This is a Statement of Work (SOW) for boiler retubing services at the United States Penitentiary (USP) Lee County in Pennington Gap, VA. The SOW outlines requirements for replacing all 231 boiler tubes in boiler #1, a Cleaver Brooks model FLX-200-1200-160HW (Serial #BT6783) located in the institutional Powerhouse.

The contractor must provide all equipment, labor, materials to remove and replace the tubes with Cleaver Brooks 1-1/2" OD x .095 SA178A tubes that meet OEM specifications. Key requirements include performing lockout/tagout procedures, gas leak testing, removal of side panels and insulation, hydrostatic testing after installation, and obtaining Board Certification for the pressure vessel. The work must comply with multiple standards including NEC, NFPA, ASME, and OSHA regulations. Work hours are 8:00 AM - 3:00 PM Monday-Friday, excluding federal holidays. The contractor must obtain security clearance for all personnel, provide required PPE, and offer a warranty covering materials and workmanship. All contractor personnel must pass security clearance to work at this high-security facility that houses approximately 1,536 inmates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

USP LEE 25Z1AA9

Retube Boiler

I. SPECIFICATIONS:

A. Introduction

The Federal Bureau of Prisons (FBOP), United States Penitentiary (USP) Lee County, located at Hickory Flats Road, Pennington Gap, VA 24277 intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, and incidentals to remove and replace all 231 boiler tubes for boiler # 1 located at the institutional Powerhouse located on the grounds of the United States Penitentiary LEE in accordance with this SOW. The supplier is responsible for compliance with all applicable codes, regulations, and manufacturers’ recommendations.

B. Background

USP LEE is a high security penitentiary, which houses approximately 1536 inmates and a low security satellite prison camp that housing approximately 130 inmates. The prison began receiving inmates in January 2001. The institution is currently in need of the total replacement of all 231 boiler tubes for boiler #1.

C. Objectives

Upon completion of the installation, USP LEE’s objective is to have a fully functioning, non-leaking, and hydrostatically tested boiler. Pressure vessel to be Board Certified.

D. Scope of Work

The equipment in need of repairs is a Cleaver Brooks boiler, model # FLX-200-1200-160HW Serial#

BT6783. This boiler is known and referred to as boiler #1. Contractor to provide complete boiler retube on the FLX boiler as specified below:

• The boiler tubes are to be Cleaver Brooks 1-1/2” OD x .095 SA178A. Qty: 231 tubes. Tubes must meet OEM specs at a minimum.

• Contractor to disengage power from the main breaker, close all gas valves and perform lockout/tagout per NFPA-70E procedures.

• Contractor to test boiler for any gas leaks before the initiation of any work.

• Contractor shall remove the boiler side panels; this includes insulation. Contractor to expose all boiler tubes and remove all boiler tubes.

• Contractor to inspect the interior of the boiler after tubes have been removed. USP

LEE personnel will assist contractor in inspecting for any damages prior to the new tubes being installed. USP LEE personnel will grant the contractor permission to continue the assigned work after their satisfied inspection.

bop44962 Approved

• Contractor to install all new tubes in the correct orientation and order per manufacturer.

• Contractor to perform hydrostatic testing upon successful tubes re-installation.

• Contractor to re-install existing insulation utilizing per manufacturer specifications.

• Contractor to re-install boiler sides with new gasket material from the manufacturer.

• Contractor to repair any broken studs throughout the repair.

• Contractor is responsible for the completion of the necessary paperwork to ensure the boiler pressure vessel is certified per National Boiler Code. A National Board R

Certificate plate shall be affixed to the boiler skin upon completion.

E. QUALITY ASSURANCE

• Installer Qualifications: Personnel shall be trained and certified by manufacturer for installation of equipment required for this Project, and shall meet federal, local, and state code requirements. Certifications must be verified in writing and submitted to the COR.

• Installer/Contractor to perform hydrostatic testing of the boiler once re-tubing has been completed.

F. Information & Closeout requirements:

The contractor shall provide the following items at a minimum:

• All installed product manufacturer data sheets, O&M manuals, drawings & specifications

(if applicable)

• All warranty documentation. (Equipment and manufacturing workmanship are warranted against defects for one (1) year after installation.)

• Installation documentation, hydrostatic test results.

Standards to comply with:

• National Electric Code (NEC)

• National fuel gas code (NFPA 54)

• National Electrical Safety Code (NESC)

• National Electrical Manufacturers Association (NEMA)

• Boiler and Pressure Vessel Code (BPVC) (ASME)

• American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE) - ASHRAE

• Occupational Safety and Health Administration (OSHA) regulations

• International Building Code (IBC)

• International Plumbing Code (IPC)

• International Mechanical Code (IMC)

• International Energy Conservation Code (IECC)

Supervision:

The level of supervision and inspections will be sufficient to assure that services are performed in accordance with requirements and all applicable Federal, State and local laws and regulations. The

Contracting Officer or the COR will be readily available by phone or other means of communication to respond to any contract issue that may arise is in progress. The COR will conduct overall management coordination and be the central point of contact with the Government for performance under the contract.

II. CONTRACTOR SECURITY/WORKING REGULATIONS

A. Work Hours:

Delivery of the equipment shall be pre-arranged with the COR and may take place between the hours of 8:00 AM – 3:00 PM, Monday – Friday, excluding federal holidays. Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour workday.

B. Security Clearance:

The Contractor shall provide to the COR all necessary security clearance documents for all personnel accessing institution property, as stated above. Security clearance documents will only be accepted from the Prime Contractor. If submitted by a sub-contractor, they will be rejected. It is the Prime Contractor’s responsibility to review security clearance submissions to ensure they are complete. In the event a Contractor or subcontractor employee cannot pass the security clearance process, it is the Contractor’s responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the reason a person was denied security clearance.

C. Safety and Personal Protective Equipment:

All Contractor personnel shall have and wear the required personal protective equipment (PPE) prescribed by industry standards while on the job site. It is the responsibility of the Contractor to provide all PPE. All ladders regardless of the size shall be stored and secured to a stationary fixture with a chain and lock in a predetermined area, in a way that they cannot be removed. If ladders are required, immediately consult with the COR to ensure that he or she can make timely notification to appropriate institution staff. All extension cords regardless of length shall be in good condition with no broken outer insulation and will be secured in a locked construction gang box.

D. Warranty:

1. The boiler retubing contractor shall provide a written guarantee covering all material and workmanship.

2. Any equipment, supply, or material that has a manufacture warranty will be provided to the COR and/or Project Representative before or upon completion date.

2024-11-27T06:56:38-0500
JOSEPH FISHER