N0002423R4417_CONFORMED through A0005.pdf

PDF 2 MB Posted

Attached to
USS RAMAGE (DDG 61) FY24 Docking Selected Restricted Availability (DSRA)
Solicitation number
N00024-23-R-4417
Issued by

View the file

Other files

File Type Posted
N0002423R4417_CONFORMED through A0007.pdf PDF
N0002423R4417_A0007.pdf PDF
N0002423R4417_CONFORMED through A0006.pdf PDF
N0002423R4417_A0006.pdf PDF
N0002423R4417_A0005.pdf PDF
N0002423R4417_A0004.pdf PDF
N0002423R4417_CONFORMED through A0004.pdf PDF
N0002423R4417_A0003.pdf PDF
N0002423R4417_CONFORMED through A0003.pdf PDF
N0002423R4417_CONFORMED through A0002.pdf PDF
N0002423R4417_A0002.pdf PDF
(USS RAMAGE) Attachment J-8 Government Furnished Material (GFM) List_Rev1.xlsx XLSX spreadsheet
N0002423R4417_A0001.pdf PDF
(USS RAMAGE) Attachment S-3 Pre-Proposal Information (PPI) Form_Rev1.xlsx XLSX spreadsheet
CDRL A016 Enc (1) End of Avail Report Template.xlsx XLSX spreadsheet
CDRL A017 Encl (1) Monthly Manning Report Template.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-7 IPTD Events SMR_Rev1.docx DOCX document
N0002423R4417_CONFORMED through A0001.pdf PDF
(USS RAMAGE) Attachment J-5 Quality Assurance Surveillance Plan_Rev1.docx DOCX document
USS Ramage N0002423R4417_RFP.pdf PDF
(USS RAM-BAT) CDRL Exhibit B_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment S-2 Past Performance CPARS References.docx DOCX document
(USS RAMAGE) Attachment S-9 Past Performance Questionnaire.docx DOCX document
(USS RAMAGE) Attachment S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
(USS RAM-BAT) CDRL Exhibit A_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment S-4 Manpower Performance Data Sheet.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment S-3A Pre-Proposal Information (PPI) Form.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-5A Quality Assurance Surveillance Plan.docx DOCX document
(USS RAM-BAT) CDRL Exhibit C_Signed - 11Jan23.pdf PDF
(USS RAMAGE) Attachment J-8A Government Furnished Material (GFM) List.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
(USS RAMAGE) Attachment J-7A IPTD Events and SMR.docx DOCX document
(USS RAMAGE) Attachment S-5A Eligibility Criteria Data Sheet.docx DOCX document
(USS RAMAGE) Attachment J-10 20 percent Open and Inspect Milestone Reports Due.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local t ime

X

A X B X C X D

EX

X

G F 169 - 182

183 - 210 X H 211 - 221 jonathan.m.overton3.civ@us.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A3 1 221

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00024 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

JONATHAN M OVERTON (202)781-2377

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 79

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

80 - 116 117 - 118

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

119 - 123

124 - 130 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 131 - 140 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 141 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

142 - 167

PART II - CO NTRACT CLAUSES

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2030

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0002423R4417C

5. DATE ISSUED

13 Jun 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0002423R4417

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

CLIN

Number

1 Lot

RESERVED

FFP

RESERVED (Availability Preparation) FOB: Destination

PURCHASE REQUEST NUMBER: N0002423R4417C

NET AMT

RESERVED

FFP

RESERVED (Advanced Material Procurement)

CDRLs

FFP

RESERVED FOR CDRLs

TYCOM BASE Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

OPTION Starboard Waterborne Propulsion Shafting

FFP

Starboard Waterborne Propulsion Shafting; inspect and repair

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Port Waterborne Propulsion Shafting

FFP

Port Waterborne Propulsion Shafting; inspect and repair (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Barge for Anchor; provide

FFP

Barge for Anchor; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-86820K

FFP

ShipAlt DDG51-86820K, Women At Sea Berthing Annex Number 4, 5 and 6;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-94624K, TI12/12R

FFP

ShipAlt DDG51-94624K, TI12/12R Common Processing System (CPS);

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-96346K, AN/SQQ89A(V)15

FFP

ShipAlt DDG51-96346K, AN/SQQ89A(V)15 Tech Refresh W/TI-20 HW;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-96840K

FFP

ShipAlt DDG51-96840K, Harpoon Weapon System Removal; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-93687K

FFP

ShipAlt DDG51-93687K, Liquid Conditioning Unit (LCU) for the AN/SLQ- 32(V)6 Design Modernization; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-90495K, AWS/SEWIP

FFP

ShipAlt DDG51-90495K, AWS/SEWIP Remove NTDS to Single Mode Fiber Converter; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-80255K

FFP

ShipAlt DDG51-80255K, Replace Magazine Fire Detection System; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Officer Living Space Habitability

FFP

Officer Living Space Habitability Project (BOFF-S1314) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Officer Living Space Habitability

FFP

Officer Living Space Habitability Project (BOFF-S9779) Installation; accomplish

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Officers Sanitary Space Habitability

FFP

Officers Sanitary Space Habitability Project (HOFF-S1322) Installation;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Officers Sanitary Space Habitability

FFP

Officers Sanitary Space Habitability Project (HOFF-S9780) Installation;

accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION OrdAlt DDG51-94624K, TI-12H

FFP

OrdAlt DDG51-94624K, TI-12H Common Processing System (CPS) Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-98313K, (VDR)

FFP

ShipAlt DDG51-98313K, Voyage Data Recorder (VDR), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-95861K, AN/USQ-T52A

FFP

ShipAlt DDG51-95861K, AN/USQ-T52A Training Interface Unit, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt 80315K

FFP

ShipAlt 80315K, Replace Aqueous Film Forming Foam (AFFF) and Counter Measure Wash Down (CMWD) Solenoid Operated Pilot Valve (SOPV), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-97437K

FFP

ShipAlt DDG51-97437K, AWS Edge Switch Enclosure Installation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Engineering Change (EC) DDG51-98814K

FFP

Engineering Change (EC) DDG51-98814K, Navy Cash 2.0, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-98418K

FFP

ShipAlt DDG51-98418K, High Frequency (HF) Terminal Mod Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-87785K, AS-4775

FFP

ShipAlt DDG51-87785K, AS-4775 Link 16 Antenna Replacement, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-84646K

FFP

ShipAlt DDG51-84646K, Ships Signal Exploitation Equipment (SSEE) Modifications, Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-75360K

FFP

ShipAlt DDG51-84646K, Ships Signal Exploitation Equipment (SSEE) Modifications, Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-96034K, BFTN AN/USQ-195A

FFP

ShipAlt DDG51-96034K, BFTN AN/USQ-195A (V)1 HW, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-91027K, GPNTS(V)4, Alt

FFP

ShipAlt DDG51-91027K, GPNTS(V)4, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION OrdAlt 80817, (ACSSFC)

FFP

OrdAlt 80817, Air Cooled Solid State Frequency (ACSSFC) Insulated Gate Bipolar Translator Alteration Installation Team (AIT) Support Service;

provide(OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-86222K and 96346K

FFP

ShipAlt DDG51-86222K and 96346K, AN/SQQ-89 A(V)15 Tech Refresh with TI 20 HW AN/UQN-10 NGF (Fathometer), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-79719K, AN/SQR-4

FFP

ShipAlt DDG51-79719K, AN/SQR-4 KU-Band Upgrade, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-94979K

FFP

ShipAlt DDG51-94979K, HM and E Condition System, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG-51-93584K

FFP

ShipAlt DDG-51-93584K, AIS V1 Cyber Hardening, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-86033K, MOS Mod Alt (AIT)

FFP

ShipAlt DDG51-86033K, MOS Mod Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG-51-90149K

FFP

ShipAlt DDG-51-90149K, ADNS AN/USQ-144L(V)2, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-89715K

FFP

ShipAlt DDG51-89715K, Ships Signal Exploitation Equipment (SSEE) Increment F System, Alteration Installation Team (AIT) Support Service; provide (OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION ShipAlt DDG51-97990K

FFP

ShipAlt DDG51-97990K, RTSO Own Force Monitoring (OFM), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Messing and Berthing Barge

FFP

Messing and Berthing Barge, Temporary Service, Inspection and Repair in Contractor Plant, Electric Barge; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Barge Temporary Service

FFP

Barge Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant; accomplish (OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Messing and Berthing Barge

FFP

Messing and Berthing Barge Ocean Tow Service; provide

(COASTWIDE/OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Temporary Galley and Messing Facility

FFP

Temporary Galley and Messing Facility; provide (COASTWIDE/OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Temporary Duty Section Berthing Off-Ship

FFP

Temporary Duty Section Berthing Off-Ship; provide (COASTWIDE/OPTION

ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

OPTION Ship Towing Service; provide

FFP

Ship Towing Service; provide (COASTWIDE/OPTION ITEM)

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A - F

TYCOM BASE Work Items

FFP

PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS

ONBOARD USS RAMAGE (DDG 61) DURING FY24 DOCKING SELECTED

RESTRICTED AVAILABILITY (DSRA) (Non-prorated WIs – See attachment J-4 for list)

The Contractor shall prepare for and accomplish repair and alterations during the Docking Selected Restricted Availability (DSRA) onboard USS RAMAGE (DDG

61) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.

See Notes A, B and D - F

OPTION Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4.

See Notes A - F

Growth Reservation for CLIN 0004

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4.

See Notes A, B and D - F

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4.

See Notes A, B and D - F

FFP

Growth Reservation Associated with CLIN 0004. See attachment J-4.

See Notes A, B and D - F

OPTION Growth Reservation for CLIN 0005

FFP

Growth Reservation Associated with CLIN 0005. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0006

FFP

Growth Reservation Associated with CLIN 0006. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0007

FFP

Growth Reservation Associated with CLIN 0007. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0008

FFP

Growth Reservation Associated with CLIN 0008. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0009

FFP

Growth Reservation Associated with CLIN 0009. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0010

FFP

Growth Reservation Associated with CLIN 0010. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0011

FFP

Growth Reservation Associated with CLIN 0011. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0012

FFP

Growth Reservation Associated with CLIN 0012. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0013

FFP

Growth Reservation Associated with CLIN 0013. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0014

FFP

Growth Reservation Associated with CLIN 0014. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0015

FFP

Growth Reservation Associated with CLIN 0015. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0016

FFP

Growth Reservation Associated with CLIN 0016. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0017

FFP

Growth Reservation Associated with CLIN 0017. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0018

FFP

Growth Reservation Associated with CLIN 0018. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0019

FFP

Growth Reservation Associated with CLIN 0019. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0020

FFP

Growth Reservation Associated with CLIN 0020. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0021

FFP

Growth Reservation Associated with CLIN 0021. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0022

FFP

Growth Reservation Associated with CLIN 0022. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0023

FFP

Growth Reservation Associated with CLIN 0023. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0024

FFP

Growth Reservation Associated with CLIN 0024. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0025

FFP

Growth Reservation Associated with CLIN 0025. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0026

FFP

Growth Reservation Associated with CLIN 0026. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0027

FFP

Growth Reservation Associated with CLIN 0027. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0028

FFP

Growth Reservation Associated with CLIN 0028. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0029

FFP

Growth Reservation Associated with CLIN 0029. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0030

FFP

Growth Reservation Associated with CLIN 0030. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0031

FFP

Growth Reservation Associated with CLIN 0031. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0032

FFP

Growth Reservation Associated with CLIN 0032. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0033

FFP

Growth Reservation Associated with CLIN 0033. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0034

FFP

Growth Reservation Associated with CLIN 0034. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0035

FFP

Growth Reservation Associated with CLIN 0035. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0036

FFP

Growth Reservation Associated with CLIN 0036. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0037

FFP

Growth Reservation Associated with CLIN 0037. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0038

FFP

Growth Reservation Associated with CLIN 0038. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0039

FFP

Growth Reservation Associated with CLIN 0039. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0040

FFP

Growth Reservation Associated with CLIN 0040. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0041

FFP

Growth Reservation Associated with CLIN 0041. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0042

FFP

Growth Reservation Associated with CLIN 0042. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0043

FFP

Growth Reservation Associated with CLIN 0043. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0044

FFP

Growth Reservation Associated with CLIN 0044. See attachment J-4.

See Notes A - F

OPTION Growth Reservation for CLIN 0045

FFP

Growth Reservation Associated with CLIN 0045. See attachment J-4.

See Notes A - F

Growth Reservation for CLIN 0046

FFP

Growth Reservation Associated with CLIN 0046. See attachment J-4.

See Notes A, B and D - F

OPTION Growth Reservation for CLIN 0046

FFP

Growth Reservation Associated with CLIN 0046. See attachment J-4.

See Notes A, B and D - F

OPTION Growth Reservation for CLIN 0046

FFP

Growth Reservation Associated with CLIN 0046. See attachment J-4.

See Notes A - F

NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR

1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS RAMAGE (DDG 61) DSRA:

a. 71,293 direct labor hours (labor hours) and $2,839,631 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS RAMAGE (DDG 61) DSRA work package under CLINS 0047 – 0094.

2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.

3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.

4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.

5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.

Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’

Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’

6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.

7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.

8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in

Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead

(including G&A), or profit into the settled cost of materials deducted from the material reservation.

9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price.

This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO. “SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.

NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND

NEW WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:

Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.

5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as

Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor (competitive quotes if required by the ACO) quotes must be submitted with the contractor’s COPA in response to RCCs, GMRs and RTRs issued by the Contracting Officer. For new work only, these subcontractor quotes must be competitively acquired.