About this file
This document includes a list of drawing sheets and federal contract opportunity related to upgrading elevators at the Salem VA Medical Center in Salem, Virginia. The opportunity is a 100% SDVOSB set-aside solicitation from the Department of Veterans Affairs seeking a general contractor to provide all labor, materials, equipment and supervision to complete work upgrading elevators in multiple buildings. Specifically, the work includes upgrading service elevators 1, 2 and 3 and patient elevators 1, 2 and 3 in Building 143, as well as cart lift elevators 1 and 2 in Building 143 and other elevators in Buildings 1, 4, 5, 10, 11 and 76. The drawings listed provide demolition plans, new work plans, schedules and other details necessary to complete the upgrade work for the elevators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Site Visit Upgrade Elevators 01-19-2021.pdf | ||
| 36C24621R0014 0002.docx | DOCX document | |
| S06 VAAR Clause 852.219-10.pdf | ||
| 36C24621R0014 0001.docx | DOCX document | |
| S05 Questions and Answers Upgrade Elevators project.pdf | ||
| 36C24621R0014 0003.docx | DOCX document | |
| Upgrade Elevators Specs Bldg 1-4-5-10-11-76.pdf | ||
| Upgrade Elevators Specs Bldg 143.pdf | ||
| List of Drawing Sheets Bldg 143.pdf | ||
| 36C24621R0014_2 Guerrant.docx | DOCX document | |
| Upgrade Elevators Drawings Bldg 1-4-5-10-11-76.pdf | ||
| Upgrade Elevators Drawings Bldg 143.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPGRADE ELEVATORS Salem VA Medical Center Final Submission July 2019
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
BUILDING 1,4,5,10,76,11
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI001 COVER SHEET
GI002 LEGENDS, SYMBOLS AND ABBREVIATIONS
GI003 GENERAL NOTES
ARCHITECTURAL
AE100 CAMPUS MAP SCOPE OF WORK
AD100 CONSTRUCTION BARRIER FLOOR PLANS
AD101 DEMOLITION FLOOR PLANS
AS100 NEW WORK FLOOR PLANS
AS200 INTERIOR ELEVATIONS & CEILING/FLOORING PLANS
AS201 FINISH SCHEDULES AND DETAILS
AS300 SECTION AND DETAILS
MECHANICAL
M001 LEGEND, ABBREVIATIONS – BLG 1,4,5,10,76,11
MD101 ENLARGED HVAC DEMOLITION PLAN – BLDG 1,4,5
MH101 ENLARGED HVAC NEW PLANS – BLDGS 1,4,5
MH102 ENLARGED HVAC PLAN – PENTHOUSE – BLDG 10,76,11
MH401 HVAC SCHEDULES – BLDGS 1,4,5,10,76,11
ELECTRICAL
E001 GENERAL NOTES AND LEGEND
ED101 ELECTRICAL DEMOLITION PLANS
ED102 ELECTRICAL DEMOLITION PLANS
EP101 ELECTRICAL NEW WORK PLANS
EP102 ELECTRICAL NEW WORK PLANS
E601 PANEL SCHEDULES
E602 PANEL SCHEDULES
UPGRADE ELEVATORS Salem VA Medical Center Final Submission July 2019
00 01 15 - 2
FIRE PROTECTION
F001 FIRE PROTECTION ABBREVIATIONS, LEGEND, AND GENERAL NOTES
F101 FIRE PROTECTION DEMOLITION PLANS
F102 FIRE PROTECTION NEW PLANS
F501 FIRE PROTECTION DETAILS
- - - END - - -