USP LEE Project 25Z1AA9 Pic 5.pdf
PDF 409 KB Posted
- Attached to
- Replace Boiler Tube Assembly Bundles
- Solicitation number
- 15B11725Q00000001
About this file
This file contains an image of a National Board certification tag for an institutional boiler at the United States Penitentiary LEE in Pennington Gap, VA. The tag shows key technical specifications for a boiler that is part of Project #25Z1AA9 "Re-Tube Boiler".
The certification tag indicates the boiler was certified by Cleaver Brooks with manufacturer's serial number F111582. The boiler's specifications include a maximum water pressure of 150 PSI, maximum water temperature of 250°F, and BHS of 1246.7 square feet. The tag appears to be mounted on a green-painted surface and shows some age/wear. This documentation appears to be related to a solicitation for replacing boiler tube assembly bundles at the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pictures and Information are for Informational Purposes Only - Not to Scale
United Stated Penitentiary LEE
Hickory Flats Road, 131 Prison Drive
Pennington Gap, VA 24277
B&F Project # 25Z1AA9 “Re-Tube Boiler”
Institutional Boiler National Certification Tag
File details come from the government source that posted it. Updated .