Upgrade Elevators Drawings Bldg 143.pdf
PDF 18 MB Posted
- Attached to
- Z1DA--Upgrade Elevator Salem VA Medical Center Salem, Virginia Total 100% SDVOSB Set-Aside
- Solicitation number
- 36C24621R0014_2
About this file
This federal contract opportunity notice seeks a general contractor to upgrade elevators at the Veterans Affairs Medical Center in Salem, Virginia. The project includes upgrading service elevators 1 through 4 in Building 143, patient elevators 1 through 3 in Building 143, cart lift elevators 1 and 2 in Building 143, and the elevators in Buildings 1, 4, 5, 10, 11, and 76. The work consists of general construction, demolition, civil, structural, architectural, medical gas, fire alarm, fire protection, plumbing, mechanical, electrical and telecommunications associated with the elevator upgrades. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The agency issuing this opportunity is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Site Visit Upgrade Elevators 01-19-2021.pdf | ||
| 36C24621R0014 0002.docx | DOCX document | |
| S06 VAAR Clause 852.219-10.pdf | ||
| 36C24621R0014 0001.docx | DOCX document | |
| S05 Questions and Answers Upgrade Elevators project.pdf | ||
| 36C24621R0014 0003.docx | DOCX document | |
| Upgrade Elevators Specs Bldg 1-4-5-10-11-76.pdf | ||
| Upgrade Elevators Specs Bldg 143.pdf | ||
| List of Drawing Sheets Bldg 1-4-5-10-11-76.pdf | ||
| List of Drawing Sheets Bldg 143.pdf | ||
| 36C24621R0014_2 Guerrant.docx | DOCX document | |
| Upgrade Elevators Drawings Bldg 1-4-5-10-11-76.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALEM VA MEDICAL CENTER
SALEM, VIRGINIA
PROJECT NO. 658-18-103 INDEX OF DRAWINGS
SHEET NO. DRAWING TITLE
GENERAL
GI001 COVER SHEET
NOT TO SCALE
GI002 LEGENDS, SYMBOLS AND ABBREVIATIONS
UPGRADE ELEVATORS
ARCHITECTURAL
AE100
F
A
D
I
ET
D S T
N U
E
TM
AP
R
E NT O
S
A
T SE FO
REM
ACI
N
VE RATE
A
FAI R
F
S
CAMPUS MAP SCOPE OF WORK
SHEET NO.
NOT TO SCALE
GI003 3 GENERAL NOTES
BUILDING 143
F001 FIRE PROTECTION ABBREVIATIONS, LEGEND, AND GENERAL NOTES
F101 FIRE PROTECTION DEMOLITION PLANS
F102 FIRE PROTECTION NEW PLANS
FIRE PROTECTION DETAILSF501
M001
MD101
MH101
LEGEND, ABBREVIATIONS - BLDG 143
ENLARGED HVAC DEMOLITION PLAN - SUBBASEMENT - BLDG 143
ENLARGED HVAC PLAN - SUBBASEMENT - BLDG 143
MH102 ENLARGED HVAC PLAN - PENTHOUSE - BLDG 143
MECHANICAL
FIRE PROTECTION
MH401 HVAC SCHEDULES - BLDG 143
CAMPUS MAP SCOPE OF WORK
AD100
AD200
AS100
AS200
AS201
AS300
CONSTRUCTION BARRIER FLOOR PLANS
DEMOLITION FLOOR PLANS
NEW WORK FLOOR PLANS
INTERIOR CAB ELEVATIONS
FINISH SCHEDULES AND DETAILS
SECTIONS AND DETAILS
E001 GENERAL NOTES AND LEGEND
ELECTRICAL
ED101
EP101
E602
ELECTRICAL DEMOLITION PLANS
ELECTRICAL NEW WORK PLANS
PANEL SCHEDULES
PH101 4 PHASING PLAN
E601 PANEL SCHEDULES
20EP102 ELECTRICAL NEW WORK PLANS
COVER SHEET
GI001
SD
RD
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
AutoCAD SHX Text
SITE
AutoCAD SHX Text
DETAIL MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
SITE
sdoty Typewritten Text sdoty Typewritten Text sdoty Typewritten Text sdoty Typewritten Text sdoty Typewritten Text sdoty Typewritten Text sdoty Typewritten Text F100 sdoty Typewritten Text 24A sdoty Typewritten Text
CONSTRUCTION BARRIER FLOOR PLANS
sdoty Typewritten Text
BUILDING CODES AND STANDARDS
STRUCT. STRUCTURAL
SUSP. SUSPENDED
WALL TYPE
WALL TYPE INDICATOR
EQUIPMENT INDICATOR
EQUIPMENT NUMBER
A
KEYNOTE INDICATOR
KEYNOTE NUMBER
WINDOW INDICATOR
ROOM NAME
ROOM NUMBER
ROOM NAME
SHEET NUMBER
DETAIL NUMBER
INTERIOR ELEVATIONS
COLUMN NUMBER
COLUMN INDICATOR
00000.001
DETAIL NUMBER
SHEET NUMBER
SECTION INDICATOR
A A100
* MULTIPLE DOORS PER ROOM
DOOR DESIGNATION
DOOR NUMBER
A A100
SHEET NUMBER
DETAIL NUMBER
EXTERIOR ELEVATION
ALT.16
ALTERNATE INDICATOR
ALTERNATE NUMBER
CEILING TYPE
CEILING HEIGHT
NOT ALL SYMBOLS ARE USED IN THIS DRAWING SET
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA PARKING DESIGN GUIDE
10. NFPA 101: LIFE SAFETY CODE
11. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
12. NFPA 70: NATIONAL ELECTRICAL CODE
13. ASHRAE 62.1: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
14. ASHRAE 90.1: ENERGY STANDARD FOR BUILDINGS EXCEPT LOW RISE
RESIDENTIAL BUILDINGS
15. VA NATIONAL CAD STANDARD APPLICATION GUIDE
16. NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 & 900)
17. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
18. OSHA STANDARDS
19. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
20. EPA 2005
21. VA MASTER SPECIFICATIONS
22. NEC NATIONAL ELECTRICAL CODE CURRENT REVISION.
23. VA SUSTAINABLE DESIGN MANUAL
CEILING INDICATOR
3 PHOTO DETAIL
NEW WORK NOTE
DEMOLITION NOTE
ROOM
NAME
A
WINDOW
DESIGNATION
4AE1002
PROJECT INFORMATION
RENOVATE ELEVATORS
SALEM VA MEDICAL CENTER
1970 ROANOKE BOULEVARD
SALEM, VA 24153-6404
VA PROJECT NUMBER: 658-18-103
SCOPE OF WORK
SAMPLING AND DETECTING FOR ASBESTOS CONTAINING MATERIAL (ACM) WITHIN THE
AREA AFFECTED BY THIS CONSTRUCTION PROJECT HAVE BEEN COMPLETED. ACM'S
WERE FOUND TO BE PRESENT WITHIN THE CONSTRUCTION LIMITS. SEE REPORT TITLED:
"LIMITED HAZARDOUS MATERIALS SURVEY SVAMC Elevator Upgrade Building 143 H&P Project 20181871. PERFORMED BY MS. MARY BETH WRISTON. VIRGINIA ASBESTOS
INSPECTOR LICENSE NUMBER 3303 003466. CONDUCTED ON DECEMBER 6, 2018
THE CONTRACTOR SHALL BE REQUIRED TO PROPERLY ABATE AND DISPOSE OF THESE
MATERIALS IN ACCORDANCE WITH STATE AND FEDERAL ASBESTOS ABATEMENT
GUIDELINES PRIOR TO ANY INTERIOR WORK.
THE BUILDING SHALL BE OCCUPIED THROUGH OUT THE CONSTRUCTION PROCESS. THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT OCCUPIED
AREAS DURING ABATEMENT AND DEMOLITION. PERFORM AIR SAMPLING WITHIN
BUILDING TO ENSURE OCCUPIED AREAS ARE SUITABLE FOR USE BY THE OWNER.
COORDINATE ANY DISRUPTIONS TO DAILY OPERATIONS WITH PROJECT ENGINEER.
THE OWNER HAS PERFORMED SURVEYS OF THE EFFECTED PORTIONS OF THE BUILDING
WHERE WORK ON THE ELEVATOR SYSTEMS WILL BE PERFORMED. THE SURVEYS WERE
CONDUCTING IN COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL
PROTECTION AGENCY (EPA) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR
POLLUTANTS (NESHAP) AS DETAILED IN 40 CFR, PART 61, SUBPART M REGULATIONS.
ASBESTOS INFO
BUILDING SUMMARY
OCCUPANCY CLASSIFICATION: INSTITUTIONAL (1-2)
USE: HEALTHCARE / HOSPITAL
CONSTRUCTION TYPE: TYPE II-B (FULLY SPRINKLERED)
FIRE RESISTANCE RATING FOR BUILDING ELEMENTS (HOURS)
BEARING WALL EXTERIOR - 2
BEARING WALL INTERIOR - 2
NON-BEARING WALL - 0
PRIMARY STRUCTURAL FRAME - 2
FLOOR CONSTRUCTION - 2
ROOF CONSTRUCTION - 1
THIS DESIGN EFFORT INCLUDES DESIGN /RENOVATION OF ELEVATORS IN BUILDINGS 1, 2, 2A, 4,5,10, 11, 76, AND 143 (THIS BID 143 ONLY). THE ORDER OF PRIORITY SHALL BE: BUILDING 2A, BUILDING 143 (TO INCLUDE ALL PASSENGER ELEVATORS AND DUMBWAITERS), BUILDING 2, BUILDING 10, BUILDING 11, BUILDING 4, BUILDING 5, BUILDING 76, AND BUILDING 1. THE ELEVATORS HAVE BEEN NOTED AS PAST LIFE EXPECTANCY AND NEED OF REPLACEMENT AND UPGRADE. A COMPLETE DESIGN PACKAGE SHALL
PROVIDE FULLY FUNCTIONAL ELEVATORS IN RESPECTIVE BUILDINGS TO ENSURE THE MEDICAL
CENTER REMAINS CAPABLE OF PROVIDING SAFE, HIGH QUALITY CARE TO OUR VETERAN POPULATION.
INFECTIOUS CONTROL NOTES
INFECTIOUS CONTROL PROCEDURES
1. CONTRACTOR SHALL PROVIDE EVERYTHING NEEDED FOR INFECTIOUS
CONTAINMENT/CONTROL SYSTEM. SOME ITEMS MAY INCLUDE, BUT NOT LIMITED TO;
CONSTRUCTION ZONE SIGNS, HEPA FILTERS, AIR SCRUBBERS, ETC. CONTACT RESIDENT
ENGINEER, FACILITY INFECTIOUS CONTROL RISKS ASSESSMENT TEAM (ICRA) FOR FULL
PROCEDURE REQUIREMENTS.
2. IT IS RECOMMENDED THAT THE CONTRACTOR UTILIZES MOVEABLE CONTAINMENT SYSTEM,
CONSTRUCTED OF A MINIMUM 6ML POLY OR PREFABRICATED ZIP WALL THAT CAN BE SEALED
TO WORK AREAS. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A COMPLETE SEAL
OF THE CONSTRUCTION AREA FROM ADJACENT AREAS.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT CONTAINMENT/CONTROL
SYSTEM PLAN TO COR FOR APPROVAL, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT
TO THE VA RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE
WITH CONTRACT REQUIREMENTS. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION SHALL
BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE
MEDICAL CENTER AND SHALL FOLLOW INFECTION CONTROL PROCEDURES.
4. IN EACH CONSTRUCTION AREA, THE CONTRACTOR SHALL UTILIZE A 120V HEPA FILTER
EQUIPPED AIR SCRUBBER MACHINE.
5. DO NOT REMOVE CONSTRUCTION BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS SIGNED OFF BY COR AND VA'S INFECTION CONTROL DEPARTMENT.
6. PROVIDE DUST “STICKY” MAT AT ENTRANCE/EXIT OF CONSTRUCTION AREA AND REPLACE OR
CLEAN WHEN NO LONGER EFFECTIVE.
7. ALL FURNITURE AND EQUIPMENT SHALL BE PROTECTED DURING DEMOLITION AND
CONSTRUCTION.
MEDICAL WASTE
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE,
INCLUDING SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE
START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOURAGED.
ENVIRONMENTAL CONTROL
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR
SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE
ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS
INCLUDING (EFFECTIVE FOR POLLEN, MOLD SPORES
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
LEGENDS, SYMBOLS
AND ABBREVIATIONS
GI002
SDRD
DEFINITIONS:
CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION
OR PERFORMANCE OF OTHER WORK.
PATCHING: FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL
CONDITIONS AFTER INSTALLATION OF OTHER WORK.
REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF
THEM OFF-SITE, UNLESS INDICATED TO BE SALVAGED OR REMOVED AND REINSTALLED.
SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO
OWNER READY FOR REUSE.
REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE
THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND
SALVAGED, OR REMOVED AND REINSTALLED.
GENERAL NOTES:
1. DEPICTION OF EXISTING CONDITIONS BASED ON ORIGINAL CONSTRUCTION
DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND
CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT
OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS
COMPLETE, REPORT ANY CONFLICTS TO COR/RE.
2. VAMC EQUIPMENT SUPPLIER TO REMOVE EXISTING UNMOUNTED AND MOUNTED
EQUIPMENT PRIOR TO CONSTRUCTION. ONCE OWNER & EQUIPMENT SUPPLIER HAS
REMOVED EQUIPMENT, PHOTOGRAPHICALLY DOCUMENT ENTIRE AREA OF NEW WORK.
TAKE NOTE OF ANY DAMAGED SURFACES OR ELEMENTS. PREPARE WRITTEN AND
PHOTOGRAPHIC REPORT OF SURVEY AND SUBMIT TO OWNER AND DESIGNER.
3. PROTECT ALL EXISTING FINISHES AND ELEMENTS TO REMAIN. REPAIR OR REPLACE
DAMAGED SURFACES TO MATCH ADJACENT FINISHES.
1. PATIENT/STAFF CIRCULATION SHALL BE COORDINATED WITH THE VA. PROVIDE TEMPORARY BARRIERS
TO ENSURE THE SAFE PASSAGE OF PEOPLE AROUND THE CONSTRUCTION AREA. CONDUCT
OPERATIONS TO PREVENT DAMAGE OF FALLING DEBRIS OR OTHER CAUSE TO ADJACENT SPACES.
2. DO NOT CLOSE OR OBSTRUCT CORRIDOR OR OCCUPIED SPACES WITHOUT PERMISSION FROM COR, PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC.
3. UTILITY OUTAGE SHALL BE DETERMINED BY CONTRACTOR AND COORDINATED WITH THE VA AT LEAST
TWO WEEKS IN ADVANCE.
4. CONSTRUCTION PERIOD TESTING REQUIREMENTS AS PER VA STANDARD CRITERIA.
5. INSPECTION REQUIREMENTS AS PER VA CRITERIA.
6. STAGGING/STORAGE AREAS AND CONSTRUCTION ROUTES FOR DELIVERY AND REMOVAL OF
MATERIALS SHALL BE COORDINATED AND APPROVED BY THE COR.
7. PROMPTLY REPAIR DAMAGE CAUSED TO ALL AREAS BY DEMOLITION/CONSTRUCTION OPERATIONS AT
NO COST TO THE VA.
8. MAINTAIN EXITING UTILITIES; KEEP IN SERVICE AND PROTECT AGAINST DAMAGE DURING DEMOLITION
AND CONSTRUCTION OPERATIONS.
9. DO NOT INTERRUPT EXISTING UTILITY SERVICE TO OCCUPIED SPACES EXCEPT WHEN AUTHORIZED BY
COR.
10.CONTRACTOR SHALL PROVIDE CONSTRUCTION ZONE SIGNS, NEGATIVE PRESSURE ZONE WITH
HEPA FILTERS, AIR SCRUBBERS STICKY MATS, DUST BARRIER; SEAL AIR OUTLETS, SEAL DOORS
BETWEEN CONSTRUCTION ZONE AND HOSPITAL. CONTRACTOR SHALL CONTACT COR FOR A
COMPLETE LIST OF INFECTION CONTROL PROCEDURES.
11.PROVIDE TEMPORARY ENCLOSURES AND OTHER SUITABLE METHODS AS NECESSARY TO LIMIT THE AMOUNT OF DUST AND DIRT RISING AND SCATTERING IN THE AIR TO THE LOWEST LEVELS OF AIR POLLUTION PRACTICAL FOR THE CONDITION OF WORK. WRAP EITHER DUCT OR OPENINGS OR OUTLET
WITH BLUE CELLOPHANE TO PREVENT DUST FROM ENTERING. COMPLY WITH GOVERNMENT
REGULATIONS.
12.CONTRACTOR SHALL PROVIDE NON-DESTRUCTIVE IMAGING AT ALL REQUIRED PENETRATIONS AT
EXISTING FLOORS AND ROOFS.
CLEANING
1. THE CONSTRUCTION ZONE AND ADJACENT AREAS SHALL BE MAINTAINED IN A CLEAN AND
SANITARY MANNER BY THE CONTRACTORS AND SHALL BE SWEPT AND MOPPED DAILY OR
MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION.
2. ALL EQUIPMENT, TOOLS, MATERIAL, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL
BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WIPE DOWN. USING HEPA
VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER SHALL BE
VACUUMED AND WET MOPED AT THE END OF EACH WORKDAY.
3. ALL DEBRIS SHALL BE REMOVED AS IT IS GENERALIZED DURING LOW TRAFFIC HOURS OR
AFTER HOURS IN A CLEAN, COVERED, SEALED CART; APPROVED BY THE COR. NO DEBRIS
SHALL BE HAULED THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR
AND THE MEDICAL CENTER. WHEN, APPROVED, DEBRIS SHALL BE HAULED IN ENCLOSED DUST
PROOF, TIGHTLY FITTED CONTAINERS, USING SPECIFIC TRAFFIC PATTERNS DAILY. PROJECT
SUPERINTENDENT SHALL OVERSEE THIS AFTER APPROVAL FROM RESIDENT ENGINEER.
1. CLOTHING SHALL BE FREE FROM DUST AND DEBRIS PRIOR TO EXITING THE CONSTRUCTION
ZONE.
2. PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELD, GLOVES AND N95
RESPIRATORS SHALL BE UTILIZED AS APPROPRIATE.
3. ALL CONSTRUCTION PERSONNEL ENTERING STERILE/INVASIVE PROCEDURE AREAS, SHALL
WEAR A DISPOSABLE JUMPSUIT, HEAD COVERED AND SHOE COVERINGS WHICH MUST BE
REMOVED PRIOR TO EXITING THE WORK AREA. CONTACT FOR SPECIFIC INSTRUCTIONS.
PROJECT COMPLETION
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP WORK AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF HVAC SYSTEMS IN AREAS WHERE WORK IS BEING PERFORMED.
5. WIPE CASEWORK AND HORIZONTAL AND VERTICAL SURFACES AT COMPLETION OF PROJECT.
SUBMITTALS
1. CONTRACTOR IS TO REVIEW INFECTIOUS CONTROL PROCEDURES PROVIDED BY THE VA'S
INFECTION CONTROL DEPARTMENT, INCLUDING LOCATION AND DETAILS OF BARRIERS PRIOR
TO START OF PROJECT.
2. CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR REVIEW.
PRODUCTS AND MATERIALS
1. CONSTRUCTION BARRIERS SHALL CONSIST OF 6 MILL. THICK FIRE RETARDANT PLASTIC
SHEETS, OR PREFABRICATED ZIP WALLS WITH 120V HEPA FILTER EQUIPPED AIR SCRUBBER.
2. DISINFECTANT AS APPROVED BY VA HOSPITAL.
1. DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE COORDINATED WITH THE VA (IN
CONJUNCTION WITH ANY NECESSARY INTERIM LIFE SAFETY MEASURES) FOR THE PROJECT.
2. ALL EGRESS PATHWAYS SHALL BE FREE OF DEBRIS.
3. UNAUTHORIZED PERSONNEL SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA.
4. ONLY DESIGNATED ELEVATORS SHALL BE USED FOR CONSTRUCTION DURING SCHEDULED
TIMES.
5. WHEN USING DEMOLITION CHUTES, CHUTE OPENINGS SHALL BE SEALED WHEN NOT IN USE.
THE CHUTE AND DAMPER SHALL BE SPRAYED WITH WATER, AS NECESSARY, TO MAINTAIN
DUST CONTROL.
6. ANY CEILING ACCESS PANELS OPENED FOR INVESTIGATION BEYOND SEALED AREAS SHALL BE
CLOSED IMMEDIATELY WHEN UNATTENDED.
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
GENERAL NOTES
GI003
SDRD
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
PHASING PLAN
PH101
SD
CAMPUS MAP
v.a. medical center, salem, va no scale
FF
EE
DD
AA
BB
T
NN
Z
U Y
W
X
V
Q
P
O
N
LL
OO
PP
KK
K
JJ
J
HH
M
R
S
GG
F
E
A
G
C
D
B
CC
To City of Salem
To City of Roanoke
Navy Way
Patriot Blvd.
Ai r F or ce
C irc le
Garden Sq.
Marine Corps Drive
Roanoke Blvd.
Patriot Circle
Ar my
R oa d
Co as t G ua rd La ne
MM
Patriot Circle
Patriot Circle
Patriot Circle
BUILDING FUNCTIONS
1 DIRECTOR, POLICE
2 EXTENDED CARE, NUCLEAR MED, DENTAL, K.T., P.T., O.T.
2A ADMISSIONS, EMER. RM., PATHOLOGY, RADIOLOGY IMAGING
4 MAIN KITCHEN, CANTEEN, MEDICAL MEDIA
5 AUDITORIUM
7 LONG TERM EXTENDED PSYCHIATRIC, SOCIAL WORK
8 SUBSTANCE ABUSE, ACUTE PSYCHIATRIC
9 SUBSTANCE ABUSE, P.T.S.D.
10 CENTRALIZED FEE
17 LEASED SPACE
18 OFFICES
29 SWIMMING POOL
34 STORAGE
77 CREDIT UNION, EDUCATION ,
ENVIRONMENTAL MGMT,
STUDENT QUARTERS
80 GREENHOUSE (WEST)
T85 SHEET METAL SHOP
121 GREENHOUSE
130 GRANDSTAND
131 ELECTRICAL SUBSTATION
133 GOLF CLUBHOUSE
138 EMERGENCY GENERATOR BLDG
139 EMERGENCY GENERATOR BLDG
140 EMERGENCY GENERATOR BLDG
141 EMERGENCY GENERATOR BLDG
142 EMERGENCY GENERATOR BLDG
143 MAIN HOSPITAL, OUTPATIENT,
INPATIENT, CLINICAL NURSING UNIT.
144 CHAPEL
145 PLUMBING SHOP
146 CHAPEL OFFICES
148 MOTOR VEHICLE SHOP
150 SMOKING SHELTER
151 SMOKING SHELTER
11 MENTAL HYGIENE, DAY TREATMENT,
PSYCHIATRY/PSYCHOLOGY ADMIN.
12 HOPTEL, PROSTHETICS, AFGE, EMP. HEALTH, C & P
13 BOILER/ CHILLED WATER PLANT
14 LAUNDRY
15 SOILED LINEN, VET. INDUST., ENG./MED. REC. STOR.
16 VISN 6 OFFICES, ADR, AC SHOP, LANDSCAPE
19 OFFICES
23 SEWAGE PUMP HOUSE
25 DUPLEX HOUSE (LEASE)
26 6-CAR GARAGE
27 5-CAR GARAGE
28 5-CAR GARAGE
35 IMPLEMENT SHED
46 FLAGPOLE
72 STORAGE
74 FMS, LOGISTICS, SAFETY, HRM, IRS
75 WHEELCHAIR CLINIC, REGION OFFICE STO, FISCAL, FITNESS CNTR
76 RESEARCH, NATIONAL AFGE, CARPENTRY & ELECTRIC SHOPS,
TRANSITIONAL LVG
153 EMERGENCY GENERATOR BLDG
154 EMERGENCY GENERATOR BLDG
155 PUMP HOUSE
156 EMERGENCY GENERATOR BLDG
157 EMERGENCY GENERATOR BLDG
158 SMOKING SHELTER
159 SMOKING SHELTER
160 OPEN FRONT SMOKING SHELTER
161 SMOKING SHELTER
162 ROANOKE CITY WATER MAIN BLDG
163 SALEM WATER MAIN BLDG
164 GREENHOUSE
165 OPEN SMOKING SHELTER
168 CENTER FOR TRAUMATIC STRESS
170 ACUTE INPATIENT PSYCHIATRIC UNIT
171 POLICE SUB STATION
172 WVWA PUMP HOUSE
173 CITY OF SALEM PUMP HOUSE
174 WATER TOWER
175 NEW BOILER PLANT
176 SALT SHED
152 SMOKING SHELTER
Building
Parking Lot
Connecting Corridor
Underground Service Tunnel
2A
H
L
I
REPLACING: 1 HYDRAULIC ELEVATOR
6 TRACTION ELEVATORS
2 HYDRAULIC CART LIFTS
SOUTH BIRD'S EYE VIEW
NORTH BIRD'S EYE VIEW
"EE"
"1"
CAMPUS MAP SCOPE OF WORK
AE100
DR
ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532 Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
'E'
NOTE: BOTH FLOORS ARE
THE SAME FOR CART LIFT E.
NOTE:
BASEMENT AND
SUB-BASEMENT
FOR BANK C ARE
THE SAME AS
FIRST FLOOR
D
NOTE: SUB-BASEMENT FOR BANK C IS
THE SAME AS THE BASEMENT PLAN
GENERAL NOTES
LEGEND & ABBREVIATIONS
ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION
ABOVE FINISHED FLOOR AFF
A/C ABOVE CEILING
AIR HANDLING UNIT AHU
AP
BTUH
ACCESS PANEL
BRITISH THERMAL UNITS PER HOUR
CUBIC FEET PER MINUTE CFM
CLG CEILING
DOWN DN
DWGS DRAWINGS
EXHAUST AIR EA
EF EXHAUST FAN
ELECTRIC ELEC
EX. EXISTING
GALLONS PER MINUTE GPM
HVAC HEATING VENTILATING & AIR CONDITIONING
MAXIMUM MAX
MIN MINIMUM
TRANSFER GRILLE TG
TYP TYPICAL
VARIABLE AIR VOLUME UNIT VAV
CTE CONNECT TO EXISTING
HWS
HWR
MBV
GV
CV
RL/RS/RHG
D
MOV
FD
MLD/MD
HOT WATER SUPPLY
HOT WATER RETURN
METERED BALANCING VALVE
GATE VALVE
CHECK VALVE
CONDENSATE DRAIN LINE
MOTOR OPERATED (2-WAY) VALVE
STRAINER
UNION
FIRE DAMPER
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
DIRECTION OF FLOW
MANUAL DAMPER
ROUND DUCT
FLAT OVAL WIDTH X DEPTH
RECTANGULAR DUCT WIDTH X DEPTH
MISSING)
RECTANGULAR ELBOWS WITH VANES EVEN IF SYMBOL IS
VANED ELBOW ( PROVIDE ALL SQUARE OR
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
HWS
HWR
OR
WXD"
WXD
MITERED ELBOWS.
E. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE
SPIN-IN COLLAR WITH SCOOP AND DAMPER.
TO RECTANGULAR OR SQUARE DUCT WITH A
D. FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED
DIMENSIONS.
C. DUCT SIZES SHOWN ARE ACTUAL INSIDE
SENSORS 48 INCHES ABOVE FINISHED FLOOR.
SPACE THERMOSTATS, HUMIDISTATS AND
B. UNLESS OTHERWISE INDICATED, INSTALL ALL
PRIOR TO INSTALLATION.
A. COORDINATE ALL WORK WITH OTHER TRADES
DESIGN CONDITIONS
UNIT AREA
INSIDE OUTSIDE
HEAT. COOLING HEAT. COOLING
DB F WB F DB F DB F WB F
72.7 92.2 16.8 62.5 75.0 70.0 BUILDING 143 AHU-S4
DB F
S-15
CR-15 LOW PRESSURE STEAM CONDENSATE RETURN
S-15
DUCT MOUNTED SMOKE DETECTOR
SKD SKD
ETR EXISTING TO REMAIN
UH
HP HEAT PUMP
ROOF HOOD
UNIT HEATER
RH
M001SNS SNS
LEGEND, ABBREVIATIONS - BLDG
AHU-PS1-1 T0 PS1-5 BUILDING 143 70.0 75.0 62.5 16.8 92.2 72.7
CR-15
D
REFRIGERANT LINE SET RL/RS/RHG
AHU-PS2-1 T0 PS2-5 BUILDING 143 70.0 75.0 62.5 16.8 92.2 72.7
CO CLEAN OUT
LOW PRESSURE STEAM (15 PSIG AND BELOW)
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 143
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
PLAN - SUBBASEMENT - BLDG 143
ENLARGED HVAC DEMOLITION
SNS SNS MD101
1 ENLARGED HVAC DEMOLITION PLAN - SUB-BASEMENT
MD101
DEMOLITION PLAN NOTESDEMOLITION PLAN NOTES
DRAWINGS FOR MORE INFORMATION.
4. ELEVATOR EQUIPMENT. REFER TO EQUIPMENT
PENETRATION.
ARCHITECTURAL FOR INFORMATION ABOUT WALL
APPROXIMATELY 18"X36" IN SIZE. REFER TO
DISPOSED OF PROPERLY. TRANSFER GRILLE IS
3. EXISTING TRANSFER GRILLE TO BE REMOVED AND
INFORMATION ABOUT WALL PENETRATION.
32"X32" IN SIZE. REFER TO ARCHITECTURAL FOR
DISPOSED OF PROPERLY. FAN IS APPROXIMATELY
2. EXISTING EXHAUST FAN SHALL BE REMOVED AND
REMAIN.
1. EXISTING SUBBASEMENT EXHAUST FAN SHALL
EXISTING TO BE REMOVED
EXISTING TO REMAIN
SCALE: 1/4" = 1'-0"
SF-100
04 - Vertical Space
ELEVATOR
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 143
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
SNS SNS MH101
MH101
ENLARGED HVAC PLAN - SUB-BASEMENT
SUBBASEMENT - BLDG 143
ENLARGED HVAC PLAN -
PLAN NOTES
RL/RS/RHG
AHU
S4
D
HP
S4
LOCATION.
FIELD VERIFY DRAIN
DRAIN LOCATED IN AIR WELL.
ROUTE CONDENSATE TO
SCALE: 1/4" = 1'-0"
2/MH401 FOR DETAIL.
4. INSTALL UNIT ON EQUIPMENT PAD. REFER TO
UNIT. ROUTE TO EXTERIOR AS SHOWN.
3. CONDENSATE DRAIN FULL SIZE OF CONNECTION AT
RECOMMENDATIONS.
IN ACCORDANCE WITH MANUFACTURER'S
OUTDOOR UNIT. SIZE AND INSTALL REFRIGERANT LINE
2. ROUTE REFRIGERANT LINE OUT ASSOCIATED
MANUFACTURER'S RECOMMENDATIONS.
1. MOUNT UNIT ON WALL IN ACCORDANCE WITH
EXISTING TO REMAIN
NEW WORK
SF-100
04 - Vertical Space
ELEVATOR
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 143
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
MECH
SJ 100CS 1
STAIR
NO 1
ELEVATOR
ELEVATOR
ELEVATOR
ELEVATOR ELEVATOR ELEVATOR
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 143
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
1 ENLARGED HVAC PLAN - PENTHOUSE
MH102
PENTHOUSE - BLDG 143
ENLARGED HVAC PLAN -
MH102SNS SNS
CO
AHU
PS1-5
AHU
PS1-3AHU
PS2-4
AHU
PS2-2
HP
PS1
PLAN NOTES
RL/RS/RHG
RL/RS/RHG
R L /R
S /R
H G
D
D
HP
PS2
AHU
PS2-5
AHU
PS2-3
AHU
PS2-1
AHU
PS1-4
AHU
PS1-2
AHU
PS1-1
R L /R
S /R
H G
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RL/RS/RHG
RECOMMENDATIONS.
IN ACCORDANCE WITH MANUFACTURER'S
OUTDOOR UNIT. SIZE AND INSTALL REFRIGERANT LINE
7. ROUTE REFRIGERANT LINE OUT ASSOCIATED
BLOCK.
6. TURN OUT CONDENSATE DRAIN OVER SPLASH
BUILDING.
5. INSTALL UNIT ON EQUIPMENT RAILS ON ROOF OF
MANUFACTURER'S RECOMMENDATIONS.
UNUSED PORTS. INSTALL IN ACCORDANCE WITH
4. REFRIGERANT HEADER. CAP, SEAL, AND INSULATE
UNIT. ROUTE TO EXTERIOR AS SHOWN.
3. CONDENSATE DRAIN FULL SIZE OF CONNECTION AT
RECOMMENDATIONS.
ACCORDANCE WITH MANUFACTURER'S
HEADER. SIZE AND INSTALL REFRIGERANT LINE IN
2. ROUTE REFRIGERANT LINE TO REFRIGERANT
RECOMMENDATIONS.
ACCORDANCE WITH MANUFACTURER'S
1. HANG UNIT FROM EXISTING STRUCTURE IN
5 5
1"
1"
3/4"
3/4"
1"
SCALE: 1/4" = 1'-0"
2.34m
2D
DX COIL
RA
48" [1200mm] AFF.
ROOM TEMPERATURE SENSOR, WALL MOUNTED
OR BEND OVER END 5D
WELD HEAD TO PLATE
FLOOR
[75mm] MIN.)
PIPE SLEEVE (5D, 3"
BOLT (TYP)
ANCHOR
CONCRETE BASE
EQUIPMENT BASE PLATE
DOWEL BASE TO FLOOR
O.C. EACH WAY IN THE BASE &
PROVIDE #3 BARS 12" [300mm]
BOLT NUT & WASHER
TYPICAL ANCHOR
SYMBOL
TYPE
TOTAL CFM
LOCATION
REMARKS
CHARACTERISTICS
ELECTRICAL
208V 1PH
SUBBASE 143
95.0
62.5
75.0
24,000
WALL MOUNT
17.0
70.0
91.5
PRESSURE, IN. H 0
EXTERNAL STATIC
BTU/HR
TOTAL CAPACITY,
22,635 CAPACITY, BTU/HR
SENSIBLE
17.0
2.5
18,000
AIR, CFM
MINIMUM OUTSIDE
BTU/HR
TOTAL CAPACITY
MINIMUM COP
H E
A T I
N G
C O
O L I
N G
DUCTLESS HEAT PUMP
AHU-S4 HP-S4
MINIMUM SUCTION
COND. AMBIENT
AMBIENT AIR
SEER
MINIMUM
SYMBOL
19.0
195,820
16.0
95.0
C O
O L I
N G
3.5
141,375
17.0
LOCATION
REMARKS
CHARACTERISTICS
ELECTRICAL
460V 3PH
PENTHOUSE 143
VRF HEAT PUMPS
HP-PS1
TONNAGE, TONS
MINIMUM NOMINAL
COND. AMBIENT
(INTEGRATED) EER
MINIMUM
H E
A T I
N G
AFTER LINE LOSSES
CAPACITY, BTU/HR
AFTER LINE LOSSES
CAPACITY, BTU/HR
AMBIENT AIR
MINIMUM COP AT
TYPE
TOTAL CFM
LOCATION
REMARKS
CHARACTERISTICS
ELECTRICAL
208V 1PH
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS1
BTU/HR
TOTAL CAPACITY,
OUTSIDE AIR, CFM
43,160
CAPACITY, BTU/HR
SENSIBLE
BTU/HR
TOTAL CAPACITY,
SYMBOL
VRF AIR HANDLERS
UNIT
ASSOCIATED OUTDOOR
PRESSURE, IN. H20
EXTERNAL STATIC
FULL/PARTIAL
DEMAND TYPE,
C O I
L
C O
O L I
N G
C O I
L
H E
A T
CEILING
CASSETTE
AHU-PS1-1
208V 1PH
31,165
32,500
FULL
1,235
HP-PS1
43,160
CEILING
CASSETTE
AHU-PS1-2
31,165
32,500
FULL
1,235
HP-PS1
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS1-3
31,165
32,500
FULL
1,235
HP-PS1
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS1-4
FAN
T-1
TT
PC
3. ALARM IF SPACE TEMPERATURE OUTSIDE OF RANGES.
2. MODULATE CONDENSER TO MAINTAIN SPACE SET POINT AND FAN SHALL CYCLE W/TEMPERATURE.
1. FAN COIL UNIT SHALL OPERATE CONTINUOUSLY
DUCTLESS SPLIT SYSTEM SEQUENCE OF OPERATION (HEAT PUMP)
RL/RS/RHG
FILTER
1 CONTROL DIAGRAM AND SEQUENCE
DUCTLESS SPLIT SYSTEM HEAT PUMP
SCALE: NTSMH401
PENTHOUSE 143 PENTHOUSE 143 PENTHOUSE 143 1
1 1 1
HVAC SCHEDULES - BLDG 143
SNS SNS MH401
PROGRAMMBALE WIRED THERMOSTAT.
LOW AMBIENT CONTROL, AND
PROVIDE UNIT WITH WIND BAFFLE FOR
UNIT SHALL HAVE A MCA/MCB OF 18A/20A.
DAIKIN AND LG ARE APPROVED EQUAL.
BASIS OF DESIGN IS MITSUBISHI PKA/PUZ.
SIMPLE WIRED THERMOSTAT.
EQUAL. UNIT SHALL HAVE A MCA/MCB OF 1.3A/15A. PROVIDE UNIT WITH
BASIS OF DESIGN IS MITSUBISHI PLFY. DAIKING AND LG ARE APPROVED
31,165
32,500
FULL
1,235
HP-PS1
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS1-5
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS2
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS2-1
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS2
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS2-2
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS2
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS2-3
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS2
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS2-4
PENTHOUSE 143
31,165
32,500
FULL
1,235
HP-PS2
208V 1PH
43,160
CEILING
CASSETTE
AHU-PS2-5
PENTHOUSE 143
19.0
195,820
16.0
95.0
3.5
141,375
17.0
460V 3PH
PENTHOUSE 143
HP-PS2
HEADER KIT, AND TWINNING KIT.
PROVIDE UNIT WITH LOW AMBIENT KIT,
20A/25A(MOD1) - 12A/15A(MOD2).
UNIT SHALL HAVE A MCA/MCB OF
DAIKIN AND LG ARE APPROVED EQUAL.
BASIS OF DESIGN IS MITSUBISHI PUHY.
SCALE: NTSMH401
L
W
A
A
D
D m m
5D
EQUIPMENT BASE PLATE.
GREATER THAN THE
SHALL BE 6" [150mm]
L & W DIMENSIONS
NOTE:
m m
M
IN
L
CONCRETE EQUIPMENT BASE2
SCH 40 PVC OR
FLATHEAD SCREWS
FASTEN TO WALL W/
ADJACENT WALL AREAS
FINISH PAINT TO MATCH
SIZED AS REQD; SEAL W/
CUT TO TIGHTLY FIT
ESCUTCHEON PLATE
MOUNT SLEEVE AND PROVIDE ESCUTCHEON PLATE.
NOTE: WHERE PIPING IS EXPOSED AT FINISH WALLS, FLUSH
2 TYP FOR MASONRY
OR CONCRETE WALL
TYP FOR NON-INSULATED
PIPE
PIPE AND CONDUIT
NOTES:
WHERE EXPOSED
AND JACKET
INSULATION
ESCUTCHEON PLATE:
3/4" PLYWOOD
EACH PIPE
PAINT ALL SIDES
SPACE BETWEEN PIPE
CAULK AND SEAL ANNULAR
AND SLEEVE
SPACE BETWEEN PIPE
CAULK AND SEAL ANNULAR
AND SLEEVE
INTERIOR
SCH 40 PVC OR
GALV STEEL SLEEVE
SECURE TO PARTITION
INSULATION
PIPE W/OR W/OUT
EXTERIOR
SECURE TO PARTITION
GALV STEEL SLEEVE
SCALE: NTSMH401
3 PIPE PENETRATION THRU WALL DETAIL
PLAN
SECTION B-B
SECTION A-A (BASE NOT POURED WITH SLAB)
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 143
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
ELECTRICAL NOTES
1. MATERIALS, EQUIPMENT, AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF THE AMERICAN SOCIETY FOR TESTING MATERIALS (ASTM), LATEST EDITION OF THE NATIONAL ELECTRIC CODE (NEC). THE UNDERWRITERS LABORATORY (UL), THE NATIONAL ELECTRIC MANUFACTURER'S ASSOCIATION (NEMA), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AND OTHER NATIONALLY RECOGNIZED AGENCIES AS WELL AS APPLICABLE LOCAL CODES.
2. ANYTHING DRAWN OR SPECIFIED SHALL NOT BE CONSTRUED TO CONFLICT WITH ANY LOCAL, MUNICIPAL OR STATE LAW, REGULATION OR ORDINANCE WHICH GOVERNS THE INSTALLATION OF ANY ELECTRICAL OR RELATED WORK. ITEMS SHALL NOT BE INSTALLED IN CONFLICT WITH THE NEC. RESOLVE ANY AND ALL CONFLICTS BEFORE INSTALLATION AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED AND LABELED FOR THE QUALIFIED USE. VERIFY CIRCUIT BREAKER INTERRUPT CAPACITY NEEDED FOR EACH PANEL WITH LOCAL UTILITY. FOR BID PURPOSES, ASSUME 25,000 AIC FOR SERVICE ENTRANCE EQUIPMENT, 14,000 AIC FOR 480/277V EQUIPMENT , AND 10,000 AIC FOR 208/120V EQUIPMENT. BALANCE THE POWER EQUALLY (+/- 10%) ON ALL PHASES.
4. THE SYSTEMS SHOWN ON DRAWINGS SHALL BE PROVIDED TO SERVE ALL FIXTURES, EQUIPMENT, AND AREAS WITHIN THE CONTRACT LIMIT LINES AS SET FORTH BY THE ARCHITECTURAL SOLUTION FOR THE PROJECT. THE BIDDING AND CONTRACT REQUIREMENTS, GENERAL REQUIREMENTS, AND GENERAL PROVISIONS SHALL APPLY TO THIS SECTION. SYSTEMS SHALL INCLUDE ALL EQUIPMENT, APPURTENANCES, SAFETY DEVICES, AND
CONTROLS NECESSARY FOR THE INTENDED SERVICE.
5. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE ELECTRICAL CONTRACTOR AND INCLUDED IN BID
PRICE.
6. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND STATE LAWS.
7. ALL EQUIPMENT SHALL BE NEW AND UNUSED. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S RECOMMENDATIONS, EXCEPT WHERE THESE SPECIFICATIONS REQUIRE A HIGHER QUALITY INSTALLATION THAN RECOMMENDED BY THE
MANUFACTURER.
8. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE. REPLACE ANY AND ALL CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF THE PROJECT.
9. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP OF ANY
KIND.
10. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE
CONNECTED. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.
11. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE WORK.
GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.
12. COORDINATE THE INSTALLATION OF ELECTRICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION SYSTEM, MECHANICAL EQUIPMENT AND SYSTEMS, AND STRUCTURAL COMPONENTS. COORDINATE ELECTRICAL EQUIPMENT AND MATERIALS INSTALLATION WITH OTHER
BUILDING COMPONENTS.
13. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL ELECTRICAL SERVICES AND OVERHEAD EQUIPMENT TO PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR REPLACEMENT OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF INTERFERENCE WITH OTHER
INSTALLATIONS.
14. COORDINATE CONNECTION OF ELECTRICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. COMPLY WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES. PROVIDE REQUIRED
CONNECTION FOR EACH SERVICE.
15. DO NOT ENDANGER OR DAMAGE INSTALLED WORK THROUGH PROCEDURES AND PROCESSES OF CUTTING AND PATCHING. ARRANGE FOR REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF ELECTRICAL INSTALLATIONS.
16. BIDDERS SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THEY SHALL EXAMINE ALL SERVICES, EQUIPMENT, SURFACES, ETC., WHICH THIS WORK IS IN ANY WAY DEPENDENT UPON, AND BRING ANY DISCREPANCIES DETERMINED OR OMISSIONS FOUND IN THE DRAWINGS TO THE OWNER'S ATTENTION BEFORE SUBMITTING BID.
17. VERIFY MECHANICAL EQUIPMENT SWITCH AND CONNECTION REQUIREMENTS, ITEM BY ITEM, WITH THE MECHANICAL CONTRACTOR, BEFORE
WIRING EQUIPMENT. RESOLVE ALL DISCREPANCIES WITHOUT FURTHER COST TO OWNER.
18. ALL WIRING SHALL BE IN CONDUIT, 3/4" MINIMUM WITH STEEL COMPRESSION FITTINGS.
19. ALL WIRING SHALL BE THHN/THWN COPPER (NO. 12 AWG MINIMUM) UNLESS OTHERWISE NOTED. WIRE AND CONDUIT SIZES ARE SHOWN ON THE
PANEL SCHEDULE.
20. ALL PANELS, CONTROL DEVICES AND MISCELLANEOUS ELECTRICAL APPARATUS SHALL BE CLEARLY MARKED FOR EASY IDENTIFICATION AND SAFETY. USE BLACK PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH. PUNCHED TAPE IS NOT ACCEPTABLE.
21. PANELS SHALL BE PROVIDED WITH A TYPEWRITTEN DIRECTORY AFFIXED TO INSIDE OF PANEL DOOR WITH A CLEAR PLASTIC SLEEVE. . THE ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE FOR CIRCUIT ALLOCATION ONLY. DO NOT SCALE DRAWINGS.
22. ELECTRICAL CONTRACTOR SHALL FURNISH RECORD SET OF DRAWINGS WITH ANY DEVIATIONS MARKED IN RED INK.
23. ALL MOTORS SHALL MEET VIRGINIA ENERGY EFFICIENCY CODE COMPLIANCE.
ELECTRICAL LEGEND
GENERAL NOTES & LEGEND
E001
RD JP
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
DEMOLITION NOTES
GENERAL DEMOLITION NOTES
ED101
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
NOT TO SCALE
NEW WORK NOTES
GENERAL NEW WORK NOTES
EP101
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
GENERAL NEW WORK NOTES
NEW WORK NOTES
EP102
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
PANEL SCHEDULES
E601
RD JP
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
PANEL SCHEDULES
E602
RD JP
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location Sheet of
FINAL SUBMISSION
V et er an s A ffa irsApproved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
1/
/2
9:
:2
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 143
SALEM VA MEDICAL CENTER
658-18-103
FIRE PROTECTION ABBREVIATIONS
1. THE FIRE ALARM SCOPE OF WORK FOR THE PROJECT INVOLVES MODIFICATIONS TO THE EXISTING FIRE ALARM SYSTEM SERVING THE ELEVATORS IN BUILDING 143. THERE ARE 7 ELEVATORS WHICH CONSIST OF 6 TRACTION
ELEVATORS AND 1 HYDRAULIC ELEVATOR.
2. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:
CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (DECEMBER 2015)
IBC - INTERNATIONAL BUILDING CODE, 2018
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 70 - NATIONAL ELECTRIC CODE, 2017 EDITION
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
NFPA 101 - LIFE SAFETY CODE, 2018 EDITION
ASME A17.1 - SAFETY CODE FOR ELEVATOR AND ESCALATORS, 2016 EDITION
3. FOR ELEVATOR RELATED FIRE ALARM SYSTEM PROGRAMMING, SEE MATRIX OF OPERATIONS ON SHEET F501.
4. PRIOR TO PERFORMING WORK ON THE ALARM SYSTEM, THE CONTRACTOR MUST FIELD LOCATE THE FIRE ALARM CONTROL PANELS SERVING ALL AREAS AFFECTED.
5. TWO WEEKS PRIOR TO FINAL INSPECTION, CONTRACTOR SHALL DELIVER TO THE COTR 3 SETS OF AS-BUILT DRAWINGS AND ONE SET OF THE AS-BUILT DRAWING COMPUTER FILES SHOWING ALL NEW AND/OR
EXISTING CONDUIT USED FOR THE FIRE ALARM SYSTEM.
6. FINAL FIRE ALARM SYSTEM TESTING SHALL BE WITNESSED BY THE COTR.
7. FILE A "RECORD OF COMPLETION" PREPARED IN ACCORDANCE WITH NFPA 72, AND THE FIRE ALARM TEST REPORT, WITH THE COTR.
8. TAMPER SWITCHES AND FLOW SWITCHES SHALL BE INSTALLED UNDER DIVISION 21, BUT SHALL BE CONNECTED TO THE FIRE ALARM SYSTEM BY THE FIRE ALARM CONTRACTOR.
9. FIRE AND SMOKE STOP ALL PENETRATIONS THROUGH RATED ASSEMBLIES. PROVIDE THROUGH-PENETRATION FIRESTOP SYSTEM PER UL 1479 AND SPECIFICATIONS.
10. ALL NEW FIRE ALARM WIRING SHALL BE CLASS B AND INSTALLED IN METALLIC CONDUIT.
11. EXISTING FIRE ALARM CONDITIONS ARE SHOWN AS ACCURATELY AS POSSIBLE. THESE DRAWINGS WERE PREPARED FROM INFORMATION TAKEN FROM THE ORIGINAL BUILDING DRAWINGS AND FIELD SURVEY INFORMATION COMPILED BY THE ENGINEERING DESIGN TEAM FOR THE PURPOSE OF ENGINEERING DESIGN CONCEPT. THERE IS THE POSSIBILITY THAT CONDITIONS SHOWN ARE NOT EXACTLY AS EXISTING.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LOCATIONS AND CONDITIONS AT THE SITE AND DOCUMENT THAT ON THEIR SUBMITTALS.
FIRE ALARM GENERAL NOTES
FIRE SUPPRESSION GENERAL NOTES
1. THE FIRE PROTECTION SCOPE OF WORK INVOLVES MODIFICATIONS TO THE EXISTING FIRE SUPPRESSION SYSTEM SERVING THE ELEVATORS BEING RENOVATED.
2. SYSTEMS SHALL BE DESIGNED, INSTALLED AND TESTED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AS WELL AS THE FOLLOWING CODES AND STANDARDS:
CRITERIA IN VA-PG-18-10 FIRE PROTECTION DESIGN MANUAL (DECEMBER 2015)
IBC - INTERNATIONAL BUILDING CODE, 2018
NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
NFPA 70 - NATIONAL ELECTRIC CODE, 2017 EDITION
NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
NFPA 101 - LIFE SAFETY CODE, 2018 EDITION
ASME A17.1 - SAFETY CODE FOR ELEVATOR AND ESCALATORS, 2016 EDITION
3. DRAWINGS ARE FOR REFERENCE PURPOSES ONLY. SHOP DRAWINGS ARE TO BE SUBMITTED FOR APPROVAL.
4. ALL MATERIALS AND EQUIPMENT USED FOR MODIFICATIONS SHALL BE NEW OR RELOCATED.
5. PRIOR TO PERFORMING WORK ON THE SPRINKLER SYSTEM, THE CONTRACTOR MUST FIELD LOCATE THE ZONE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .