USNH_Request for Proposal MRO Services_Final.docx

DOCX document 144 KB Posted

Attached to
MRO Services
Solicitation number
2120271019
Issued by
New Hampshire

About this file

This Request for Proposal (RFP No. 2120271019) is issued by the University System of New Hampshire (USNH) to procure Maintenance, Repair, and Operations (MRO) services across 18 trade categories at Keene State College (KSC), Plymouth State University (PSU), the University of New Hampshire (UNH), and the Community College System of New Hampshire (CCSNH). The services requested include flooring, roofing, carpentry, electrical, masonry, excavating, asbestos abatement, landscaping, asphalt paving, campus signage, emergency response and restoration, general contracting, HVAC, painting, plumbing, sheet metal, welding, and fire stopping services. USNH intends to award CD200 agreements to up to five firms per category, with preference given to firms capable of providing comprehensive coverage across all three USNH campuses. The deadline for firm questions is November 13, 2026, responses to questions will be issued by November 18, 2026, and proposals are due November 30, 2026, at 3:00 p.m. EST through UShopNH. The contract term will be approximately three years, expiring October 31, 2029, with options for two one-year extensions by mutual consent. The RFP Coordinator is Hilary E Neal, Director of Strategic Sourcing.

Pricing will be evaluated as a major award factor, with hourly labor rates required to be all-inclusive with no mobilization fees or fuel surcharges permitted. All billable parts, components, devices, and subcontracted services shall be billed at the firm's cost-plus markup not to exceed 10 percent. Purchase thresholds establish that purchases up to $99,999.99 may be awarded using best business practices among awarded firms, purchases from $100,000 to $499,999.99 require competitive requests for quotes with awards based on lowest responsive and responsible bids, and projects estimated at values exceeding $125,000 require a Performance Bond equal to 100 percent of the project sum. USNH reserves the right to audit financial records pertaining to the contract and to extend contracts to all USNH institutions. Firms must provide detailed Statements of Work responses within timeframes typically set at two weeks and not exceeding 30 calendar days. Insurance requirements and the USNH CD200 standard terms and conditions will apply to awarded contracts. The RFP evaluation will consider competitiveness and stability of pricing, response to scope of work specifications on a pass/fail basis, depth of experience, firm profile and technical certifications, overall suitability, and services offered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal RFP No. 2120271019

MRO Services For the University System of New Hampshire

Issue Date: 11/02/2026

TABLE OF CONTENTS

1.INTRODUCTION3
1.1.Purpose3
1.2.About the RFP4
1.3.About USNH17
2.RFP PROCESS18
2.1.Key Event Dates18
2.2.General Instructions18
2.3.Informational Meetings19
2.4.Firm Questions19
2.5.Proposal Format19
2.6.Addenda20
2.7.Bid Opening20
3.EVALUATION20
3.1.Evaluation Committee20
3.2.Evaluation Criteria21
3.3.Public Records: Applicability of the New Hampshire Right to Know Law, RSA 91-A21
3.4.Solicitation Results22
4.ADDITIONAL INFORMATION22
4.1.Term22
4.2.Insurance Requirements22
4.3.Agreement/University’s Standard Terms and Conditions22
4.4.UNH’s Rights and Responsibilities23
4.5.Firm’s Rights and Responsibilities23
4.6.Rights Afforded to Both Parties23
4.7.Mediation24
4.8.Sustainability Statement24

ISSUE DATE: 11/02/2026

RFP No. 2120271019

RFP COORDINATOR: Hilary E Neal, Director of Strategic Sourcing USNH Procurement Services Farnum Hall, 28 College Drive Concord, NH 03301 E-mail: Hilary.Neal@usnh.edu

1. INTRODUCTION

Purpose The University System of New Hampshire (hereafter referred to as USNH or Owner) is requesting proposals from qualified firms that can provide MRO Services, consisting of the following 18 categories at each of its member institutions comprised of Keene State College (KSC), Plymouth State University (PSU), and the University of New Hampshire (UNH). This program will also extend to the Community College System of New Hampshire (CCSNH).

1. Flooring

2. Roofing

3. Carpentry

4. Electrical

5. Masonry

6. Excavating

7. Asbestos Abatement

8. Landscaping Services

9. Asphalt

10. Campus Signage

11. Emergency Response and Restoration

12. General Contractor

13. HVAC

14. Painting

15. Plumbing

16. Sheet Metal

17. Welding

18. Fire Stopping USNH intends to award CD200 agreements to up to five (5) Firms per category, with preference given to firms that can provide comprehensive coverage across all three (3) USNH campuses. Additional vendors may be selected on a case-by-case basis if needed to ensure adequate service coverage for a specific campus. Selection will be based on each firm’s demonstrated capabilities and ability to meet the needs of USNH and each of its campuses and price.

About the RFP

General Requirements:

SCOPE & RESPONSIBILITIES

The Firm shall furnish all labor, materials, equipment, services, and incidentals necessary to complete project work in accordance with specifications, including any work reasonably required to meet all project objectives, unless otherwise specified by Campus Project Manager. The Firm is responsible for all necessary drawings; engineering services will be provided by the University if required.

MATERIALS & STORAGE

The Firm is responsible for receiving, storing, unloading, checking deliveries, and transporting materials to work sites. On-site storage requires Campus Project Manager’s approval. The Firm shall protect all materials from damage and provide repair/replacement for items damaged during operations. USNH reserves the right to purchase materials/merchandise and will either deliver to job site or compensate the Firm for relocation of owner-furnished materials.

WORK SCHEDULING & ACCESS

Work must be scheduled during normal business hours (Monday-Friday) unless otherwise authorized by Owner. Other arrangements may be made with Owner Representative to meet project requirements. Firm shall provide 72-hour advance notice before beginning work and obtain campus keys as needed. No doors shall remain unlocked unless occupied by workers.

SITE MANAGEMENT & PROTECTION

Site Limits: Confine operations to designated contract areas only. Areas outside construction limits shall not be disturbed.

Building Protection: Maintain existing buildings in watertight condition throughout construction. Take all necessary precautions to protect buildings and occupants. The Firm is responsible for any damage to existing buildings and shall replace/repair at the Firm's expense.

Daily Operations: Sites shall be cleaned daily with debris removed and disposed of off-site legally or properly stored for recycling. Use of campus dumpsters by the Firm is prohibited. Leave work areas "broom clean" daily. Do not mark, soil, or deface finishes; clean and restore surfaces to original condition or replace as required by Engineer/Architect.

COORDINATION & COMMUNICATION

The Firm shall coordinate all construction activities, verify dimensions and field conditions, establish on-site authority/communication, monitor schedules/progress/quality, maintain records, and minimize disruptions to existing operations (subject to Owner approval).

COMPLIANCE REQUIREMENTS

The Firm shall comply with all applicable Local, State, and Federal laws, codes, regulations, and ordinances, including: ADA, Equal Employment Opportunity, Affirmative Action, OSHA, environmental regulations (erosion, sedimentation, dust control), local building codes and permits (water/sewer connections, road cuts/closures, noise ordinances), New Hampshire RSAs 21-I:81-a and 21-I:81-b, and OSHA Certification.

SAFETY & FACILITIES

The Firm shall provide and maintain personal protection equipment, fire protection equipment, sanitary enclosed watertight chemical toilets for all construction personnel. All work shall comply with applicable Local, State, and Federal codes and regulations under authority having jurisdiction.

ADMINISTRATIVE

Parking: All Firms must obtain Contractor Parking Permits as required by each campus at the Firm's expense. Parking is limited to designated areas.

Contract Terms: The University makes no representation of exclusivity, business volume, or value to selected Firms. The University reserves the right to terminate work at any time with payment for work completed through the effective termination date.

FINANCIAL TERMS

Payment: Payment will be made for work completed through the effective date of any termination. USNH does not accept mobilization fees or fuel surcharges. Hourly labor rates shall be all inclusive; special charges, surcharges, or fuel charges of any kind (by whatever name) may not be added at any time.

Markup: All billable parts, components, devices, and subcontracted services shall be billed at the Firm's cost-plus markup not to exceed 10%.

Ordering Procedures:

PROJECT THRESHOLDS & BIDDING

Purchases Up to $99,999.99: Associate campuses may reach out to any awarded Firm using best business practices. Competitive pricing from multiple suppliers should be used as a basis for award whenever possible. Firms will invoice based on firm-fixed price.

Purchases $100,000 to $499,999.99: Associate campuses must issue a competitive Request for Quote with a detailed scope of work to all awarded Firms in the service category through UShop/Procurement. Award will be based on the lowest responsive and responsible bid. Awards will be firm-fixed-price unless otherwise approved by the CPO or VCFA designee.

Bonding: Project values that fall below the USNH bonding threshold, currently set at $125,000, will not require a bond. Projects whose completed value are estimated at greater than $125,000, the Contractor shall deliver to the Owner, at the time of execution of the award from the RFQ process, a Performance Bond equal to 100% of the project sum, with USNH named as obligee. No work shall be started until the bond is delivered to the Owner.

STATEMENTS OF WORK & PRICING

USNH shall provide detailed Statements of Work (SOW) as part of all quotation requests for individual projects. Firms' quotes will be based on rates equal to or less than the rates awarded in any contract. Firms shall submit quotes within the timeframe specified in each quotation request. Quote response times will be set based on project scope and urgency, typically two (2) weeks and not to exceed thirty (30) calendar days. Project costs will not exceed the quoted price unless there is a change in the work. Any changes to the scope of work must be reviewed and approved in writing by the Owner prior to implementation. Change orders shall be processed in accordance with USNH purchasing policies and procedures.

PURCHASE ORDERS AND INVOICING

Purchase Order: Will be issued for individual projects prior to the Firm entering the premises to begin work on any projects.

Invoicing: Invoices must be submitted based on the amount completed when accompanied by the proper documents. If additional equipment is required beyond the standard tools of the trade, it must be obtained and billed to the job with prior written approval. All invoices must list contract number and any applicable PO number, product description, quantity, unit price, total price for payment and any discounts allowed. All invoices will be detailed by line item (product/position description, quantity, hourly rate, unit pricing, extended price, % markup, any discount, etc.) Nonconforming invoices shall be returned to the Supplier and any payment due date will not be effective until receipt of a compliant invoice.

CONTRACT REQUIREMENTS & GUIDELINES

Design Guidelines: When submitting a proposal on any construction work on any USNH campus, contractors must familiarize themselves with the most current version of the “UNH Planning, Design and Construction Guidelines,” as applicable, available at https://www.unh.edu/facilities/resources/planning-design-construction-guidelines as well as “Dig Safe Information” available at https://www.unh.edu/facilities/resources/contractors-consultants, which shall be considered a part of the requirements for this Contract. Firms will also work with each campus representative to familiarize themselves with any campus-specific requirements provided by that campus representative, which shall be considered part of the contract requirements.

General Conditions: The CD200 Lump Sum will be part of any awarded contract.

Specifications for Services:

SECTION 1: FLOORING SERVICES

· Provide installation, removal, and replacement of carpeting in various buildings and facilities across USNH institutions:

· Remove existing carpet and wall base.

· Supply carpet and wall base.

· Remove and replace doorstops or provide where missing. Placement as agreed to by Campus Project Manager.

· Repair floor where required to prepare for direct glue down unless advised otherwise by Campus Project Manager.

· Coordinate with Owner the responsibility for removal of furniture from spaces to receive new flooring.

· Door adjustments, if necessary, are the responsibility of the Owner, but the Contractor must inform the Campus Project Manager of necessary adjustments in a timely manner.

· Large carpet pieces left over from the installation are to be rolled, tied and marked with the date of installation and job name by the Contractor to become property of the University.

· Contractor shall be responsible for the clean-up and removal of all debris from the premises of the University and for relocating leftover materials as specified.

· All flooring shall be approved by Project Manager prior to purchase. Flooring will be ordered and installed under the supervision of Project Manager. Flooring to be installed will be appropriate to the traffic patterns, use of space and in keeping with the visual unity of the building.

· Warranties: All flooring and backings must have a minimum 10-year wear warranty. Polyurethane backings will have a lifetime warranty on edge ravel and zippering, increased tuft bind and delaminating.

· Recycling: Flooring recycling continues to evolve. As programs develop, these standards will be updated. At present, consider the following when specifying a carpet:

· Carpet & Rug Institute (CRI) green labeled carpet

· CRI green labeled adhesive for installation

· CRI green labeled cushion

· Some recycled fiber content (unless natural fibers)

· Repairable carpet

· Recyclable carpet

· Manufacturer who codes the materials used on the backing

· Manufacturer who maintains a take-back or recycling program

· Off-gassing: Low-emitting adhesives should always be specified. These adhesives will show the CRI IAQ Adhesive Testing label. Carpet cushions should also bear the CRI IAQ label.

· Traffic Areas: Traffic area definitions are as follows:

· Low traffic – executive offices, executive conference rooms

· Medium traffic – interior corridors, private offices

· High traffic – dining rooms, entrance lobbies, public spaces, public corridors

SECTION 2: ROOFING SERVICES

· Provide installation, repair, and replacement of roofing materials including but, not limited to the following:

· Asphalt shingles

· Slate shingles

· Metal roof panels

· Membrane roofing

· Surface preparation

· Underlayment installation

· Ice and water shield installation

· Sheet metal flashing and trim installation

· Roof insulation

· Snow guards

· Gutters

· Demolition

· Deck repairs

· Deck replacement

· Wire brush deck

· Paint deck

· Rough carpentry

· Vapor barriers

· Roof drains

· Soffit and fascia assembly

· Temporary mechanical disconnects

· Temporary electrical disconnects

· Roof repairs

SECTION 3: CARPENTRY SERVICES

· Provide carpentry services for installation, repair, and replacement, including, but not limited to the following:

· Rough Carpentry

· Miscellaneous Carpentry

· Exterior and Interior Finish Carpentry

· Bituminous Damp proofing

· Self-Adhering Sheet Waterproofing

· Building Insulation

· Siding

· Sheet Metal Flashing and Trim

· Joint Sealants

· Steel And Wood Doors and Frames

· Windows

· Unit Skylights

· Door Hardware

· Non-Load-Bearing Steel Framing

· Gypsum Board

· Acoustical Tile Ceilings

· Exterior and Interior Painting

· Staining and Transparent Finishing

· Managing small projects with light MEP (Mechanical, Electrical, Plumbing)

SECTION 4: ELECTRICAL SERVICES

· Provide electrical services for installation, repair, and replacement, including, but not limited to the following:

· Electrical Identification

· Conductors And Cables

· Raceways And Boxes

· Wiring Devices

· Lighting Control Devices

· Electricity Metering

· Transient Voltage Suppression

· Enclosed Switches And Circuit Breakers

· Enclosed Controllers

· Switchboards

· Panel boards

· Dry-Type Transformers (600 V And Less)

· Fuses

· Lighting

· Conductors And Cables For Electronic Safety And Security

SECTION 5: MASONRY SERVICES

· Provide masonry services for installation, repair, and replacement including but, not limited to the following:

· Brickwork

· Stonework

· Block work

· Concrete work

SECTION 6: EXCAVATING SERVICES

· Provide excavating services for installation, repair, and replacement, including, but not limited to the following:

· Excavation, debris removal and offsite disposal, fill, compacting and paving services as required in support of utility systems including sewer, storm water, steam, water and gas distribution systems.

· Repair of sewer and storm water systems including piping, manholes, frames, hand holes, catch basins, grates, covers, outfalls and culverts.

· Test completed work.

· Other general excavation and related services as requested by USNH campuses.

· Contractor to provide or sub-contract pavement patching for repairs as requested by USNH campuses.

· Contractor to install and remove erosion and sediment control measures as required during work.

SECTION 7: ASBESTOS ABATEMENT SERVICES

· Provide asbestos abatement services including, but not limited to the following:

· Design the abatement process (decontamination unit, containment, exhaust)

· Build the containment (set-up barrier walls, exhaust and decontamination unit)

· Conduct the removal of asbestos containing material (ACM) from building elements

· Provide containment or encapsulation of ACM on building elements

· Provide transportation of ACM from job site to transfer and/or disposal facility

· Firm shall “self-identify” and describe their capabilities in order for USNH to request services that match experience and capabilities to need.

· USNH recognizes that there is considerable variation among asbestos abatement projects. Not all firms are capable of conducting full-scale projects. Therefore, Firm shall be required to state the maximum scale project they can reasonably conduct as follows:

· Small scale projects (<$10,000)

· Large scale projects (>$10,000).

· USNH reserves the right to restrict a firm to specific scale projects based upon the RFP response.

· Firm should include the following when submitting a proposal:

· NH Asbestos Contractor’s license and number

· Transporter permits for vehicles that would service USNH

· If applicable, permits to receive asbestos for treatment, storage or disposal

· If applicable, proof of ownership of land and buildings used for storage

· If applicable, property title insurance with documentation of any easements or attachments

SECTION 8: LANDSCAPING SERVICES

· Provide landscaping services including but not limited to the following:

· Lawnmowing

· Planting annuals, trees and perennials

· Fertilizing, herbicide and fungicide treatments

· Flower bed / mulch bed cleanup

· Trimming edge of lawn and beds

· Seeding (terra seed)

· Raking and leaves cleanup

· Tree and shrub care and maintenance

· Safety practices to include hazard tree assessment and removal

· Winterize irrigation systems

· Replacement of irrigation system heads, and fixing lateral and mainline leaks

· Water conservation

· Repair damage after storm

· Snow removal

· Hardscape installation

· Firms shall provide the following materials for USNH campus landscaping needs, including but not limited to the following:

· Lawnmowers

· Rakes, and tools for leaf cleanup

· Hardscape materials

· Bark mulch

· Loam

· Seeds (terra seed)

· Plants, shrubs and trees selection

· Fertilizer and herbicides

· Equipment for irrigation

· Firms must meet the State of New Hampshire requirements for using pesticides.

· Firms should list any certifications or memberships, such as:

· NHLA membership

· ICPI and SRW certifications

· Green Snowpro certification

SECTION 9: ASPHALT PAVING SERVICES

· Paving services for site work pertaining to the preparation and installation of asphalt pavement including sidewalks, fire lanes, streets, and parking lots on an as needed basis.

· The requirements of this bid may include, but shall not be limited to the following:

· Preparation for asphalt paving, furnishing and placement of asphalt

· Roadway/parking lot sweeping

· Asphalt overlays over existing pavement, including surface preparation and leveling courses, tack coating, and all other associated operations required

· Tack coat of emulsified asphalt to be applied to contact surfaces of existing cement concrete and asphalt abutting new pavement

· Fine grading and compaction of pavement sub grade

· Furnishing, placing and compacting of sub-base and base material as required

· Pulverization of existing asphalt concrete

· Mixing of pulverized materials with existing and added granular materials as required to meet the gradation requirements

· Grading and compaction of the reclaimed material to the lines and grades required

· Raising all new and existing manhole and catch basin frames and covers, to meet finish grade of pavement, including valve boxes in paved area

· Removal of excess or reclaimed asphalt to be disposed of off Campus

· Trucking stockpile of reclaimed material (within 10 miles campus)

· Pavement striping

SECTION 10: CAMPUS SIGNAGE

· The scope of this contract may include, but is not limited to, the following capabilities:

· Vinyl Lettering for Signs and Vehicles

· Vehicle Wraps and Lettering

· Indoor Signage and Wayfinding

· Illuminated Signs

· Electronic Message Boards

· Custom Routed Signs

· Real Estate Signs

· Parking and ADA Signs

· Large Format Printing

· Indoor and Outdoor Banners

· Pylons Signs

· Construction Signs

· Point of Sale Signs

· Channel Letters

· Directional Signs

· Custom Fabrication and Steel

· Design Services

· Provide up to three (3) proofs per sign type per project

· Installation Services

· Sign mediums could include, but are not limited to:

· Plastic

· Metal

· Vinyl

· Acrylic

SECTION 11: EMERGENCY RESPONSE AND RESTORATION SERVICES

· Emergency and restoration services resulting from fire, flood, storm damage, utility failures and vandalism to include, but not limited to, the following:

· Water extraction

· Biohazard substance removal/disposal

· Drying/Dehumidification

· Deodorization/Sanitization

· Carpet removal

· Mold mitigation and remediation

· Carpet, flooring, upholstery and window treatment cleaning and waxing

· Furniture cleaning

· Interior/exterior window cleaning

· Blow off brush-vacuum soot and loose smoke particles

· Smoke damage repair

· Ceiling and wall cleaning and restoration

· Move building/room contents

· Itemize, record, move-out and store contents

· Clean and restore electronics

· Document Drying

· Contents claim inventory service

· Demolition

· Debris disposal

· Site preparation

· Insulation replacement

· Drywall replacement

· Air duct/HVAC cleaning

· Electrical system repair/replacement

· Plumbing system repair/replacement

· Painting services

· Carpentry services

· Contractor to provide toll free 24/7 emergency call service.

· Contractor to provide maximum 2-hour response time to USNH campus on notice of emergency situation.

· Assign a project coordinator for each emergency response project.

· Analyze the situation, assess the damage and determine the services recommended for timely and complete restoration.

· Within eight hours of on-site arrival, the project coordinator shall meet with the Owner Representative or his/her designee to review the scope and develop a response action plan.

· Within 8 hours of the review, provide a cost estimate and projected schedule for the required work.

· Upon acceptance of cost estimates and schedule by the Owner Representative, begin work within the time frame outlined on the schedule.

· Project coordinator will meet daily with the Owner Representative or his/her designee during the emergency response and restoration to communicate status, progress/delays or any concerns as they arise.

· Changes in scope will require approval by Owner Representative prior to proceeding.

· Assign a lead person to be available at the job site whenever work is underway; lead person shall be fluent in English and shall remain in the role of lead person for the entire duration of the work.

· Immediately notify the Owner Representative of hazardous materials or conditions found during cleanup or restoration. Work closely with the Owner Representative and the Owner’s hazmat/safety personnel to develop an action plan to safeguard the site and for removal and disposal of hazardous materials.

· Provide all permits, materials, containers, and services necessary for the emergency containment, clean-up, removal, transport, storage testing, treatment and/or disposal of hazardous and industrial materials and waste resulting from the event.

· Provide all labor, materials and equipment necessary to provide the required services on an as needed basis; all contractor-owned equipment shall be clearly identified as such.

· Work closely with the Owner Representative or his/her designee and Owner’s housekeeping staff to restore all surfaces to normal conditions.

· Provide full documentation of emergency conditions and restoration, including photos/videos (before, progress and after) and means used to restore.

· Perform a walk-through with Owner Representative or his/her designee to identify punch list items.

· Punch lists items will be corrected within ten (10) days or as otherwise agreed upon with Owner Representative.

· The intent is to return all to pre-event conditions, with all materials and workmanship matching or exceeding pre-existing and/or adjacent undamaged conditions.

SECTION 12: GENERAL CONTRACTOR SERVICES

· Provide general contractor services on an as needed basis at the request of the campus facilities group at each of its campus

· Firms shall provide at a minimum the following:

· Perform services consistent with the industry-accepted role of the General Contractor.

· Provide all material, labor, equipment and services necessary for individual construction projects.

· Hire specialized subcontractors to perform all or portions of the construction work.

· Prepare a cost based upon the construction documents (CDs).

· Coordinate planning, scheduling, and sequencing of all trades.

· Coordinate inspections with all authorities having jurisdiction to include, but not be limited to, the State Fire Marshall’s Office, the Durham Fire Department, the State Plumbing Inspector, the State Electrical Inspector, and the State Elevator Inspector.

· Protect the general public from all construction related activities.

· Document all modifications in work which deviate from the construction documents and provide all such recorded and dated changes to the Project Manager.

· Produce all potential change orders (PCOs) and all change orders requests (CORs) for review by Project Manager.

· Provide all phase records and project accounting as required.

· Project closeout.

· Provide project warranty period—one year from substantial completion.

SECTION 13: HVAC SERVICES

· HVAC services shall include a variety of institutional projects encompassing but not limited to alteration, renovation, remodeling and major repairs to structures and properties.

· Items may include, but not be limited to, the following:

· Valves For HVAC piping Systems

· Meters And Gages For HVAC Piping

· Refrigerant Piping

· Electric, and Fuel-Fired Domestic Water Heaters

· Heating Boilers and Accessories

· Cast-Iron Boilers

· Condensing Boilers

· Direct-Fired H&V Units

· Indirect-Fired H&V Units

· Condensing Units

· Packaged Terminal Air-Conditioners

· Rooftop Air Conditioners

· Unit Heaters

· Fan-Coil Units

· Radiant Heating Piping Ducts And Accessories

· Power Ventilators

· Air Terminal Units

· Diffusers, Registers, And Grilles

· HVAC Instrumentation and Controls

· Testing, Adjusting, and Balancing

· Gas Fitting

· Pipe Fitting

· Ductless Mini-Splits

SECTION 14: PAINTING SERVICES

· Provide all labor, material, equipment and supervision to perform painting and related painting work. Painting services may include exterior and interior spaces including walls, ceilings, trim, exposed pipes, etc. and surface preparation.

· Traffic Areas: Traffic area definitions are as follows:

· Low traffic – executive offices, executive conference rooms

· Medium traffic – interior corridors, private offices

· High traffic – dining rooms, entrance lobbies, public spaces, public corridors

· Keene State College Campus Guidelines Paint Specifications

· No opened containers of paint or solvents shall be left on site.

· Contractors are responsible for the proper disposal of all waste materials and shall not use Keene State College dumpsters.

· The Contractor shall furnish the color formula to mix all the paint used on the project. Approved Manufacturers include Behr/Sherwin Williams/Benjamin Moore Paint lines. Standard interior paint shall be latex in an eggshell finish unless otherwise approved. Flat finishes have been used in limited, specific areas but are generally discouraged due to maintenance and color‑matching challenges.

. Exterior metal frames are finished in a high gloss enamel.

· Contractor shall complete minor surface preparation and patching prior to painting,(i.e. command strip tears/residue.)

· Contractor shall meet separately with Facilities department to discuss/ensure proper paint finishes and materials are specified.

· A meeting will be held with painting contractors prior to applications of finishing coat.

· Plymouth State University

· No opened containers of paint or solvents shall be left on site.

· The Contractor shall submit a detailed and complete Color Schedule, including exact color names and formula information, as part of the As‑Built Architectural Finish Schedule Plan.The University’s standard interior paint is Sherwin Williams ProMar 200 Zero VOC, Dover White, semi‑gloss finish, unless otherwise specified.http://www.sherwinwilliams.com/painting-contractors/products/catalog/promar-200-zero-vocinterior-latex/.

· The Contractor shall furnish the color formula to mix all the paint used on the project in a Sherwin Williams products and specified finishes..

· Standard interior finishes are latex eggshell or velvet unless otherwise approved. Flat finishes may exist in limited areas but are generally discouraged due to maintenance and repair considerations. Exterior metal frames are finished in a high gloss enamel.

· Contractor shall meet separately with the University to discuss/ensure proper paint finishes and materials are specified.

· A meeting will be held with painting contractors prior to applications of finishing coat.

· University of New Hampshire Campus Guidelines Paint Specifications

· https://scholars.unh.edu/pdch_5_09/11/

SECTION 15: PLUMBING SERVICES

· Services will include multiple institutional type plumbing projects encompassing alteration, renovation, remodeling and major repairs to structures and properties.

· Services shall include, but are not limited to, the following:

· Plumbing Insulation

· Valves For Plumbing Piping

· Meters And Gages For Plumbing Piping

· Domestic Water Piping and Specialties

· Sanitary Waste and Vent Piping

· Drainage Piping

· Storm Drainage Piping

· Hydronic Piping

· Hydronic Pumps

· Plumbing Fixtures

· Domestic Water Pumps

· Electric, And Fuel-Fired Domestic Water Heaters

· HVAC Instrumentation and Controls

· Testing, Adjusting, And Balancing

· Gas Fitting

· Pipe Fitting

SECTION 16: SHEET METAL SERVICES

· Services shall include, but not limited to, the following capabilities:

· Bending (to include installation and fabrication of HVAC systems, louvers, and miscellaneous metals)

· Shearing

· Forming

· Rolling

· Welding

· Design

· Installation

· Project management

· Supervision

· Fabrication

· Sketching

· Estimating

· Finishing (powder coat)

· Plasma cutting

· SS/copper/aluminum fabrication

SECTION 17: WELDING SERVICES

· Services shall include pipefitting, welding and fabrication services. Some fabrication work could be done at the contractor’s shop and some will be required on site

· Work shall include, but not limited to, the following:

· Steam pipe (Schedule 80 pipe)

· Condensate

· Lines (Copper)

· Boiler Console Fabrication (aluminum and steel)

· Feed Water Line

· Hot Water Lines

· Chilled Water Piping

SECTION 18: FIRE STOPPING SERVICES

· Provide fire stopping services for installation, repair, and replacement in new and existing construction, encompassing alteration, renovation, remodeling and major repairs to structures and properties.

· Services shall include, but are not limited to, the following:

· Penetration fire stopping (pipe, conduit, cable, duct and cable tray penetrations)

· Through-penetration firestop systems for fire-rated walls, floors and ceilings

· Joint and perimeter fire stopping (head-of-wall, curtain wall, floor-to-wall joints)

· Smoke and acoustical sealing

· Firestop sleeves, collars, wraps, pillows and pathway devices

· Survey, inspection and documentation of existing fire stopping conditions

· Remediation of deficient or missing fire stopping

· Labeling and identification of installed firestop systems

· All fire stopping shall use tested and listed systems (UL or equivalent) appropriate to the assembly and penetrating item, installed per the manufacturer's instructions and applicable codes.

· Firm shall provide documentation of the systems installed, including system designations and locations, upon completion of each project.

· Pricing: Labor shall be billed at the awarded hourly rates, which are not-to-exceed rates. Firestop materials and listed system components shall be billed at the Firm's cost plus a markup not to exceed 10%, consistent with the Financial Terms of this RFP. Manufacturer invoices or other cost documentation shall be provided upon request.

About USNH The University System of New Hampshire is the largest provider of postsecondary education in the Granite State. With approximately 32,000 enrolled students annually and more than 90,000 alumni living in state, the institutions of the University System - the University of New Hampshire - Durham, the University of New Hampshire School of Law, the University of New Hampshire at Manchester, Plymouth State University, and Keene State College - have a direct impact on hundreds of thousands of New Hampshire citizens every year.

In concert with our commitment to teaching, our community outreach and service programs expand knowledge and have a positive impact on the state, and our research efforts add insight and understanding to subjects as varied as air quality, economic development, family health, teacher training, and ocean mapping.

It is the expectation, that the pricing and terms provided in any proposal and the resulting agreement is available to all institutions and affiliates of the University System of New Hampshire.

Please visit the following links for detailed information relative to all University System of New Hampshire institutions:

University System of New Hampshire Keene State College Plymouth State University University of New Hampshire

1. RFP PROCESS

Key Event Dates

The key dates for the RFP process are currently as follows:

Key Milestones
Dates
Comments
Solicitation Release
11/02/2026
Deadline for Firm Questions
11/13/2026 @ 12:00pm EST
Response to Questions
11/18/2026
Submittals Due
11/30/2026 @ 3:00pm EST
Interviews/Oral Presentations
By Request only.

The University reserves the right to amend this schedule as it deems necessary.

General Instructions

· In order to participate in the Sourcing Event, suppliers must create an account and login credentials. Successful bidders will be invited to provide full company and tax profile information in order to complete the registration process, using the login credentials previously established.

· Questions and answers will be submitted on the Q&A Board under Tools. It is the Firm’s responsibility to ensure that the entire solicitation package and links are reviewed prior to submittal of a response.

· Oral information provided by the evaluation committee or any other USNH personnel will not alter or change this solicitation. Changes to the solicitation will be documented by addendum.

· Revisions, Amendments, and Cancellation: The owner may extend the deadline date for submissions if, in the owner’s opinion, any revisions or amendments to this solicitation make this necessary. The owner may also cancel this solicitation, in whole or in part, or reject all submissions when this action is deemed to be in the best interest of the owner.

· Submission packages shall include all required information and documents or will be considered non-conforming and subject to disqualification.

· Submission packages should be prepared simply and economically, providing a straightforward, concise description of the respondent’s ability to fulfill the requirements of this solicitation.

· Submission documents should be uploaded as a single document in pdf format unless otherwise indicated.

· Responses shall be transmitted electronically through UShopNH. The Event will close automatically at the due date and time. Each respondent is solely responsible for the timely submission of its response. Late submittals will not be accepted. Responses submitted by any other method will not be accepted.

· Responses are not final upon completion of the fields and uploading documents. In order to finalize the response, it is critical for the respondent to Review and Submit the proposal or it will not be available in UShopNH for owner consideration.

· Each submission will be reviewed to determine its completeness prior to actual evaluation. Failure to provide or adequately address all categories of information requested, may result in rejection of the Firm’s response.

· The owner reserves the right to accept or reject any or all submissions received as a result of this solicitation, to waive minor irregularities, or to negotiate with any respondent, in any manner necessary, to serve the best interests of the owner.

· USNH reserves the right to request clarification of any aspect of materials received or to request further information as might be required to adequately evaluate credentials and qualifications.

· Any costs incurred by the respondent in preparing and submitting a response to this solicitation will be the sole responsibility of the respondent and will not be reimbursed by the owner.

· USNH considers all terms and conditions, and insurance requirements, to be accepted unconditionally by a Firm unless written exceptions are made to specific clauses of this solicitation when submitting a response. Such exceptions may, however, be used as a basis for rejection of a response.

· For technical issues, contact JAGGAER Supplier Support at 1-800-233-1121 and select option 2.

Firm Questions

Questions and inquiries concerning this solicitation shall be submitted through the UShopNH Event Q&A Board. Oral questions or responses will not be recognized as confirmed information.

Proposal Format All Firms should provide the information as specified in:

· Cover Sheet. Clearly identify the Firm submitting the response.

· Executive Summary. (i.e., cover letter) signed by an authorized officer (no more than three pages).

· Appendix A – General Response Workbook Complete in its entirety. NOTE: The Respondent certifies that it is empowered to use the names of references it provides and agrees that the USNH may contact these references.

· Appendix B – Financial Response Workbook in its original Excel format. Fill in the tabs that your Firm is proposing services for. For services not being offered, please enter NOT APPLICABLE in that tab.

· Appendix C – USNH CD200 will be the basis for contract award.

Only information received in response to this RFP will be evaluated. Reference to information previously submitted to the University will not be considered. Failure to respond in full can be reason for rejecting the proposal as a whole or in part at the discretion of the University.

In submitting a proposal, Firm agrees that the proposal remains valid for one hundred eighty (180) calendar days after the closing date of submission of proposals and may be extended beyond that time by mutual agreement.

Strict compliance with this proposal format is essential to facilitate the evaluation process. Accordingly, USNH reserves the right to reject any proposal which is either incomplete or does not conform to these instructions.

Addenda

All addenda will be posted in UShopNH under Buyer Attachments. It is the responsibility of the Firm to check UShopNH prior to the due date to verify receipt of all information and required documentation.

Bid Opening

Bid responses will be opened by USNH Procurement Services at the time and date indicated. Any bid may be withdrawn prior to the time established for the opening of bids by withdrawing through UShopNH.

The Owner will not accept any written requests to withdraw. Any bid withdrawn during the bid acceptance period shall result in forfeiture of the respective Bidder’s bid security.

EVALUATION

Evaluation Committee The evaluation committee expressly reserves the right to reject any and all proposals without penalty, to waive all technicalities and irregularities and deviations of proposals from this request for proposal, to decide whether a proposal does or does not substantially comply with the requirements of this request for proposal, to be the final judge as to which is the best overall proposal, and to award a contract to the Firm whose proposal it considers to be in the best interest to USNH.

In the event that a contract acceptable to the committee cannot be executed with the top Firm, the committee may eliminate that Firm from further consideration. The committee may then proceed to conduct negotiations and planning sessions with the Firm next preferred among the Firms who have not been eliminated. Such processes will be continued until either an acceptable contract is executed, or all proposals have been eliminated.

USNH reserves the right to negotiate simultaneously with more than one Firm.

Evaluation Criteria Evaluation criteria will be based on but not necessarily limited to the following factors. Negative findings or judgments on the basis of any one of the criteria may result in elimination of a given response from further consideration.

· Competitiveness and stability of pricing will be the major factor in award.

· Response to Scope of Work/Technical Specifications, based on a pass/fail criteria.

· Depth of experience across business functions.

· Overall profile of Firm and technical certifications

· Overall suitability of the response for current and future needs

· Services offered Public Records: Applicability of the New Hampshire Right to Know Law, RSA 91-A

·Subject to the provisions of the New Hampshire Right to Know Law, RSA 91-A, prior to the issuance of an award the evaluation committee shall treat all proposals received as confidential. After the issuance of an award all proposals shall be public records. If no award is issued and the solicitation is cancelled without intention of reissuance, all proposals shall be public at the time of cancellation. If no award is issued and USNH intends to reissue the solicitation, all proposals shall be confidential until the award is issued, or the subsequent solicitation is cancelled without intention of reissuance.
·Also subject to the provisions of the New Hampshire Right to Know Law, RSA 91-A, the working papers and any other records of the discussions or deliberations of the evaluation committee or any of its members shall be treated as confidential and entitled to either or both of the specific exemptions from public access provided for in RSA 91-A:5, VIII and IX.

· If the Firm considers any portion of a submission confidential, they shall provide a separate copy of the full and complete document, fully redacting those portions by blacking them out and shall note on the applicable page or pages of the document that the redacted portion or portions are “confidential.” Use of any other term or method, such as stating that a document or portion thereof is “proprietary”, “not for public use”, or “for client’s use only”, is not acceptable. In addition, the Firm shall provide a letter which specifically states why and under what legal authority each redaction has been made. Submissions which do not conform to these instructions may be rejected as not conforming to the requirements of the bid or proposal. USNH will generally assume that a bid or proposal submitted without an additional redacted copy contains no information which the bidder deems confidential. Applying labels to documents such as “confidential” may not keep them from becoming public records as described in the preceding paragraphs or otherwise affect the application and operation of the New Hampshire Right to Know Law, RSA 91-A.

· USNH shall have no obligation to maintain the confidentiality of any portion of a bid, proposal or related material, which is not marked in accordance with the foregoing provisions. It is specifically understood and agreed that the Firm waives any claim of confidentiality as to any portion of a response to this RFB or RFP that is not marked as indicated above.

Solicitation Results Respondents list or bid summary are available on the USNH Procurement Services web page: Bid Results. Time frame may vary depending on the complexity and number of responses. Participants in the solicitation will also be able to track the status of the solicitation in UShopNH.

ADDITIONAL INFORMATION

Term It is USNH’s intent that any contract resulting from this solicitation will be for approximately three (3) years with the option for two (2) 1-year extensions with the mutual consent of USNH and the Supplier.

The existing agreements for these services have varying expiration dates. The intent is to replace any existing agreement with the agreements awarded from this solicitation.

The initial 3-year term will expire on October 31, 2029.

The intent to renew or not to renew the contract by either party shall be filed in writing with the Owner’s Agent by July 1st of the current contract term for the succeeding contract term. The Owner’s Agent is to be advised if that is not possible.

It is USNH’s intent that the required negotiation and approvals for any extension will be completed by September 1st of the current contract term for the succeeding contract term. The Owner’s Agent will represent USNH during negotiations.

Insurance Requirements USNH insurance requirements are available on the USNH Procurement Services web page under Other Forms: Within ten (10) business days after the Owner delivers a Notice of Acceptance, Agreement or Purchase Order, or prior to beginning work on campus, whichever is sooner, the successful Firm shall deliver to the Owner the Certificate of Insurance as specified in the USNH Insurance Requirements. Insurance requirements for construction related events can be found under USNH Insurance Requirements for Construction Contracts.

Agreement/University’s Standard Terms and Conditions Appendix C – USNH CD200 shall be used upon award. Please review and provide your Firm’s redlines to the agreement template for our consideration.

Terms and conditions are available on the USNH Procurement Services web page: USNH Terms and Conditions. Supplier understands that payments under any resulting Agreement may be subject to the withholding requirements of Section 3402(t) of the Internal Revenue Code.

UNH’s Rights and Responsibilities USNH reserves the right to audit those financial records of the Firm, which pertain to the contract.

USNH reserves the right not to enter into a contract if, after reviewing all responses received, it is determined such a contract would not be in the best interest of USNH.

USNH intends to meet contractual obligations and to treat all Firms fairly.

USNH reserves the right to extend contracts for supplies to all USNH institutions.

Firm’s Rights and Responsibilities The Firm agrees to maintain records arising from the operation of this contract for a period of two (2) years following its termination or expiration date, unless permission to the contrary is given by USNH in writing. The Supplier agrees to provide access to its accounting information pertaining to this USNH contract in the event an audit is requested.

The Firm will be responsible for purchasing merchandise and services and executing contracts in its own name and at its own cost and expense and on its own credit.

Rights Afforded to Both Parties Awarded Firm shall indemnify and hold harmless the USNH and its affiliates, trustees, officers, directors, employees and agents from and against any and all liabilities, claims, damages, awards, judgments, costs and expenses (including reasonable attorneys’ fees) arising out of its negligent acts or omissions of the negligent acts or omissions of its employees, agents, s or affiliates. This section shall survive termination of the contract.

If, because of riots, war, pandemic, public emergency or calamity, fire, earthquake, Acts of God, government restriction, labor disturbance or strike, or any cause beyond the Owner’s reasonable control, the business operations at the University System of New Hampshire shall be interrupted or stopped, performance of this contract, with the exception of moneys already due and owing shall be suspended and excused to the extent commensurate with such interfering occurrence, and the expiration date of the contract may be extended for a period of time equal to the time that such default in performance is excused.

The contract shall be governed by and construed in accordance with the laws of the State of New Hampshire. In the event any provision of these terms and conditions shall be declared illegal or unenforceable by a competent court within this jurisdiction the remaining provisions shall remain in full force and effect. Any litigation related to this agreement will be brought and maintained in courts within the State of New Hampshire.

Neither party may assign this contract without the written consent of the other party; and any assignment attempted without such consent shall give the other party the immediate right to cancel this contract except that the Firm may assign this contract with the consent of Owner to any subsidiary or affiliate of the Firm or any corporation into which the Firm or its successor may be merged, converted or consolidated, or which may otherwise succeed to substantially all of its assets; but the Firm shall during the term hereof remain liable for its obligation hereunder.

Mediation In the event the parties are unable to resolve a dispute, controversy or claim arising under this agreement, then either party may give written notice to the other party of its intention to mediate. Any dispute arising under this Agreement may be settled by mediation in the State of New Hampshire in accord with such procedures as may be acceptable to the parties.

If the dispute has not been resolved through mediation within thirty (30) days after the written notice beginning the mediation process (or a longer period, if the parties agree to extend the mediation), the mediation shall terminate and the parties shall be free to litigate the matter.

In the event of any mediation or litigation arising under this Agreement, each party shall be responsible for its own costs and expenses arising therefrom, including any and all attorney’s fees. Neither party shall seek reimbursement from the other party.

Sustainability Statement USNH strives to conduct business in a sustainable manner that balances economic priorities with environmental health and social impact and prefers do business with companies that share our commitment to sustainability and will partner with us to further sustainability objectives. USNH endeavors to minimize the adverse life cycle effects of the products and services it utilizes, preferring to purchase items with recognized certifications and/or attributes, e.g. Energy Star™, FSC, Safer Choice and Fair Trade. Please include as part of your proposal, pertinent information in reference to any sustainable practices and products.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .