Universal_EV_RFP_Shell_LittleChute_WI.pdf

PDF 192 KB Posted

Attached to
EV Charging Station Installation – LITTLE CHUTE, WI
Solicitation number
RFP-Little Chute-WI-003
Issued by
Outagamie County, Wisconsin

About this file

Summary

This is a Request for Proposals (RFP) issued by Universal EV LLC for the turnkey supply, installation, operation, maintenance, and service-level support of a publicly accessible Direct Current Fast Charging (DCFC) station at Shell in Little Chute, Wisconsin, funded through the National Electric Vehicle Infrastructure (NEVI) Formula Program administered by the Wisconsin Department of Transportation (WisDOT). The project involves installation of four Tesla V4 Superchargers with NACS and CCS1 connectors via Tesla Magic Dock, each rated at 150kW output with a combined station capacity of 600kW. The civil work scope includes converting five parking stalls to accommodate four EV charging stalls (including one van-accessible stall) with associated concrete foundations, site grading, drainage, signage, striping, and bollard installation. Additional infrastructure includes a 750kVA utility transformer with combined CT and meter socket, a 1200A main switchboard, and complete electrical conduit and trenching work per approved engineering drawings from Nordic Asia Solutions. The site is an active, operating Shell fuel station and convenience store that must remain fully operational throughout construction; contractors must submit a detailed phasing and traffic control plan to maintain continuous public access. Proposals are due October 19, 2026, with anticipated construction start on March 1, 2027 and substantial completion by April 30, 2027. Pre-bid site visits are available by request. The contract includes a fixed-price lump sum for all equipment, installation, five-year warranty, operations and maintenance (O&M), and a Service Level Agreement (SLA).

The pricing structure is a fixed-price lump sum inclusive of all equipment, materials, labor, permits, and five-year O&M and SLA services, with progress payments based on verified completion and 10 percent retainage until final acceptance. No substitutions are permitted for the Tesla V4 Supercharger equipment; substitutions to switchgear and electrical components require written approval from Universal EV LLC at least five business days before the proposal deadline. Qualified contractors must hold valid Wisconsin electrical and general contractor licenses, minimum EVITP installer certification, and a minimum two years of DCFC installation experience with three completed projects and references. Insurance requirements include $2,000,000 commercial general liability per occurrence, $4,000,000 aggregate, $1,000,000 automobile liability, and workers' compensation per Wisconsin state law. The project is funded through the NEVI Program under the Infrastructure Investment and Jobs Act and is subject to 2 CFR Part 200 federal procurement requirements, the Build America, Buy America Act (BABA), Davis-Bacon prevailing wage requirements, and ADA accessibility standards. Evaluation criteria weight price/total cost at 30 percent, DCFC experience and references at 20 percent, technical approach at 15 percent, O&M plan quality at 15 percent, SLA commitments at 10 percent, and qualifications and project schedule at five percent each. The contractor must provide 24/7 warranty service with critical fault response within four hours, quarterly preventive maintenance, remote monitoring, and a 97 percent uptime requirement per port per month; all O&M reporting must align with WisDOT's five-year operating period beginning on the Initial Operation Date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

EV Charging Station — Turnkey Supply, Installation, Operations, Maintenance & Service Level Agreement

NEVI Program — Wisconsin Department of Transportation (WisDOT)

Shell at Little Chute, WI 2221 Freedom Rd, Little Chute, WI 54140

Issued by: Universal EV LLC 5600 Tennyson Parkway, Suite 140, Plano, TX 75024

Contact: proposal@universalgreengroup.com | (214) 989-4173

RFP Issue Date September 29, 2026 Proposal Submission Deadline October 19, 2026

This procurement is subject to 2 CFR Part 200 Federal Procurement Requirements.

Universal EV LLC | NEVI Program RFP | 2221 Freedom Rd, Little Chute, WI 54140

Confidential — For Bidding Purposes Only | Page 2 of 16

SECTION 1 — INTRODUCTION AND BACKGROUND

Universal EV LLC ("Owner") is issuing this Request for Proposals (RFP) for the turnkey supply, installation, operation, maintenance, and service-level support of a publicly accessible Direct Current Fast Charging (DCFC) station at the Site described herein.

This Project is funded through the National Electric Vehicle Infrastructure (NEVI) Formula Program under the Infrastructure Investment and Jobs Act (IIJA), administered in Wisconsin by the Wisconsin Department of Transportation (WisDOT).

This procurement, and any contract awarded as a result of it, is subject to 2 CFR Part 200 Federal Procurement Requirements, the Build America, Buy America Act (BABA), the Davis-Bacon Act, and all other applicable federal requirements described in Section 8 of this RFP.

Universal EV LLC is committed to full and open competition. All qualified contractors are encouraged to submit proposals.

OWNER-FURNISHED ITEMS NOTICE

Owner provides network/OCPP services only, unless Tesla Supercharger equipment is specified in the engineering drawings, in which case Tesla provides network/OCPP services. Tesla V4 Supercharger equipment is specified for this Project; accordingly, Tesla will provide network/OCPP services for this Site.

ALL other equipment, materials, labor, permits, and services are contractor-furnished.

Confidential — For Bidding Purposes Only | Page 3 of 16

SECTION 2 — PROJECT OVERVIEW

2.1 Site Information

Item Detail

Site Name Shell at Little Chute, WI

Site Address 2221 Freedom Rd, Little Chute, WI 54140

County Outagamie County, Wisconsin

Proximity to Interstate Located directly at I-41, Exit 146

Site Host Universal EV LLC

Permitting Jurisdiction Village of Little Chute Community Development and Inspections Department, and the applicable local Authority Having Jurisdiction (AHJ)

Utility Company Kaukauna Utilities

Engineer of Record Nordic Asia Solutions

2.2 Full Scope of Work

The scope of work described below is pulled directly from the approved, stamped engineering drawings for this Site (Nordic Asia Solutions, Project ID UNE-26-72/07, dated August 27, 2026). All bidders are responsible for reviewing the complete drawing set before submitting a proposal.

Civil Work

• Convert (5) standard parking stalls to (3) standard EV parking stalls and (1) van-accessible EV parking stall with a 5-foot accessible aisle

• Demolition of existing asphalt pavement, striping, and site features as needed to accommodate EV infrastructure (per Demolition Plan, Sheet C0.1); includes removal of approximately 1,640 sq. ft. of full-depth asphalt pavement and 49 sq. ft. of existing concrete sidewalk

• Construct 118 sq. ft. of new concrete pavement per Civil Details (Sheets C2.0–C4.0)

• Construct (4) concrete EV charger foundations

• Construct (1) concrete Main Switchboard foundation

• Construct (1) concrete Power Cabinet foundation

• Construct (1) concrete Transformer foundation (combined CT/meter socket — no separate CT cabinet foundation required for this Site)

• Install (4) EV charging stall signage/bollard assemblies, ADA accessibility signage, and pavement striping per Sheets EV2.0 and EV5.0

• Grading, drainage, and ADA path/ramp construction per Sheets C1.0 and C1.1; existing 89 parking spaces (including ADA) are reconfigured to 84 non-EV stalls plus (4) EV charging stalls and (1) ADA access aisle post-construction

Electrical Infrastructure

• Install (1) utility transformer — 750kVA pad-mounted, with combined CT & meter socket — coordinated with, furnished, and installed per Kaukauna Utilities specifications (Standard Drawing UM1-7C, "Basement for Transformers 750kVA and Larger"); pad construction requires inspection by Kaukauna Utilities prior to pour

• Install (1) Main Switchboard — 277/480V, 1200A rated

• Install (1) Tesla V4 Supercharger Power Cabinet — 625kVA, DC bus output 180-1000VDC, AC input

480V

Confidential — For Bidding Purposes Only | Page 4 of 16

• All conduit, conductor, grounding, and trenching work per the Electrical Details, Three-Line Diagram, and Trenching/Grounding sheets (Sheets EV3.0 and EV4.0), and in accordance with applicable WisDOT Standard Specifications (Sections 501, 652, 655, and 716)

• Install (1) emergency disconnect / stop switch (Schneider Electric Harmony 9001K, 10A rated, Model 9001KYK117) per manufacturer specifications

EVSE Equipment

• Install (4) Tesla V4 Superchargers, 1 port per dispenser, rated output 500kW (limited output 150kW per port), all 4 ports capable of simultaneous charging (600kW total station capacity)

• Connector type: CS-615-A2 (NACS + CCS1 via Tesla Magic Dock)

• Chargers comply with UL 2202, IEC/EN 61851-23, CAN/CSA C22.2 No. 107.1, and OCPP 2.0.1

• Certifications and equipment data sheets per Sheets EV6.0 and EV7.0 of the engineering drawings

Signage, Striping, and Site Finishing

• EV parking stall signage (standard and van-accessible "Use Last"), emergency shut-off signage, no-parking-except-while-charging signage, and system labeling per Sheet EV5.0

• Pavement striping, truncated domes, and bollard/impact recovery post installation per Sheets EV2.0 and

C2.0

NO SUBSTITUTIONS — CHARGING EQUIPMENT

The EVSE charging equipment (dispensers and rectification units) specified in the engineering drawings must be supplied and installed exactly as specified. No substitutions, alternatives, or equivalents are permitted for charging equipment under any circumstances. Alternatives to charging equipment are only permissible if explicitly authorized via a published addendum.

LIMITED SUBSTITUTIONS — SWITCHGEAR AND ELECTRICAL COMPONENTS ONLY

Substitutions to switchgear and related electrical components (main switchboard, CT cabinet, disconnect, emergency stop button) may be considered only if: (a) the proposed alternative meets all applicable NEVI technical requirements per 23 CFR Part 680, and (b) the contractor submits a written substitution request to Universal EV LLC at proposal@universalgreengroup.com no later than 5 business days before the proposal deadline. Approved substitutions will be issued via written addendum to all bidders.

Unapproved substitutions will result in disqualification.

All civil materials, conduit, wire, and other specified components must be installed exactly per the engineering drawings. No deviation is permitted without written approval from the Engineer of Record.

TRANSFORMER PAD NOTICE

Transformer pad shall be designed, furnished, and installed per Kaukauna Utilities specification (Standard Drawing UM1-7C, "Basement for Transformers 750kVA and Larger"). Utility specification governs — engineering drawing transformer pad detail is superseded by utility requirements for this element. Pad construction requires inspection by Kaukauna Utilities prior to pour.

SPECIAL SITE CONDITION — ACTIVE GAS STATION AND CONVENIENCE STORE

Confidential — For Bidding Purposes Only | Page 5 of 16

This Site is an active, operating Shell fuel station and convenience store. The station and convenience store must remain open and fully operational to the public throughout the entire duration of construction.

The contractor must coordinate all work, staging, deliveries, and traffic control with the site host to maintain safe, continuous access to the fuel dispensers, convenience store, and customer parking at all times.

The contractor's technical approach, schedule, and safety plan submitted with its proposal must specifically address phasing and traffic control to accommodate continued site operations.

2.3 Owner-Furnished Items

• Network services and OCPP connectivity — provided by Tesla, since Tesla V4 Supercharger equipment is specified in the engineering drawings for this Site.

• Everything else — all equipment, materials, labor, permits, and services — is contractor-furnished.

This RFP is based on engineering drawings prepared by Nordic Asia Solutions (Project ID UNE-26-72/07, dated August 27, 2026) and the Wisconsin NEVI Program requirements. All bidders are responsible for reviewing the complete drawing set before submitting a proposal.

Confidential — For Bidding Purposes Only | Page 6 of 16

SECTION 3 — WARRANTY, O&M, AND SERVICE LEVEL AGREEMENT

3.1 5-Year Equipment and Installation Warranty

• All EVSE equipment: minimum 5-year warranty

• All electrical infrastructure and civil work: minimum 5-year warranty

• 24/7 warranty service, with critical fault response within 4 hours

3.2 5-Year O&M Plan

• Quarterly scheduled preventive maintenance, minimum

• 24/7 remote monitoring

• Software and firmware updates included

• Monthly O&M reporting to Owner

• Contractor's O&M reporting must align with Owner's Period of Performance reporting obligations to

WisDOT (5-year / 60-month Operating Period beginning on the Initial Operation Date per WisDOT's Notice of Acceptance)

3.3 5-Year Service Level Agreement (SLA)

SLA Metric Minimum Requirement

Station uptime per port per month 97% (NEVI minimum)

Critical fault — remote response Within 30 minutes

On-site technician dispatch Within 24 hours

Fault resolution Within 72 hours

Preventive maintenance Quarterly minimum

Help desk / driver support 24/7/365 — English and Spanish

Software/firmware updates Included

Monthly uptime reporting Required

Confidential — For Bidding Purposes Only | Page 7 of 16

SECTION 4 — APPLICABLE CODES AND STANDARDS

• 2021 International Building Code

• 2017 Accessibility Code (ICC/ANSI A117.1-2017, as adopted)

• 2021 International Fire Code

• 2021 International Existing Building Code

• Current National Electrical Code (NEC) — 2017 NEC as adopted

• Wisconsin Energy Code 2021

• Wisconsin Accessibility Code 2017

• OSHA Construction Standards (29 CFR Part 1926)

• Build America, Buy America Act (BABA)

• ADA Standards for Accessible Design, and U.S. Access Board Design Recommendations for Accessible

Electric Vehicle Charging Stations (July 2022)

• IESNA RP-20 (Parking Lot Lighting)

• UL 2202 / CSA C22.2 No. 107.1 (DC Charging Equipment)

• UL 2231-1 and UL 2231-2 (Personnel Protection Systems)

• OCPP 2.0.1

• WisDOT Standard Specifications for Highway and Structure Construction (applicable sections for concrete, electrical conduit, and wiring)

• All applicable local jurisdiction requirements, including the Village of Little Chute Community

Development and Inspections Department and the applicable local Authority Having Jurisdiction (AHJ)

Confidential — For Bidding Purposes Only | Page 8 of 16

SECTION 5 — CONTRACTOR QUALIFICATIONS

• Valid Wisconsin electrical contractor license

• Valid Wisconsin general contractor license (or applicable Wisconsin dwelling/commercial contractor credential)

• All applicable local licenses

• EVITP Installer Certification — minimum one lead electrician or superintendent — provide certificate number and expiration

• Minimum 2 years installing DC Fast Charging (DCFC) stations

• Minimum 3 completed DCFC projects with references

• Ability to provide the 5-year O&M and SLA described in Section 3

• Commercial General Liability: $2,000,000 per occurrence / $4,000,000 aggregate

• Workers Compensation: per applicable Wisconsin state law

• Automobile Liability: $1,000,000 combined single limit

• Universal EV LLC named as additional insured

Confidential — For Bidding Purposes Only | Page 9 of 16

SECTION 6 — PROPOSAL REQUIREMENTS

Each proposal must include the following:

• Company information (legal name, address, UEI/SAM.gov, EIN)

• Copies of all licenses and certifications

• EVITP certification documentation

• Insurance certificates

• Minimum 3 DCFC project references

• Technical approach and construction methodology, including a phasing/traffic-control plan for maintaining continuous gas station and convenience store operations

• Subcontractor list with qualifications

• BABA compliance plan

• Detailed project schedule

• Itemized line-item cost proposal

• 5-Year Warranty description

• 5-Year O&M Plan

• 5-Year SLA with specific commitments

• 24/7 driver support capability description (English and Spanish)

• Acknowledgment of all addenda received

Confidential — For Bidding Purposes Only | Page 10 of 16

SECTION 7 — EVALUATION CRITERIA

Criterion Weight

Price / Total Cost (installation + 5-yr O&M/SLA) 30%

Relevant DCFC Experience & References 20%

Technical Approach & Methodology 15%

5-Year O&M Plan Quality 15%

5-Year SLA Commitments 10%

Qualifications & Certifications 5%

Project Schedule 5%

Total 100%

Universal EV LLC reserves the right to reject any or all proposals, cancel this solicitation, request additional information, and award to the proposer deemed most advantageous. Lowest price is not guaranteed to be selected.

Confidential — For Bidding Purposes Only | Page 11 of 16

SECTION 8 — FEDERAL COMPLIANCE REQUIREMENTS

8.1 NEVI Program Technical Standards (23 CFR Part 680)

• 150kW minimum per port

• CCS1 and NACS connectors required

• Open access — no membership required

• Credit/debit card (contactless RFID) and QR code payment

• OCPP 2.0.1 network protocol

• 97% uptime per port per month

• FHWA data portal (EV-ChART) reporting — station location, charging sessions, uptime, outages, maintenance costs, station operator identity/program, distributed energy resource information, and capital/installation costs, per 23 CFR 680.112

• Charging station data (location, connector type, power level, real-time status, and real-time price) must be made available free of charge to third-party software developers via an Application Programming Interface (API), per 23 CFR 680.116(c)

8.2 Build America, Buy America Act (BABA)

• All iron, steel, manufactured products, and construction materials must be US-produced

• BABA compliance certification required with proposal

• Waiver requests must be submitted in writing 5 business days before the proposal deadline

• Contractor and each subcontractor must additionally comply with FHWA Buy America Requirements under 23 U.S.C. 313 and 23 CFR 635.410

8.3 Davis-Bacon Act

All laborers and mechanics employed on this project must be paid not less than prevailing wages. If awarded, the contractor must confirm the applicable Davis-Bacon wage determination number with Universal EV LLC prior to contract execution. The current wage determination for Outagamie County, Wisconsin will be incorporated into the executed contract. Contractor must submit weekly certified payroll records (DOL Form WH-347) throughout construction.

8.4 Equal Employment Opportunity

• Executive Order 11246 compliance, including the Standard Federal Equal Employment Opportunity Construction Contract Specifications

• Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246)

• No discrimination in employment

• FHWA-1273 Required Contract Provisions for Federal-Aid Construction Contracts apply and flow down to all subcontractors

8.5 Title VI — Civil Rights Act of 1964

• No discrimination based on race, color, or national origin

8.6 Section 504 / ADA

• ADA accessibility compliance, including the U.S. Access Board's Design Recommendations for Accessible Electric Vehicle Charging Stations (July 2022)

• Minimum one ADA-accessible (van-accessible) charging stall per site

8.7 Procurement Integrity — 2 CFR Part 200

Confidential — For Bidding Purposes Only | Page 12 of 16

• Records retention minimum 3 years post-final payment

• Audit access for Owner, WisDOT, FHWA, and Inspector General

8.8 Debarment and Suspension

• Contractor must not appear on SAM.gov excluded parties list

• Must verify all subcontractors

8.9 Byrd Anti-Lobbying Amendment

• Contracts over $100,000 require signed certification

8.10 Drug-Free Workplace

• Drug-free workplace policy required

8.11 Subcontracting Requirements

• All federal requirements flow to subcontractors at every tier

• Subcontractor list must be submitted to Owner for approval before execution

8.12 Wisconsin NEVI Program-Specific Requirements

The following requirements flow down from Universal EV LLC's NEVI Program grant agreement with the Wisconsin Department of Transportation (WisDOT) and apply to the contractor and all subcontractors to the extent they perform work affecting compliance with that agreement:

• Contractor must cooperate with Owner's development and maintenance of a written Cybersecurity Plan for the EVSE, subject to WisDOT review and approval.

• Contractor must support Owner's Emergency Incident Reporting obligations to WisDOT, including notice within 24 hours of: any charging plug inoperable for more than 24 hours, all publicly available DCFC plugs at the Site inoperable for more than 15 minutes, critical equipment failures, EV damage incidents, safety-related incidents, or dispatch of emergency responder personnel at or near the charging station.

• Contractor must support Owner's compliance with the 97% average annual uptime requirement per charging port (23 CFR 680.116(b)); repeated non-compliance may result in reduced payments to Owner or termination of Owner's grant agreement by WisDOT.

• Contractor is responsible for all costs related to relocating, temporarily or permanently, any non-electric utilities (water, gas, sewage, oil/petroleum) required to accommodate construction, operation, or maintenance of the Project.

• Contractor must support Owner's compliance with NEPA environmental review and mitigation measures applicable to the Site.

• Contractor must support Owner's Period of Performance obligations — a 5-year (60-month) Operating Period for O&M services beginning on the Site's Initial Operation Date.

If a state-specific requirement is identified that is not reflected above, Universal EV LLC will issue a written addendum to all bidders.

FEDERAL COMPLIANCE CERTIFICATION REQUIRED

By submitting a proposal, the contractor certifies that it has read, understands, and agrees to comply with all federal requirements in Section 8. Required certifications (BABA compliance, Byrd Anti-Lobbying, Debarment/Suspension) must be submitted with the proposal as separate signed attachments.

Confidential — For Bidding Purposes Only | Page 13 of 16

SECTION 9 — SUBMISSION INSTRUCTIONS

9.1 Deadline

Proposals are due no later than deadline mentioned in this document.

9.2 Submission Method

Submit proposals by email to proposal@universalgreengroup.com. Subject line format: "RFP Response — Shell at Little Chute, WI NEVI Site — [Company Name]."

9.3 Questions

All questions must be submitted in writing to proposal@universalgreengroup.com no later than October 1, 2026.

9.4 Pre-Bid Site Visit

Available upon request — contact proposal@universalgreengroup.com to schedule. Because the Site is an active, operating gas station and convenience store, site visits must be coordinated in advance to avoid disrupting customer operations.

9.5 Proposal Validity

Proposals must remain valid for a minimum of 90 days from the proposal submission deadline.

Confidential — For Bidding Purposes Only | Page 14 of 16

SECTION 10 — CONTRACT TERMS

• Fixed-price lump sum inclusive of all equipment, installation, 5-year warranty, O&M, and SLA

• All 2 CFR Part 200 federal clauses included

• Progress payments based on verified completion, 10% retainage until final acceptance

• Executed contract submitted to WisDOT within 30 days of execution

Deliverables at Close-Out

• As-built redline drawings (civil and electrical)

• Equipment warranties and manufacturer registrations

• O&M manuals

• Commissioning test results

• All permits and inspection certificates

• Executed 5-Year O&M and SLA agreements

Confidential — For Bidding Purposes Only | Page 15 of 16

SECTION 11 — KEY DATES TABLE

Milestone Date

RFP Issue Date September 29, 2026

Questions Deadline October 12, 2026

Proposal Submission Deadline October 19, 2026

Anticipated Construction Start March 1, 2027

Substantial Completion April 30, 2027

Confidential — For Bidding Purposes Only | Page 16 of 16

SECTION 12 — NOTICES

• Full and open competition notice referencing 2 CFR Part 200.320

• Universal EV LLC reserves the right to reject any or all proposals

• No cost incurred by Universal EV LLC for proposal preparation

• Anti-collusion notice: by submitting a proposal, the proposer certifies that the proposal was arrived at independently, without collusion with any other proposer

Complaints regarding this solicitation may be directed to evsupport@universalgreengroup.com.