This document is a Geotechnical Engineering Report prepared by Terracon for the Moffatt & Nichol engineering firm regarding the Hutchinson Island Slip 3 Buckhead Repair project in Savannah, Georgia. The report presents the findings of the subsurface exploration and geotechnical recommendations for the proposed repair or replacement of the approximately 1,290-foot long Slip 3 bulkhead located on the west side of the Savannah Convention Center. The geotechnical investigation included 9 Cone Penetration Test (CPT) soundings and 1 Standard Penetration Test (SPT) boring to assess the condition of the existing bulkhead and provide recommendations for repair and replacement. The report includes detailed soil parameters, groundwater conditions, and driven pile design recommendations.
The report indicates the site has a corrosive environment, and the new sheet pile should use corrosion protection measures. It also notes the stability of the bulkhead will be significantly impacted by the tidal fluctuations in the Savannah River, and the design should incorporate drainage features to reduce unbalanced hydrostatic pressures. No funding sources or budget information is provided in the report.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Cover Page
Hutchinson Island Slip 3 Buckhead Repair
Geotechnical Engineering Report
December 12, 2023 | Terracon Project No. ES225343
Prepared for:
Moffatt & Nichol
2E Bryan St. Ste 501
Savannah, GA 31401
2201 Rowland Avenue
Savannah, GA 31404
P (912) 629-4000
Terracon.com
Facilities | Environmental | Geotechnical | Materials
Report Cover Letter to Sign
December 12, 2023
Moffatt & Nichol
2E Bryan St. Ste 501
Savannah, GA 31401
Attn: Mr. Michael Pettijohn, P.E.
P: (912) 298 0708
E: mpettijohn@moffattnichol.com
Re: Geotechnical Engineering Report
Hutchinson Island Slip 3 Buckhead Repair
Hutchinson Island
Savannah, Georgia
Terracon Project No. ES225343
Dear Mr. Pettijohn:
We have completed the scope of Geotechnical Engineering services for the above referenced project in general accordance with Terracon Proposal No. PES225343 dated
September 14, 2023. This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning the design parameters for the proposed project.
Project Description
The Slip 3 bulkhead, approximately 1,290 feet long, is located on the west (32.0858, -
81.0885) of the Savannah Convention Center on Hutchinson Island in Savannah, Georgia.
This project is for the repair or replacement study of the Slip 3 bulkhead due to the extensive fill loss behind a portion of the bulkhead, severe corrosion and other concerns.
This geotech investigation is for assessing the condition of the existing Slip 3 bulkhead and provides further recommendations for repair and replacement.
Hutchinson Island Slip 3 Buckhead Repair | Savannah, Georgia
Geotechnical Characterization
The subsurface profile is variable along the bulkhead alignment. We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, geologic setting, and our understanding of the project. The following tables provide our geotechnical characterization.
The geotechnical characterization forms the basis of our geotechnical calculations and evaluation of site preparation, foundation options, and pavement options. As noted in
General Comments, the characterization is based upon widely spaced exploration points across the site, and variations are likely.
Stratum
Approximate Depth to Bottom of
Stratum (feet)
Material Description Consistency/Relative
Density
1 0.5 to 1.3 Topsoil/Asphalt pavement -
2 5 to 12 Silty sand, with variable clay contents Loose to medium dense
3 27 to 39 Sandy clay, with interbedded sand layers Very soft and soft
4 62 to 69 Silty sand Medium dense to dense
74, termination of borings Sandy clay/sandy silt Very stiff
1. The thickness of the topsoil at the project site may reach deeper than 1 foot.
The depth/thickness of topsoil will vary, depending upon the near-surface soil disturbance during the site preparation.
The conditions observed at each exploration point are indicated on the individual logs shown in the Exploration Results attachment of this report. Stratification boundaries on the logs represent the approximate location of changes in native soil types; in situ, the transition between materials may be gradual.
Groundwater Conditions
The soundings and hand auger borings were observed while drilling and after completion for the presence and level of groundwater. We used a Slope Indicator® water level meter upon completing the CPT sounding tests to obtain the groundwater depths. The water levels observed in the soundings and borings can be found on the individual logs shown in the Exploration Results attachment of this report.
Groundwater was measured or estimated based on cave-in at depths ranging from approximately 5 to 9.9 ft BGS among the CPT sounding locations. The site has clayey soils (sandy clay/clayey sand) close to the surface, which have poor drainage characteristics and are prone to perched water table conditions that will have a direct impact on the subgrade stability and site work conditions.
It should be noted that groundwater levels tend to fluctuate with seasonal and climatic variations, as well as with construction activities. The groundwater in the bulkhead and deadman areas will be significantly influenced by the tides in the Savannah
River. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.
Soil Parameters for Bulkhead Wall
Soil Parameters for Bulkhead Wall (C1A) Marl Top Depth 65 feet
Soil
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion, c (psf)
Friction Angle φ
Soil Cohesion, c
(psf)
Friction Angle φ
1 5 Sand 120 0 32 0 32
2 39 Clay 95 200 0 100 10
3 65 Sand 115 0 32 0 32
4 74 Marl 120 4000 10 500 30
Wall Design Parameters (C1A) Marl Top Depth 65 feet
Soil
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall friction
Ka Kp K0 Cal
(psf)
Wall
Friction
1 5 Sand 120 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
2 39 Clay 95 1.00 1.00 1.00 100 0 0.65 1.62 0.83 50 7
3 65 Sand 115 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
4 74 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C2) Marl Top Depth 61 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion, c (psf)
Friction
Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 4 Sand 115 0 30 0 30
2 6 Clay 105 500 0 250 10
3 11 Sand 105 0 28 0 28
4 21 Clay 95 250 0 125 10
5 26 Sand 110 0 28 0 28
6 39 Clay 100 250 0 125 10
7 61 Sand 110 0 32 0 32
Wall Design Parameters (C2) Marl Top Depth 61 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 4 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 6 Clay 105 1.00 1.00 1.00 250 0 0.65 1.62 0.83 125 7
3 11 Sand 105 0.32 5.15 0.53 0 19 0.32 5.15 0.53 0 19
4 21 Clay 95 1.00 1.00 1.00 125 0 0.65 1.62 0.83 62.5 7
5 26 Sand 110 0.32 5.15 0.53 0 19 0.32 5.15 0.53 0 19
6 39 Clay 100 1.00 1.00 1.00 125 0 0.65 1.62 0.83 62.5 7
7 61 Sand 110 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
Soil Parameters for Bulkhead Wall (C3) Marl Top Depth 60 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion, c
(psf)
Friction
Angle φ
Soil Cohesion, c
(psf)
Friction
Angle φ (°)
1 5 Sand 115 0 30 0 30
2 10 Sand 105 0 28 0 28
3 35 Clay 90 250 0 125 10
4 54 Clay 105 750 0 375 10
5 60 Sand 110 0 30 0 30
Wall Design Parameters (C3) Marl Top Depth 60 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 5 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 10 Sand 105 0.32 5.15 0.53 0 19 0.32 5.15 0.53 0 19
3 35 Clay 90 1.00 1.00 1.00 125 0 0.65 1.62 0.83 62.5 7
4 54 Clay 105 1.00 1.00 1.00 375 0 0.65 1.62 0.83 187.5 7
5 60 Sand 110 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
Soil Parameters for Bulkhead Wall (C4) Marl Top Depth 60 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion, c (psf)
Friction
Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 4 Sand 120 0 30 0 30
2 37 Clay 105 500 0 250 10
3 54 Sand 115 0 30 0 30
4 57 Clay 105 500 0 250 10
5 60 Sand 115 0 30 0 30
6 68 Marl 120 4000 10 500 30
Wall Design Parameters (C4) Marl Top Depth 60 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 4 Sand 120 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 37 Clay 105 1.00 1.00 1.00 250 0 0.65 1.63 0.83 125 7
3 54 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
4 57 Clay 105 1.00 1.00 1.00 250 0 0.65 1.62 0.83 125 7
5 60 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
6 68 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C5) Marl Top Depth 61 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion, c (psf)
Friction
Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 6 Sand 115 0 30 0 30
2 35 Clay 100 350 0 175 10
3 61 Sand 115 0 32 0 32
4 70 Marl 120 4000 10 500 30
Wall Design Parameters (C5) Marl Top Depth 61 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 6 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 35 Clay 100 1.00 1.00 1.00 175 0 0.65 1.63 0.83 87.5 7
3 61 Sand 115 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
4 70 Marl 120 0.65 1.62 0.83 2000 7 0.3 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C6) Marl Top Depth 62 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion c (psf)
Friction Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 13 Sand 115 0 30 0 30
2 20 Clay 100 350 0 175 10
3 26 Clay 105 750 0 375 10
Wall Design Parameters (C6) Marl Top Depth 62 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 13 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 20 Clay 100 1.00 1.00 1.00 175 0 0.65 1.63 0.83 87.5 7
3 26 Clay 105 1.00 1.00 1.00 375 0 0.65 1.62 0.83 187.5 7
Soil Parameters for Bulkhead Wall (C7) Marl Top Depth 62 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion c (psf)
Friction Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 12 Sand 110 0 28 0 28
2 17 Clay 100 350 0 175 10
3 27 Clay 105 750 0 375 10
4 62 Sand 115 0 30 0 30
5 80 Marl 120 4000 10 500 30
Wall Design Parameters (C7) Marl Top Depth 62 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 12 Sand 110 0.32 5.15 0.53 0 19 0.30 5.15 0.53 0 19
2 17 Clay 100 1.00 1.00 1.00 175 0 0.65 1.63 0.83 87.5 7
3 27 Clay 105 1.00 1.00 1.00 375 0 0.65 1.62 0.83 187.5 7
4 62 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
5 80 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C8) Marl Top Depth 63 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion c (psf)
Friction Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 8 Sand 115 0 30 0 30
2 20 Clay 105 350 0 175 10
3 27 Clay 115 1000 0 500 10
4 63 Sand 115 0 32 0 32
5 74 Marl 120 4000 10 500 30
Wall Design Parameters (C8) Marl Top Depth 63 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 8 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 20 Clay 105 1.00 1.00 1.00 175 0 0.65 1.63 0.83 87.5 7
3 27 Clay 115 1.00 1.00 1.00 500 0 0.65 1.62 0.83 250 7
4 63 Sand 115 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
5 74 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C9) Marl Top Depth 68 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion c (psf)
Friction Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 10 Sand 115 0 30 0 30
2 20 Clay 100 500 0 250 10
3 23 Sand 115 0 30 0 30
4 29 Clay 110 750 0 375 10
5 40 Sand 115 0 30 0 30
6 48 Clay 110 500 0 250 10
7 68 Sand 120 0 32 0 32
8 74 Marl 120 4000 10 500 30
Wall Design Parameters (C9) Marl Top Depth 68 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 10 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
2 20 Clay 100 1.00 1.00 1.00 250 0 0.65 1.63 0.83 125 7
3 23 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
4 29 Clay 110 1.00 1.00 1.00 375 0 0.65 1.63 0.83 187.5 7
5 40 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
6 48 Clay 110 1.00 1.00 1.00 250 0 0.65 1.63 0.83 125 7
7 68 Sand 120 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
8 74 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Soil Parameters for Bulkhead Wall (C10) Marl Top Depth 66 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Soil Cohesion c (psf)
Friction Angle φ (°)
Soil Cohesion, c (psf)
Friction Angle φ (°)
1 15 Clay 110 750 0 375 10
2 28 Clay 105 300 0 150 10
3 32 Sand 115 0 30 0 30
4 46 Clay 105 500 0 250 10
5 66 Sand 120 0 32 0 32
6 73 Marl 120 4000 10 500 30
Wall Design Parameters (C10) Marl Top Depth 66 feet
Stratum
Bottom
Depth of
Stratum
(ft)
Soil type
Total
Unit
Weight
(pcf)
Short-term Design Long-term Design
Ka Kp K0 Cas
(psf)
Wall
(psf)
Wall
1 15 Clay 110 1.00 1.00 1.00 375 0 0.65 1.63 0.83 187.5 7
2 28 Clay 105 1.00 1.00 1.00 150 0 0.65 1.63 0.83 75 7
3 32 Sand 115 0.30 6.11 0.50 0 20 0.30 6.11 0.50 0 20
4 46 Clay 105 1.00 1.00 1.00 250 0 0.65 1.63 0.83 125 7
5 66 Sand 120 0.28 7.33 0.47 0 21 0.28 7.33 0.47 0 21
6 73 Marl 120 0.65 1.62 0.83 2000 7 0.30 6.11 0.50 250 20
Note: Ka = the coefficient of active earth pressure; Kp = the coefficient of passive earth pressure;
Ko= the coefficient of at-rest earth pressure; Cas and Cal = adhesion under short-term and long-term, respectively.
The above earth pressure parameters were calculated using Coulomb’s Earth Pressure
Theory, which accounts for the wall friction between the wall and the soils. A factor of safety of 1.5 to 2.0 should apply to the passive earth pressure to limit deflection that would be required to fully mobilize the soil wedge.
Driven Pile Design Parameters
We understand the new bulkhead wall will include deadman supported on HP 14x89 driven steel piles. The site includes very soft to soft clay layer to the depth of 40 feet
BGS, followed with medium dense to dense silty sand layer to the depths of 62 to 68 feet which are the approximate top depth of Marl layer.
The following table can be used to estimate capacities for individual H piles. We recommend all piles be driven into the marl formation. An allowable pile capacity is estimated for pile length from 75 to 95 feet below the existing grade. A factor of 2 is included in the allowable pile capacities. Driven piles should be spaced at least three pile widths apart (center-to-center).
We assume less than two of fill will be placed over the existing grades to cause additional ground settlements. No downdrag load was explicitly considered in the pile capacity analysis. Based on our experience, piles embedded into the marl have a low risk of pile foundation settlement.
Approximately Depth of Bottom of Stratum (feet) HP14x89
Allowable Compression Capacities (kips) 1, 2
75 158
80 185
85 215
90 245
95 274
Allowable Tension Capacities (kips) 1, 2
70 97
75 116
80 136
85 155
95 175
1. Design capacities are dependent upon the method of installation and quality control parameters. The values provided are estimates and should be verified during construction through pile testing using pile driving analyzer (PDA).
2. Based on soil profiles of CPT soundings C1A and C4.
Because the soil transitions between borings are irregular and a majority of the axial capacities are from the marl formation. We recommend the above pile capacities be used for all driven steel H piles for this site.
After the sheet pile length has been determined, the engineer should evaluate the global stability of the bullhead system. Based on our experience, the sheet pile embedded into the marl formation should be able to achieve the required factor of safety against global stability failure.
We understand the existing sheet piles experienced severe corrosion. Our scope of work did not include testing of soil and water corrosion potential. Based on our experience, the site has a corrosive environment. We recommend the new sheet pile uses corrosion protection measures or corrosion-resistant material.
Unbalanced water levels on both sides of the sheet piles can have a significant effect on the stability of the bulkhead. The Savannah River has two tide cycles each day, and the groundwater will be influenced by the tide levels. The bulkhead should be designed with drains to reduce the Waterhead difference and unbalanced hydrostatic pressure.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.
Sincerely, Terracon
Chao Zheng, Ph.D., P.E. Guoming Lin, Ph.D., PE, D.GE
Project Engineer Senior Consultant
November 15, 2023 | Terracon Project No. ES225343
Attachments
Exploration and Testing Procedures
Field Exploration
Number of
Borings Type of Exploration
Approximate
Boring Depth (feet) Location
Cone Penetration Test
(CPT) Sounding 25 to 74 Existing Bulkhead
Standard Penetration
Test (SPT) Boring 80 Existing Bulkhead
Boring Layout and Elevations: Terracon personnel provided the boring layout using handheld GPS equipment (estimated horizontal accuracy of about ±10 feet) and referencing existing site features.
Subsurface Exploration Procedures: We pushed the CPT soundings with a track-mounted drill rig. CPT sounding is the technology in which an electronically instrumented cone penetrometer is hydraulically pushed through the soil while nearly continuous readings are recorded to a portable computer. The cone is equipped with electronic load cells to measure tip resistance and sleeve resistance and a pressure transducer to measure the generated ambient pore pressure. The face of the cone has an apex angle of 60° and an area of 10 cm2. Digital data representing the tip resistance, friction resistance, pore water pressure, and probe inclination angle are recorded about every 2 centimeters while advancing through the ground at a rate between 1½ and 2½ centimeters per second. These measurements are correlated to various soil properties used for geotechnical design. No soil samples are gathered through this subsurface investigation technique.
CPT testing was conducted in general accordance with ASTM D5778 "Standard Test
Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of
Soils." Upon completion, the CPT data collected was analyzed and processed by the project engineer.
The SPT soil borings were performed with a truck mounted mud rotary type drill rigs equipped with a hydraulic head employed in drilling and sampling operations. The borings were advanced using 6-inch diameter hollow stem augers. Soil samples were obtained using spilt-barrel sampling procedures in accordance with ASTM Specifications
D1586. In the split-barrel sampling procedure the number of blows required to advance a standard 2-inch O.D., 1-3/8-inch I.D spilt-barrel sampler from 6 to 18 inches of penetration by means of a 140-pound hammer with a free fall of 30 inches is used to obtain the Standard Penetration Test (SPT) or N-value. The SPT is used to estimate the in-situ relative density of cohesionless soils and the consistency of cohesive soils.
We also observed the boreholes while drilling and at the completion of drilling for the presence of groundwater. The groundwater level is shown on the attached boring logs.
For safety purposes, all borings were backfilled with auger cuttings after their completion.
The sampling depths, penetration distances, and other sampling information was recorded on the field boring logs. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a Geotechnical Engineer. Our exploration team prepared field boring logs as part of the drilling operations. These field logs included visual classifications of the materials observed during drilling and our interpretation of the subsurface conditions between samples. Final boring logs were prepared from the field logs. The final boring logs represent the Geotechnical Engineer's interpretation of the field logs and include modifications based on observations and tests of the samples in our laboratory.
Laboratory Testing
The project engineer reviewed the field data and assigned laboratory tests. The laboratory testing program included the following types of tests:
■ ASTM D2216 Standard Test Methods for Laboratory Determination of Water
(Moisture)
■ ASTM D422 Standard Test Method for Particle-Size Analysis of Soils
■ ASTM D4318 Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity
Index of Soils
The laboratory testing program often included examination of soil samples by an engineer.
Based on the results of our field and laboratory programs, we described and classified the soil samples in accordance with the Unified Soil Classification System.
Photography Log
Pavement Coring at C7
Pavement Coring at C9
Pavement Coring at C10
Site Location and Exploration Plans
Contents:
Site Location Plan
Exploration Plan
Note: All attachments are one page unless noted above.
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page.
Site Location
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY GOOGLE EARTH MAPS
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page.
Exploration Plan
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY GOOGLE EARTH MAPS
LEGEND
CPT Sounding
SPT Boring
Exploration and Laboratory Results
Subsurface Profile Cross Section
CPT Sounding Logs
SPT Boring Log
Lab Results Summary
Grain Size Distribution Results
Atterberg Limits Results
Liquid and Plastic Limits
Borehole Number
Borehole Termination Type
Borehole Lithology
Explanation
D ep th
F ee t
Water Level Reading after drilling.
Water Level Reading at time of drilling.
C01A
%wMoisture Content
LL PL
AR
BT
Sampling
SUBSURFACE PROFILE EXHIBITNOTES:
Approved by: GL
Project Manager: CZ
HUTCHINSON ISLAND SLIP 3 BUCKHEAD REPAIR
1 INTERNATIONAL DR
SAVANNAH, GA
File Name: ES225343
Scale: N.T.S.
Project No.: ES225343
Drawn by: CZ
Date: 11/15/2023
See Exhibit for orientation of soil profile.
See General Notes in Appendix for symbols and soil classifications.
Soils profile provided for illustration purposes only.
Soils between borings may differ.
AR - Auger Refusal BT - Boring Termination
2201 Rowland Ave Savannah, GA
PH. 912-629-4000 FAX. 912-629-4001
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T . 1
1X
C P
T F
E N
C E
E S
H U
T C
H
IN
S O
N
IS
LA
N
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
1/
5/
C1A Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C2 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C3 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C4 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C5 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C6 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
Liquid and Plastic Limits
Borehole Number
Borehole Termination Type
Borehole Lithology
Explanation
Water Level Reading after drilling.
Water Level Reading at time of drilling.
C08
%wMoisture Content
LL PL
AR
BT
Sampling
SUBSURFACE PROFILE EXHIBITNOTES:
Approved by: GL
Project Manager: CZ
HUTCHINSON ISLAND SLIP 3 BUCKHEAD
REPAIR 1 INTERNATIONAL DR
SAVANNAH, GA
File Name: ES225343
Scale: N.T.S.
Project No.: ES225343
Drawn by: CZ
Date: 11/15/2023
See Exhibit for orientation of soil profile.
See General Notes in Appendix for symbols and soil classifications.
Soils profile provided for illustration purposes only.
Soils between borings may differ.
AR - Auger Refusal BT - Boring Termination
2201 Rowland Ave Savannah, GA
PH. 912-629-4000 FAX. 912-629-4001
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T . 1
1X
C P
T F
E N
C E
E S
H U
T C
H
IN
S O
N
IS
LA
N
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
1/
5/
C8 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C9 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
C10 Material
Description Normalized CPT
Soil Behavior Type Tip Resistance, qt
(tsf) 0 100 200 300 400
D ep th
F ee t
Depth (ft)
Depth (ft)
CPT Sounding ID C1A
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 74 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
9.9 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0870° Longitude: -81.0885°
North: 0 East: 1
CPT Completed: 11/1/2023
CPT Started: 11/1/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
CPT Rig: Geoprobe
Facilities | Environmental | Geotechnical | Materials 1
Depth (ft)
CPT Sounding ID C2
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 60.8 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
5.7 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0866° Longitude: -81.0885°
North: 0 East: 2
CPT Completed: 11/1/2023
CPT Started: 11/1/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
Facilities | Environmental | Geotechnical | Materials 2
Depth (ft)
CPT Sounding ID C3
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Hydrostatic Pressure
CPT Terminated at 60.2 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
6.2 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0862° Longitude: -81.0885°
North: 0 East: 3
CPT Completed: 11/1/2023
CPT Started: 11/1/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
Facilities | Environmental | Geotechnical | Materials 3
Depth (ft)
CPT Sounding ID C4
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 68.2 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
5.6 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0859° Longitude: -81.0885°
North: 0 East: 4
CPT Completed: 11/1/2023
CPT Started: 11/1/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
Facilities | Environmental | Geotechnical | Materials 4
Depth (ft)
CPT Sounding ID C5
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 69.6 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
6.2 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0856° Longitude: -81.0885°
North: 0 East: 5
CPT Completed: 11/2/2023
CPT Started: 11/2/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
Facilities | Environmental | Geotechnical | Materials 5
Depth (ft)
CPT Sounding ID C6
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Facilities | Environmental | Geotechnical | Materials
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 25.7 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
9 ft estimated water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0852° Longitude: -81.0885°
North: 0 East: 6
CPT Completed: 11/2/2023
CPT Started: 11/2/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
CPT Rig: Geoprobe
Pavement Coring to 6.5" BGS
CONCRETE CORE, [5" thick] SILTY SAND (SM), with asphalt debris and graded aggregate base (GAB), fine to medium grained, gray/white, medium dense with large rocks low recovery, loose with brick and other debris, gray, medium dense with large wood debris, some rock debris, wet soil, loose
SANDY SILT (ML), with elastic silt (MH), gray, very soft soft
SILTY SAND (SM), gray, loose
POORLY GRADED SAND, fine to coarse grained, gray, medium dense with some mica with mica, fine to medium grained with wood debris (2"), fine to coarse grained loose
SANDY SILT (ML), marl, gray, very stiff hard very stiff Boring Terminated at 80 Feet
Boring Log No. C7
W at er L ev el
O bs er va tio ns
D ep th
Ft
Facilities | Environmental | Geotechnical | Materials
G ra p h ic
L o g
32.1
81.8
23.1
21.3
23.4
27.5
19.6
40-27-13
0.4
12.0
22.0
27.0
62.0
80.0
1-5-12-22 N=17
3-7-5-10 N=12
5-4-5-5 N=9
4-5-9-11 N=14
7-3-2-3 N=5
1-0-1 N=1
3-2-2 N=4
4-3-5 N=8
3-6-6 N=12
4-4-8 N=12
5-7-7 N=14
2-5-11 N=16
4-5-5 N=10
5-8-8 N=16
5-4-2 N=6
5-7-10 N=17
4-6-9 N=15
14-26-31 N=57
5-7-10 N=17
Abandonment Method Boring backfilled with auger cuttings upon completion.
Advancement Method Mud Rotary
Hammer Type Automatic
Driller
PG/DZ
Logged by
Boring Started 11-09-2023
Boring Completed 11-09-2023
2201 Rowland Ave
Drill Rig
CME 45
Hutchinson Island Slip 3 Buckhead Repair
Savannah, GA
1 International Dr | Savannah, GA
Terracon Project No. ES225343
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
Notes
Water Level Observations
Groundwater not recorded due to drilling techniques
S am pl e
T yp e
O rg an ic
C o n te n t
Pe rc en t
Fi n es
W at er C o n te n t
) Atterberg
Limits
LL-PL-PI
See Exploration PlanLocation:
Latitude: 32.0849° Longitude: -81.0886°
Depth (Ft.)
Fi el d T es t
R es u lt s
Depth (ft)
CPT Sounding ID C8
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 73.8 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
8.5 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0845° Longitude: -81.0886°
North: 0 East: 8
CPT Completed: 11/2/2023
CPT Started: 11/2/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
Facilities | Environmental | Geotechnical | Materials 7
Depth (ft)
CPT Sounding ID C9
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 74 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
5 ft estimated water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0842° Longitude: -81.0886°
North: 0 East: 9
CPT Completed: 11/2/2023
CPT Started: 11/2/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
CPT Rig: Geoprobe
Facilities | Environmental | Geotechnical | Materials 8 to 16" BGS
Depth (ft)
CPT Sounding ID C10
5 10 15 20
Tip Resistance, qt (tsf)
50 100 150 200
Friction Ratio, Fr
0.8 1.6 2.4 3.2
Sleeve Friction, fs (tsf)
0.5 1.0 1.5 2.0
0.05 0.10 0.15 0.20 Material Description
Normalized CPT Soil Behavior Type
1 2 3 4 5 6 7 8
Pore Pressure, u2 (tsf)
0 1 2 3
Hydrostatic Pressure
CPT Terminated at 73 Feet
1 Sensitive, fine grained
Normalized Soil Behavior Type (Robertson 1990)
Water Level ObservationSee Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any.
See Supporting Information for explanation of symbols and abbreviations. (used in normalizations and correlations)
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Notes
Test Location: See Exploration Plan
6.9 ft measured water depth
CPT Equipment
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
3 Clay - silty clay to clay
2 Organic soils - clay
CPT sensor calibration reports available upon request
Probe No. 5890 with net area ratio of 0.842
Manufactured by Geotech A.B.- Calibrated 3/28/2023
Tip and sleeve areas of 15 cm2 and 225 cm2
Latitude: 32.0838° Longitude: -81.0886°
North: 0 East: 10
CPT Completed: 11/2/2023
CPT Started: 11/2/2023
9 Very stiff fine grained
4 Silt mixtures - clayey silt to silty clay
8 Very stiff sand to clayey sand
7 Gravelly sand to dense sand
6 Sands - clean sand to silty sand
5 Sand mixtures - silty sand to sandy silt
Operator: AF/SJ
CPT Rig: Geoprobe
Facilities | Environmental | Geotechnical | Materials 9 to 14.5" BGS
C7 8-10
SILTY SAND(SM)
81.8 32.1
C7 13.5-15
SANDY SILT(ML)
23.1 0.0 48.7 51.3 40 27 13
C7 23.5-25
SILTY SAND(SM)
21.3 0.0 85.0 15.0
C7 28.5-30
POORLY GRADED SAND(SP)
23.4 0.0 97.1 2.9
C7 43.5-45
POORLY GRADED SAND(SP)
27.5 0.0 95.9 4.1
C7 58.5-60
POORLY GRADED SAND(SP)
19.6 1.1 95.8 3.1
PAGE 1 OF 1SUMMARY OF LABORATORY RESULTS
PROJECT: Hutchinson Island Slip 3 Buckhead Repair PROJECT NUMBER: ES225343
CLIENT: Moffatt & Nichol Savannah, GA
SITE: 1 International Dr Savannah, GA
PH. 912-629-4000 FAX. 912-629-4001
2201 Rowland Ave Savannah, GA
T H
IS
B
O R
IN
G
L O
G
IS
N O
T V
A
LI
D
IF
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T . S
M A
R T
L A
B S
U M
M A
R Y
-L A
N D
S C
A P
E _A
E S
H U
T C
H
IN
S O
N
IS
LA
N
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
1/
/2
BORING
ID
Soil Classification
USCS
Depth (Ft.) % Gravel Liquid Limit
Plastic Limit
Plasticity Index
Organic Content (%)
Water Content
% Sand % Fines
0.0010.010.1110100 Grain Size (mm)
30 403 60
U.S. Sieve Numbers
16 20
44 10063 2 10 14 506 2001.5 81 140
HydrometerU.S. Sieve Opening in Inches
Grain Size Distribution
ASTM D422 / ASTM C136
3/4 1/23/8
D30
0.034 0.111 0.344
Pe rc en t
Fi n er b y
W ei g h t
Sand Silt or ClayCobbles coarse fine coarse finemedium
Gravel
Pe rc en t
Fi n er b y
W ei g h t
Percen t C o arser b y W eig h t
Boring ID
Facilities | Environmental | Geotechnical | MaterialsLaboratory tests are not valid if separated from original report.
3.36 2.42
D60 0.088 0.154 0.55
1.74 0.95
CU
Sieve % FinerSieve% Finer
Sieve% Finer
#10 #20 #40 #60 #100 #140 #200
100.0 99.56 89.32 42.69 10.92 6.07 3.97 2.91
#4 #10 #20 #40 #60 #100 #140 #200
100.0 99.88 98.16 93.66 58.31 26.09 14.96
48.7
85.0
97.1
% Fines
Grain Size
D10 0.046 0.227
Coefficients
CC
Remarks
#10 #20 #40 #60 #100 #140 #200
100.0 99.71 99.04 98.59 94.4 70.56 51.28
0.0
0.0
% Cobbles % Gravel % Sand % Clay
23.6
4.7
0.0
0.0
0.0
% Silt
2.9
27.7
10.3
SANDY SILT
SILTY SAND(SM)
POORLY GRADED SAND
Description
13.5 - 15
23.5 - 25
28.5 - 30
Depth
C7
C7
C7
Savannah, GA
2201 Rowland Ave
USCS
ML
SM
SP
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Terracon Project No. ES225343
0.0010.010.1110100 Grain Size (mm)
30 403 60
U.S. Sieve Numbers
16 20
44 10063 2 10 14 506 2001.5 81 140
HydrometerU.S. Sieve Opening in Inches
Grain Size Distribution
ASTM D422 / ASTM C136
3/4 1/23/8
D30
0.196 0.423
Pe rc en t
Fi n er b y
W ei g h t
Sand Silt or ClayCobbles coarse fine coarse finemedium
Gravel
Pe rc en t
Fi n er b y
W ei g h t
Percen t C o arser b y W eig h t
Boring ID
Facilities | Environmental | Geotechnical | MaterialsLaboratory tests are not valid if separated from original report.
2.03 3.21
D60 0.288 0.818
0.94 0.86
CU
Sieve % FinerSieve% Finer
Sieve% Finer
#10 #20 #40 #60 #100 #140 #200
100.0 98.87 90.17 61.76 30.22 9.25 5.18 3.87 3.1
95.9
95.8
% Fines
Grain Size
D10 0.142 0.255
Coefficients
CC
Remarks
3/8" #4 #10 #20 #40 #60 #100 #140 #200
100.0 99.43 93.73 47.58 10.83 5.56 4.13
1.1
% Cobbles % Gravel % Sand % Clay
0.0
0.0
% Silt
4.1
3.1
POORLY GRADED SAND
POORLY GRADED SAND
Description
43.5 - 45
58.5 - 60
Depth
C7
C7
Hutchinson Island Slip 3 Buckhead Repair
1 International Dr | Savannah, GA
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
USCS
SP
SP
0 10 20 30 40 50 60 70 80 90 100 110
"A " L ine
ASTM D4318
CH
o r
OH
CL
or
OL
ML or OL
MH or OH
13 51.3 ML27 13 51.3 ML27 40 SANDY SILT
Atterberg Limit Results
"U " L in e
Liquid Limit
LL PL PI Fines USCS DescriptionFines
Pl as ti ci ty I n d ex
CL - ML
Facilities | Environmental | Geotechnical | MaterialsLaboratory tests are not valid if separated from original report.
C7 13.5 - 15
Boring ID Depth (Ft)
Hutchinson Island Slip 3 Bulkhead Repair
1 International Dr | Savannah, GA
Terracon Project No. ES225343
Savannah, GA
2201 Rowland Ave
Supporting Information
General Notes
Unified Soil Classification System
CPT General Notes
Ring Sampler
SA
M
PL
IN
G
G R
O U
N D
W
AT
ER
Groundwater Initially Encountered
(More than 50% retained on No. 200 sieve.)
Density determined by Standard Penetration Resistance
Includes gravels, sands and silts.
Boulders Cobbles Gravel Sand Silt or Clay
Auger Split Spoon
No Recovery Rock Core
Shelby Tube Macro Core
FI
EL
D T
ES
TS
PLASTICITY DESCRIPTION
Term
Hand Penetrometer
Torvane
Standard Penetration Test (blows per foot)
Photo-Ionization Detector
Organic Vapor Analyzer
Groundwater Level After a Specified Period of Time
Static Groundwater Level After a Specified Period of Time
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area.
Non-plastic Low Medium High
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
Plasticity Index
1 - 10 11 - 30
> 30
RELATIVE PROPORTIONS OF FINES
Descriptive Term(s) of other constituents
Percent of Dry Weight
< 5 5 - 12 > 12
Trace With Modifier
RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY
Hard
Trace With Modifier above 4.00 > 30
2.00 to 4.00
1.00 to 2.00
0.50 to 1.00
0.25 to 0.50 less than 0.25
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance
CONSISTENCY OF FINE-GRAINED SOILS
Very Loose
Loose
Medium Dense
Dense
Descriptive Term (Density)
> 50
30 - 50
10 - 29
4 - 9
0 - 3
ST
R
EN
G
TH
T
ER
M
S Std. Penetration Resistance (blows per foot)
Very Stiff
Stiff
RELATIVE DENSITY OF COARSE-GRAINED SOILS
15 - 30
8 - 14
Medium-Stiff
Soft
Very Soft
Descriptive Term (Consistency)
2 - 4
0 - 1
Std. Penetration Resistance (blows per foot)
Undrained Shear Strength (kips per square foot)
Very Dense
5 - 7
Over 12 in. (300 mm) 12 in. to 3 in. (300mm to 75mm)
3 in. to #4 sieve (75mm to 4.75 mm) #4 to #200 sieve (4.75mm to 0.075mm
Passing #200 sieve (0.075mm)
< 15 15 - 29 > 30
Descriptive Term(s) of other constituents
Percent of Dry Weight
Descriptive Term(s) of other constituents
Percent of Dry Weight
No Groundwater Observed
GENERAL NOTES
LOCATION AND ELEVATION NOTES
(HP)
(T)
(b/f)
(PID)
(OVA)
Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated.
Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations.
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS
DESCRIPTIVE SOIL CLASSIFICATION
Unified Soil Classification System
Criteria for Assigning Group Symbols and Group Names Using
Laboratory Tests A
Soil Classification
Group
Symbol Group Name B
Coarse-Grained Soils:
More than 50% retained on No. 200 sieve
Gravels:
More than 50% of coarse fraction retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F
Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F, G, H
Fines classify as CL or CH GC Clayey gravel F, G, H
Sands:
50% or more of coarse fraction passes No. 4 sieve
Clean Sands:
Less than 5% fines D
Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I
Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G, H, I
Fines classify as CL or CH SC Clayey sand G, H, I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than
Inorganic:
PI > 7 and plots above “A” line J CL Lean clay K, L, M
PI < 4 or plots below “A” line J ML Silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OL
Organic clay K, L, M, N
Organic silt K, L, M, O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K, L, M
PI plots below “A” line MH Elastic silt K, L, M
Organic:
𝐿𝐿 𝑜𝑣𝑒𝑛 𝑑𝑟𝑖𝑒𝑑
𝐿𝐿 𝑛𝑜𝑡 𝑑𝑟𝑖𝑒𝑑
< 0.75 OH
Organic clay K, L, M, P
Organic silt K, L, M, Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve.
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay.
E Cu = D60/D10 Cc =
F If soil contains ≥ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains ≥ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or
“with gravel,” whichever is predominant.
L If soil contains ≥ 30% plus No. 200 predominantly sand, add
“sandy” to group name.
M If soil contains ≥ 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI ≥ 4 and plots on or above “A” line.
O PI < 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
DxD
)(D
CPT GENERAL NOTES
DESCRIPTION OF GEOTECHNICAL CORRELATIONSDESCRIPTION OF MEASUREMENTS
AND CALIBRATIONS
REPORTED PARAMETERS
CONE PENETRATION SOIL BEHAVIOR TYPE
WATER LEVEL
Effective Friction Angle, '
100.1 1
N O
R M
AL
IZ
ED
C
O N
E R
ES
IS
TA
N
C E, q t / a tm
4 Silt mixtures - clayey silt to silty clay
5 Sand mixtures - silty sand to sandy…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .