This is a Schedule of Supplies and Services (SOS&S) for the USCGC SPAR (WLB-225B) Unplanned Dry Dock, detailing line items and cost estimate breakdowns for shipyard maintenance and repair work. The document outlines ten contract line items (CLINs) valued at $0.00 in the definite items section, with work to be performed at an unspecified location (though the related solicitation indicates Duluth, MN). The primary work items include: OD Box Major Inspection and Repair (CLIN 0001), Controllable Pitch Propeller System Maintenance (CLIN 0002), Controllable Pitch Propeller Hub General Maintenance (CLIN 0003), Propeller Blade Removal and Installation (CLIN 0004), Drydock Services (CLIN 0005), Propulsion Shaft Seals Mechanical Overhaul and Inflatable Renewal (CLIN 0006), Towing Services (CLIN 0007), and Sea Trial Performance Support (CLIN 0008). Additional CLINs include 95 hours of Growth/Composite Labor (CLIN 0009) and Growth Materials estimated at $40,000.00 for planning purposes only (CLIN 0010), plus 5 days of Laydays (CLIN 0011).

The cost estimate template establishes a composite labor rate of $55 per hour with assumed G&A and profit factors of 15% and 10% respectively, and identifies multiple geographic work locations including Baltimore, Biloxi, Boston, Charleston, Corpus Christi, Hampton Roads, Houston, Los Angeles, New Orleans, New York, Philadelphia, Portland, San Diego, San Francisco, and Seattle. The document specifies that contractors must provide fully-burdened labor rates for CLIN 0009, which shall be the same rate used to calculate fixed prices for CLINs 0001-0008. The cost estimate breakdown includes detailed labor categories (Engineering Technician, Machinist/Pipe Fitter, Electrician, Shipfitter, Welder, Firewatch, Insulator/Lagger, Painter, General Labor/Helper/Rigger, and Supervisor/QA/NDT) and material/subcontractor cost lines for contractors to populate with actual pricing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

USCGC SPAR (WLB-225B) UNPLANNED DRY DOCK SCHEDULE OF SUPPLIES & SERVICES

CLINDESCRIPTIONQTYU/MUNIT PRICEEXTENDED PRICE
0001OD Box Major Inspection and Repair (Work Item 2)1JB$0.00$0.00
0002Controllable Pitch Propeller, System Maintenance, Perform (Work Item 3)1JB$0.00$0.00
0003Controllable Pitch Propeller Hub, General Maintenance with EAL, Perform (Work Item 4)1JB$0.00$0.00
0004Propeller Blade, Removal and Installation (Work Item 5)1JB$0.00$0.00
0005Drydock (Work Item 6)1JB$0.00$0.00
0006Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal (Work Item 8)1JB$0.00$0.00
0007Towing Services, Provide (Work Item 9)1JB$0.00$0.00
0008Sea Trial Performance, Support, Provide (Work Item 10)1JB$0.00$0.00
0009Growth - Composite Labor Rate95HR$0.00$0.00
0010Growth - Materials1LONSP$0.00
0011Laydays5DY$0.00$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
CLINs 0009 & 0010 are for estimating purposes only.
Contractor shall provide their fully-burdened labor rate
for CLIN 0009, which shall be the same rated used to
calculate fixed prices for CLINs 0001-0008.
CLIN 0010 is estimated at $40,000.00 for planning purposes only

(6/8/2026)_x000D_ Draft-2 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
D-001Fire Prevention Requirements «TYPE»$ - 00062Baltimore, MD11293110
D-002Propulsion Shafting; Remove, Inspect, and Reinstall$ - 00052Biloxi, MS5195121
D-003Controllable Pitch Propeller, System Maintenance, Perform$ - 00056Boston, MA8601WLB 225B
D-004Controllable Pitch Propeller Hub, General Maintenance with EAL, Perform$ - 00050Charleston, SC1067810
D-005Propeller Blade, Removal and Installation$ - 00060Corpus Christi, TX107712
D-006Drydock$ 149,250.00160061250$1,600.00$49,000.0051Hampton Roads555195
D-007Temporary Services, Provide - Cutter$ - 00064Honolulu, HI5561FY2026
D-008Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal$ - 00055Houston, TX96791DD
D-009Towing Services, Provide$ - 00056Los Angeles, CA95424cutter
D-010Sea Trial Performance, Support, Provide$ - 00055Median Rate5631SPAR (WLB 225B) UPDD FQ4 BGW 26D2.doc
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

(09/28/2009)_x000D_ Page &P of &N

CostEstimateTemplate

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
Sub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDT
DESCRIPTIONUNIT PRICELab RateArea
$00$062Baltimore, MD
$00$052Biloxi, MS
$00$056Boston, MA
$00$050Charleston, SC
$00$060Corpus Christi, TX
$00$064Honolulu, HI
$00$055Houston, TX
$00$056Los Angeles, CA
$00$055Median Rate
$00$055Median Rate
$00$050Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE