USP LEE Project 25Z1AA9 Pic 5.pdf

PDF 409 KB Posted

Attached to
Replace Boiler Tube Assembly Bundles
Solicitation number
15B11725Q00000001
Issued by

About this file

This file contains an image of a National Board certification tag for an institutional boiler at the United States Penitentiary LEE in Pennington Gap, VA. The tag shows key technical specifications for a boiler that is part of Project #25Z1AA9 "Re-Tube Boiler".

The certification tag indicates the boiler was certified by Cleaver Brooks with manufacturer's serial number F111582. The boiler's specifications include a maximum water pressure of 150 PSI, maximum water temperature of 250°F, and BHS of 1246.7 square feet. The tag appears to be mounted on a green-painted surface and shows some age/wear. This documentation appears to be related to a solicitation for replacing boiler tube assembly bundles at the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pictures and Information are for Informational Purposes Only - Not to Scale

United Stated Penitentiary LEE

Hickory Flats Road, 131 Prison Drive

Pennington Gap, VA 24277

B&F Project # 25Z1AA9 “Re-Tube Boiler”

Institutional Boiler National Certification Tag

File details come from the government source that posted it. Updated .