiliary Machinery Room Number One Bilge; repair3.1.1.1 , 3.4.4
123-11-008Fuel Oil Gravity Head Tank; preserve3.1.4 , 3.3
123-11-009Fuel Oil Tank Equalizing Pipe; replace3.2.1
123-12-001JP-5 Tank; preserve3.2.1
123-12-002JP-5 Tank; repair3.1.2.1
123-14-001Potable Water Tank; repair3.1.2
123-14-002Potable Water Tank; preserve3.2.1
123-15-001Lube Oil Tank; repair and preserve3.4.1
123-17-001Contaminated Oil Tank; preserve3.2
123-17-001Contaminated Oil Tank; preserve3.3
123-17-002Contaminated Oil Tank; repair3.2.1
123-17-003Contaminated Oil Tank; preserve (touch up)3.2
123-19-001Waste Water Tank; preserve3.2.1
123-19-001Waste Water Tank; preserve3.2
123-19-002Waste Water Tank; repair3.2.1
123-19-002Waste Water Tank; repair3.5
123-19-005Refrigeration Drain Collecting Tank; replace
3.2.1
123-21-001Accessible Void; preserve3.2.1
123-21-002Accessible Void; repair3.1.1
123-21-003Accessible Void; preserve (touch up)3.2.1
123-21-004Underwater Log Trunk; repair and preserve3.2.1
123-21-005Fathometer Trunk; repair and preserve3.2.1
123-22-001Chain Locker and Chain Locker Sump; preserve3.2.1
123-22-002Chain Locker and Chain Locker Sump; repair3.1.1
163-11-001Sea Chest; inspect and repair3.3
165-11-001Sonar Dome Pressurization System Valve; replace3.2.1
165-11-002Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish3.10.1
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.3
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.1.1
243-11-002Starboard Stern Tube Shaft Seal; overhaul3.1,1
243-11-003Starboard Waterborne Propulsion Shafting Replacement; accomplish3.2.1
243-12-001Port Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)3.1,1
243-12-002Port Stern Tube Shaft Seal; overhaul3.2.1
243-12-003Port Waterborne Propulsion Shafting Replacement; accomplish3.1.1
244-10-001Strut Bearing Thru-Hole Plug; install3.1.1
244-10-002Bearing Reaction Measurement; accomplish3.1.1
244-10-003Stern Tube and Strut Bearing Strap Replacement; accomplish3.1.1
244-11-001Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish3.2.1
244-12-001Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish3.2.2
245-11-001Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish3.1.1
245-11-002Number One Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish3.1.1
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.1.1
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair3.1.1
245-12-001Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish3.1.1
245-12-002Number 2 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish3.1.1
245-12-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair3.1.1
251-30-001Air Intake and Exhaust Louver; preserve3.1.1
251-30-001Air Intake and Exhaust Louver; preserve3.2.1
251-30-002Number One Gas Turbine Intake; repair3.1.1
251-30-003Number 2 Gas Turbine Intake; repair3.3.2.1
251-30-003Number 2 Gas Turbine Intake; repair3.3
251-30-004Number One Gas Turbine Module (GTM) Clean Air Intake; repair3.4.8.1
251-30-005Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair3.3.4.1
256-51-001Air Conditioning Condenser Number 4 Inlet Seawater Cooling System Valve; replace3.3.4.1
259-10-001Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair3.1.1
259-10-002Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair3.1.1
259-10-003Gas Turbine (GTRB) Exhaust Duct Collector; repair3.1.1
259-10-004Uptake CRES Exhaust Ring Deck Insert; install3.4.3.1
262-11-002Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect3.1.1
264-32-001Number 2 Lube Oil Purifier Heater; clean3.1
321-80-001DDG51 Class AER 92464D, Modify Shore Power Station; accomplish3.1.1
426-22-002Fathometer Cutout Valve; replace3.1.1
432-80-001ShipAlt DDG51-76922D Composite Electrical Enclosure Installation; accomplish3.1.1
437-21-001Contaminated Oil Tank Level Indicator (TLI), Cable and Transmitter; inspect and replace3.2.1
456-01-001HD-1140/SPY-1D Cooling Skid; repair and preserve3.5.1
456-01-002Spy Array Flange; repair3.2.2.1 , 3.3.1 , 3.4.1
461-80-001DDG51 Class AER DDG51-66,037D, Sonar Dome Status Panel Solid State Relay Modernization; Accomplish3.2
462-08-001DT-513 Hydrophone and Cable Assembly Replacement; accomplish3.1.3.2
463-89-001AN/SQQ-89 Sonar Transducer, Stave Cable Connectorization and Transducer Element Replacement; accomplish3.2.2.1 , 3.3.1 , 3.4.2
471-90-001ShipAlt DDG51-93687K, Liquid Conditioning Unit (LCU) for the AN/SLQ-32(V)6 Design Modernization; accomplish (OPTION ITEM)3.2.2.1 , 3.3.1
472-11-001Passive Countermeasure System (PCMS) Material Replacement; accomplish3.1.1
474-90-001ShipAlt DDG51-90495K, AWS/SEWIP Remove NTDS to Single Mode Fiber Converter; accomplish (OPTION ITEM)3.1.1
505-10-001Flexible Hose Assembly Replacement; accomplish3.2.2.1
505-11-001Flexible Hose Assembly Replacement; accomplish3.1.1
505-11-002Flexible Hose Assembly Replacement; accomplish3.1.4
508-11-001Inside Machinery Space Lagging and Insulation Replacement; accomplish3.1
508-12-001Outside Machinery Space Lagging and Insulation Replacement; accomplish3.1
512-11-001Main Deck Fan Room; repair3.1.4
512-11-002Galley and Laundry Ventilation; clean3.1.4
512-11-004Cooling Coil Drain Pan Clean; accomplish3.1.4
512-11-005Ventilation Spool and Vent Screen; replace3.2.3
512-11-006Supply Ventilation Duct; replace3.2.2
514-11-001Chill Water Valve; replace3.2.1.1
514-11-002Fan Coil Assembly (1-352-2) Chill Water Supply and Return Piping; replace3.1.3
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean3.1.4
520-11-001Sea Valve and Waster Sleeve, Repair and Replace; accomplish3.5.2
520-11-002Underwater Log Sea Valve Assembly; replace3.2.1.1
521-11-001Firemain Valve; replace3.4.1.1
522-90-001ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)3.4.1.1
523-11-001Countermeasure Washdown (CMWD) Piping; repair3.3.1
526-11-001Deck Drain; repair3.3.1
528-10-001Plumbing Drain Piping and Fitting Replacement; accomplish3.3.1
531-80-001DDG51 Class AER 66040D, Navy Standard Reverse Osmosis (NSRO) Desalinator High Pressure Pump Stuffing Box Modernization; accomplish3.3.1
532-11-001Electronic Cooling Water Supply and Return Flexible Hose; repair3.3.1
532-11-002Command and Decision HD-1077/SSQ Cooling Water Skid and Electronic Cooling Water (ECW) Isolation Valve; replace
3.3.1
534-61-001Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.3.1
534-61-002Oily Waste Water Transfer Piping and Fitting Replacement; accomplish3.4
551-51-001High Pressure Air Compressor (HPAC) Number One and Number 2, Class B Overhaul; repair3.3.1
551-60-001Bleed Air Flexible Hose Assembly Replacement; accomplish3.5.1
551-80-001DDG51 Class AER 64099D Anchor Chain Compressor Control Corrosion; accomplish3.1
561-11-001Hydraulic Power Unit Cooler, Cascade Orificial Restrictive Device (CORD); replace3.4.4.1
561-80-001DDG51 Class AER 66058D, Steering Hydraulic Power Unit (HPU) Pressure Switch Replacement and Installation of Isolation Mounting HPU Gauge; accomplish3.3.2.1
562-11-001Rudder; inspect and repair3.1.5 , 3.4.3.1
562-11-002Rudder Bearing Seal and Rudderstock Seal; replace3.2.1.1 , 3.6.6 3.12
562-11-003Rudder Stock Bearing Replacement; accomplish3.1.1 , 3.3
571-11-001Tilting Sliding Padeye; overhaul and preserve3.4
573-21-001Package Conveyor Structure; repair and preserve3.1
581-11-001Anchor Hawse Pipe and Deck Bolster; repair and preserve3.1
581-11-002Anchor Windlass Wildcat-Capstan; repair3.1
583-11-001Boat Handling and Stowage System; repair3.1
583-11-002Life Raft Cradle Structure; repair3.1
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; install3.5
593-11-002Vacuum, Collection, Holding, and Transfer (VCHT) Valve Remote Operator Welded Deck Box; replace3.2 , 3.3
593-11-003Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean3.2.1
593-11-004Vacuum Collection Holding Tank (VCHT) Vacuum Pressure Switch and Valve; repair3.3
624-11-001Balanced Joiner Door; repair
631-11-001Bilge; preserve3.1.1.1
631-13-001Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve3.1.1.1
631-13-002Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve3.1.6
631-31-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish3.1.6
631-41-001Freeboard; preserve3.1.1
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repair3.2.2
3.2

Sheet1

110-11-001Auxiliary Machinery Room Number One Structure; repair
110-11-002Engine Room Number One Structure; repair and preserve
110-11-003Engine Room Number 2 Structure; repair and preserve
110-11-004Auxiliary Room Number 2 Structure; repair and preserve
110-11-005Vacuum Collecting Holding Tank Room Number One Structure; repair and preserve
110-11-006Air Conditioning Machinery and Pump Room Structure; repair and preserve
110-11-007Generator Room Structure; repair and preserve
110-11-008Steering Gear Bilge; repair and preserve
110-11-009Sonar Cooling Equipment Room Structure; repair
110-11-010Auxiliary Machinery Room Number One Escape Trunk Structure; repair and preserve
110-11-011Passage Structure; repair and preserve
110-11-012Escape Trunk Structure; repair and preserve
110-11-014Underwater Hull; inspect and repair
110-11-015Supply Department Storeroom Structure; repair and preserve
110-11-016Boatswain Storeroom Structure; repair and preserve
110-11-017Shell and Margin Plate; repair and preserve
110-11-020Underwater Hull; repair
110-11-023Auxiliary Machinery Room Number One Transverse Bulkhead and Tank Top; inspect and repair
113-11-001Drain Well; repair
122-20-001Number 3 Generator Room Bulkhead; repair
123-10-001Tank and Void Cleaning and Pumping; accomplish
123-11-001Fuel Oil Tank Equalizing Pipe; repair
123-11-003Compensated Fuel Tank; repair
123-11-004Compensated Fuel Tank; preserve
123-11-005Fuel Oil Service Tank; preserve
123-11-006Fuel Oil Service and Gravity Head Tank; repair
123-11-007Auxiliary Machinery Room Number One Bilge; repair
123-11-008Fuel Oil Gravity Head Tank; preserve
123-11-009Fuel Oil Tank Equalizing Pipe; replace
123-12-001JP-5 Tank; preserve
123-12-002JP-5 Tank; repair
123-14-001Potable Water Tank; repair
123-14-002Potable Water Tank; preserve
123-15-001Lube Oil Tank; repair and preserve
123-17-001Contaminated Oil Tank; preserve
123-17-001Contaminated Oil Tank; preserve
123-17-002Contaminated Oil Tank; repair
123-17-003Contaminated Oil Tank; preserve (touch up)
123-19-001Waste Water Tank; preserve
123-19-001Waste Water Tank; preserve
123-19-002Waste Water Tank; repair
123-19-002Waste Water Tank; repair
123-19-005Refrigeration Drain Collecting Tank; replace
123-21-001Accessible Void; preserve
123-21-002Accessible Void; repair
123-21-003Accessible Void; preserve (touch up)
123-21-004Underwater Log Trunk; repair and preserve
123-21-005Fathometer Trunk; repair and preserve
123-22-001Chain Locker and Chain Locker Sump; preserve
123-22-002Chain Locker and Chain Locker Sump; repair
163-11-001Sea Chest; inspect and repair
165-11-001Sonar Dome Pressurization System Valve; replace
165-11-002Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)
243-11-001Starboard Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)
243-11-002Starboard Stern Tube Shaft Seal; overhaul
243-11-003Starboard Waterborne Propulsion Shafting Replacement; accomplish
243-12-001Port Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)
243-12-002Port Stern Tube Shaft Seal; overhaul
243-12-003Port Waterborne Propulsion Shafting Replacement; accomplish
243-12-003Port Waterborne Propulsion Shafting Replacement; accomplish
244-10-001Strut Bearing Thru-Hole Plug; install
244-10-002Bearing Reaction Measurement; accomplish
244-10-003Stern Tube and Strut Bearing Strap Replacement; accomplish
244-11-001Starboard Outboard Propulsion Shafting Bearing Clearance Measurement; accomplish
244-12-001Port Outboard Propulsion Shafting, Bearing Clearance Measurement; accomplish
245-11-001Number One Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish
245-11-002Number One Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair
245-11-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repair
245-12-001Number 2 Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplish
245-12-002Number 2 Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Replacement; accomplish
245-12-003Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repair
251-30-001Air Intake and Exhaust Louver; preserve
251-30-001Air Intake and Exhaust Louver; preserve
251-30-002Number One Gas Turbine Intake; repair
251-30-003Number 2 Gas Turbine Intake; repair
251-30-003Number 2 Gas Turbine Intake; repair
251-30-004Number One Gas Turbine Module (GTM) Clean Air Intake; repair
251-30-005Number 2 Gas Turbine Module (GTM) Clean Air Intake; repair
256-51-001Air Conditioning Condenser Number 4 Inlet Seawater Cooling System Valve; replace
259-10-001Number 2 Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair
259-10-002Number One Gas Turbine Mixing Room, Uptake and Boundary Layer Infra-Red Suppression System (BLISS) Cap; repair
259-10-003Gas Turbine (GTRB) Exhaust Duct Collector; repair
259-10-004Uptake CRES Exhaust Ring Deck Insert; install
262-11-002Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect
264-32-001Number 2 Lube Oil Purifier Heater; clean
321-80-001DDG51 Class AER 92464D, Modify Shore Power Station; accomplish
426-22-002Fathometer Cutout Valve; replace
432-80-001ShipAlt DDG51-76922D Composite Electrical Enclosure Installation; accomplish
437-21-001Contaminated Oil Tank Level Indicator (TLI), Cable and Transmitter; inspect and replace
456-01-001HD-1140/SPY-1D Cooling Skid; repair and preserve
456-01-002Spy Array Flange; repair
463-89-001AN/SQQ-89 Sonar Transducer, Stave Cable Connectorization and Transducer Element Replacement; accomplish
471-90-001ShipAlt DDG51-93687K, Liquid Conditioning Unit (LCU) for the AN/SLQ-32(V)6 Design Modernization; accomplish (OPTION ITEM)
472-11-001Passive Countermeasure System (PCMS) Material Replacement; accomplish
474-90-001ShipAlt DDG51-90495K, AWS/SEWIP Remove NTDS to Single Mode Fiber Converter; accomplish (OPTION ITEM)
505-10-001Flexible Hose Assembly Replacement; accomplish
505-11-001Flexible Hose Assembly Replacement; accomplish
505-11-002Flexible Hose Assembly Replacement; accomplish
508-11-001Inside Machinery Space Lagging and Insulation Replacement; accomplish
508-12-001Outside Machinery Space Lagging and Insulation Replacement; accomplish
512-11-001Main Deck Fan Room; repair
512-11-002Galley and Laundry Ventilation; clean
512-11-004Cooling Coil Drain Pan Clean; accomplish
512-11-005Ventilation Spool and Vent Screen; replace
512-11-006Supply Ventilation Duct; replace
514-11-001Chill Water Valve; replace
514-11-002Fan Coil Assembly (1-352-2) Chill Water Supply and Return Piping; replace
514-20-001Air Conditioning (AC) Plant Condenser; mechanically clean
520-11-001Sea Valve and Waster Sleeve, Repair and Replace; accomplish
520-11-002Underwater Log Sea Valve Assembly; replace
521-11-001Firemain Valve; replace
522-90-001ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)
523-11-001Countermeasure Washdown (CMWD) Piping; repair
526-11-001Deck Drain; repair
528-10-001Plumbing Drain Piping and Fitting Replacement; accomplish
531-80-001DDG51 Class AER 66040D, Navy Standard Reverse Osmosis (NSRO) Desalinator High Pressure Pump Stuffing Box Modernization; accomplish
532-11-001Electronic Cooling Water Supply and Return Flexible Hose; repair
532-11-002Command and Decision HD-1077/SSQ Cooling Water Skid and Electronic Cooling Water (ECW) Isolation Valve; replace
533-11-001Hot Potable Water Pipe; replace
534-61-001Oily Waste Water Transfer Piping and Fitting Replacement; accomplish
534-61-002Oily Waste Water Transfer Piping and Fitting Replacement; accomplish
551-51-001High Pressure Air Compressor (HPAC) Number One and Number 2, Class B Overhaul; repair
551-60-001Bleed Air Flexible Hose Assembly Replacement; accomplish
551-80-001DDG51 Class AER 64099D Anchor Chain Compressor Control Corrosion; accomplish
561-11-001Hydraulic Power Unit Cooler, Cascade Orificial Restrictive Device (CORD); replace
561-80-001DDG51 Class AER 66058D, Steering Hydraulic Power Unit (HPU) Pressure Switch Replacement and Installation of Isolation Mounting HPU Gauge; accomplish
562-11-001Rudder; inspect and repair
562-11-002Rudder Bearing Seal and Rudderstock Seal; replace
562-11-003Rudder Stock Bearing Replacement; accomplish
571-11-001Tilting Sliding Padeye; overhaul and preserve
573-21-001Package Conveyor Structure; repair and preserve
581-11-001Anchor Hawse Pipe and Deck Bolster; repair and preserve
581-11-002Anchor Windlass Wildcat-Capstan; repair
583-11-001Boat Handling and Stowage System; repair
583-11-002Life Raft Cradle Structure; repair
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Ejector Pump and Motor; install
593-11-002Vacuum, Collection, Holding, and Transfer (VCHT) Valve Remote Operator Welded Deck Box; replace
593-11-003Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically clean
593-11-004Vacuum Collection Holding Tank (VCHT) Vacuum Pressure Switch and Valve; repair
612-11-001Lifeline Rail Support Pedestal and Hold Down Replacement; accomplish
622-12-001Nomex Deck Panel; replace
622-12-002Close In Weapon System (CIWS) Grating Platform; replace
623-21-001Accommodation Ladder Bracket; replace and test
623-80-001DDG51 Class AER 66048, Accommodation Ladder Feathering Bar Securing Pin; accomplish
624-11-001Balanced Joiner Door; repair
631-11-001Bilge; preserve
631-13-001Collective Protection System (CPS) Zone 2 Fan Room; repair and preserve
631-13-002Collective Protection System (CPS) Zone 3 Fan Room; repair and preserve
631-31-001Underwater Hull Preservation with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish
631-41-001Freeboard; preserve
633-21-001Impressed Current Cathodic Protection (ICCP) System; inspect and repair