This document provides the product specification sheet for a Mobile Boat Hoist system required by the United States Coast Guard Station in Oswego, New York. The Coast Guard requires a hoist with a maximum height of 24 feet, width of 30 feet to 20 feet 2 inches, and length of 25 feet. The hoist weight cannot exceed 24,000 pounds based on pier rating and must have a minimum working load limit of 35 metric tons. The specification sheet outlines detailed technical requirements for the hoist system components, controls, safety features, manufacturing standards, inspection and testing protocols, installation parameters, training needs, warranty terms and other specifications. Offerors must deliver and install the hoist within 120 days of award.

The related federal contract opportunity is a solicitation issued by the Department of Homeland Security United States Coast Guard to acquire this Mobile Boat Hoist System. The solicitation number is 70Z04023Q19689B00 and is for the product described in the attached specification sheet for use at the Coast Guard Station in Oswego, New York.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOBLIE BOAT HOIST PRODUCT SPECIFICATION SHEET 8/7/2023

The Government’s Requirement is for a Mobile Boat Hoist system, located at USCG Station Oswego, Oswego, New York.

USCG STA Oswego Specifications:

Hoist System: Each end of the hoisting strap (control) must be capable on moving independently.

Hoist System Travel speed: Proportional Hoist Controls Wire rope: Must have a minimum rating of 110% of the Working Load Limit.

Slings: Sling Spacing must be adjustable. Min spacing 12.75’, Max spacing 22’9”. Slings must provide Spacing and configuration IAW 45-RBM-084-002, 47B-MLB-801-002, and 49A-085-003 Drive System: All Wheel Drive System Shall have a maximum Hoist height of 24’- Based on MBH Boat House Shall have a maximum Hoist Width of 30’ and a minimum hoist width of 20’ 2” Shall have a maximum Hoist Length of 25’. No minimum length as long as it meets the sling spacing measurements identified above.

Hoist Weight: Not to exceed 24000 lbs based on pier rating.

Working Load Limit: Minimum of 35 Metric Tons Standard equipment: Vendor shall provide product sheet for hoist system they may choose to propose that can meet (or exceed) the standard equipment requirements identified here.

Wireless Remote control Greaseable pivot trunnion with Zerk fittings All greaseable sheaves/pins Bolting flange in top beam No sheet metal O-ring face hydraulic fittings 316 Stainless steel hydraulic tubing Inline hoist block sheaves Powered sling adjustment Independent hoisting strap control (capable of synchronization) Load indicators Use Corrosion resistant Coating System based on Federal, State, and Local environmental requirements Weighted Chine pads for each sling Shall have both drive lights and work lights designed to provide safe nighttime operating capabilities.

Overload alarm system installed in accordance with SFLC Technical Standard (TS) 583-4, which is included Manufacturer shall provide maintenance manual and (2) operating manuals, drawings and a consumable parts list Manufacturer shall provide a minimum of a 2-year parts and labor warranty, from the date of final inspection and acceptance Manufacturer shall provide onsite maintenance training – Government expectation is for 2-3 days of training Manufacturer shall provide onsite operator training – Government expectation is for 2-3 days of training.

Manufacturer: Hoist must be manufactured in the United States 3rd party inspection of final assembly prior to acceptance, which includes 3 Static and 3 Dynamic Weight Tests - Resistance load fixture that tests full machine is acceptable. Due to environmental restrictions, water MAY NOT be allowed to be drained on site Hoist shall be built to comply with all federal, state, and local standards Manufacture shall provide reaction data provided with proposal Hoist must be delivered and installed within 120 days after award Manufacturer may request a pre-award site survey prior to proposal submission Contractor is responsible for removing the old hoist and disposing of it properly in accordance with Federal, State and Local regulations. Current MBH Manufacturer: Marine Travel Lift, Model: 30AMO Coast Guard Facilities to provide a staging area sufficient for delivery and installation of the hoist