This document is a Nationwide Permit (NWP) verification letter from the U.S. Army Corps of Engineers, Savannah District, for a project at the Savannah Convention Center located at 1 International Drive, Savannah, Georgia. The project involves the repair and replacement of 500 linear feet of sheet pile bulkhead along the downstream portion of Slip 3. The NWP No. 03 (Maintenance) is authorized, subject to the permittee obtaining Georgia Coastal Management Program certification from the Georgia Department of Natural Resources, Coastal Resources Division, prior to commencing work. The verification letter outlines specific conditions the permittee must adhere to, including notifications, manatee protection measures, and project completion reporting requirements.
The document does not provide details on pricing, set-asides, incumbents, funding sources, or other contractual information. It focuses solely on the environmental permitting requirements and construction conditions for the bulkhead repair project at the Savannah Convention Center.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT
100 W. OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3604
May 3, 2024
Regulatory Division
SAS-2007-01444
Mr. Stephen Hall Savannah Convention Center 1 International Drive Savannah, GA, 31421
Dear Mr. Stephen Hall:
I refer to the Pre-Construction Notification submitted on your behalf by Brandon Wall, requesting verification for use of Nationwide Permit (NWP) No. 03 (Maintenance) for impacts to 500 linear feet of impacts for the repair/replacement of 500 linear feet of sheet pile bulkhead located on the downstream portion of Slip 3.The project site is located at 1 International Dr, Savannah, Chatham County, Georgia at Latitude 31.08422, and Longitude -81.08872. This project has been assigned number SAS- 2007-01444 and it is important that you refer to this number in all communication concerning this matter.
We have completed coordination with other federal and state agencies as described in Part C (32)(d) of our NWP Program, published in the January 13, 2021, Federal Register, Vol. 86, No. 8, Pages 2744-2877 (86 FR) and/or the December 27, 2021, Federal Register, Vol. 86, No. 245, Pages 73522-73583 (86 FR). The NWPs and Savannah District’s Regional Conditions for NWPs can be found on our website at http://www.sas.usace.army.mil/Missions/Regulatory/Permitting/GeneralPermits/Nationwi dePermits.aspx. During our coordination procedure, no adverse comments regarding the proposed work were received.
As a result of our evaluation of your project, we have determined that your proposed activity is authorized under NWP 03, as described in Part B of the NWP Program.
However, at this time, the Georgia Department of Natural Resources, Coastal Resources Division (Georgia CRD), has denied Georgia Coastal Management Program (GCMP) certification, pursuant to the Coastal Zone Management Act, of 1972 (16 U.S.C. § 1455), as amended, for use of a NWP for your project.
This letter is the U.S. Army Corps of Engineers’ provisional verification for your use of NWP 03 and does not authorize work in aquatic resources on the project site. Prior to beginning work in aquatic resources, you must obtain GCMP certification from the Georgia CRD for your project and submit a copy of this certification to this office.
http://www.sas.usace.army.mil/Missions/Regulatory/Permitting/GeneralPermits/NationwidePermits.aspx http://www.sas.usace.army.mil/Missions/Regulatory/Permitting/GeneralPermits/NationwidePermits.aspx
- 2 -
Once you submit a copy of the GCMP Certification for your project to this office, you will have fulfilled this prerequisite for use of the NWP. You will not receive confirmation of receipt of the required certification from this office.
Please be advised that if you fail to obtain and submit the necessary GCMP Certification prior to beginning work, this action would be considered a willful and knowing violation of Section 404 of the Clean Water Act and appropriate enforcement action will be taken.
Your use of this NWP is valid only if you comply with all of the following conditions:
a. The activity is conducted in accordance with the information submitted and meets the conditions applicable to the NWP, as described at Part C of the NWP Program and the Savannah District’s Regional Conditions for NWPs.
b. You shall notify the Corps, in writing, at least 10 days in advance of commencement of work authorized by this permit.
c. You fill out and sign the enclosed certification and return it to our office within 30 days of completion of the activity authorized by this permit.
d. The permittee shall ensure that all personnel associated with the construction of the bank stabilization are informed of the civil and criminal penalties for harming, harassing, or killing manatees, which are protected under the Endangered Species Act of 1973 (ESA) and the Marine Mammal Protection Act of 1972. The permittee and the permittee’s contractor(s) (contractor) will be held responsible for any manatee harmed, harassed or killed as a result of construction activities.
e. The use of siltation barriers in waters of the United States, below the high tide line, is not allowed in association with the construction of the authorized bank stabilization.
f. All vessels associated with project construction shall operate at "no wake/idle" speeds at all times while in the project area. All vessels will follow routes of deep water when entering or exiting the project area, and while operating in the project area, whenever possible. For the purposes of compliance with manatee conditions, the project area is defined as all areas of shoreline, marsh and open waters within 100 feet of the outermost perimeter of the authorized bank stabilization.
g. All contractors and other on-site personnel are responsible for observing for the presence of manatees in or near the project area. All in-water construction activities
- 3 -shall cease upon sighting of a manatee within 50 feet of any ongoing work in the marsh or open waters. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.
h. Extreme care shall be taken when lowering equipment and materials below the water surface and/or to the water bottom. Equipment and materials include but are not limited to: piles; sheet piles; casings for drilled shaft construction; spuds; pile templates;
and anchors. All such equipment/material shall be lowered as slow as possible, to avoid injury to any manatee that may have entered the project area undetected.
i. In the event of injury to or mortality of a manatee in the project area, the permittee or contractor shall immediately notify the Georgia Department of Natural Resources (Georgia DNR) at 912-264-7218 or 1-800-272-8363 on weekdays between 8:00 a.m. to 4:30 p.m., or 1-800-241-4113 on nights and weekends. Within one hour of a manatee injury or mortality the permittee or contractor shall notify the Corps at 1-800- 448-2402 and the US Fish and Wildlife Service, Georgia Ecological Services Field Office at912-832-8739. Any dead manatee found in the project area shall be secured to a stable object to prevent the carcass from moving with the current. In the event of a manatee injury or mortality, all open water construction activity shall cease pending completion of consultation between the Corps and the FWS, pursuant to Section 7 of the ESA.
j. The permittee shall ensure that the contractor keeps a log of sightings, collisions or injury to manatees that occur during the construction of the authorized bank stabilization.
k. Within 30 days of project completion, the permittee shall submit a report summarizing manatee sightings or incidents that occurred during project construction, to the FWS, Ecological Services Field Office, Coastal Georgia Sub-Office, 4980 Wildlife Drive NE, Townsend, Georgia 31331. Submission of a negative report is not required.
l. All temporary or unused construction materials shall be removed from the project area upon completion of the work, and any impacted area of salt marsh shall be restored. No construction debris or trash is to be discarded in project area.
m. The permitee shall regularly inspect and maintain all hoses, faucets, and other potential sources of freshwater, to ensure that any freshwater leak is stopped and immediately repaired. Manatees are attracted to freshwater leaking from dock facilities, where boats are concentrated and there is an increased risk for manatee collisions.
- 4 -
n. Prior to initiating authorized construction activities, the permittee shall contact Georgia DNR at 912-264-7218 for assistance with development of temporary manatee awareness sign plan for the project area. The plan will include the types and number of signs; and locations where signs will be installed to be prominently visible to contractors entering the project area from uplands and from the water. The permittee shall install temporary manatee awareness signs in accordance with the Georgia DNR approved plan. See attached Appendix A for information about the size and appearance of temporary manatee awareness signs. Within 30 days of project completion, the permittee shall remove all temporary manatee signs.
o. All work shall be completed in accordance with the enclosed plans, “Savannah Convention Center, 1 International Dr Savannah GA, Bulkhead Repair” SAS-2007- 01444/Slip 3”, pages 1-8, dated May 01, 2024.
This proposal was reviewed in accordance with Section 7 of the Endangered Species Act. Based on the information we have available, we have determined that the project may affect, but is not likely to adversely affect the West Indian manatee (Trichechus manatus), wood stork (Mycteria americana), and Eastern indigo snake (Drymarchon couperi); and/or would have no effect on any other threatened or endangered species nor any critical habitat for such species. Authorization of an activity by a NWP does not authorize the "take" of threatened or endangered species. In the absence of separate authorization, both lethal and non-lethal "takes" of protected species are in violation of the Endangered Species Act. See Part (C) of 86 FR for more information.
This verification is valid until the NWP is modified, reissued or revoked. All of the existing NWPs are scheduled to expire on March 14, 2026. It is incumbent upon you to remain informed of changes to the NWPs. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP.
This authorization should not be construed to mean that any future projects requiring Department of the Army authorization would necessarily be authorized. Any new proposal, whether associated with this project or not, would be evaluated on a case-by-case basis. Any prior approvals would not be a determining factor in making a decision on any future request.
Revisions to your proposal may invalidate this authorization. In the event changes to this project are contemplated, I recommend that you coordinate with us prior to proceeding with the work.
- 5 -
This communication does not relieve you of any obligation or responsibility for complying with the provisions of any other laws or regulations of other federal, state or local authorities. It does not affect your liability for any damages or claims that may arise as a result of the work. It does not convey any property rights, either in real estate or material, or any exclusive privileges. It also does not affect your liability for any interference with existing or proposed federal projects. If the information you have submitted and on which the Corps bases its determination/decision of authorization under the NWP is later found to be in error, this determination may be subject to modification, suspension, or revocation.
An electronic copy of this letter is being provided to the following party: Mr. Brandon Wall, Sligh Environmental Consultants, Inc.
Thank you in advance for completing our on-line Customer Survey Form located at http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey. We value your comments and appreciate your taking the time to complete a survey each time you have interaction with our office.
If you have any questions, please contact Ms. Casey Haywood, Team Lead, at the SAD Technical Regional Execution Center on behalf of the Savannah District, coastal Branch by email at casey.m.haywood@usace.army.mil.
Sincerely, Casey Haywood Team Lead SAD Technical Regional Execution Center
Enclosures:
Project Plans Compliance Certification Form
Cc (w/enclosures) Brandon Wall, Sligh Environmental Consultants, Inc. (via b_wall@slighec.com) http://corpsmapu.usace.army.mil/cm_apex/f?p=regulatory_survey
Regulatory Division
CERTIFICATION OF COMPLIANCE
WITH
DEPARTMENT OF THE ARMY
NATIONWIDE PERMIT 03
PERMIT FILE NUMBER: SAS-2007-01444
PERMITTEE/ADDRESS: Mr. STEPHEN HALL, SAVANNAH CONVENTION CENTER
1 INTERNATIONAL DRIVE, SAVANNAH, GA 31421.
LOCATION OF WORK: The project site is located at 1 International Dr, Savannah, Chatham County, Georgia at Latitude 31.08422, and Longitude -81.08872.
PROJECT DESCRIPTION: The repair/replacement of 500 linear feet of sheet pile bulkhead located on the downstream portion of Slip 3.
ACRES AND/OR LINEAR FEET OF WATERS OF THE UNITED STATES IMPACTED:
500 Linear Feet.
DATE WORK IN WATERS OF UNITED STATES COMPLETED:__________________
COMPENSATORY MITIGATION REQUIRED: N/A.
DATE MITIGATION COMPLETED OR PURCHASED (include name of bank):
I understand that the permitted activity is subject to a U.S. Army Corps of Engineers' Compliance Inspection. If I fail to comply with the permit conditions at Part C of the Nationwide Permit Program, published in the January 13, 2021, Federal Register, Vol.
86, No. 8, Pages 2744-2877 (86 FR) and/or the December 27, 2021, Federal Register, Vol. 86, No. 245, Pages 73522-73583 (86 FR), it may be subject to suspension, modification or revocation.
I hereby certify that the work authorized by the above referenced permit as well as any required mitigation (if applicable) has been completed in accordance with the terms and conditions of the said permit.
Signature of Permittee Date
I G
� en
I a, r-urrnmumn,, +fDlttlHH{)M-01-t+V �0-!tHtttllfOttlV ii a N
Ill
� _ .... SAV .... :"ll,,H.0,,\314,J1
JRP IIIOJ/'21
�t• Sfl,'I = .. C) J III monott I. nlchol ,,;,.n, .. rou
� � H f----------+=-:::-:-'--t.:=:::-----J � f
�-- 111,Pt<fl') g □l> llrrr.....A..■ :?£A!T:A.'ISTSTE!i01
F;,, o\S11111mwCALXJ\..k!�Nm,,,.s.-!UI..Kt£.AD_>n1n1 PtJl:/-1101:,,y1on1:n51PM
SAVNmAHeot.VEtmotiaPITER
□o D
DD
CJ
2]
11/ITE.AJ.L.\TIOtW..ORSAVI.J:l»i,� Bl.l.lOE,l,OREPN�
SITE PLAN
m m t:.:
I �z - - ""z --
U.S. Army Corps of Engineers
SAS-2007-01444
5/1/2024 Project Manager: C Haywood
E i----
D t-
C
B
A
_! ..£ .l
~ RI\/ERWAlX
SLIP NO 3
[ l l
- -- - - w -====ur-- -ib: w---
I
I
EXISTFlOATINO
DOCKCTYPJ
'le I < l!!!Af:.:;~ :[.:,;;,;1,:,.,;,;,[ ,;,;11--· i~~~~~~~i==~~~~~1~~~~~~~i=~~~~~~i=~~~~~~1~~~~~~ Ill
1=-lW 2? ; i? 2 ; ,JV ? 2 ? ,. c 2? IP Z 2 c ' 2? ,. oiP 2 ; 2 2 2 2 2 dlt LL
f. l lf~
- --/t~ -----+----i--- I ----i ff--_~ ~ \_ CONSffiUCTION 8'SEU,E -
/!f------_:._ \_ OEMOEXISTHEUCAI.ANC!-IOR(TYP)
,IJ
i I
/2
~:\! OEMO EXIST ORAOE
SEAM AND TtE.flODS
OEMO EJO ST
TIE-ROD(TYP}
Gu OVERALL DEMOLITION PLAN
\:'SJ
-t-i
OEMOEXIST
OEAOMAN, SEE NOTE
::::::::: _w :::-
==-=-- 111 l
Q EXlSTIN018"SCPISPILE
~ EXJSITNO STEEL 1-1-f>llE, SATTER.ED
= eotfTR.ACTOR TOVEAIF'Y AND REMOVE EXISTINOOEAOMANSYSTEMFORl'EWS!-EET PILESut.KI-IEAO.
------~: ------1n= mnn EXISTDl:AOMAN PJLE Cl,P(TYPJ
-----l ! I I -+- /oJ ~
I I_J._..:J oc;;J ~, ~o
.f~--i SllPN0.3 /IlTt l~ -:~_5/~ ;r-r~Ji-:
- KEY PLAN
z
20 0'-0" 20' 4(1
SCALE: 1"'"20'
60% SUBMITTAL
NOT TO BE USED FOR CONSTRUCTION
1 I ~ 3 4 5 6 ORA.WINO SCALES SHOWN BASED ON 22"'lt3,I" DRAWll'IIO
,I I I -----rn-
S AV ANN A H
lt:O t<V ~ NH O W Ct,tH1.ll
Er 1111111111:1 i----
D
B~cx
~~i -~~ a!§ ~i• z O z i;j C
:I "' ffi 1';
C~• 11; • ~ I. 1 ..
i_HHh
;ti "
.. .t- t' ; ~ 1 i Jq i ii~$
Bl ~,~ t
Shoot
Roforoneo No.
S0100 ltllOEX: t. OF 0
I
U.S. Army Corps of Engineers
SAS-2007-01444
D
C
B e-
A
? 3
35•.r•1-
EXISTPILEROW
/ IXSIONA.TION{T't'P)
~ -;-, (ci (;)
l.:J l..( ~OEXISTP/SOEO(
I ' PANELt TOPPINO~ i ! """"h~~ i l 4 l 5
APPROXIMATE EXCAVATION LIMITS
E>QSTP,SOEO< I I \ ' /
~-,(TY•J, ' aj~;xt;;jir., /
• :i;myJih 1mr.;;illrn;, • ' · · · / cq"' • i :nr / , ✓- ~~~~ii' I '---a,°" , .<.
I I STEEL....-, :
' j I , , I
N'PROJ( EXIST I '
"""-'" i ! ! i - ., EXISTlll"SOP/S I ""fr<''\
L.., L
• I I , , I
I , '"" "'""o i I /REMAIN
L L
SD-!02. SD-103
I'\_,,,,,.,,.,.""'
PILE TO REMAIN
A1 DEMOLITION CROSS-SECTION
SO.IOI sc...LE:'.l.'11!"•1'-0"
I 4 al~·~ "
El~~"
~v:"
EL~
T
!iQ.Is
RECORD OR,I\WINCS 00 NOT INOIC,.TE SIZE OR
LOC-.TION OF DEADMAN STRUCTURE.
•-0· _Q'_.(J" 4'--0" 8'-0"
SCALE: 3116"•1'-0"
I 60% SUBMITTAL I
NOT TO BE USED FOR CONSTRUCTOON
ORAWINO SCALES SHOWN &.SEO ON~- CAA.WINO
d I I ----.-,n-
SAVANNA H
lco ,, v - H H O H c11 ,11~ n , Ef I 111111111~ l-l 11111111 l
• l
D z ffi~
~~a:
J, 0 ~~!· rr
" g~ z
~1- 0 :l
~~ 0 ill C
C '< ~ ' i j_ t 11 ' .
i : l ! f i l ~ ! i ' " > ~ ! C
' ! • l ~ ti~$
Bl ~{~ ~r i_ll_J
} f 'i
LJ §'
DI
A i
Shoo!
Roforonco No.
SD301
I
" INOEX: 13 OF 3-1 I~
U.S. Army Corps of Engineers
SAS-2007-01444
i _l __£
~ .711
D
S.,MLW
C
B
A
S ~2.02 n .-.. ·•:cj
N'PROXMUOCINE ~
v-OJST•NSSP
PAYERS 1"'"""°'
J?l
~ '- OEMOEX"IT 00NC
OAACE"-'M
OEMOEXIST
• TIE-ROD
OEMOEXIST
HELICAi.ANCHOR
A1 DEMOLITION CROSS.SECTION AT RIVER FRONT
50101 SCALE: 3/UJ" "' 1'-0"
l _[ l
_l I
8'--0" (1..(1' 4'.(J" 8'..Q"
SCALE: 3/16"•1'-0"
60% SUBMITTAL
NOT TO BE USED FOR CONSTRUCTION
ORAWINO SCALES SHOWN MSEOON 2Tsl(" OAAWINO
D di, ---v.-
S AV ANN AH
CO •IV t W I I O N C leN l!l l'I ffi~ =~ ~~I ;,5 • id ~m= z
I!
fil:rn ~t a:o Oz z" o -U> 1-W :Jc ill C cµ...:_ I
Uli JJh
~HF! t;;
Bl i~~ ::;:
§• ~ .. • I r i j t i ~
1 !'
A--=-----,i i
Shoo!
RoforancoNo.
5D302
INEC. 11 OF O I~
U.S. Army Corps of Engineers
SAS-2007-01444
D
C
B
A
EXJSTPILEUNE
OESICNATION (TYPJ
EXJST18"SO
PISPILE(TYP)
EXIST PIL£CAP(TYPJ
I • I' -~·t1 1 ·------ - -----
✓EXISTPILEROW
~ DESICNo\TION so102,so,03 r """'"o'~""'
,r--fil
EXIST PIC CEO< PANEL
T08€SALVAOEO
- -- - - - - PARTIALOEMOOF -------~-rJ-+l--- EXISTSSP(TYP) : ~-t-~ :
!) ~~~~~i~.o-DEMOLITION PLAN
UMITSOFOEMO
SECTION
DEMO EXIST
aCECAP
ET:~="
EXISTPILEFIOW
DES1GNo<.TION v
~1!
I
4 5 a.aerrCAP
<ACE
!le..l_ S_ECTION
~I ~ z-0· 0'-0" 1'-0" 2"-0"
SCALE: 3/4"•1'-0"
4•.zy- 0'-0" z-0· 4'.0-
SCALE: 318'"•1'-0"
60% SUBMITTAL
NOT TO_BE USED FOR CONSTRUCTION
DRAWING SCALES SHOwN IW>EOON ~-DRAWING
.11 1 --rn-
SAVANNAH
C tH n• t tUI O N C t:H l 1t ll l
El 111111111:1:1
D ffi~ !e3 ~ii -~· U!
,. ::S:"' iffi ~!e f <If
!!l ~;
wO c;::
zo.
oO ;::z ::J" oiii :,;W .,c C
Cl L
"!' i~H rn j;
• I ill' J' b i
Bl ii~ i
• I t ~ ~-i'
Shoot ~ ·;·;;~;· I lf'OEX: 1~ OF O ~
U.S. Army Corps of Engineers
SAS-2007-01444
I-'
D
C
B
A
EXIST PARTIAL SSP BULKl-lEAO
TOREMAIN(TYP)
ff I =~=== ➔j < =~~-=1 -1-------~ -------! ,' ;;;;;;r ;;;j~;r ;;;;;;f ;;;;;;
I
FRONT FACE OF EXIST
~VERW"'-'<
3 T
SLIP NO 3
I
- - -- --- I
- - .,-...>Z.111-700SSP . _____ _
_rr,r~ -+
4 5
/ ~FLO.-.TINO
~~~~~~~t~~~~~~H~~~~~~
Q EXIST18"SOPISPJU::
~ EXIST STEfl Ii-PILE, BATTERED
:I: 14..SiSTEELH-PILE i 1•oaDSTEELH-PILE.BATTERE0• :12
~---exisr -
- "AZ\SSSP'-\_-
§ /'f;"., -~ r_ ~Y-X..~~yy_~~~y_x_~~Y...!--'-~~yy_x_~~Y-'""-~~y_y_~~~y_y_~~y_y_~~~y_x._~~y_y_~~~y_x_~~Y-'"'-~~~Y-X..~~
;~oooo~ooo,i)oo-;oooioooeoo-ooo~;ooo;;.;,;oo;,;o-ooo;;ooooe('o;oo;;o-oo;o;oooo;o;o r-;---~--,--~-~--r-~--r-~---r-~--r- ~--r-r-~--r-~--r - ~--r- ~--,-- ~-~- -r-~--r - ~--,- - ~--r-r--r-r-~--r-~- -r-~---r-i--r-~-~7 ~ .. r ~~~3-~ _ _.._ _ . _ _.__. _ _.__.L-i--~ -~--~-~- __....-• -+- •-+-►-~--►-~--►-•-+-•-+-•-+-► - ~--~-~--~-• - _._ _ . _ _._ _ ~ - 4--►-~--~- ~ J I •I jJ?crro-o ~/ J:7
;,. ,.I EOOEOFDEAOMANPILECAP
- --i -- ,1-/---->---------t--- <SHOWN,ORRB') t----------t--- \ --+--------t--------~--------i --------+--U----t
;., -,.,.., ;:_ ! \_COl~STRUCTION O oi C
- I f - - B.t.SELINE -f.~ I I
I I
/, f.~
I, I I I I I I ,.~ 1!tJ-!_j
T
Gu._ OVERALL PILE PLAN
T 1 " T T tr / 6C]Dc:;)
f~--
' } SUPN0,3 ,r
~ I~ - _-=.,_'h-~ :~ ::;~Jr·
_,] I ~ -- ~I:
KEY PLAN
z
"' a-<r "' 4a
SCALE; 1"s20'
60% SUBMITTAL
NOT TO BE USED FOR CONSTRUClLON dl 1 ----.,-n-:-
SAVAN NA H
t;(l tlV k NI I ON C ~ N I • II
E[ 111111111~11
E I
I~
D ffi~ ~~a:
Sg~ ~-•iii z :l ..
ii:
::l ~ w i:i ck.:. i i = hlUII t-ii3 i • l· e Ii • , _"_ j_ , ' ~ t;S m Bl ~~~
~[i i
Shoot
RoforoncoNo.
S-100
INDEX: 1, OF O
U.S. Army Corps of Engineers
SAS-2007-01444
El
D
C
B
A
3 4 r DESIO NATION [NP)
(0
EXIST?ILERON l (~') 0 (e) SMEETPILEREFUNE
Y r.,. ·,r s.v 1 ... .(l'" 1 1 1'-(l"
'-r- ,_,-7'-1"
I !
I r-
E>OSTFASQ.e'-'EC_;[ut ' >
EXIST BENT CAP J i i
1i"ff~~v~g1~
I i I I
I i
~~XS.ST 'H! I ~ """'"'"\ ! --
I
I
"'":,0-ce~~\ i~I ::: PILECAf'
I l
I ii A
1/f
~ "1.24-700STEEL
SHEET PILE
EXISTH-PltETO j' I'{
~ EXISTSTEELSt-EET
PILETOREWJN
II
LJ L..
A1 TYPICAL CROS~ECTION
1'P111! SCAlE. :ino~ ~ r.o-
2 T _4
T
~""""""'00 TOREt.WN
Ei.;~-~~-'
El ~
EXISTOEACMANTO
EL~
~L~-'
!:!.Q.li RECORO ORA~NGS 00 NOT lM'.:llCATE SIZE 00 LOC,l,TtONOFDEADMANSTRuCTIJRE.
8'--0" _!!.()" 4'-0" 8'.()"
SCALE: 3/16"• 1'-0"
60% SUBMITTAL
NOT TO BE USED FOR CONSTRUCTION
OAAWINO SCA!.ES SHONN 8AS€00N 22"ll3'1" ORAWINO tll1 ---.yn-
SAVANNAH
C0 t1V ll. tl 11 0 11 C " tll oc ll
El I I I I I I I I lil:1
L--111111111 o[ I -~ ~~ z ~-- 0 ~,, ;::
~~~ 0 w sd u, "' u, ~1- 0 a:
0 ~.
C • < H ,,__
• = u .~ .
I i
Iii
' ' ' ' . i ~
! , f .. l " l ~
In;;; ...
Bl ~{~ a
I t I
1---<□j' A !
i ,,.------.i
Shoot RolcnoncoNo.
S-301
INDEX za OF :w I~
U.S. Army Corps of Engineers
SAS-2007-01444
~ 00
' <I
APPROX MUOUNE """
'- -- I
- ~ 11
--------- r l / - 11 --------- ,;
I y--EXIST4NSSP
I
'' I f'alP1LE TIP
A1 j
I
CROSS-SECTION AT RIVER FRONT
SCALE:J/16" K 1".(T
i
Al ~ Ii
U.S. Army Corps of Engineers
SAS-2007-01444
| 2024-05-03T11:05:18-0400 | |
| Casey Haywood |
File details come from the government source that posted it. Updated .