This is a Construction Bid Form issued by the Pennsylvania Game Commission for the Stone Hollow Road Project (PGC-64-25-01) located in Pike Township, Potter County. The project involves maintenance of 1.54 miles of road on State Game Lands #64, with bids due on March 27, 2025, at 2:00 P.M. The contract encompasses comprehensive road construction and drainage improvements, including clearing, pipe removal and installation, road surface preparation, and roadway construction. Key work items include removing existing pipes, installing 620 linear feet of 18-inch corrugated plastic pipe, placing 30 precast concrete winged headwalls, preparing 15,129 square yards of road surface, and applying 5,083 tons of #2A coarse aggregate.
The bid form indicates a comprehensive approach to road maintenance with specific quantities for each construction element. The project requires the contractor to provide all necessary materials, equipment, labor, and superintendence to complete the work in an expeditious and workmanlike manner. While specific pricing details are not provided in the document, the bid form outlines the precise scope of work and expected deliverables. The project appears to be funded through the Pennsylvania Game Commission's infrastructure maintenance budget, with a focus on improving access and drainage on State Game Lands #64.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Drawing 1 (5).pdf | ||
| Electronic Bid Notice (6).pdf | ||
| Worker Protection Form .docx | DOCX document | |
| Drawing 2 (5).pdf | ||
| Construction Bid Form (7).doc | DOC document | |
| Specifications (5).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF PENNSYLVANIA
PENNSYLVANIA GAME COMMISSION
DESCRIPTION:
Stone Hollow Road Project
PROJECT NO.:
PGC-64-25-01
LOCATION OF WORK:
SGL #64, Pike Township, Potter County
DATE DUE:
March 27, 2025
TIME: 2:00 P.M.
This project shall be known as PGC-64-25-01
The contractor agrees to furnish, deliver to the site, and use materials, water, tools, equipment, light, power, and to perform all labor, superintendence, and all means of demolition necessary to execute, construct and finish in an expeditious, substantial and workmanlike manner all the work necessary for maintenance of 1.54-miles of road on State Game Lands #64 in Pike Township, Potter County. The principal items of work under this contract and estimated quantities are as follows:
1. Contract Bonds – Job
2. Clearing - Job
3. Remove Existing Pipes – 10 Each
4. 18-inch Corrugated Plastic Pipe – 620 LF
5. Pipe Bedding and Backfill – 393 Tons
6. Precast Concrete Headwalls (18-inch Winged) – 30- Each
7. Precast Concrete Headwalls (18-inch Flat) – 2 Each
8. Riprap Splash Pads – 44 SY
9. Road Surface Preparation – 15,129 SY
10. #2A Coarse Aggregate – 5,083 Tons
11. Seeding - Job