Appendix B - Offer Sheet.xlsx
XLSX spreadsheet 105 KB Posted
- Attached to
- MRO Services
- Solicitation number
- 2120271019
- Issued by
- New Hampshire
About this file
Summary of Appendix B - Offer Sheet
This is a financial response worksheet for the University System of New Hampshire (USNH) Maintenance, Repair, and Operations (MRO) Services contract opportunity across multiple New Hampshire institutions. The offer sheet establishes a framework for qualified firms to submit hourly labor rates and material costs across 18 distinct trade categories: flooring, roofing, carpentry, electrical, masonry, excavating, abatement, landscaping, asphalt, campus signage, emergency response, general contracting, HVAC, painting, plumbing, sheet metal, welding, and fire stopping. Prospective bidders must complete relevant tabs corresponding to the services their firm proposes to provide and clearly identify which USNH campuses they can support, including UNH-Durham, UNH-Manchester, UNH-Law School, Plymouth State University (PSU), and Keene State College (KSC). The contract spans a three-year term with separate pricing schedules for Years 1, 2, and 3. Firms may add position types not explicitly listed in the template and must submit a detailed equipment list with associated pricing as a separate attachment.
All hourly labor rates must be fully inclusive with no additional charges, surcharges, or fuel fees permitted. Submitted rates serve as not-to-exceed maximums; firms may quote lower rates during the subsequent RFQ process but cannot exceed the awarded rate for any position. Material and subcontractor markups are capped at 10 percent across all trade categories. Pricing structures vary by trade—some categories specify separate regular and overtime rates for different labor classifications, while others such as asphalt include tiered unit pricing based on quantity ranges. The landscaping section offers particularly granular pricing with separate standard and overtime rates for 16 distinct services including lawn mowing, tree removal, snow removal, and hardscaping. Campus signage requires labor rates for installation, design, and project management services only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix C - USNH CD200 rev 10.1.20.docx | DOCX document | |
| 1467821-event.pdf | ||
| Appendix A - General Response Workbook - MRO Services.xlsx | XLSX spreadsheet | |
| USNH_Request for Proposal MRO Services_Final.docx | DOCX document | |
| Appendix D General Conditions of the Contract for Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Attachment B - Financial Response Worksheet | |
| 1 | Please complete the relevant tabs of the pricing sheet corresponding to the services your firm is proposing. |
| 2 | Note: Submission of a response for a particular service does not guarantee award for that service. |
| 3 | If your firm offers positions not explicitly listed in the template, please add them directly to the spreadsheet in the appropriate section. |
| 4 | As specified in Appendix A, include a detailed equipment list with associated pricing as a separate attachment to your proposal. |
| 5 | For each tab where your firm is submitting a proposal, clearly indicate the specific USNH campus or campuses you are proposing to support. |
| 6 | Hourly labor rates shall be all inclusive, special charges, surcharges, or fuel charges of any kind (by whatever name) may not be added on at any time. |
Flooring
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Roofing
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Carpentry
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Electrical
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Journeyman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Journeyman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Master Electricial - Regular Rate | $0.00 | $0.00 | $0.00 |
| Master Electricial - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Masonry
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Mason - Regular Rate | $0.00 | $0.00 | $0.00 |
| Mason - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Mason Helper - Regular Rate | $0.00 | $0.00 | $0.00 |
| Mason Helper - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Excavating
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Truck Driver - Regular Rate | $0.00 | $0.00 | $0.00 |
| Truck Driver - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Operator - Regular Rate | $0.00 | $0.00 | $0.00 |
| Operator - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Abatement
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Project Manager - Regular Rate | $0.00 | $0.00 | $0.00 |
| Project Manager - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Supervisor - Regular Rate | $0.00 | $0.00 | $0.00 |
| Supervisor - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| Disposal - Cost Plus mark up | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Landscaping
| Description | Standard Hourly Rate Year 1 | Overtime Hourly Rate Year 1 | Standard Hourly Rate Year 2 | Overtime Hourly Rate Year 2 | Standard Hourly Rate Year 3 | Overtime Hourly Rate Year 3 |
| Lawnmowing Hourly Rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trimming edge of lawn and beds hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Planting hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hazard assessment hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Tree removal hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Pruning hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Weeding hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Raking hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Irrigation hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow removal shoveling | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Snow removal plowing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Salting for snow removal hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Sanding for snow removal hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hardscaping hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hardscaping tender hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Laborer hourly rate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | |||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | ||
| Campuses Firm can cover - Mark Yes or No | ||||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Asphalt
| ITEM # | DESCRIPTION | QTY | UOM | Unit Price |
| 1 | Asphalt pavement installation - Machine method | ≤ 50 | ton | $ |
| 50 - 200 | ton | $ | ||
| 200 - 500 | ton | $ | ||
| > 500 | ton | $ | ||
| 2 | Asphalt pavement installation - Manual method | ≤ 50 | ton | $ |
| 50 - 200 | ton | $ | ||
| 200 - 500 | ton | $ | ||
| > 500 | ton | $ | ||
| 3 | Crushed gravel in-place and compacted | ≤ 100 | cu yard | $ |
| 100 - 250 | cu yard | $ | ||
| ≥ 250 | cu yard | $ | ||
| 4 | Fine grade - Grader method | ≤ 500 | sq yard | $ |
| 500 - 1,500 | sq yard | $ | ||
| 1,500 - 2,500 | sq yard | $ | ||
| ≥ 2,599 | sq yard | $ | ||
| 5 | Fine grade - Manual method | ≤ 500 | sq yard | $ |
| 6 | Remove and dispose of existing asphalt off Campus | ≤ 1,000 | sq yard | $ |
| 1,000 - 2,000 | sq yard | $ | ||
| ≥ 2,000 | sq yard | $ | ||
| 7 | Reclaimed stabilized base, process in place | ≤ 3,000 | sq yard | $ |
| 3,000 - 6,000 | sq yard | $ | ||
| ≥ 6,000 | sq yard | $ | ||
| 8 | Reclaimed stabilized base, graded and compacted | ≤ 3,000 | sq yard | $ |
| 3,000 - 6,000 | sq yard | $ | ||
| ≥ 6,000 | sq yard | $ | ||
| 9 | Remove and dispose of excess reclaimed material off Campus | ≤ 100 | ton | $ |
| 100 - 250 | ton | $ | ||
| ≥ 250 | ton | $ | ||
| 10 | Saw cut existing pavement | ≤ 100 | ln foot | $ |
| 100 - 200 | ln foot | $ | ||
| ≥ 200 | ln foot | $ | ||
| 11 | Apply Tack Coat to existing surfaces to be overlaid | ≤ 1,500 | sq yard | $ |
| 1,500 - 3,000 | sq yard | $ | ||
| ≥ 3,000 | sq yard | $ | ||
| 12 | Shim existing surface to be overlaid | ≤ 50 | ton | $ |
| 50 - 100 | ton | $ | ||
| 100 - 150 | ton | $ | ||
| 150 - 200 | ton | $ | ||
| 200 - 300 | ton | $ | ||
| 300 - 400 | ton | $ | ||
| 400 - 500 | ton | $ | ||
| > 500 | ton | $ | ||
| 13 | Raise CI Frames and covers for paving (2" including row of brick and concrete collar) - Price per structure | 2" | each | $ |
| 2 - 4" | each | $ | ||
| 4 - 6" | each | $ | ||
| 14 | Truck and stockpile reclaimed materials within 10 miles of site | ≤ 50 | ton | $ |
| 50 - 100 | ton | $ | ||
| 100 - 150 | ton | $ | ||
| 150 - 200 | ton | $ | ||
| 15 | Roadway/Parking lot sweeping | Hourly Rate | $ |
| 16 | Pavement Striping | ≤ 100 | ln foot | $ | |
| 100 - 200 | ln foot | $ | |||
| ≥ 200 | ln foot | $ | |||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Campus Signage
| Description | Standard Hourly Rate Year 1 | Standard Hourly Rate Year 2 | Standard Hourly Rate Year 3 | ||
| Installation Labor | $0.00 | $0.00 | $0.00 | ||
| Design Labor | $0.00 | $0.00 | $0.00 | ||
| Project Management | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | |||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Emergency Response
| REQUIREMENT | DESCRIPTION | UNIT OF MEASURE | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Schedule 1 - Standard Rates |
| Supervisory / Lead Personnel | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Cleaning Technician | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| General Service Personnel | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Carpenter | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Drywall Installer | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Drywall Finisher | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Painter | Schedule 1 - Labor Rates - Regular | per hour | $ - 0 | $ - 0 | $ - 0 |
| Schedule 2 - Overtime Rates |
| Supervisory / Lead Personnel | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Cleaning Technician | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| General Service Personnel | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Carpenter | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Drywall Installer | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Drywall Finisher | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Painter | Schedule 2 - Labor Rates - Overtime | per hour | $ - 0 | $ - 0 | $ - 0 |
| Schedule 3 - Disposal Fees |
| Waste Disposal Fees | Per Ton | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 |
Schedule 4 - Mark-Ups
| Material Markup (not to exceed 10%) | % | 0% |
| Schedule 5 - Other |
| Normal Working Hours | |||||
| Standard Emergency Reponse Time | |||||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
General Contractor
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 | ||||
| Principals | $0.00 | $0.00 | $0.00 | ||||
| Project Executive | $0.00 | $0.00 | $0.00 | ||||
| Senior Project Manager | $0.00 | $0.00 | $0.00 | ||||
| Project Manager | $0.00 | $0.00 | $0.00 | ||||
| Assistant Project Manager | $0.00 | $0.00 | $0.00 | ||||
| Estimator | $0.00 | $0.00 | $0.00 | ||||
| Subcontractor Compliance Manager | $0.00 | $0.00 | $0.00 | ||||
| Accounting | $0.00 | $0.00 | $0.00 | ||||
| Administrative | $0.00 | $0.00 | $0.00 | ||||
| Senior Superintendent | $0.00 | $0.00 | $0.00 | ||||
| Superintendent | $0.00 | $0.00 | $0.00 | ||||
| Assistant Superintendent | $0.00 | $0.00 | $0.00 | Markup (not to exceed 10%) | % | 0% | |
| Assistant Superintendent | $0.00 | $0.00 | $0.00 | ||||
| Skilled Labor | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | |||||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |||
| Campuses Firm can cover - Mark Yes or No | |||||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
HVAC
Schedule 1 - Standard Rate
| REQUIREMENT | SECTION | UNIT OF MEASURE | Rate Year 1 | Rate Year 2 | Rate Year 3 |
| Foreman | Schedule 1 - Labor Rates - Standard | per hour | |||
| HVAC Technician | Schedule 1 - Labor Rates - Standard | per hour | |||
| Gas Fitter | Schedule 1 - Labor Rates - Standard | per hour | |||
| Pipe Fitter | Schedule 1 - Labor Rates - Standard | per hour | |||
| General Laborer | Schedule 1 - Labor Rates - Standard | per hour | |||
| Schedule 2 - Overtime Rate |
| Foreman | Schedule 2 - Labor Rates - Overtime | per hour |
| HVAC Technician | Schedule 2 - Labor Rates - Overtime | per hour |
| Gas Fitter | Schedule 2 - Labor Rates - Overtime | per hour |
| Pipe Fitter | Schedule 2 - Labor Rates - Overtime | per hour |
| General Laborer | Schedule 2 - Labor Rates - Overtime | per hour |
| Schedule 3 - Mark-Ups |
| Material Cost Plus (Markup as a Percentage not to exceed 10%) | Schedule 3 - Materials Mark Up | % |
| Sub-Contractor Cost Plus (Markup as a Percentage not to exceed 10%) | Schedule 3 - Sub-Contractors Mark Up | % |
| Schedule 4 - Other |
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Painting
| FIRM: | ||||||
| DESCRIPTION | Brush/Roll Method Pricing YR 1 | Brush/Roll Method Pricing YR 2 | Brush/Roll Method Pricing YR 3 | Spraying Method Pricing YR 1 | Spraying Method Pricing YR 2 | Spraying Method Pricing YR 3 |
| 1. Supervisor | ||||||
| Hourly Rate (per hour) | $ | $ | $ | $ | $ | $ |
| Overtime Rate (per hour) | $ | $ | $ | $ | $ | $ |
| 2. Laborer | ||||||
| Hourly Rate (per hour) | $ | $ | $ | $ | $ | $ |
| Overtime Rate (per hour) | $ | $ | $ | $ | $ | $ |
| 3. Materials Cost % Markup (not to exceed 10%) | % | |||||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | ||
| Campuses Firm can cover - Mark Yes or No | ||||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Plumbing Schedule 1 - Standard Rate
| Pricing Year 1 | Pricing Year 2 | Pricing Year 3 | |||
| Superintendent / Foreman | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Pipe Fitter / Welder | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Gas Fitter | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Master Plumber | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Journeyman Plumber | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Apprentice Plumber | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Schedule 2 - Overtime Rate |
| Superintendent / Foreman | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Pipe Fitter / Welder | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Gas Fitter | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Master Plumber | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Journeyman Plumber | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Apprentice Plumber | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Schedule 3 - Mark-Ups |
| Material Cost Plus (Markup as a Percentage not to exceed 10%) | Schedule 3 - Materials Mark Up | % |
| Sub-Contractor Cost Plus (Markup as a Percentage, not to exceed 10%) | Schedule 3 - Sub-Contractors Mark Up | % |
| Schedule 4 - Other |
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Sheet Metal Schedule 1 - Standard Rate
| Pricing Year 1 | Pricing Year 2 | Pricing Year 3 | |||
| Gneral Laborer | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Supervisor | Schedule 1 - Labor Rates - Regular | Per Hour |
Schedule 2 - Overtime Rate
| Gneral Laborer | Schedule 2 - Labor Rates - Overtime | Per Hour |
| Supervisor | Schedule 2 - Labor Rates - Overtime | Per Hour |
Schedule 3 - Mark-Ups
| Material Cost Plus (Markup as a Percentage not to exceed 10%) | Schedule 3 - Materials Mark Up | % |
| Schedule 4 - Other |
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Welding Schedule 1 - Standard Rate
| Pricing Year 1 | Pricing Year 2 | Pricing Year 3 | |||
| Welder - Shop Rate | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Welder - w/portable machine/truck | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Code Pipe Welder | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Supervisor | Schedule 1 - Labor Rates - Regular | Per Hour | |||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 1 - Labor Rates - Regular | Per Hour | ||||
| Schedule 2 - Overtime Rate |
| Welder - Shop Rate | Schedule 1 - Labor Rates - Regular | Per Hour |
| Welder - w/portable machine/truck | Schedule 1 - Labor Rates - Regular | Per Hour |
| Code Pipe Welder | Schedule 1 - Labor Rates - Regular | Per Hour |
| Supervisor | Schedule 1 - Labor Rates - Regular | Per Hour |
Schedule 3 - Mark-Ups
| Material Cost Plus (Markup as a Percentage not to exceed 10%) | Schedule 3 - Materials Mark Up | % |
| Schedule 4 - Other |
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
Fire Stopping
| Description | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year 3 |
| Foreman - Regular Rate | $0.00 | $0.00 | $0.00 |
| Foreman - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Firestop Installer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Firestop Installer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Regular Rate | $0.00 | $0.00 | $0.00 |
| Laborer - Overtime Rate | $0.00 | $0.00 | $0.00 |
| Material - Cost Plus not to exceed 10% | 0% | 0% | 0% | ||
| UNH-Durham | UNH-Manchester | UNH-Law School | PSU | KSC | |
| Campuses Firm can cover - Mark Yes or No | |||||
| Hourly rates shall be a not to exceed rate. During the RFQ process an awarded firm may quote a lower rate, but shall not exceed the rate awarded per position. |
image1.png
File details come from the government source that posted it. Updated .