This document is the General Conditions of the Contract for Construction prepared by the University System of New Hampshire (USNH) for use in construction projects across its institutions, including Keene State College (KSC), Plymouth State University (PSU), University of New Hampshire (UNH), and the Community College System of New Hampshire (CCSNH). The General Conditions establish the contractual framework governing the relationship between the Owner (USNH), the Contractor, the Architect, and all subcontractors for construction work. The conditions cover 14 major articles addressing general provisions, owner responsibilities, contractor obligations, contract administration, subcontractor relationships, construction by separate contractors, changes in work, time requirements, payments and completion procedures, protection of persons and property, insurance and bonds, correction of work, miscellaneous provisions, and termination or suspension of the contract. Contractors must submit a construction schedule using Primavera, Microsoft Project, or equivalent software within thirty days of contract award, and must maintain current schedules with each payment requisition and within seven days of any information that may affect the completion date. All work must comply with Contract Documents in order of precedence, with Change Orders taking precedence over the Agreement, Addenda, General Conditions, Specifications, and Drawings.
The General Conditions establish comprehensive pricing and payment procedures requiring contractors to submit itemized applications for payment supported by appropriate documentation, with the Architect issuing Certificates for Payment within seven days of receipt. Changes to work involving additions exceeding $1,000 require complete cost itemization, with overhead and profit allowances limited to ten percent for work performed by the Contractor, ten percent plus five percent for Subcontractor work, and seven and one half percent plus five percent plus five percent for Sub-subcontractor work. Contractors bear responsibility for all labor, materials, equipment, permits, and fees unless otherwise specified, and must maintain strict discipline and quality standards with all materials and equipment new and of recent manufacture unless specified otherwise. The Architect serves as the Owner's representative during construction and through final payment, with authority to reject non-conforming work, require inspections and testing, and interpret contract requirements. Claims between parties must be initiated within twenty-one days of the event or discovery of the condition and are subject to initial Architect decision, followed by mediation and arbitration procedures in accordance with American Arbitration Association Construction Industry rules if disputes remain unresolved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix C - USNH CD200 rev 10.1.20.docx | DOCX document | |
| 1467821-event.pdf | ||
| Appendix B - Offer Sheet.xlsx | XLSX spreadsheet | |
| Appendix A - General Response Workbook - MRO Services.xlsx | XLSX spreadsheet | |
| USNH_Request for Proposal MRO Services_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 10/21/2019 SECTION 00700 - PAGE 1 USNH GENERAL CONDITIONS
University System of New Hampshire General Conditions of the Contract for Construction
TABLE OF ARTICLES
1. GENERAL PROVISIONS
2. OWNER
3. CONTRACTOR
4. ADMINISTRATION OF THE CONTRACT
5. SUBCONTRACTORS
6. CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7. CHANGES IN THE WORK
8. TIME
9. PAYMENTS AND COMPLETION
10. PROTECTION OF PERSONS AND PROPERTY
11. INSURANCE AND BONDS
12. UNCOVERING AND CORRECTION OF WORK
13. MISCELLANEOUS PROVISIONS
14. TERMINATION OR SUSPENSION OF THE CONTRACT
Rev 10/21/2019 SECTION 00700 - PAGE 2 USNH GENERAL CONDITIONS
ARTICLE 1 GENERAL PROVISIONS
1.1 BASIC DEFINITIONS
1.1.1 THE CONTRACT DOCUMENTS
The Contract Documents consist of the Agreement between Owner and Contractor (hereinafter the Agreement), Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive of (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract Documents do not include other documents such as bidding requirements (advertisement or invitation to bid, Instructions to Bidders, sample forms, the Contractor’s bid or portions of Addenda relating to bidding requirements).
1.1.2 THE CONTRACT
The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Architect and Contractor, (2) between the Owner and a Subcontractor or Sub-subcontractor, (3) between the Owner and Architect or (4) between any persons or entities other than the Owner and Contractor.
1.1.3 THE WORK
The term “Work” means the construction and services required by the Contract Documents, whether completed or partially completed, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations. The Work may constitute the whole or a part of the Project.
1.1.4 THE PROJECT
The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner or by separate contractors.
1.1.5 THE DRAWINGS
The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location, and dimensions of the Work, generally including plans, elevations, sections, details, schedules, and diagrams.
1.1.6 THE SPECIFICATIONS
The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards, and workmanship for all Work, and performance of related services
1.1.7 THE PROJECT MANUAL
The Project Manual is a volume assembled for the Work, which may include the bidding requirements, sample forms, Conditions of the Contract and Specifications.
1.1.8 TERMINOLOGY
Unless otherwise indicated the term “provide” shall include furnishing & installing a product, materials, systems, and/or equipment complete in place, fully tested and approved.
The terms “approved” or approval shall mean approved or approval in writing, unless otherwise indicated.
Rev 10/21/2019 SECTION 00700 - PAGE 3 USNH GENERAL CONDITIONS
1.2 CORRELATION AND INTENT OF THE CONTRACT DOCUMENTS
1.2.1 The intent of the Contract Documents is to include, in a manner consistent with other elements of the design, all items necessary for the proper execution and completion of the Work by the Contractor. All Work shown in, described in, or reasonably inferable from the Contract Documents to produce the indicated results shall be performed by the Contractor as part of this Contract unless noted ‘N.I.C.’ or otherwise specifically excluded. If there is any disagreement within the Contract Documents regarding the quality or quantity of Work and/or materials, the order of precedence of such documents shall be as follows: (1) Change Orders or Construction Change Directives, beginning with most recent; (2) Agreement; (3) Addenda, beginning with most recent; (4) these General Conditions as modified herein; (5) Specifications; (6) Drawings. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all.
1.2.2 Arrangement of the Drawings and organization of the Specifications into divisions, sections, and articles shall not control the Contractor in dividing the Work among Subcontractors or in establishing the extent of Work to be performed by any trade. The Contractor and All Subcontractors shall refer to all Contract Documents, including those not specifically showing the Work of their specialized trades, and shall perform all Work necessary to produce the results shown or reasonably inferable therefrom.
1.2.3 Unless otherwise stated in the Contract Documents, words that have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings.
1.2.4 All indications or notations that apply to one or a number of similar situations, materials, or processes shall be deemed to apply to all such situations, materials or processes wherever they appear in the Work, except where a contrary result is clearly indicated by the Contract Documents.
1.2.5 Codes, standards and published requirements or recommendations cited in the Contract Documents shall be current versions as of the date on which general bids were received, unless otherwise indicated
1.2.6 Work for which no explicit quality of standards of materials and/or workmanship is defined in the Contract
Documents shall be of good quality for the intended use and consistent with the quality of surrounding work and of the construction of the Project generally.
1.2.7 All manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with the manufacturers’ written instructions, unless specifically indicated otherwise in the Contract Documents.
1.2.8 The Drawings are generally made to scale, but all working dimensions shall be taken from the figured dimensions, or by actual measurements taken at the job, and in no case by scaling. Whether or not an error is believed to exist, deviation from the Drawings and the dimensions given thereon shall be made only after approval in writing from the Architect.
1.2.9 The Contractor is entitled to rely reasonably on the accuracy of test boring or soil test information in the
Contract Documents at, and only at, the specific locations of such borings or tests. The Owner does not hold such information to be an accurate or approximate indication of subsurface conditions at any other points. If the Contractor in the course of excavation finds that subsurface conditions at any specific test location differ from the information in the Contract Documents, the Contractor shall immediately so notify the Owner and Architect in writing, and shall not further disturb the noted conditions until authorized to do so by the Architect. No claim for extra cost or extension of time shall be allowed unless such notification is given by the Contractor, the Architect determines that the information contained in the Contract Documents was incorrect, and the Architect determines that the claim is justified by the discrepancy. Claims based on interpolation, extrapolation or any other assumptions by the Contractor as to subsurface conditions between test locations shall not be allowed.
1.2.10 Where the Work is to fit with existing conditions or work to be performed by others, the Contractor shall join the Work fully and completely with such conditions or work, unless otherwise specified.
1.3 CAPITALIZATION
Rev 10/21/2019 SECTION 00700 - PAGE 4 USNH GENERAL CONDITIONS
1.3.1 Terms capitalized in these General Conditions include those that are (1) specifically defined, (2) the titles of numbered articles and identified references to Paragraphs, Subparagraphs, and Clauses in the document
1.4 INTERPRETATION
1.4.1 In the interest of brevity the Contract Documents frequently omit modifying words such as “all” and “any” and articles such as “the” and “an,” but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement.
1.5 EXECUTION OF CONTRACT DOCUMENT
1.5.1 The Contract Documents shall be signed by the Owner and Contractor. If either the Owner or the
Contractor or both do not sign all the Contract Documents, the Architect shall identify such unsigned Documents upon written request.
1.5.2 Execution of the Contract by the Contractor is a representation that the Contractor has visited the site, become generally familiar with local conditions under which the Work is to be performed and correlated personal observations with requirements of the Contract Documents.
1.6 OWNERSHIP AND USE OF DRAWINGS, SPECIFICATIONS, AND OTHER INSTRUMENTS OF
SERVICE
1.6.1 The Drawings, Specifications and other documents, including those in electronic form, prepared by the
Architect and the Architect’s consultants are Instruments of Service through which the Work to be executed by the Contractor is described. The Contractor may retain one record set. Neither the Contractor nor any Subcontractor, Sub-subcontractor, or material or equipment supplier shall own or claim a copyright in the Drawings, Specifications, and other documents prepared by the Architect or the Architect’s consultants;
and, unless otherwise indicated, the Architect and the Architect’s consultants shall be deemed the authors of them and will retain all common law, statutory and other reserved rights, in addition to the copyrights.
All copies of Instruments of Service, except the Contractor’s record set, shall be returned or suitably accounted for to the Architect, on written request, upon completion of the Work. The Drawings, Specifications and other documents prepared by the Architect and the Architect’s consultants, and copies thereof furnished to the Contractor, are for use solely with respect to this Project. They are not to be used by the Contractor or any Subcontractor, Sub-subcontractor or material or equipment supplier on other projects or for additions to this Project outside the scope of the Work without the specific written consent of the Owner. The Contractor, Subcontractors, Sub-subcontractors, and material or equipment suppliers are authorized to use and reproduce applicable portions of the Drawings, Specifications and other documents prepared by the Architect and the Architect’s consultants appropriate to and for use in the execution of their Work under the Contract Documents. All copies made under this authorization shall bear the statutory copyright notice, if any, shown on the Drawings, Specifications and other documents prepared by the Architect and the Architect’s consultants. Submittal or distribution to meet official regulatory requirements or for other purposes in connection with this Project is not to be construed as publication in derogation of the Architect’s or Architect’s consultants’ copyrights or other reserved rights.
ARTICLE 2 OWNER
2.1 GENERAL
2.1.1 The Owner is the person or entity identified as such in the Agreement; and is referred to throughout the
Contract Documents as if singular in number. The Owner shall designate in writing a representative who shall have express authority to bind the Owner with respect to all matters requiring the Owner’s approval or authorization. Except as otherwise provided in Subparagraph 4.2.1, the Architect does not have such authority. The term “Owner” means the Owner or the Owner’s authorized representative.
2.1.2 The Owner shall furnish to the Contractor within fifteen days after receipt of a written request, information necessary and relevant for the Contractor to evaluate, give notice of, or enforce mechanic’s lien rights.
Such information shall include a correct statement of the record legal title to the property on which the Project is located, usually referred to as the site, and the Owner’s interest therein.
2.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
Rev 10/21/2019 SECTION 00700 - PAGE 5 USNH GENERAL CONDITIONS
2.2.1 The Owner shall, at the written request of the Contractor, prior to commencement of the Work and thereafter, furnish to the Contractor reasonable evidence that financial arrangements have been made to fulfill the Owner’s obligations under the Contract. After such evidence has been furnished, the Owner shall not materially vary such financial arrangements without prior notice to the Contractor.
2.2.2 Except for permits and fees, including those required under Subparagraph 3.7.1, which are the responsibility of the Contractor under the Contract Documents, the Owner shall secure and pay for necessary approvals, easements, assessments and charges required for construction, use or occupancy of permanent structures or for permanent changes in existing facilities
2.2.3 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and if applicable a legal description of the site. The Contractor shall be entitled to rely reasonably on the accuracy of information furnished by the Owner but shall exercise proper precautions relating to the safe performance of the Work
2.2.4 Information or services required of the Owner by the Contract Documents shall be furnished by the Owner with reasonable promptness. Any other information or services relevant to the Contractor’s performance of the Work under the Owner’s control shall be furnished by the Owner after receipt from the Contractor of a written request for such information or services.
2.3 OWNER’S RIGHT TO STOP THE WORK
2.3.1 If the Contractor fails to correct Work which is not in accordance with the requirements of the Contract
Documents as required by Paragraph 12.2 or persistently fails to carry out Work in accordance with the Contract Documents, the Owner may issue a written order to the Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, the right of the Owner to stop the Work shall not give rise to a duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity, except to the extent required by Subparagraph 6.1.3.
2.4 OWNER’S RIGHT TO CARRY OUT THE WORK
2.4.1 If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a seven-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may after such seven-day period give the Contractor a second written notice to correct such deficiencies within a three-day period. If the Contractor within such three-day period after receipt of such second notice fails to commence and continue to correct any deficiencies, the Owner may, without prejudice to other remedies the Owner may have, correct such deficiencies. In such case, an appropriate Change Order shall be issued deducting from payments then or thereafter due the Contractor the reasonable cost of correcting such deficiencies, including Owner’s expenses and compensation for the Architect’s additional amounts charged to the Contractor are both subject to prior approval of the Architect, which shall not be unreasonably withheld. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner.
ARTICLE 3 CONTRACTOR
3.1 GENERAL
3.1.1 The Contractor is the person or entity identified as such in the Agreement and is referred to throughout the
Contract Documents as if singular in number. The term “Contractor” means the Contractor or the Contractor’s authorized representative.
3.1.2 The Contractor shall perform the Work in accordance with the Contract Documents, supplementary instructions, and submittals approved pursuant to Paragraph 3.12.
3.1.3 The Contractor shall not be relieved of obligations to perform the Work in accordance with the Contract
Documents by either activities or duties of the Architect in the Architect’s administration of the Contract, or by tests, inspections, or approvals required or performed by persons other than the Contractor.
Rev 10/21/2019 SECTION 00700 - PAGE 6 USNH GENERAL CONDITIONS
3.2 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR
3.2.1 Before starting each portion of the Work, and at frequent intervals during the progress thereof, the
Contractor shall carefully study and compare with each other all architectural, structural, mechanical, fire protection, electrical the various Drawings and other Contract Documents relating to such portion with the intent both to ascertain their accuracy and completeness and to ensure that the Work of all trades can be constructed as shown thereon while clearing any obstructions and maintaining proper clearances for the Work of other trades. In performing these studies and comparisons, the Contractor shall recognize and take account of the fact that the mechanical, fire protection and electrical drawings, and any other drawings so noted, are diagrammatic and may not be drawn to scale. The Contractor shall promptly notify the Architect as provided in Subparagraph 3.2.3 of any errors, omissions or inconsistencies found in the course of the studies and comparisons required by this Subparagraph 3.2.1; however, responsibility for any such errors, omissions or inconsistencies shall remain with the Architect.
3.2.2 The Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to the Contractor with the Contract Documents before commencing any activities affected thereby.
3.2.3 The Contractor shall not proceed with any Work with respect to which errors, omissions or inconsistencies have been found by the studies and comparisons required by Subparagraphs 3.2.1 and 3.2.2, but shall immediately notify the Architect thereof in writing, and shall request supplementary instructions as provided in Subparagraph 3.2.4. If the Contractor proceeds with the Work without first obtaining such supplementary instructions, the Contractor shall correct work incorrectly done at the Contractor’s expense.
3.2.4 Requests by the Contractor for additional information relative to the Contract Documents (RFIs) shall be submitted simultaneously to the Owner and Architect in writing, on a form prepared or approved by the Architect, and shall include a detailed statement indicating the specific drawings or specifications in need of clarification and the nature of the clarification requested, such as supplementary drawings or specifications, or review and approval of product data, samples or sketches submitted by the Contractor. If mutually agreed upon by the Architect, Contractor and Owner, “in writing” may include fax transmissions, electronic mail, or other documentable communication methods.
3.2.5 RFIs shall be submitted in a timely manner so as to cause no delay in the progress of the Work, and to allow adequate time for review and response prior to the date on which the Contractor’s current schedule of submittals requires a subsequent submittal which is dependent on the information requested. Unless another period of time is reasonably requested and agreed to at the time of submittal, the Architect shall respond to each RFI within not more than four working days after receiving it.
3.2.6 If the Contractor fails to comply with the requirements of Paragraphs 3.2.4 and 3.2.5, or if information requested in an RFI is clearly and unequivocally provided in the Contract Documents, the Contractor shall reimburse the Owner for such costs and damages as would otherwise have been avoided, including but not limited to the cost of any Change in the Architect’s Services.
3.3 SUPERVISION AND CONSTRUCTION PROCEDURES
3.3.1 The Contractor shall supervise and direct the Work, using the Contractor’s best skill and attention. The
Contractor shall solely responsible for and have control over construction means, methods, techniques, sequences, procedures, safety precautions, and for coordinating all portions of the Work under the Contract, unless the Contract Documents give other specific instructions concerning these matters.
3.3.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor’s employees, Subcontractors and their agents and employees, and other persons or entities performing portions of the Work for or on behalf of the Contractor or any of its Subcontractors.
3.3.3 The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work.
3.3.4 The Contractor shall study and compare all Drawings and verify all figures shown thereon before laying out or constructing the Work. The Contractor shall be responsible for errors in its work and the work of its Subcontractors that might reasonably have been avoided thereby. The Contractor shall establish and be
Rev 10/21/2019 SECTION 00700 - PAGE 7 USNH GENERAL CONDITIONS responsible for the accuracy of all lines, grades, measurements, levels, column lines, wall and partition lines required by the various Subcontractors in laying out their Work, and shall protect and preserve all permanent bench and other markers. Checking of the figures or layout by the Architect shall not relieve the Contractor of these responsibilities.
3.4 LABOR AND MATERIALS
3.4.1 Unless otherwise provided in the Contract Documents, the Contractor shall provide and pay for labor materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.
3.4.2 The Contractor shall enforce strict discipline and good order among the Contractor’s employees and other persons carrying out the Contract. The Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them.
3.4.3 The Contractor shall be responsible for determining that all materials furnished for the Work meet all requirements of the Contract Documents. If the Architect reasonably believes that a material proposed by the Contractor, but not specified by brand name and grade or model designation, may not comply with all such requirements, the Architect may require the Contractor to produce, at the Contractor’s expense, reasonable evidence of such compliance. This provision shall not require the Contractor to pay for periodic testing of different batches of the same material, unless such testing is specifically required by the Contract Documents to be performed at the Contractor’s expense.
3.4.4 If a manufacturer’s name, trade name or proprietary designation is used in the Contract Documents in connection with materials or products to be furnished under this Contract, the Contractor shall furnish the product of the named manufacturer, except as follows:
.1 Where the words “or equal” are used after such manufacturer’s name, trade name or proprietary designation, Contractor proposed substitutions will be accepted only if they are, in the opinion of the Architect, proved equal to the specified material or product through the submittal of comparative manufacturer’s information or as otherwise provided in Subparagraph 3.4.3. The Contractor shall inform the Architect in writing of the proposed substitution and request approval thereof prior to or at the time the material or product is submitted for approval. Written approval by the Architect shall be required for the acceptance of any such substitution.
.2 Where the words “or equal” are not used after such manufacturer’s name, trade name or proprietary designation, Contractor proposed substitutions may be accepted or rejected whether or not they are or can be, in the opinion of the Architect, proved equal to the specified material or product through the submittal of comparative manufacturer’s information or as otherwise provided in Subparagraph 3.4.3.
The Contractor shall inform the Architect in writing of the proposed substitution and request approval thereof prior to or at the time the material or product is submitted for approval. Written approval by the Architect shall be required for the acceptance of any such substitution.
3.4.5 If the Contractor proposes to use a material which, while suitable for the intended use, deviates in any way from the detailed requirements of the Contract Documents, the Contractor shall inform the Architect in writing as to the nature of such deviations at the time the material is submitted for approval, and shall request written approval of the deviation from the requirements of the Contract Documents. Written approval by the Architect shall be required for the acceptance of any such deviation.
3.4.6 The Contract Documents are intended to produce a building of consistent character and quality of design.
All components of the building including visible items of mechanical and electrical equipment have been selected to produce a coordinated design in relation to the overall appearance of the building. The Architect will judge the design and appearance of proposed substitutes based on their appropriateness in relation to the overall design of the project, as well as for their intrinsic merits. The Architect will not approve as equal to materials specified, proposed substitutions which, in the Architect’s opinion, would be out of character, obtrusive, or otherwise inconsistent with the character opinion, would be out of character, obtrusive, or otherwise inconsistent with the character or quality of design of the Project. In order to permit coordinated design of color and finishes the Contractor shall, if required by the Architect, furnish the substituted material in any color, finish, texture or pattern which would have been available from the manufacturer originally specified, at no additional cost to the Owner.
Rev 10/21/2019 SECTION 00700 - PAGE 8 USNH GENERAL CONDITIONS
3.4.7 Any additional cost, loss, or damage arising from the substitution of any materials or products for those originally specified shall be borne by the Contractor, notwithstanding approval or acceptance of such substitution by the Owner or the Architect, unless such substitution was made at the written request or direction of the Owner or the Architect.
3.5 WARRANTY
3.5.1 The Contractor warrants that the materials and equipment furnished under the Contract will be new and of recent manufacture unless otherwise specified, and that all Work will be of good quality, free from faults and defects, and in conformance with the Contract Documents. Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective.
The Contractor’s warranty excludes remedy for damage or defect resulting from abuse, improper operation, or modifications by the Owner at any time, inadequate or improper maintenance, or normal wear and tear and normal usage by the Owner after issuance by the Architect of a Certificate of Substantial Completion for the damaged or defective work. If required by the Architect, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment.
3.5.2 The warranty required by this Paragraph 3.5 shall be in addition to and not in limitation of any other warranty required by the Contract Documents or otherwise prescribed by law.
3.5.3 The Contractor shall procure and deliver to the Architect, no later than the Date of Substantial Completion, all warranties required by the Contract Documents.
3.6 TAXES
3.6.1 For the Work provided by the Contractor, the Contractor shall pay sales, consumer, use, and similar taxes that are legally enacted when bids are received and negotiations concluded, whether or not yet effective or merely scheduled to go into effect. The Owner is an institution exempt from sales tax; Bidders shall take this in consideration in calculating their bid amount. Tax Exemption Number will be furnished to the selected Contractor.
3.7 PERMITS, FEES, AND NOTICES
3.7.1 Unless otherwise provided in the Contract Documents, the Contractor shall secure and pay all required permits and governmental fees, licenses and inspections necessary for proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required when bids are received or negotiations concluded.
3.7.2 The Contractor shall comply with and give notices required by laws, ordinances, rules, regulations, and lawful orders of public authorities applicable to performance of the Work. The Contractor shall be responsible for scheduling all tests and inspections required by authorities having jurisdiction.
3.7.3 It is not the Contractor’s responsibility to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, building codes, and rules and regulations. However, if the Contractor observes that portions of the Contract Documents are at variance therewith, the Contractor shall promptly notify the Architect and Owner in writing, and necessary changes shall be accomplished by appropriate Modification.
3.7.4 If the Contractor performs Work knowing it to be contrary to laws, statutes, ordinances, building codes, and rules and regulations without such notice to the Architect and Owner, the Contractor shall assume appropriate responsibility for such Work and shall bear the costs attributable to correction.
3.8 ALLOWANCES
3.8.1 The Contractor shall include in the Contract Sum all allowances states in the Contract Documents. Items covered by allowances shall be supplied for such amounts and by such persons or entities as the Owner may direct, but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable objection.
Rev 10/21/2019 SECTION 00700 - PAGE 9 USNH GENERAL CONDITIONS
3.8.2 Unless otherwise provided in the Contract Documents:
.1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts;
.2 Unless otherwise indicated Contractor’s costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances;
.3 Whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference between actual costs and the allowances under Clause 3.8.2.1 and (2) changes in Contractor’s costs under Clause 3.8.2.2.
3.8.3 Materials and equipment under an allowance shall be selected by the Owner in sufficient time to avoid delay in the Work.
3.9 SUPERINTENDENT
3.9.1 The Contractor shall employ a competent superintendent and necessary assistants, who shall be at the
Project site during performance of the Work. The superintendent shall represent the Contractor, and communications given to the superintendent shall be as binding s if given to the Contractor. Important communications shall be confirmed in writing. Other communications shall be similarly confirmed on written request in each case.
3.9.2 The Contractor shall coordinate and supervise the work performed by Subcontractors to ensure that the
Work is carried out without conflict between trades and so that no trade, at any time, causes delay to the general progress of the Work. The Contractor and all Subcontractors at all times shall afford each trade, any separate contractor, or the Owner, every reasonable opportunity for the installation of their work and the storage of materials.
3.9.3 The Contractor shall arrange for and attend job meetings with the Architect and such other persons as the
Architect may from time to time wish to have present. The Contractor shall be represented by a principal, project manager, general superintendent, or other authorized main office representative, as well as by the Contractor’s own superintendent. An authorized representative of any Subcontractor or Sub-subcontractor shall attend such meetings if the representative’s presence is requested by the Architect. Such representatives shall be empowered to make binding commitments on all matters to be discussed at such meetings, including costs, payments, Change Orders, time schedules, and manpower. Any notices required under the Contract may be served on such representatives.
3.10 CONTRACTOR’S CONSTRUCTION SCHEDULES
3.10.1 The Contractor shall, within thirty days unless otherwise specified after being awarded the Contract, prepare and submit for the Owner’s and Architect’s information and review a Contractor’s construction schedule for the Work. The schedule shall include the same breakdown as the Schedule of Values required by Paragraph 9.2, shall conform to all time limits and other schedule requirements current under the Contract Documents, shall be related to the entire Project to the extent required by the Contract Documents, and shall provide for expeditious and practicable execution of the Work. Unless objected to in writing by the Owner or Architect within fourteen days, the Contractor’s Schedule shall be the Baseline Schedule for the Work, and the Contractor shall sign, date, and transmit copies thereof designated “Baseline Schedule,” to the Architect and Owner. In addition, the Contractor shall maintain one copy thereof similarly designated, signed, and dated at the Contractor’s field office throughout the Work for reference.
3.10.2 The Contractor shall prepare and keep current, for the Architect’s approval, a schedule of submittals which is coordinated with the Contractor’s construction schedule and allows the Architect reasonable time to review submittals.
3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules submitted to the Owner and Architect.
Rev 10/21/2019 SECTION 00700 - PAGE 10 USNH GENERAL CONDITIONS
3.10.4 The Contractor’s schedule shall be prepared and maintained using Primavera, Microsoft Project, or equivalent computer software, shall clearly show the critical path of the entire Project, and shall show long lead time items and critical material and equipment delivery dates.
3.10.5 The Contractor shall revise the construction schedule at appropriate intervals as required by the conditions of the Work and Project. At a minimum, an up-to-date schedule shall be submitted with each Requisition for Payment, and within seven days following receipt of information by the Contractor, which the Contractor believes may result in a change of completion date.
3.11 DOCUMENTS AND SAMPLES AT THE SITE
3.11.1 The contractor shall maintain at the site for the Owner one record copy of the Drawings, specifications, addenda, change orders, baseline schedule, current schedule, schedule of submittals, and other documents related to the project as directed by the Architect, in good order and marked currently to record changes and selections made during construction, and one record copy of approved Shop Drawings, Product Data, Samples and similar required submittals. These shall be available to the Architect and shall be delivered to the Architect upon completion of the Work.
3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
3.12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the
Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier, or distributor to illustrate some portion of the Work.
3.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by the Contractor to illustrate materials or equipment for some portion of the Work.
3.12.3 Samples are physical examples that illustrate materials, equipment, or workmanship and establish standards by which the Work will be judged.
3.12.4 Shop Drawings, Product Data, Samples, and similar submittals are not Contract Documents. The purpose of their submittal is to demonstrate for those portions of the Work for which submittals are required by the Contract Documents the way by which the Contractor proposes to conform to the information given in the Contract Documents and the intent of the Contract Documents as defined in Subparagraph 1.2.1. Review by the Architect is subject to the limitations of Subparagraph 4.2.7. Informational submittals upon which the Architect is not expected to take responsive action may be so identified in the Contract Documents.
Submittals not required by the Contract Documents may be returned by the Architect without action.
3.12.5 The contractor shall review for compliance with the Contract Documents, approve and submit to the
Architect Shop Drawings, Product Data, Samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of the Owner or of separate contractors. Submittals not marked as reviewed for compliance with the Contract Documents and approved by the Contractor may be returned by the Architect without action.
3.12.6 By approving and submitting Shop Drawings, Product Data, Samples, and similar submittals, the
Contractor thereby represents that the Contractor has determined and verified all dimensions, quantities, field conditions, relations to existing work, coordination with work to be installed later, coordination with information on Shop Drawings, Product Data, Samples, or similar submittals previously approved by the Architect or submitted by the Contractor for approval but not yet acted upon by the Architect, and verification of compliance with all the requirements of the Contract Documents. The accuracy of all such information is the responsibility of the contractor. In approving Shop Drawings, Product Data, Samples, and similar submittals, the Architect shall be entitled to rely upon the Contractor’s representation that such information is accurate and in compliance with the Contract.
3.12.7 The Contractor shall perform no portion of the Work for which the contract Documents require submittal and review of Shop Drawings, Product Data, Samples or similar submittals until the respective submittal has been approved by the Architect.
Rev 10/21/2019 SECTION 00700 - PAGE 11 USNH GENERAL CONDITIONS
3.12.8 The Work shall be in accordance with approved submittals except that the Contractor shall not be relieved of responsibility for deviations from requirements of the Contract Documents by the Architect’s approval of Shop Drawings, Product Data, Samples or similar submittals unless the Contractor has specifically informed the Architect in writing of such deviation at the time of submittal and (1) the Architect has given written approval to the specific deviation as a minor change in the Work, or (2) a Change Order or construction Change Directive has been issued authorizing the deviation. The Contractor shall not be relieved of responsibility for errors or omissions in Shop Drawings, Product Data, Samples or similar submittals by the Architect’s approval thereof.
3.12.9 The Contractor shall specific attention, in writing or on resubmitted Shop Drawings, Product Data, Samples or similar submittals, to revisions other than those requested by the Architect on previous submittals. In the absence of such written notice, the Architect’s approval of a resubmission shall not apply to such revisions.
3.12.10 No claim for delay shall be allowed on account of failure of the Architect to furnish instructions, or return
Shop Drawings, Product Data, Samples and the like, unless the Architect has failed to comply with the requirements of Subparagraph 4.2.7 and not then unless the Contractor’s latest construction schedule demonstrates that the claimed failure has caused an equivalent extension of the critical path.
3.13 USE OF SITE
3.13.1 The right of possession of the premises and the improvements made thereon by the Contractor shall remain at all times with the Owner. The Contractor’s right to entry and use thereof arises solely from the permission granted by the Owner under the Contract Documents. The Contractor shall confine the contractor’s apparatus, the storage of materials, and the operations of the Contractor’s workmen to limits indicated by law, ordinances, the contract Documents, and permits and/or directions of the Architect and shall not unreasonably encumber the premises with the Contractor’s materials or equipment.
3.14 CUTTING AND PATCHING
3.14.1 The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.
3.14.2 The Contractor shall not damage or endanger a portion of the Work or fully or partially completed construction of the Owner or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. The Contractor shall not cut or otherwise alter such construction by the Owner or a separate contractor except with written consent of the Owner and of such separate contractor;
such consent shall not be unreasonably withheld. The Contractor shall not unreasonably withhold from the Owner or a separate contractor the Contractor’s consent to cutting or otherwise altering the Work.
3.15 CLEANING UP
3.15.1 The Contractor shall keep the premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under the Contract. At completion of the Work, the Contractor shall remove from the about the Project waste materials, rubbish, the Contractor’s tools, construction equipment, machinery and surplus materials. Immediately prior to the Architect’s inspection for Substantial Completion, the Contractor shall completely clean the premises. Concrete and ceramic surfaces shall be cleaned and washed. Resilient coverings shall be cleaned, waxed, and buffed. Woodwork shall be dusted and cleaned. Sash, fixtures and equipment shall be thoroughly cleaned. Stains, spots, dust marks, and smears shall be removed from all surfaces. Hardware and all metal surfaces shall be cleaned and polished.
Glass and plastic surfaces shall be thoroughly cleaned by professional window cleaners. All damaged, broken, or scratched glass or plastic shall be replaced by the Contractor at the Contractor’s expense.
3.15.2 If the Contractor fails to clean up as provided in the Contract Documents, the Owner may do so and the cost thereof shall be charged to the Contractor.
3.16 ACCESS TO WORK
3.16.1 The Contractor shall provide the Owner and Architect access to the Work in preparation and progress wherever located.
Rev 10/21/2019 SECTION 00700 - PAGE 12 USNH GENERAL CONDITIONS
3.17 ROYALTIES, PATENTS AND COPYRIGHTS
3.17.1 The Contractor shall pay all royalties and license fees. The Contractor shall defend suits or claims for infringement of copyrights and patent rights and shall hold the Owner and Architect harmless from loss on account thereof, but shall not be responsible for such defense or loss when a particular design, process or product of a particular manufacturer or manufacturers is required by the Contract Documents or where the copyright violations are contained in Drawings, Specifications or other documents prepared by the Owner or Architect. However, if the Contractor has reason to believe that the required design, process or product is an infringement of a copyright or a patent, the Contractor shall be responsible for such loss unless such information is promptly furnished to the Architect.
3.18 INDEMNIFICATION
3.18.1 To the fullest extent permitted by law, and to the extent claims, damages, losses or expenses are not covered by insurance purchased by the Contractor in accordance with Paragraph 11.1, the Contractor shall indemnify and hold harmless the Owner and Owner’s agents and employees from and against claims, damages, losses and expenses, including but not limited to attorneys’ fees, arising out of or resulting from or caused by the negligent acts, errors or omissions of the Contractor, a sub-contractor, and anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity which would otherwise exist as to a party or person described in this Paragraph 3.18.
3.18.2 In claims against any person or entity indemnified under this Paragraph 3.18 by an employee of the
Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be liable, the indemnification obligation under Subparagraph 3.18.1 shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the Contractor of a Subcontractor under workers’ compensation acts, disability benefit acts or other employee benefit acts.
ARTICLE 4 ADMINISTRATION OF THE CONTRACT
4.1 ARCHITECT
4.1.1 The Architect is the person lawfully licensed to practice architecture or an entity lawfully practicing architecture identified as such in the Agreement and is referred to throughout the Contract Documents as if singular in number. The term “Architect” means the Architect or the Architect’s authorized representative.
4.1.2 Duties, responsibilities and limitations of authority of the Architect as set forth in the Contract Documents shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect. Consent shall not be unreasonably withheld.
4.1.3 If the employment of the Architect is terminated, the Owner may employ, at its option, a new Architect against whom the Contractor has no reasonable objection and whose status under the Contract Documents shall be that of the former Architect.
4.2 ARCHITECT’S ADMINISTRATION OF THE CONTRACT
4.2.1 The Architect will provide administration of the Contract as described in the Contract Documents, and will be an Owner’s representative (1) during construction, (2) until final payment is due and (3) with the Owner’s concurrence, from time to time during the one-year period for correction of Work described in Paragraph 12.2. The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract Documents, unless otherwise modified in writing in accordance with other provisions of the Contract.
4.2.2 The Architect, will visit the site at intervals appropriate to the stage of the Contractor’s operations (1) to become generally familiar with, to observe and to keep the Owner informed about the progress and quality of the portion of the Work completed, (2) to endeavor to guard the Owner against defects and deficiencies in the Work, and (3) to determine in general if the Work is being performed in a manner indicating that the Work, when fully completed, will be in accordance with the Contract Documents. However, the Architect
Rev 10/21/2019 SECTION 00700 - PAGE 13 USNH GENERAL CONDITIONS will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Architect will neither have control over or charge of, nor be responsible for, the construction means, methods, techniques, sequences or procedures, or for the safety precautions and programs in connection with the Work, since these are solely the Contractor’s rights and responsibilities under the contract Documents, except as provided in Subparagraph 3.3.1.
4.2.3 The Architect will not be responsible for the Contractor’s failure to perform the Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or employees, or any other persons or entities performing portions of the Work.
4.2.4 Communications Facilitating Contract Administration. Except as otherwise provided in the contract
Documents or when direct communications have been specially authorized, the Owner and Contractor shall endeavor to communicate with each other through the Architect about matters arising out of or relating to the Contract. Communications by and with the Architect’s consultants shall be through the Architect.
Communications by and with Subcontractors and material suppliers shall be through the Contractor.
Communications by and with separate contractors shall be through the Owner.
4.2.5 Based on the Architect’s evaluations of the Contractor’s Applications for Payment, the Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts.
4.2.6 The Architect will have authority to reject Work that does not conform to the Contract Documents.
Whenever the Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the Work in accordance with Subparagraph 13.5.2 and 13.5.3, whether or not such Work is fabricated, installed, or completed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .