USCG STA Oswego MBH Product Specification Sheet (revised 15-SEP-23).pdf
PDF 437 KB Posted
- Attached to
- Mobile Boat Hoist System
- Solicitation number
- 70Z04023Q19689B00
About this file
This product specification sheet outlines requirements for a mobile boat hoist system to be installed at the United States Coast Guard Station in Oswego, New York. The hoist must have a maximum height of 24 feet, width of 30 feet to 20 feet 2 inches, and length of 45 feet. It should have a minimum working load limit of 35 metric tons and not exceed 24,000 pounds in weight. Additional requirements include independent hoisting strap control, overload alarm system, lighting for nighttime operation, corrosion resistant coating, and adjustable sling spacing to accommodate specific vessels. The manufacturer must be located in the United States and provide onsite training, maintenance manuals, a minimum two-year warranty, and third party inspection of the final assembly including load tests. The selected contractor will also be responsible for removal of the existing hoist. The related federal contract opportunity is solicitation number 70Z04023Q19689B00 for the mobile boat hoist system through the United States Coast Guard with a response due date not provided.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOBLIE BOAT HOIST PRODUCT SPECIFICATION SHEET (revised 15-SEP-23)
The Government’s Requirement is for a Mobile Boat Hoist system, located at USCG Station Oswego, Oswego, New York.
USCG STA Oswego Specifications:
Hoist System: Each end of the hoisting strap (control) must be capable on moving independently.
Hoist System Travel speed: Proportional Hoist Controls
Wire rope: Must have a minimum rating of 110% of the Working Load Limit.
Slings: Sling Spacing must be adjustable. Slings must provide Spacing and configuration for the 45-RBM- 084-002 and 47B-MLB-801-002.
Drive System: All Wheel Drive System
Shall have a maximum Hoist height of 24’- Based on MBH Boat House
Shall have a maximum Hoist Width of 30’ and a minimum hoist width of 20’ 2”
Shall have a maximum Hoist Length of 45’. No minimum length as long as it meets the sling spacing measurements identified above.
Hoist Weight: Not to exceed 24000 lbs based on pier rating.
Working Load Limit: Minimum of 35 Metric Tons
Standard equipment: Vendor shall provide product sheet for hoist system they may choose to propose that can meet (or exceed) the standard equipment requirements identified here.
Wireless Remote control
Greaseable pivot trunnion with Zerk fittings
All greaseable sheaves/pins
Bolting flange in top beam
No sheet metal
O-ring face hydraulic fittings
316 Stainless steel hydraulic tubing
Inline hoist block sheaves
Powered sling adjustment
Independent hoisting strap control (capable of synchronization)
Load indicators
Use Corrosion resistant Coating System based on Federal, State, and Local environmental requirements
Weighted Chine pads for each sling
Shall have both drive lights and work lights designed to provide safe nighttime operating capabilities.
Overload alarm system installed in accordance with SFLC Technical Standard (TS) 583-4, which is included
Manufacturer shall provide maintenance manual and (2) operating manuals, drawings and a consumable parts list
Manufacturer shall provide a minimum of a 2-year parts and labor warranty, from the date of final inspection and acceptance
Manufacturer shall provide onsite maintenance training – Government expectation is for 2-3 days of training
Manufacturer shall provide onsite operator training – Government expectation is for 2-3 days of training.
Manufacturer: Hoist must be manufactured in the United States
Manufacturer shall provide 3rd party inspection of final assembly prior to acceptance, which includes 3 Static and 3 Dynamic Weight Tests - Resistance load fixture that tests full machine is acceptable. Due to environmental restrictions, water MAY NOT be allowed to be drained on-site. A USCG representative must be present to witness the 3rd party inspection.
Hoist shall be built to comply with all federal, state, and local standards
Manufacture shall provide reaction data provided with proposal
Hoist must be delivered and installed within 120 days after award
Manufacturer may request a pre-award site survey prior to proposal submission
Contractor is responsible for removing the old hoist and disposing of it properly in accordance with Federal, State and Local regulations. Current MBH Manufacturer: Marine Travel Lift, Model: 30AMO
Coast Guard Facilities to provide a staging area sufficient for delivery and installation of the hoist