Appendix B - Offer Sheet.xlsx

XLSX spreadsheet 105 KB Posted

Attached to
MRO Services
Solicitation number
2120271019
Issued by
New Hampshire

About this file

Summary of Appendix B - Offer Sheet

This is a financial response worksheet for the University System of New Hampshire (USNH) Maintenance, Repair, and Operations (MRO) Services contract opportunity across multiple New Hampshire institutions. The offer sheet establishes a framework for qualified firms to submit hourly labor rates and material costs across 18 distinct trade categories: flooring, roofing, carpentry, electrical, masonry, excavating, abatement, landscaping, asphalt, campus signage, emergency response, general contracting, HVAC, painting, plumbing, sheet metal, welding, and fire stopping. Prospective bidders must complete relevant tabs corresponding to the services their firm proposes to provide and clearly identify which USNH campuses they can support, including UNH-Durham, UNH-Manchester, UNH-Law School, Plymouth State University (PSU), and Keene State College (KSC). The contract spans a three-year term with separate pricing schedules for Years 1, 2, and 3. Firms may add position types not explicitly listed in the template and must submit a detailed equipment list with associated pricing as a separate attachment.

All hourly labor rates must be fully inclusive with no additional charges, surcharges, or fuel fees permitted. Submitted rates serve as not-to-exceed maximums; firms may quote lower rates during the subsequent RFQ process but cannot exceed the awarded rate for any position. Material and subcontractor markups are capped at 10 percent across all trade categories. Pricing structures vary by trade—some categories specify separate regular and overtime rates for different labor classifications, while others such as asphalt include tiered unit pricing based on quantity ranges. The landscaping section offers particularly granular pricing with separate standard and overtime rates for 16 distinct services including lawn mowing, tree removal, snow removal, and hardscaping. Campus signage requires labor rates for installation, design, and project management services only.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Attachment B - Financial Response Worksheet
1Please complete the relevant tabs of the pricing sheet corresponding to the services your firm is proposing.
2Note: Submission of a response for a particular service does not guarantee award for that service.
3If your firm offers positions not explicitly listed in the template, please add them directly to the spreadsheet in the appropriate section.
4As specified in Appendix A, include a detailed equipment list with associated pricing as a separate attachment to your proposal.
5For each tab where your firm is submitting a proposal, clearly indicate the specific USNH campus or campuses you are proposing to support.
6Hourly labor rates shall be all inclusive, special charges, surcharges, or fuel charges of any kind (by whatever name) may not be added on at any time.

Flooring

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Roofing

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Carpentry

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Electrical

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Journeyman - Regular Rate$0.00$0.00$0.00
Journeyman - Overtime Rate$0.00$0.00$0.00
Master Electricial - Regular Rate$0.00$0.00$0.00
Master Electricial - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Masonry

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Mason - Regular Rate$0.00$0.00$0.00
Mason - Overtime Rate$0.00$0.00$0.00
Mason Helper - Regular Rate$0.00$0.00$0.00
Mason Helper - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Excavating

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Truck Driver - Regular Rate$0.00$0.00$0.00
Truck Driver - Overtime Rate$0.00$0.00$0.00
Operator - Regular Rate$0.00$0.00$0.00
Operator - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Abatement

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Project Manager - Regular Rate$0.00$0.00$0.00
Project Manager - Overtime Rate$0.00$0.00$0.00
Supervisor - Regular Rate$0.00$0.00$0.00
Supervisor - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
Disposal - Cost Plus mark up0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Landscaping

DescriptionStandard Hourly Rate Year 1Overtime Hourly Rate Year 1Standard Hourly Rate Year 2Overtime Hourly Rate Year 2Standard Hourly Rate Year 3Overtime Hourly Rate Year 3
Lawnmowing Hourly Rate$0.00$0.00$0.00$0.00$0.00$0.00
Trimming edge of lawn and beds hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Planting hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Hazard assessment hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Tree removal hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Pruning hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Weeding hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Raking hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Irrigation hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Snow removal shoveling$0.00$0.00$0.00$0.00$0.00$0.00
Snow removal plowing$0.00$0.00$0.00$0.00$0.00$0.00
Salting for snow removal hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Sanding for snow removal hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Hardscaping hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Hardscaping tender hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
Laborer hourly rate$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Asphalt

ITEM #DESCRIPTIONQTYUOMUnit Price
1Asphalt pavement installation - Machine method≤ 50ton$
50 - 200ton$
200 - 500ton$
> 500ton$
2Asphalt pavement installation - Manual method≤ 50ton$
50 - 200ton$
200 - 500ton$
> 500ton$
3Crushed gravel in-place and compacted≤ 100cu yard$
100 - 250cu yard$
≥ 250cu yard$
4Fine grade - Grader method≤ 500sq yard$
500 - 1,500sq yard$
1,500 - 2,500sq yard$
≥ 2,599sq yard$
5Fine grade - Manual method≤ 500sq yard$
6Remove and dispose of existing asphalt off Campus≤ 1,000sq yard$
1,000 - 2,000sq yard$
≥ 2,000sq yard$
7Reclaimed stabilized base, process in place≤ 3,000sq yard$
3,000 - 6,000sq yard$
≥ 6,000sq yard$
8Reclaimed stabilized base, graded and compacted≤ 3,000sq yard$
3,000 - 6,000sq yard$
≥ 6,000sq yard$
9Remove and dispose of excess reclaimed material off Campus≤ 100ton$
100 - 250ton$
≥ 250ton$
10Saw cut existing pavement≤ 100ln foot$
100 - 200ln foot$
≥ 200ln foot$
11Apply Tack Coat to existing surfaces to be overlaid≤ 1,500sq yard$
1,500 - 3,000sq yard$
≥ 3,000sq yard$
12Shim existing surface to be overlaid≤ 50ton$
50 - 100ton$
100 - 150ton$
150 - 200ton$
200 - 300ton$
300 - 400ton$
400 - 500ton$
> 500ton$
13Raise CI Frames and covers for paving (2" including row of brick and concrete collar) - Price per structure2"each$
2 - 4"each$
4 - 6"each$
14Truck and stockpile reclaimed materials within 10 miles of site≤ 50ton$
50 - 100ton$
100 - 150ton$
150 - 200ton$
15Roadway/Parking lot sweepingHourly Rate$
16Pavement Striping≤ 100ln foot$
100 - 200ln foot$
≥ 200ln foot$
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Campus Signage

DescriptionStandard Hourly Rate Year 1Standard Hourly Rate Year 2Standard Hourly Rate Year 3
Installation Labor$0.00$0.00$0.00
Design Labor$0.00$0.00$0.00
Project Management$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Emergency Response

REQUIREMENTDESCRIPTIONUNIT OF MEASUREHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Schedule 1 - Standard Rates
Supervisory / Lead PersonnelSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
Cleaning TechnicianSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
General Service PersonnelSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
CarpenterSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
Drywall InstallerSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
Drywall FinisherSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
PainterSchedule 1 - Labor Rates - Regularper hour$ - 0$ - 0$ - 0
Schedule 2 - Overtime Rates
Supervisory / Lead PersonnelSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
Cleaning TechnicianSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
General Service PersonnelSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
CarpenterSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
Drywall InstallerSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
Drywall FinisherSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
PainterSchedule 2 - Labor Rates - Overtimeper hour$ - 0$ - 0$ - 0
Schedule 3 - Disposal Fees
Waste Disposal FeesPer Ton$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0

Schedule 4 - Mark-Ups

Material Markup (not to exceed 10%)%0%
Schedule 5 - Other
Normal Working Hours
Standard Emergency Reponse Time
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

General Contractor

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Principals$0.00$0.00$0.00
Project Executive$0.00$0.00$0.00
Senior Project Manager$0.00$0.00$0.00
Project Manager$0.00$0.00$0.00
Assistant Project Manager$0.00$0.00$0.00
Estimator$0.00$0.00$0.00
Subcontractor Compliance Manager$0.00$0.00$0.00
Accounting$0.00$0.00$0.00
Administrative$0.00$0.00$0.00
Senior Superintendent$0.00$0.00$0.00
Superintendent$0.00$0.00$0.00
Assistant Superintendent$0.00$0.00$0.00Markup (not to exceed 10%)%0%
Assistant Superintendent$0.00$0.00$0.00
Skilled Labor$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

HVAC

Schedule 1 - Standard Rate

REQUIREMENTSECTIONUNIT OF MEASURERate Year 1Rate Year 2Rate Year 3
ForemanSchedule 1 - Labor Rates - Standardper hour
HVAC TechnicianSchedule 1 - Labor Rates - Standardper hour
Gas FitterSchedule 1 - Labor Rates - Standardper hour
Pipe FitterSchedule 1 - Labor Rates - Standardper hour
General LaborerSchedule 1 - Labor Rates - Standardper hour
Schedule 2 - Overtime Rate
ForemanSchedule 2 - Labor Rates - Overtimeper hour
HVAC TechnicianSchedule 2 - Labor Rates - Overtimeper hour
Gas FitterSchedule 2 - Labor Rates - Overtimeper hour
Pipe FitterSchedule 2 - Labor Rates - Overtimeper hour
General LaborerSchedule 2 - Labor Rates - Overtimeper hour
Schedule 3 - Mark-Ups
Material Cost Plus (Markup as a Percentage not to exceed 10%)Schedule 3 - Materials Mark Up%
Sub-Contractor Cost Plus (Markup as a Percentage not to exceed 10%)Schedule 3 - Sub-Contractors Mark Up%
Schedule 4 - Other
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Painting

FIRM:
DESCRIPTIONBrush/Roll Method Pricing YR 1Brush/Roll Method Pricing YR 2Brush/Roll Method Pricing YR 3Spraying Method Pricing YR 1Spraying Method Pricing YR 2Spraying Method Pricing YR 3
1. Supervisor
Hourly Rate (per hour)$$$$$$
Overtime Rate (per hour)$$$$$$
2. Laborer
Hourly Rate (per hour)$$$$$$
Overtime Rate (per hour)$$$$$$
3. Materials Cost % Markup (not to exceed 10%)%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Plumbing Schedule 1 - Standard Rate

Pricing Year 1Pricing Year 2Pricing Year 3
Superintendent / ForemanSchedule 1 - Labor Rates - RegularPer Hour
Pipe Fitter / WelderSchedule 1 - Labor Rates - RegularPer Hour
Gas FitterSchedule 1 - Labor Rates - RegularPer Hour
Master PlumberSchedule 1 - Labor Rates - RegularPer Hour
Journeyman PlumberSchedule 1 - Labor Rates - RegularPer Hour
Apprentice PlumberSchedule 1 - Labor Rates - RegularPer Hour
Schedule 2 - Overtime Rate
Superintendent / ForemanSchedule 2 - Labor Rates - OvertimePer Hour
Pipe Fitter / WelderSchedule 2 - Labor Rates - OvertimePer Hour
Gas FitterSchedule 2 - Labor Rates - OvertimePer Hour
Master PlumberSchedule 2 - Labor Rates - OvertimePer Hour
Journeyman PlumberSchedule 2 - Labor Rates - OvertimePer Hour
Apprentice PlumberSchedule 2 - Labor Rates - OvertimePer Hour
Schedule 3 - Mark-Ups
Material Cost Plus (Markup as a Percentage not to exceed 10%)Schedule 3 - Materials Mark Up%
Sub-Contractor Cost Plus (Markup as a Percentage, not to exceed 10%)Schedule 3 - Sub-Contractors Mark Up%
Schedule 4 - Other
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Sheet Metal Schedule 1 - Standard Rate

Pricing Year 1Pricing Year 2Pricing Year 3
Gneral LaborerSchedule 1 - Labor Rates - RegularPer Hour
SupervisorSchedule 1 - Labor Rates - RegularPer Hour

Schedule 2 - Overtime Rate

Gneral LaborerSchedule 2 - Labor Rates - OvertimePer Hour
SupervisorSchedule 2 - Labor Rates - OvertimePer Hour

Schedule 3 - Mark-Ups

Material Cost Plus (Markup as a Percentage not to exceed 10%)Schedule 3 - Materials Mark Up%
Schedule 4 - Other
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Welding Schedule 1 - Standard Rate

Pricing Year 1Pricing Year 2Pricing Year 3
Welder - Shop RateSchedule 1 - Labor Rates - RegularPer Hour
Welder - w/portable machine/truckSchedule 1 - Labor Rates - RegularPer Hour
Code Pipe WelderSchedule 1 - Labor Rates - RegularPer Hour
SupervisorSchedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 1 - Labor Rates - RegularPer Hour
Schedule 2 - Overtime Rate
Welder - Shop RateSchedule 1 - Labor Rates - RegularPer Hour
Welder - w/portable machine/truckSchedule 1 - Labor Rates - RegularPer Hour
Code Pipe WelderSchedule 1 - Labor Rates - RegularPer Hour
SupervisorSchedule 1 - Labor Rates - RegularPer Hour

Schedule 3 - Mark-Ups

Material Cost Plus (Markup as a Percentage not to exceed 10%)Schedule 3 - Materials Mark Up%
Schedule 4 - Other
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

Fire Stopping

DescriptionHourly Rate Year 1Hourly Rate Year 2Hourly Rate Year 3
Foreman - Regular Rate$0.00$0.00$0.00
Foreman - Overtime Rate$0.00$0.00$0.00
Firestop Installer - Regular Rate$0.00$0.00$0.00
Firestop Installer - Overtime Rate$0.00$0.00$0.00
Laborer - Regular Rate$0.00$0.00$0.00
Laborer - Overtime Rate$0.00$0.00$0.00
Material - Cost Plus not to exceed 10%0%0%0%
UNH-DurhamUNH-ManchesterUNH-Law SchoolPSUKSC
Campuses Firm can cover - Mark Yes or No
Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position.

image1.png

File details come from the government source that posted it. Updated .