Upgrade Elevators Drawings Bldg 1-4-5-10-11-76.pdf
PDF 16 MB Posted
- Attached to
- Z1DA--Upgrade Elevator Salem VA Medical Center Salem, Virginia Total 100% SDVOSB Set-Aside
- Solicitation number
- 36C24621R0014_2
About this file
This federal contract opportunity notice seeks a general contractor to upgrade elevators at the VA Medical Center in Salem, Virginia. The project includes upgrading service elevators 1 through 4 in Building 143, patient elevators 1 through 3 in Building 143, and cart lift elevators 1 and 2 in Building 143. Elevators will also be upgraded in Building 1, Building 4, Building 5, Building 10, Building 11, and Building 76. The work consists of general construction, demolition, civil, structural, architectural, medical gas, fire alarm, fire protection, plumbing, mechanical, electrical and telecommunications. The opportunity is a 100% total SDVOSB set-aside being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The solicitation number is 36C24621R0014_2 and responses are due by the date specified on the System for Award Management website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Site Visit Upgrade Elevators 01-19-2021.pdf | ||
| 36C24621R0014 0002.docx | DOCX document | |
| S06 VAAR Clause 852.219-10.pdf | ||
| 36C24621R0014 0001.docx | DOCX document | |
| S05 Questions and Answers Upgrade Elevators project.pdf | ||
| 36C24621R0014 0003.docx | DOCX document | |
| Upgrade Elevators Specs Bldg 1-4-5-10-11-76.pdf | ||
| Upgrade Elevators Specs Bldg 143.pdf | ||
| List of Drawing Sheets Bldg 1-4-5-10-11-76.pdf | ||
| List of Drawing Sheets Bldg 143.pdf | ||
| 36C24621R0014_2 Guerrant.docx | DOCX document | |
| Upgrade Elevators Drawings Bldg 143.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SALEM VA MEDICAL CENTER
SALEM, VIRGINIA
PROJECT NO. 658-18-103
NOT TO SCALE
UPGRADE ELEVATORS
F
A
D
I
E
T
D
S
T
N
U
E
T
M
A
P
R
E
N
T
O
S
A
T
SE
F
O
R
E
M
A
C
I
N
VE
R
A
T E
A
F
A
I
R
F
S
NOT TO SCALE
BUILDING 1, 4, 5, 10, 11, 76
INDEX OF DRAWINGS
SHEET NO. DRAWING TITLE
GENERAL
GI001
COVER SHEET
GI002
LEGENDS, SYMBOLS AND ABBREVIATIONS
ARCHITECTURAL
AE100 CAMPUS MAP SCOPE OF WORK
SHEET NO.
GI003 3
GENERAL NOTES
F001
FIRE PROTECTION ABBREVIATIONS, LEGEND, AND GENERAL NOTES
F101
F102
F501
FIRE PROTECTION DETAILS
FIRE PROTECTION
M001
MD101
MH101
LEGEND, ABBREVIATIONS - BLDG 1, 4, 5, 10, 76, 11
ENLARGED HVAC DEMOLITION PLAN - BLDG 1, 4, 5
ENLARGED HVAC NEW PLANS- BLDGS 1, 4, 5
MH102
HVAC SCHEDULES - BLDGS 1, 4, 5, 10, 76, 11
MECHANICAL
ENLARGED HVAC PLAN - PENTHOUSE - BLDGS 10, 76, 11
MH401
AD100
AD101
AS100
AS200
AS201
AS300
CONSTRUCTION BARRIER FLOOR PLANS
DEMOLITION FLOOR PLANS
NEW WORK FLOOR PLANS
INTERIOR ELEVATIONS & CEILING/FLOORING PLANS
FINISH SCHEDULES & DETAILS
SECTIONS & DETAILS
ELECTRICAL
E001 GENERAL NOTES AND LEGEND
ELECTRICAL
ED101
EP101
E601
ELECTRICAL DEMOLITION PLANS
ELECTRICAL NEW WORK PLANS
PANEL SCHEDULES
FIRE PROTECTION DEMOLITION PLANS
FIRE PROTECTION NEW PLANS
E602 PANEL SCHEDULES
ED102 ELECTRICAL DEMOLITION PLANS
EP102 ELECTRICAL NEW WORK PLANS
COVER SHEET
GI001
SD
RD
o n e e i g h t h i c e f o t t h r e e i n c h e s o t o n e a d a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
NOT TO SCALE
10 5A 4A
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
NOT TO SCALE
AutoCAD SHX Text
SITE
AutoCAD SHX Text
DETAIL MAP
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
SITE
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
ELEVATOR
BUILDING CODES AND STANDARDS
STRUCT. STRUCTURAL
SUSP. SUSPENDED
WALL TYPE
WALL TYPE INDICATOR
EQUIPMENT INDICATOR
EQUIPMENT NUMBER
A
KEYNOTE INDICATOR
KEYNOTE NUMBER
WINDOW INDICATOR
ROOM NAME
ROOM NUMBER
ROOM NAME
SHEET NUMBER
DETAIL NUMBER
INTERIOR ELEVATIONS
COLUMN NUMBER
COLUMN INDICATOR
00000.00
DETAIL NUMBER
SHEET NUMBER
SECTION INDICATOR
A
A100
* MULTIPLE DOORS PER ROOM
DOOR DESIGNATION
DOOR NUMBER
A
A100
SHEET NUMBER
DETAIL NUMBER
EXTERIOR ELEVATION
ALT.16
ALTERNATE INDICATOR
ALTERNATE NUMBER
CEILING TYPE
CEILING HEIGHT
NOT ALL SYMBOLS ARE USED IN THIS DRAWING SET
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA PARKING DESIGN GUIDE
10. NFPA 101: LIFE SAFETY CODE
11. NFPA 13: STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
12. NFPA 70: NATIONAL ELECTRICAL CODE
13. ASHRAE 62.1: VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY
14. ASHRAE 90.1: ENERGY STANDARD FOR BUILDINGS EXCEPT LOW RISE
RESIDENTIAL BUILDINGS
15. VA NATIONAL CAD STANDARD APPLICATION GUIDE
16. NFPA NATIONAL FIRE CODES (EXCEPT NFPA 5000 & 900)
17. VA SEISMIC DESIGN REQUIREMENTS, H-18-8
18. OSHA STANDARDS
19. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN
CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
20. EPA 2005 (CURRENT REVISION)
21. VA MASTER SPECIFICATIONS
22. NEC NATIONAL ELECTRICAL CODE CURRENT REVISION.
23. VA SUSTAINABLE DESIGN MANUAL
CEILING INDICATOR
PHOTO DETAIL
NEW WORK NOTE
DEMOLITION NOTE
ROOM
NAME
A
WINDOW
DESIGNATION
AE100
PROJECT INFORMATION
RENOVATE ELEVATORS
SALEM VA MEDICAL CENTER
1970 ROANOKE BOULEVARD
SALEM, VA 24153-6404
VA PROJECT NUMBER: 658-18-103
SCOPE OF WORK
SAMPLING AND DETECTING FOR ASBESTOS CONTAINING MATERIAL (ACM) WITHIN THE
AREA AFFECTED BY THIS CONSTRUCTION PROJECT HAVE BEEN COMPLETED. ACM'S
WERE FOUND TO BE PRESENT WITHIN THE CONSTRUCTION LIMITS. SEE REPORT TITLED:
"LIMITED HAZARDOUS MATERIALS SURVEY SVAMC Elevator Upgrade Buildings 76, 1, 10, 5, 4
H&P Project 20181871. PERFORMED BY MS. MARY BETH WRISTON. VIRGINIA ASBESTOS
INSPECTOR LICENSE NUMBER 3303 003466. CONDUCTED ON DECEMBER 6, 2018
THE CONTRACTOR SHALL BE REQUIRED TO PROPERLY ABATE AND DISPOSE OF THESE
MATERIALS IN ACCORDANCE WITH STATE AND FEDERAL ASBESTOS ABATEMENT
GUIDELINES PRIOR TO ANY INTERIOR WORK.
THE BUILDING SHALL BE OCCUPIED THROUGH OUT THE CONSTRUCTION PROCESS. THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT OCCUPIED
AREAS DURING ABATEMENT AND DEMOLITION. PERFORM AIR SAMPLING WITHIN
BUILDING TO ENSURE OCCUPIED AREAS ARE SUITABLE FOR USE BY THE OWNER.
COORDINATE ANY DISRUPTIONS TO DAILY OPERATIONS WITH PROJECT ENGINEER.
THE OWNER HAS PERFORMED SURVEYS OF THE EFFECTED PORTIONS OF THE BUILDING
WHERE WORK ON THE ELEVATOR SYSTEMS WILL BE PERFORMED. THE SURVEYS WERE
CONDUCTING IN COMPLIANCE WITH THE REQUIREMENTS OF THE ENVIRONMENTAL
PROTECTION AGENCY (EPA) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR
POLLUTANTS (NESHAP) AS DETAILED IN 40 CFR, PART 61, SUBPART M REGULATIONS.
ASBESTOS INFO
BUILDINGS SUMMARY
OCCUPANCY CLASSIFICATION: INSTITUTIONAL (1-2)
USE: HEALTHCARE / HOSPITAL
CONSTRUCTION TYPE: TYPE II-B (FULLY SPRINKLERED)
FIRE RESISTANCE RATING FOR BUILDING ELEMENTS (HOURS)
BEARING WALL EXTERIOR - 2
BEARING WALL INTERIOR - 2
NON-BEARING WALL - 0
PRIMARY STRUCTURAL FRAME - 2
FLOOR CONSTRUCTION - 2
ROOF CONSTRUCTION - 1
THIS DESIGN EFFORT INCLUDES DESIGN /RENOVATION OF ELEVATORS IN BUILDINGS 1, 2, 2A, 4,5,10, 11, 76, AND 143. THE ORDER OF PRIORITY SHALL BE: BUILDING 2A, BUILDING 143 (TO INCLUDE ALL
PASSENGER ELEVATORS AND DUMBWAITERS), BUILDING 2, BUILDING 10, BUILDING 11, BUILDING 4, BUILDING 5, BUILDING 76, AND BUILDING 1. THE ELEVATORS HAVE BEEN NOTED AS PAST LIFE
EXPECTANCY AND NEED OF REPLACEMENT AND UPGRADE. A COMPLETE DESIGN PACKAGE SHALL
PROVIDE FULLY FUNCTIONAL ELEVATORS IN RESPECTIVE BUILDINGS TO ENSURE THE MEDICAL
CENTER REMAINS CAPABLE OF PROVIDING SAFE, HIGH QUALITY CARE TO OUR VETERAN POPULATION.
INFECTIOUS CONTROL NOTES
INFECTIOUS CONTROL PROCEDURES
1. CONTRACTOR SHALL PROVIDE EVERYTHING NEEDED FOR INFECTIOUS
CONTAINMENT/CONTROL SYSTEM. SOME ITEMS MAY INCLUDE, BUT NOT LIMITED TO;
CONSTRUCTION ZONE SIGNS, HEPA FILTERS, AIR SCRUBBERS, ETC. CONTACT RESIDENT
ENGINEER, FACILITY INFECTIOUS CONTROL RISKS ASSESSMENT TEAM (ICRA) FOR FULL
PROCEDURE REQUIREMENTS.
2. IT IS RECOMMENDED THAT THE CONTRACTOR UTILIZES MOVEABLE CONTAINMENT SYSTEM,
CONSTRUCTED OF A MINIMUM 6ML POLY OR PREFABRICATED ZIP WALL THAT CAN BE SEALED
TO WORK AREAS. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A COMPLETE SEAL
OF THE CONSTRUCTION AREA FROM ADJACENT AREAS.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT CONTAINMENT/CONTROL
SYSTEM PLAN TO COR FOR APPROVAL, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT
TO THE VA RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE
WITH CONTRACT REQUIREMENTS. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION SHALL
BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE
MEDICAL CENTER AND SHALL FOLLOW INFECTION CONTROL PROCEDURES.
4. IN EACH CONSTRUCTION AREA, THE CONTRACTOR SHALL UTILIZE A 120V HEPA FILTER
EQUIPPED AIR SCRUBBER MACHINE.
5. DO NOT REMOVE CONSTRUCTION BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS SIGNED OFF BY COR AND VA'S INFECTION CONTROL DEPARTMENT.
6. PROVIDE DUST “STICKY” MAT AT ENTRANCE/EXIT OF CONSTRUCTION AREA AND REPLACE OR
CLEAN WHEN NO LONGER EFFECTIVE.
7. ALL FURNITURE AND EQUIPMENT SHALL BE PROTECTED DURING DEMOLITION AND
CONSTRUCTION.
MEDICAL WASTE
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE,
INCLUDING SHARP CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR TO THE
START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF
IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOURAGED.
ENVIRONMENTAL CONTROL
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR
SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE
ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS
INCLUDING (EFFECTIVE FOR POLLEN, MOLD SPORES
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
LEGENDS, SYMBOLS
AND ABBREVIATIONS
GI002
SDRD
DEFINITIONS:
CUTTING: REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION
OR PERFORMANCE OF OTHER WORK.
PATCHING: FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL
CONDITIONS AFTER INSTALLATION OF OTHER WORK.
REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF
THEM OFF-SITE, UNLESS INDICATED TO BE SALVAGED OR REMOVED AND REINSTALLED.
SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO
OWNER READY FOR REUSE.
REMOVE AND REINSTALL: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE
THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.
EXISTING TO REMAIN: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE
REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND
SALVAGED, OR REMOVED AND REINSTALLED.
GENERAL NOTES:
1. DEPICTION OF EXISTING CONDITIONS BASED ON ORIGINAL CONSTRUCTION
DOCUMENTS AND LIMITED FIELD OBSERVATIONS. EXISTING ELEMENTS AND
CONDITIONS CONCEALED BY IN-PLACE EQUIPMENT AND FINISHES WERE NOT
OBSERVED OR INVESTIGATED. ONCE CUTTING AND SELECTIVE DEMOLITION WORK IS
COMPLETE, REPORT ANY CONFLICTS TO COR/RE.
2. VAMC EQUIPMENT SUPPLIER TO REMOVE EXISTING UNMOUNTED AND MOUNTED
EQUIPMENT PRIOR TO CONSTRUCTION. ONCE OWNER & EQUIPMENT SUPPLIER HAS
REMOVED EQUIPMENT, PHOTOGRAPHICALLY DOCUMENT ENTIRE AREA OF NEW WORK.
TAKE NOTE OF ANY DAMAGED SURFACES OR ELEMENTS. PREPARE WRITTEN AND
PHOTOGRAPHIC REPORT OF SURVEY AND SUBMIT TO OWNER AND DESIGNER.
3. PROTECT ALL EXISTING FINISHES AND ELEMENTS TO REMAIN. REPAIR OR REPLACE
DAMAGED SURFACES TO MATCH ADJACENT FINISHES.
1. PATIENT/STAFF CIRCULATION SHALL BE COORDINATED WITH THE VA. PROVIDE TEMPORARY BARRIERS
TO ENSURE THE SAFE PASSAGE OF PEOPLE AROUND THE CONSTRUCTION AREA. CONDUCT
OPERATIONS TO PREVENT DAMAGE OF FALLING DEBRIS OR OTHER CAUSE TO ADJACENT SPACES.
2. DO NOT CLOSE OR OBSTRUCT CORRIDOR OR OCCUPIED SPACES WITHOUT PERMISSION FROM COR, PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC.
3. UTILITY OUTAGE SHALL BE DETERMINED BY CONTRACTOR AND COORDINATED WITH THE VA AT LEAST
TWO WEEKS IN ADVANCE.
4. CONSTRUCTION PERIOD TESTING REQUIREMENTS AS PER VA STANDARD CRITERIA.
5. INSPECTION REQUIREMENTS AS PER VA CRITERIA.
6. STAGGING/STORAGE AREAS AND CONSTRUCTION ROUTES FOR DELIVERY AND REMOVAL OF
MATERIALS SHALL BE COORDINATED AND APPROVED BY THE COR.
7. PROMPTLY REPAIR DAMAGE CAUSED TO ALL AREAS BY DEMOLITION/CONSTRUCTION OPERATIONS AT
NO COST TO THE VA.
8. MAINTAIN EXITING UTILITIES; KEEP IN SERVICE AND PROTECT AGAINST DAMAGE DURING DEMOLITION
AND CONSTRUCTION OPERATIONS.
9. DO NOT INTERRUPT EXISTING UTILITY SERVICE TO OCCUPIED SPACES EXCEPT WHEN AUTHORIZED BY
COR.
10.CONTRACTOR SHALL PROVIDE CONSTRUCTION ZONE SIGNS, NEGATIVE PRESSURE ZONE WITH
HEPA FILTERS, AIR SCRUBBERS STICKY MATS, DUST BARRIER; SEAL AIR OUTLETS, SEAL DOORS
BETWEEN CONSTRUCTION ZONE AND HOSPITAL. CONTRACTOR SHALL CONTACT COR FOR A
COMPLETE LIST OF INFECTION CONTROL PROCEDURES.
11.PROVIDE TEMPORARY ENCLOSURES AND OTHER SUITABLE METHODS AS NECESSARY TO LIMIT THE
AMOUNT OF DUST AND DIRT RISING AND SCATTERING IN THE AIR TO THE LOWEST LEVELS OF AIR
POLLUTION PRACTICAL FOR THE CONDITION OF WORK. WRAP EITHER DUCT OR OPENINGS OR OUTLET
WITH BLUE CELLOPHANE TO PREVENT DUST FROM ENTERING. COMPLY WITH GOVERNMENT
REGULATIONS.
12.CONTRACTOR SHALL PROVIDE NON-DESTRUCTIVE IMAGING AT ALL REQUIRED PENETRATIONS AT
EXISTING FLOORS AND ROOFS.
CLEANING
1. THE CONSTRUCTION ZONE AND ADJACENT AREAS SHALL BE MAINTAINED IN A CLEAN AND
SANITARY MANNER BY THE CONTRACTORS AND SHALL BE SWEPT AND MOPPED DAILY OR
MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION.
2. ALL EQUIPMENT, TOOLS, MATERIAL, ETC. TRANSPORTED THROUGH OCCUPIED AREAS SHALL
BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WIPE DOWN. USING HEPA
VACUUM, CLEAN INSIDE THE BARRIER AND VACUUM CEILING TILE PRIOR TO REPLACEMENT.
ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER SHALL BE
VACUUMED AND WET MOPED AT THE END OF EACH WORKDAY.
3. ALL DEBRIS SHALL BE REMOVED AS IT IS GENERALIZED DURING LOW TRAFFIC HOURS OR
AFTER HOURS IN A CLEAN, COVERED, SEALED CART; APPROVED BY THE COR. NO DEBRIS
SHALL BE HAULED THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR
AND THE MEDICAL CENTER. WHEN, APPROVED, DEBRIS SHALL BE HAULED IN ENCLOSED DUST
PROOF, TIGHTLY FITTED CONTAINERS, USING SPECIFIC TRAFFIC PATTERNS DAILY. PROJECT
SUPERINTENDENT SHALL OVERSEE THIS AFTER APPROVAL FROM RESIDENT ENGINEER.
1. CLOTHING SHALL BE FREE FROM DUST AND DEBRIS PRIOR TO EXITING THE CONSTRUCTION
ZONE.
2. PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELD, GLOVES AND N95
RESPIRATORS SHALL BE UTILIZED AS APPROPRIATE.
3. ALL CONSTRUCTION PERSONNEL ENTERING STERILE/INVASIVE PROCEDURE AREAS, SHALL
WEAR A DISPOSABLE JUMPSUIT, HEAD COVERED AND SHOE COVERINGS WHICH MUST BE
REMOVED PRIOR TO EXITING THE WORK AREA. CONTACT FOR SPECIFIC INSTRUCTIONS.
PROJECT COMPLETION
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP WORK AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF HVAC SYSTEMS IN AREAS WHERE WORK IS BEING PERFORMED.
5. WIPE CASEWORK AND HORIZONTAL AND VERTICAL SURFACES AT COMPLETION OF PROJECT.
SUBMITTALS
1. CONTRACTOR IS TO REVIEW INFECTIOUS CONTROL PROCEDURES PROVIDED BY THE VA'S
INFECTION CONTROL DEPARTMENT, INCLUDING LOCATION AND DETAILS OF BARRIERS PRIOR
TO START OF PROJECT.
2. CONTRACTOR SHALL SUBMIT PRODUCT DATA FOR REVIEW.
PRODUCTS AND MATERIALS
1. CONSTRUCTION BARRIERS SHALL CONSIST OF 6 MILL. THICK FIRE RETARDANT PLASTIC
SHEETS, OR PREFABRICATED ZIP WALLS WITH 120V HEPA FILTER EQUIPPED AIR SCRUBBER.
2. DISINFECTANT AS APPROVED BY VA HOSPITAL.
1. DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE COORDINATED WITH THE VA (IN
CONJUNCTION WITH ANY NECESSARY INTERIM LIFE SAFETY MEASURES) FOR THE PROJECT.
2. ALL EGRESS PATHWAYS SHALL BE FREE OF DEBRIS.
3. UNAUTHORIZED PERSONNEL SHALL NOT BE ALLOWED TO ENTER THE CONSTRUCTION AREA.
4. ONLY DESIGNATED ELEVATORS SHALL BE USED FOR CONSTRUCTION DURING SCHEDULED
TIMES.
5. WHEN USING DEMOLITION CHUTES, CHUTE OPENINGS SHALL BE SEALED WHEN NOT IN USE.
THE CHUTE AND DAMPER SHALL BE SPRAYED WITH WATER, AS NECESSARY, TO MAINTAIN
DUST CONTROL.
6. ANY CEILING ACCESS PANELS OPENED FOR INVESTIGATION BEYOND SEALED AREAS SHALL BE
CLOSED IMMEDIATELY WHEN UNATTENDED.
1. CONTRACTOR SHALL PERFORM ALL WORK AT THE SALEM VA MEDICAL CENTER BUILDINGS 1, 4, 5, 10, 11 AND 76 SUCH THAT THE DAILY OPERATIONS OF THE ELEVATORS AREA ARE NOT
COMPLETELY INTERRUPTED. ALL WORK MUST BE ACCOMPLISHED IN PHASES OF ONE ELEVATOR
AT A TIME AS SPECIFIED AND/OR INDICATED. SEE DRAWINGS AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION. THE FACILITY WILL BE OCCUPIED AND IN OPERATION DURING THE
LIFE OF THE CONTRACT. WORK SHALL BE ACCOMPLISHED IN AREAS AND/OR PHASES SO AS TO
PERMIT CONTINUOUS OPERATION OF THE FACILITIES EXCEPT AS NOTED OTHERWISE. THESE
FACILITIES ARE IN USE 24 HOURS PER DAY, SEVEN DAYS PER WEEK.
2. THE ELEVATORS ARE CRITICAL TO THE HOSPITAL OPERATIONS AND MUST REMAIN OPERATIONAL
THROUGHOUT THE LIFE OF THE CONSTRUCTION CONTRACT EXCEPT FOR THE ELEVATOR IN THE
PHASE. THE ELEVATOR AREA IS OCCUPIED DURING THE HOURS OF 0700 TO 1600 - MONDAY THRU
FRIDAY. TEMPORARY OUTAGES AND DISRUPTIVE CONSTRUCTION AND/OR DEMOLITION SHALL BE
SCHEDULED DURING UNOCCUPIED HOURS, UNLESS APPROVED OTHERWISE BY THE COR/RE.
APPROVAL MUST BE REQUESTED AT LEAST 14 DAYS PRIOR TO THE PROPOSED WORK.
3. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES AS REQUIRED TO MAINTAIN ALL
EXISTING SYSTEMS (INCLUDING BUT NOT LIMITED T0 FIRE PROTECTION, FIRE DETECTION/ALARM, LIFE SAFETY CONTROL SYSTEMS). IF PART OF THE WORK REQUIRES CLOSURE OF EXISTING
EMERGENCY EXIT STAIR DOORS THAT SERVE OTHER PARTS OF THE FACILITY; CONTRACTOR
SHALL BE REQUIRED TO NOTIFY THE COR/RE AT LEAST 30-DAY PRIOR TO CLOSURE OF THESE
AREAS TO ENSURE THAT THE GOVERNMENT CAN MAKE ARRANGEMENTS TO RE-ROUTE EGRESS
FROM THESE OTHER SPACES. CONTRACTOR SHALL PROVIDE TEMPORARY SIGNAGE FOR
ALTERNATE EGRESS TO BE POSTED IN ACCORDANCE WITH THE VA SAFETY OFFICER.
4. PHASES INDICATED ON THIS SHEET ARE TO BE USED BY THE CONTRACTOR AS A GUIDE FOR
PHASING THE WORK ASSOCIATED WITH THE ELEVATORS SO THAT ACCESS TO DIFFERENT
FLOORS IN THE BUILDING IS NOT COMPLETELY RESTRICTED DURING THE COURSE OF THE WORK.
ACCESS ONTO EACH FLOOR SHALL BE PROVIDED AT ALL TIMES DURING THE LIFE OF THE
CONTRACT EXCEPT AS SPECIFICALLY PERMITTED OTHERWISE, IN WRITING, BY THE COR/RE. THE
CONTRACTOR SHALL PROVIDE A DETAILED PHASING PLAN WHICH INCORPORATES THE PHASING
LIMITATIONS/OPERATIONS DELINEATED IN THESE PHASING PLANS. THE CONTRACTORS PLAN
SHALL HIGHLIGHT ANY DEVIATIONS FROM THESE PHASING PLANS FOR REVIEW AND APPROVAL
BY THE COR/RE, PRIOR TO ACCOMPLISHING ANY SITE WORK. DO NOT PROCEED IN
UNCERTAINTY.
5. THE CONTRACTOR SHALL PROVIDE ACCESS TO ALL UTILITY CONNECTIONS AND MAINTAIN AT
LEAST ONE LANE OF PEDESTRIAN TRAFFIC ACCESS AND OTHER CLEARANCES DURING WORKING
HOURS.
6. THE CONTRACTORS DETAILED PHASING PLAN SHALL INCLUDE AS A MINIMUM:
FOR EACH PHASE:
A.1. DATE OF COMMENCEMENT AND COMPLETION
A.2. PLANS SHOWING LIMITS OF WORK, TEMPORARY BARRIERS, ACCESS POINTS AND
ALTERATIONS TO EGRESS FOR OCCUPIED PORTIONS OF THE BUILDING AS MAY BE
REQUIRED.
A.3. A LIST OF ANTICIPATED ACTIVITIES IN EACH PHASE IN WHICH LIMITED ACCESS IS ALLOWED.
INCLUDE DESCRIPTION OF EACH ACTIVITY AND ANTICIPATED DURATION.
A.4. A LIST OF ANTICIPATED INTERRUPTIONS AND ANTICIPATED DURATION OF ACTIVITIES IN
EACH PORTION OF THE BUILDING IN WHICH LIMITED ACCESS IS REQUIRED. A LIST OF
ANTICIPATED INTERRUPTIONS OF BUILDING SERVICES (CUT-OVERS) IN EACH OTHER
PORTION OF THE BUILDING INCLUDING DURATION.
FOR THE ENTIRE PROJECT:
B.1. LIMITS OF WORK FOR EACH PHASE
B.2. THE PROPOSED LAY-DOWN AND STORAGE AREAS, FOR EACH PHASE. CONTRACTOR SHALL
COORDINATE REQUEST FOR A LAY-DOWN AND STORAGE AREA WITH THE COR/RE. ACCESS,
SECURITY, AND SIZE SHALL BE APPROVED BY COR/RE PRIOR TO ANY WORK AT THE SITE.
B.3. PROPOSED BUILDING ACCESSWAYS THAT WILL BE MAINTAINED FOR USE BY OCCUPANTS
DURING CONSTRUCTION. INCLUDE TEMPORARY BARRIERS AND PROTECTIONS WHICH MAY
BE REQUIRED FOR OCCUPANT SAFETY.
7. IF DURING THE COURSE OF THE WORK THE CONTRACTORS DEEMS IT NECESSARY TO SUBMIT
REVISIONS TO THE PHASING PLANS, SUCH REVISIONS SHALL INCLUDE LOCATIONS AND
SEQUENCE OF PHASES, FOR APPROVAL BY THE COR/RE. APPROVAL MUST BE REQUESTED AT
LEAST 14 DAYS PRIOR TO IMPLEMENTATION.
8. WORK FOR EACH PHASE MUST BE COMPLETED, TESTED AND ACCEPTED BY THE COR/RE FOR
BENEFICIAL USE PRIOR TO PROCEEDING WITH SUBSEQUENT PHASES.
9. PHASING FOR THE TUGS
10. PHASING FOR THE PATIENT WANDERING
11. THE FOLLOWING LISTS THE GENERAL PHASING STRATEGIES FOR THE ELEVATORS AND BUILDING
AREAS ONLY, AND IS NOT INTENDED TO LIST ALL WORK REQUIRED FOR THIS CONTRACT:
A. INSTALL AND IMPLEMENT CAR SCOPE IN ACCORDANCE WITH INFECTION CONTROL
MEASURES. PROTECT EXISTING SPRINKLER HEADS, LIGHT FIXTURES, AND OTHER
ELEVATOR SHAFT MOUNTED ITEMS TO REMAIN IN PLACE UNTIL SUBSEQUENT PHASES.
B. COORDINATE ALL NON ELEVATOR WORK WITH OTHER TRADES SUCH AS:
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
GENERAL NOTES
GI003
SDRD
BLDG 4: REPLACING 1 TRACTION FREIGHT ELEVATOR
BLDG 1: NORTH BIRD'S EYE VIEW
BLDG 5: REPLACING 1 HYDRAULIC ELEVATOR
BLDG 10: REPLACING 1 HYDRAULIC ELEVATOR
BLDG 1: REPLACING 1 HYDRAULIC ELEVATOR
BLDG 76: REPLACING 1 TRACTION ELEVATOR
BLDG 4: NORTH BIRD'S EYE VIEW
BLDG 5: NORTH BIRD'S EYE VIEW
BLDG 10: NORTH BIRD'S EYE VIEW
BLDG 76: NORTH BIRD'S EYE VIEW
CAMPUS MAP
v.a. medical center, salem, va no scale
FF
EE
DD
AA
BB
T
NN
Z
U Y
W
X
V
Q
P
O
N
LL
OO
PP
KK
K
JJ
J
HH
M
R
S
GG
F
E
A
G
C
D
B
CC
To City of Salem
T
C y
R a n o k e
N a v
W y
P a t r i
B l v d
A r
F r r c l e
G a r d q
M a r i r p
D i v e
Roanoke Blvd.
P a t r i o t
C i r c l e
A r m
R a d
C o a s t
G u a
L n e
MM
P a t r i o t
C i r c l e
P a t r i r c l e
P a t r i r c l e
BUILDING FUNCTIONS
1 DIRECTOR, POLICE
2 EXTENDED CARE, NUCLEAR MED, DENTAL, K.T., P.T., O.T.
2A ADMISSIONS, EMER. RM., PATHOLOGY, RADIOLOGY IMAGING
4 MAIN KITCHEN, CANTEEN, MEDICAL MEDIA
5 AUDITORIUM
7 LONG TERM EXTENDED PSYCHIATRIC, SOCIAL WORK
8 SUBSTANCE ABUSE, ACUTE PSYCHIATRIC
9 SUBSTANCE ABUSE, P.T.S.D.
10 CENTRALIZED FEE
17 LEASED SPACE
18 OFFICES
29 SWIMMING POOL
34 STORAGE
77 CREDIT UNION, EDUCATION ,
ENVIRONMENTAL MGMT,
STUDENT QUARTERS
80 GREENHOUSE (WEST)
T85 SHEET METAL SHOP
121 GREENHOUSE
130 GRANDSTAND
131 ELECTRICAL SUBSTATION
133 GOLF CLUBHOUSE
138 EMERGENCY GENERATOR BLDG
139 EMERGENCY GENERATOR BLDG
140 EMERGENCY GENERATOR BLDG
141 EMERGENCY GENERATOR BLDG
142 EMERGENCY GENERATOR BLDG
143 MAIN HOSPITAL, OUTPATIENT,
INPATIENT, CLINICAL NURSING UNIT.
144 CHAPEL
145 PLUMBING SHOP
146 CHAPEL OFFICES
148 MOTOR VEHICLE SHOP
150 SMOKING SHELTER
151 SMOKING SHELTER
11 MENTAL HYGIENE, DAY TREATMENT,
PSYCHIATRY/PSYCHOLOGY ADMIN.
12 HOPTEL, PROSTHETICS, AFGE, EMP. HEALTH, C & P
13 BOILER/ CHILLED WATER PLANT
14 LAUNDRY
15 SOILED LINEN, VET. INDUST., ENG./MED. REC. STOR.
16 VISN 6 OFFICES, ADR, AC SHOP, LANDSCAPE
19 OFFICES
23 SEWAGE PUMP HOUSE
25 DUPLEX HOUSE (LEASE)
26 6-CAR GARAGE
27 5-CAR GARAGE
28 5-CAR GARAGE
35 IMPLEMENT SHED
46 FLAGPOLE
72 STORAGE
74 FMS, LOGISTICS, SAFETY, HRM, IRS
75 WHEELCHAIR CLINIC, REGION OFFICE STO, FISCAL, FITNESS CNTR
76 RESEARCH, NATIONAL AFGE, CARPENTRY & ELECTRIC SHOPS,
TRANSITIONAL LVG
153 EMERGENCY GENERATOR BLDG
154 EMERGENCY GENERATOR BLDG
155 PUMP HOUSE
156 EMERGENCY GENERATOR BLDG
157 EMERGENCY GENERATOR BLDG
158 SMOKING SHELTER
159 SMOKING SHELTER
160 OPEN FRONT SMOKING SHELTER
161 SMOKING SHELTER
162 ROANOKE CITY WATER MAIN BLDG
163 SALEM WATER MAIN BLDG
164 GREENHOUSE
165 OPEN SMOKING SHELTER
168 CENTER FOR TRAUMATIC STRESS
170 ACUTE INPATIENT PSYCHIATRIC UNIT
171 POLICE SUB STATION
172 WVWA PUMP HOUSE
173 CITY OF SALEM PUMP HOUSE
174 WATER TOWER
175 NEW BOILER PLANT
176 SALT SHED
152 SMOKING SHELTER
Building
Parking Lot
Connecting Corridor
Underground
Service Tunnel
2A
H
L
I
"EE"
"1"
BLDG 11: REPLACING 1 HYDRAULIC ELEVATOR
CAMPUS MAP SCOPE OF WORK
AE100
DR
RD
e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
JLH KBJ
GENERAL NOTES
MITERED ELBOWS.
E. INSTALL TURNING VANES IN ALL 45 AND 90 DEGREE
SPIN-IN COLLAR WITH SCOOP AND DAMPER.
TO RECTANGULAR OR SQUARE DUCT WITH A
D. FLEXIBLE OR ROUND DUCT SHALL BE CONNECTED
DIMENSIONS.
C. DUCT SIZES SHOWN ARE ACTUAL INSIDE
SENSORS 48 INCHES ABOVE FINISHED FLOOR.
SPACE THERMOSTATS, HUMIDISTATS AND
B. UNLESS OTHERWISE INDICATED, INSTALL ALL
PRIOR TO INSTALLATION.
A. COORDINATE ALL WORK WITH OTHER TRADES
M001SNS SNS
DESIGN CONDITIONS
UNIT AREA
INSIDE OUTSIDE
HEAT. COOLING HEAT. COOLING
DB F WB F DB F DB F WB F
72.7 92.2 16.8 62.5 75.0 70.0 BUILDING 1 AHU-1
DB F
AHU-4 BUILDING 4 70.0 75.0 62.5 16.8 92.2 72.7
AHU-5 BUILDING 5 70.0 75.0 62.5 16.8 92.2 72.7
AHU-10 BUILDING 10 70.0 75.0 62.5 16.8 92.2 72.7
AHU-76 BUILDING 76 70.0 75.0 62.5 16.8 92.2 72.7
LEGEND & ABBREVIATIONS
ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION
ABOVE FINISHED FLOOR AFF
A/C ABOVE CEILING
AIR HANDLING UNIT AHU
AP
BTUH
ACCESS PANEL
BRITISH THERMAL UNITS PER HOUR
CUBIC FEET PER MINUTE CFM
CLG CEILING
DOWN DN
DWGS DRAWINGS
EXHAUST AIR EA
EF EXHAUST FAN
ELECTRIC ELEC
EX. EXISTING
GALLONS PER MINUTE GPM
HVAC HEATING VENTILATING & AIR CONDITIONING
MAXIMUM MAX
MIN MINIMUM
TRANSFER GRILLE TG
TYP TYPICAL
VARIABLE AIR VOLUME UNIT VAV
CTE CONNECT TO EXISTING
HWS
HWR
MBV
GV
CV
RL/RS/RHG
D
MOV
FD
MLD/MD
HOT WATER SUPPLY
HOT WATER RETURN
METERED BALANCING VALVE
GATE VALVE
CHECK VALVE
CONDENSATE DRAIN LINE
MOTOR OPERATED (2-WAY) VALVE
STRAINER
UNION
FIRE DAMPER
SINGLE LINE DUCT
FLEXIBLE DUCT
DUCT TRANSITION
ROUND
PIPE UP
PIPE OR DUCT DOWN
DIRECTION OF FLOW
MANUAL DAMPER
ROUND DUCT
FLAT OVAL WIDTH X DEPTH
RECTANGULAR DUCT WIDTH X DEPTH
MISSING)
RECTANGULAR ELBOWS WITH VANES EVEN IF SYMBOL IS
VANED ELBOW ( PROVIDE ALL SQUARE OR
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
HWS
HWR
OR
WXD"
WXD
S-15
CR-15 LOW PRESSURE STEAM CONDENSATE RETURN
S-15
DUCT MOUNTED SMOKE DETECTOR
SKD SKD
ETR EXISTING TO REMAIN
UH
HP HEAT PUMP
ROOF HOOD
UNIT HEATER
RH
CR-15
D
REFRIGERANT LINE SET RL/RS/RHG
CO CLEAN OUT
LOW PRESSURE STEAM (15 PSIG AND BELOW)
4, 5, 10, 76, 11
LEGEND, ABBREVIATIONS - BLDG 1,
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 1, 4, 5, 10, 76, 11.
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
ELEVATOR
ELEVATOR
ELEVATOR
KEY PLAN
NOT TO SCALE
10 5A
4A
NORTH
KEY PLAN
NOT TO SCALE
NORTH
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
ELEVATOR11
STORAGE
POLICE
EVIDENCE
3A
CORRIDOR
3J
MECH
3L
ELEVATOR
STAIR
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 1, 4, 5, 10, 76, 11.
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
ELEVATOR
ELEVATOR
ELEVATOR
KEY PLAN
NOT TO SCALE
10 5A
4A
NORTH
KEY PLAN
NOT TO SCALE
NORTH
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
ELEVATOR11
NOT TO SCALE
BUILT-UP ROOF
EQUIP RM
ELEVATOR
STAIR
STORAGE
MACH RM
ELEVATOR
ELEVATOR
P1
PLAN - BLDG 1, 4, 5
ENLARGED HVAC DEMOLITION
SNS SNS MD101
1 BASEMENT - BLDG 1
ENLARGED HVAC DEMOLITION -
MD101
PENTHOUSE - BLDG 4
ENLARGED HVAC DEMOLITION -
MD101
BASEMENT - BLDG 5
ENLARGED HVAC DEMOLITION -
MD101
DEMOLITION PLAN NOTESDEMOLITION PLAN NOTES
10X8
14X14
20X8
S-15
S -1
HWS
H W
R
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
8. EXISTING UNIT HEATER TO REMAIN.
7. CUT, CAP, AND INSULATE HOT WATER PIPES.
6. EXISTING ROOF FAN TO REMAIN.
5. CUT, CAP, AND SEAL DUCT.
DRAWINGS FOR MORE INFORMATION.
4. ELEVATOR EQUIPMENT. REFER TO EQUIPMENT
PENETRATION.
ARCHITECTURAL FOR INFORMATION ABOUT WALL
DISPOSED OF PROPERLY. REFER TO
3. EXISTING TRANSFER GRILLE TO BE REMOVED AND
AND DISPOSED OF PROPERLY.
2. EXISTING INLINE EXHAUST FAN SHALL BE REMOVED
ARCHITECTURAL FOR MORE INFORMATION.
PENETRATION SHALL BE FILLED IN. REFER TO
REMOVED AND PROPERLY DISPOSED OF. WALL
1. EXISTING WALL MOUNTED EXHAUST FAN TO BE
EXISTING TO BE REMOVED
EXISTING TO REMAIN
SCALE: 1/4" = 1'-0"
1, 4, 5
STORAGE
POLICE
EVIDENCE
3A
CORRIDOR
3J
MECH
3L
ELEVATOR
STAIR
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 1, 4, 5, 10, 76, 11.
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
ELEVATOR
ELEVATOR
ELEVATOR
KEY PLAN
NOT TO SCALE
10 5A
4A
NORTH
KEY PLAN
NOT TO SCALE
NORTH
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
ELEVATOR11
NOT TO SCALE
BUILT-UP ROOF
EQUIP RM
ELEVATOR
STAIR
STORAGE
MACH RM
ELEVATOR
ELEVATOR
P1
S-15
S -1
HWS
H W
R
SNS SNS MH101
MH101
MH101
MH101
AHU
HP
AHU
HP
HP
AHU
PLAN NOTES
R L /R
S /R
H G
D
D
D
GRADE
SPLASH BLOCK AT
TURN OUT OVER
ROOF
SPLASH BLOCK ON
TURN OUT OVER
GRADE
SPLASH BLOCK AT
TURN OUT OVER
EQUIPMENT RAILS.
5. UNIT LOCATED ON ROOF. INSTALL UNIT ON
2/MH401 FOR EQUIPMENT PAD DETAIL.
4. INSTALL UNIT ON EQUIPMENT PAD. REFER TO
RECOMMENDATIONS.
IN ACCORDANCE WITH MANUFACTURER'S
OUTDOOR UNIT. SIZE AND INSTALL REFRIGERANT LINE
3. ROUTE REFRIGERANT LINE OUT ASSOCIATED
UNIT. ROUTE TO EXTERIOR AS SHOWN.
2. CONDENSATE DRAIN FULL SIZE OF CONNECTION AT
MANUFACTURER'S RECOMMENDATIONS.
1. MOUNT UNIT ON WALL IN ACCORDANCE WITH
NEW WORK
ENLARGED HVAC - BASEMENT - BLDG 1
SCALE: 1/4" = 1'-0"
ENLARGED HVAC - PENTHOUSE - BLDG 4
SCALE: 1/4" = 1'-0"
ENLARGED HVAC - BASEMENT - BLDG 5
SCALE: 1/4" = 1'-0"
ENLARGED HVAC NEW PLANS
BLDG 1, 4, 5
1, 4, 5
SNS SNS MH102
PLAN NOTES
HP
AHU
MH102
D
HP
AHU
MH102
D
ROUTE DOWN TO ROOF BELOW ROUTE DOWN TO ROOF BELOW
ENLARGED HVAC PLAN - PENTHOUSE - BUILDING 10 ENLARGED HVAC PLAN - PENTHOUSE - BUILDING 76
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"
EQUIPMENT RAILS.
4. UNIT LOCATED ON ROOF. INSTALL UNIT ON
RECOMMENDATIONS.
IN ACCORDANCE WITH MANUFACTURER'S
OUTDOOR UNIT. SIZE AND INSTALL REFRIGERANT LINE
3. ROUTE REFRIGERANT LINE OUT ASSOCIATED
UNIT. ROUTE TO EXTERIOR AS SHOWN.
2. CONDENSATE DRAIN FULL SIZE OF CONNECTION AT
MANUFACTURER'S RECOMMENDATIONS.
1. MOUNT UNIT ON WALL IN ACCORDANCE WITH
NEW WORK
MH101
ENLARGED HVAC PLAN - PENTHOUSE - BLDG 113
AHU
HP
D
ROUTE DOWN TO ROOF BELOW.
SCALE: 1/4" = 1'-0"
PENTHOUSE - BLDG 10, 11, 76
ENLARGED HVAC PLAN -
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 1, 4, 5, 10, 76, 11.
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
ELEVATOR
ELEVATOR
ELEVATOR
KEY PLAN
NOT TO SCALE
10 5A
4A
NORTH
KEY PLAN
NOT TO SCALE
NORTH
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
ELEVATOR11
NOT TO SCALE
MACHINE RM.
S
10, 11, 76
2.34m
2D
DX COIL
RA
48" [1200mm] AFF.
ROOM TEMPERATURE SENSOR, WALL MOUNTED
OR BEND OVER END 5D
WELD HEAD TO PLATE
FLOOR
[75mm] MIN.)
PIPE SLEEVE (5D, 3"
BOLT (TYP)
ANCHOR
CONCRETE BASE
EQUIPMENT BASE PLATE
DOWEL BASE TO FLOOR
O.C. EACH WAY IN THE BASE &
PROVIDE #3 BARS 12" [300mm]
BOLT NUT & WASHER
TYPICAL ANCHOR
SYMBOL
TYPE
TOTAL CFM
LOCATION
REMARKS
CHARACTERISTICS
ELECTRICAL
208V 1PH
BLDG 1
95.0
62.5
75.0
24,000
WALL MOUNT
21.0
70.0
91.8
PRESSURE, IN. H 0
EXTERNAL STATIC
BTU/HR
TOTAL CAPACITY,
18,480 CAPACITY, BTU/HR
SENSIBLE
17.0
2.6
18,300
AIR, CFM
MINIMUM OUTSIDE
BTU/HR
TOTAL CAPACITY
MINIMUM COP
H E
A T I
N G
C O
O L I
N G
DUCTLESS HEAT PUMP
AHU-1 HP-1
MINIMUM SUCTION
COND. AMBIENT
AMBIENT AIR
SEER
MINIMUM
MH401SNS SNS
208V 1PH
BLDG 4
95.0
62.5
75.0
36,000
WALL MOUNT
20.8
70.0
30,350
17.0
2.6
22,400
AHU-4 HP-4
208V 1PH
BLDG 5
95.0
62.5
75.0
36,000
WALL MOUNT
20.8
70.0
30,350
17.0
2.6
22,400
AHU-5 HP-5
FAN
T-1
TT
PC
3. ALARM IF SPACE TEMPERATURE OUTSIDE OF RANGES.
2. MODULATE CONDENSER TO MAINTAIN SPACE SET POINT AND FAN SHALL CYCLE W/TEMPERATURE.
1. FAN COIL UNIT SHALL OPERATE CONTINUOUSLY
DUCTLESS SPLIT SYSTEM SEQUENCE OF OPERATION (HEAT PUMP)
RL/RS/RHG
FILTER
1 CONTROL DIAGRAM AND SEQUENCE
DUCTLESS SPLIT SYSTEM HEAT PUMP
SCALE: NTSMH401
208V 1PH
BLDG 10
95.0
62.5
75.0
36,000
WALL MOUNT
20.8
70.0
30,350
17.0
2.6
22,400
AHU-10 HP-10
208V 1PH
BLDG 76
95.0
62.5
75.0
36,000
WALL MOUNT
20.8
70.0
30,350
17.0
2.6
22,400
AHU-76 HP-76
92.5 92.5 92.5 92.5
2 2 2 2
10, 76
HVAC SCHEDULES - BLDG 1, 4, 5,
AMBIENT CONTROL, AND PROGRAMMBALE WIRED THERMOSTAT.
SHALL HAVE A MCA/MCB OF 19A/25A. PROVIDE UNIT WITH WIND BAFFLE FOR LOW
BASIS OF DESIGN IS MITSUBISHI PKA/PUZ. DAIKIN AND LG ARE APPROVED EQUAL. UNIT
THERMOSTAT.
BAFFLE FOR LOW AMBIENT CONTROL, AND PROGRAMMBALE WIRED
EQUAL. UNIT SHALL HAVE A MCA/MCB OF 25A/30A. PROVIDE UNIT WITH WIND
BASIS OF DESIGN IS MITSUBISHI PKA/PUZ. DAIKIN AND LG ARE APPROVED 2
SCALE: NTSMH401
L
W
A
A
D
D m m
5D
EQUIPMENT BASE PLATE.
GREATER THAN THE
SHALL BE 6" [150mm]
L & W DIMENSIONS
NOTE:
m m
M
IN
L
CONCRETE EQUIPMENT BASE2
SCH 40 PVC OR
FLATHEAD SCREWS
FASTEN TO WALL W/
ADJACENT WALL AREAS
FINISH PAINT TO MATCH
SIZED AS REQD; SEAL W/
CUT TO TIGHTLY FIT
ESCUTCHEON PLATE
MOUNT SLEEVE AND PROVIDE ESCUTCHEON PLATE.
NOTE: WHERE PIPING IS EXPOSED AT FINISH WALLS, FLUSH
2 TYP FOR MASONRY
OR CONCRETE WALL
TYP FOR NON-INSULATED
PIPE
PIPE AND CONDUIT
NOTES:
WHERE EXPOSED
AND JACKET
INSULATION
ESCUTCHEON PLATE:
3/4" PLYWOOD
EACH PIPE
PAINT ALL SIDES
SPACE BETWEEN PIPE
CAULK AND SEAL ANNULAR
AND SLEEVE
SPACE BETWEEN PIPE
CAULK AND SEAL ANNULAR
AND SLEEVE
INTERIOR
SCH 40 PVC OR
GALV STEEL SLEEVE
SECURE TO PARTITION
INSULATION
PIPE W/OR W/OUT
EXTERIOR
SECURE TO PARTITION
GALV STEEL SLEEVE
SCALE: NTSMH401
3 PIPE PENETRATION THRU WALL DETAIL
208V 1PH
BLDG 11
95.0
62.5
75.0
36,000
WALL MOUNT
18.8
70.0
30,350
17.0
2.5
22,400
AHU-11 HP-11
92.5
PLAN
SECTION B-B
SECTION A-A (BASE NOT POURED WITH SLAB)
o n e e ig h th i n c h o n e f o o t th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Fax: 251.990.3716
Phone: 251.990.5778
Fairhope, AL 36532
766 Middle St, Corporate Office:
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e te ra n s
A ff a ir s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
/3
/2
:2
:2
A
M
Revisions: Date:
BUILDING 1, 4, 5, 10, 76, 11.
UPGRADE ELEVATORS
SALEM VA MEDICAL CENTER
658-18-103
2019.07.29
ELEVATOR
ELEVATOR
ELEVATOR
KEY PLAN
NOT TO SCALE
10 5A
4A
NORTH
KEY PLAN
NOT TO SCALE
NORTH
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
NOT TO SCALE
KEY PLAN
ELEVATOR11
NOT TO SCALE
, 11
1, 4, 5, 10, 76, 11
HW-1
ELECTRICAL NOTES
1. MATERIALS, EQUIPMENT, AND SYSTEMS SHALL MEET ALL PERTINENT REQUIREMENTS OF THE AMERICAN SOCIETY FOR TESTING
MATERIALS (ASTM), 2017 NATIONAL ELECTRIC CODE (NEC). THE UNDERWRITERS LABORATORY (UL), THE NATIONAL ELECTRIC MANUFACTURER'S
ASSOCIATION (NEMA), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AND OTHER
NATIONALLY RECOGNIZED AGENCIES AS WELL AS APPLICABLE LOCAL CODES.
2. ANYTHING DRAWN OR SPECIFIED SHALL NOT BE CONSTRUED TO CONFLICT WITH ANY LOCAL, MUNICIPAL OR STATE LAW, REGULATION OR
ORDINANCE WHICH GOVERNS THE INSTALLATION OF ANY ELECTRICAL OR RELATED WORK. ITEMS SHALL NOT BE INSTALLED IN CONFLICT WITH
THE NEC. RESOLVE ANY AND ALL CONFLICTS BEFORE INSTALLATION AT NO ADDITIONAL EXPENSE TO THE OWNER.
3. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED AND LABELED FOR THE QUALIFIED USE. VERIFY CIRCUIT BREAKER INTERRUPT CAPACITY
NEEDED FOR EACH PANEL WITH LOCAL UTILITY. FOR BID PURPOSES, ASSUME 25,000 AIC FOR SERVICE ENTRANCE EQUIPMENT, 14,000 AIC FOR
480/277V EQUIPMENT , AND 10,000 AIC FOR 208/120V EQUIPMENT. BALANCE THE POWER EQUALLY (+/- 10%) ON ALL PHASES.
4. THE SYSTEMS SHOWN ON DRAWINGS SHALL BE PROVIDED TO SERVE ALL FIXTURES, EQUIPMENT, AND AREAS WITHIN THE CONTRACT LIMIT
LINES AS SET FORTH BY THE ARCHITECTURAL SOLUTION FOR THE PROJECT. THE BIDDING AND CONTRACT REQUIREMENTS, GENERAL
REQUIREMENTS, AND GENERAL PROVISIONS SHALL APPLY TO THIS SECTION. SYSTEMS SHALL INCLUDE ALL EQUIPMENT, APPURTENANCES, SAFETY DEVICES, AND CONTROLS NECESSARY FOR THE INTENDED SERVICE.
5. ALL PERMITS AND FEES REQUIRED FOR THE WORK SHALL BE SECURED AND PAID FOR BY THE ELECTRICAL CONTRACTOR AND INCLUDED IN
BID PRICE.
6. BIDDERS SHALL BE LICENSED CONTRACTORS IN ACCORDANCE WITH LOCAL AND STATE LAWS.
7. ALL EQUIPMENT SHALL BE NEW AND UNUSED. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT CONFORMANCE TO MANUFACTURER'S
RECOMMENDATIONS, EXCEPT WHERE THESE SPECIFICATIONS REQUIRE A HIGHER QUALITY INSTALLATION THAN RECOMMENDED BY THE
MANUFACTURER.
8. ALL INSTALLED SYSTEMS, DEVICES AND RELATED ITEMS SHALL BE TESTED IN PLACE ON SITE. REPLACE ANY AND ALL
CONTRACTOR-SUPPLIED DEFECTIVE DEVICES, ITEMS OR SYSTEMS AT CONTRACTOR'S OWN EXPENSE BEFORE COMPLETION OF THE PROJECT.
9. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE FURNISHED, FABRICATED OR FIELD ERECTED, ALL FACTORY
ASSEMBLED EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS FURNISHED, AND ALL WORK IN CONNECTION WITH
INSTALLING MANUFACTURER'S GUARANTEED EQUIPMENT. THIS CONTRACTOR'S GUARANTEE SHALL EXIST FOR A PERIOD OF ONE (1) YEAR
FROM THE DATE OF FINAL OWNER ACCEPTANCE OF THE WORK AND SHALL APPLY TO DEFECTS IN MATERIAL AND TO DEFECTIVE WORKMANSHIP
OF ANY KIND.
10. VERIFY FINAL LOCATIONS FOR ROUGH-INS WITH FIELD MEASUREMENTS AND WITH THE REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE
CONNECTED. VERIFY ALL DIMENSIONS BY FIELD MEASUREMENTS.
11. SEQUENCE, COORDINATE, AND INTEGRATE INSTALLATIONS OF ELECTRICAL MATERIALS AND EQUIPMENT FOR EFFICIENT FLOW OF THE
WORK. GIVE PARTICULAR ATTENTION TO LARGE EQUIPMENT REQUIRING POSITIONING PRIOR TO CLOSING-IN THE BUILDING. COORDINATE THE
CUTTING AND PATCHING OF BUILDING COMPONENTS TO ACCOMMODATE INSTALLATION OF ELECTRICAL EQUIPMENT AND MATERIALS.
12. COORDINATE THE INSTALLATION OF ELECTRICAL MATERIALS AND EQUIPMENT ABOVE CEILINGS WITH SUSPENSION SYSTEM, MECHANICAL
EQUIPMENT AND SYSTEMS, AND STRUCTURAL COMPONENTS. COORDINATE ELECTRICAL EQUIPMENT AND MATERIALS INSTALLATION WITH
OTHER BUILDING COMPONENTS.
13. WHERE MOUNTING HEIGHTS ARE NOT DETAILED OR DIMENSIONED, INSTALL ELECTRICAL SERVICES AND OVERHEAD EQUIPMENT TO
PROVIDE THE MAXIMUM HEADROOM POSSIBLE. INSTALL ELECTRICAL EQUIPMENT TO FACILITATE MAINTENANCE AND REPAIR OR REPLACEMENT
OF EQUIPMENT COMPONENTS. AS MUCH AS PRACTICAL, CONNECT EQUIPMENT FOR EASE OF DISCONNECTING, WITH MINIMUM OF
INTERFERENCE WITH OTHER INSTALLATIONS.
14. COORDINATE CONNECTION OF ELECTRICAL SYSTEMS WITH EXTERIOR UNDERGROUND AND OVERHEAD UTILITIES AND SERVICES. COMPLY
WITH REQUIREMENTS OF GOVERNING REGULATIONS, FRANCHISED SERVICE COMPANIES, AND CONTROLLING AGENCIES. PROVIDE REQUIRED
CONNECTION FOR EACH SERVICE.
15. DO NOT ENDANGER OR DAMAGE INSTALLED WORK THROUGH PROCEDURES AND PROCESSES OF CUTTING AND PATCHING. ARRANGE FOR
REPAIRS REQUIRED TO RESTORE OTHER WORK, BECAUSE OF DAMAGE CAUSED AS A RESULT OF ELECTRICAL INSTALLATIONS.
16. BIDDERS SHALL THOROUGHLY ACQUAINT THEMSELVES WITH THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED. THEY
SHALL EXAMINE ALL SERVICES, EQUIPMENT, SURFACES, ETC., WHICH THIS WORK IS IN ANY WAY DEPENDENT UPON, AND BRING ANY
DISCREPANCIES DETERMINED OR OMISSIONS FOUND IN THE DRAWINGS TO THE OWNER'S ATTENTION BEFORE SUBMITTING BID.
17. VERIFY MECHANICAL EQUIPMENT SWITCH AND CONNECTION REQUIREMENTS, ITEM BY ITEM, WITH THE MECHANICAL CONTRACTOR, BEFORE
WIRING EQUIPMENT. RESOLVE ALL DISCREPANCIES WITHOUT FURTHER COST TO OWNER.
18. ALL WIRING SHALL BE IN CONDUIT, 3/4" MINIMUM WITH STEEL COMPRESSION FITTINGS.
19. ALL WIRING SHALL BE THHN/THWN COPPER (NO. 12 AWG MINIMUM) UNLESS OTHERWISE NOTED. WIRE AND CONDUIT SIZES ARE SHOWN ON
THE PANEL SCHEDULE.
20. ALL PANELS, CONTROL DEVICES AND MISCELLANEOUS ELECTRICAL APPARATUS SHALL BE CLEARLY MARKED FOR EASY IDENTIFICATION
AND SAFETY. USE BLACK PLASTIC OR BAKELITE NAME PLATE ENGRAVED WITH WHITE LETTERS 1/4" HIGH. PUNCHED TAPE IS NOT ACCEPTABLE.
21. PANELS SHALL BE PROVIDED WITH A TYPEWRITTEN DIRECTORY AFFIXED TO INSIDE OF PANEL DOOR WITH A CLEAR PLASTIC SLEEVE. . THE
ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE FOR CIRCUIT ALLOCATION ONLY. DO NOT SCALE DRAWINGS.
22. ELECTRICAL CONTRACTOR SHALL FURNISH RECORD SET OF DRAWINGS WITH ANY DEVIATIONS MARKED IN RED INK.
23. ALL MOTORS SHALL MEET VIRGINIA ENERGY EFFICIENCY CODE COMPLIANCE.
ELECTRICAL LEGEND
PANEL BOARD, SURFACE MOUNTED
POWER CIRCUIT IN WALLS OR CEILING
PANEL BOARD, RECESSED
HOME RUN TO PANEL BOARD, NUMBER IS CKT. #
HEAVY DUTY NON-FUSED DISCONNECT SWITCH
UNLESS NOTED OTHERWISEUNO
NOT TO SCALENTS
J JUNCTION BOX
HEAVY DUTY FUSED DISCONNECT SWITCH
COMBINATION MAGNETIC MOTOR STARTER DISCONNECT
ELECTRIC MOTOR
GROUNDING TYPE. SURFACE MOUNTED, WP = WEATHER PROOF,
RECEPTACLE, DUPLEX, 20 AMP, 125 VOLT, 2 POLE, 3 WIRE,
TELEPHONE OUTLET
GENERAL NOTES & LEGEND
E001
RD JP
o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Corporate Office:
766 Middle St, Fairhope, AL 36532
Phone: 251.990.5778
Fax: 251.990.3716
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
AutoCAD SHX Text
MDP-1
sdoty Walt
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
ED101
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
NOT TO SCALE
10 5A 4A
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
ED102
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
NOT TO SCALE
10 5A 4A
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
GENERAL NEW WORK NOTES
NEW WORK NOTES
EP101
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS Coordinator
Approved: Infection Control Officer
Approved: Safety Manager
Approved: Chief of Mental Health Service
Approved: Chief of Police
Approved: Energy EngineerApproved: Patient Safety Nurse
Approved: Chief of Facility Management Svc.
Approved: Medical Center Director
DESIGN/BUILD
A
M
Revisions: Date:
UPGRADE ELEVATORS
BUILDING 1, 4, 5, 10, 76, 11.
SALEM VA MEDICAL CENTER
658-18-103
1,4,5,10,76,11
2019.07.29
NOT TO SCALE
10 5A 4A
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
GENERAL NEW WORK NOTES
NEW WORK NOTES
EP102
RD JP
SCALE: 1/8" = 1'-0"
0 4' 8' 16' o n e e i g h o t t h r e e i n c h e o t o n e a l f i n c h e o t o n e i n o t t h r e e q u a r t e r s i n o t o n e h a l f i n o t t h r e e e i g h t h s i n o t o n e q u a r t e r i n o t
VA FORM 08-6231, OCT 1978
A
123456789
123456789
B
C
D
E
F
A
B
C
D
E
F
Drawing Title Project Title
CheckedBuilding Number Drawn
Date
Project No.
Drawing No.
Location
Sheet of
FINAL SUBMISSION
V e t e r a n s
A f f a i r s
Approved: Associate Director
Approved: Chief of Staff
Approved: Service Chief
Approved: GEMS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .